Amount of cash settlement for building damage, temporary accommodation and non-financial loss after tree fell on home
Text of the determination
Determination
|
Case number
|
12-00-1092796
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-00-1092796 27 March 2025
Determination overview
Complaint
The complainant company holds a home and contents insurance policy with the financial firm (insurer). The complainant is represented by a director of the company, who I will also refer to as the complainant.
On 16 May 2022, a tree fell on the complainant’s home. On 17 May 2022, he lodged a claim which was ultimately accepted by the insurer on 3 February 2023.
The insurer says the damage to the property was limited, based on information received from its experts. The complainant says the damage to the property was much more extensive than the insurer claims. He says the insurer did not conduct make safe works after the impact from the tree which allowed water to leak through the roof of the property. As a result, the property suffered water damage and required a complete strip out and restoration.
The complainant says he has paid for restoration works himself, all of which should be covered under the policy. He seeks to be paid the total sum insured ($315,000) as well as temporary accommodation for 52 weeks, the cost of his expert reports and non-financial loss compensation.
The insurer has offered the complainant a cash settlement which it says covers the repairs related to the impact from the tree.
Issues and key findings
Is the insurer’s cash settlement offer reasonable?
Yes, mostly. The insurer is not required to pay the complainant the total sum insured because I am not satisfied the amount claimed relates to damage caused by the impact from the tree or resultant water ingress. The insurer is liable for $65,400 for building repairs.
Is the insurer required to pay temporary accommodation?
No. That is because the information available does not show the insured event damage caused the complainant’s home to be unliveable or uninhabitable during repairs.
Is non-financial loss compensation payable?
The insurer has offered the complainant $3,000. This is fair in all the circumstances.
Why is the outcome fair?
The outcome is fair as it recognises the extent of the contribution to the loss or damage by the impact from the tree and the pre-existing damage and/or repairs not related to the claimed event.
Determination
This determination is in favour of the insurer. However, if the complainant accepts this determination, within 14 days of being notified of his acceptance of this determination, the insurer is to pay the complainant:
$65,400 for building damage as set out in section 2.1
$3,000 for the complainant’s expert report, and
$3,000 for non-financial loss.
Reasons for determination
Is the insurer’s cash settlement offer reasonable?
Yes, mostly. The insurer is not required to pay the complainant the total sum insured because I am not satisfied the amount claimed relates to damage caused by the impact from the tree or resultant water ingress. The insurer is liable for $65,400 for building repairs.
Policy provides cover for accidental damage, subject to exclusions
It is established insurance law that an insured has the initial onus to prove, on the balance of probabilities (that is more likely than not), the loss or damage claimed falls within the terms of the policy.
Subject to the terms and conditions set out in the policy, the complainant’s building is covered for damage that occurs during the period of insurance, including accidental damage.
It is not in dispute that the complainant has lodged a valid claim for impact damage.
Once a valid claim is established, the onus shifts to the insurer to prove that an exclusion applies within the policy to limit its liability.
Although the insurer accepted the claim, the complainant said the insurer did not conduct an adequate make safe initially by ensuring the roof was watertight. Because the roof was not watertight, the complainant says this allowed water ingress that created further damage.
The complainant also says the insurer did not conduct repairs in a timely manner and therefore he paid for repairs to be completed so that he and his family had somewhere to live.
The insurer says the complainant undertook renovation works and authorised repairs without its consent, in contravention of the terms and conditions of the policy. It also disputes that it is liable for all of the repairs claimed by the complainant because the damage was not caused by the insured event.
See section 3.2 below for the relevant sections of the policy.
Insurer accepted the claim and damage
After the claim was lodged, the insurer appointed PB to attend the property. PB prepared a report dated 29 June 2022 that noted damage to the roof, guttering, flashings and to a water tank as a result of the tree impact. The reports also noted that the complainant was concerned that there may have been damage to the internal roof trusses. However, PB was not going to inspect the roof trusses given the presence of asbestos. PB recommended an engineer be appointed.
On the basis of PB’s report, the insurer accepted the claim.
The insurer then arranged for an engineer to inspect the property. BE (Engineer) prepared a report dated 12 December 2022 that said:
he undertook a non-invasive visual inspection with no internal linings being removed to expose the frame and a ceiling level survey
there may be damage/defects that are concealed which may be exposed during the course of rectification works
photos of the tree on the house were provided by the complainant
he observed impact damage to the gutter, fascia and edge of the roof sheet to the rear left of the building, with some signs of long-term timber rot to exterior fascia
although signs of mould and maintenance related disrepair was noted, no apparent cracking/damage was noted to the internal wall and ceiling linings and external brickwork adjacent to this impacted area
inspection of the roof structure from the manhole shows poor detailing to the roof framing with ad hoc/minimal fixings
although the hand pitched roof framing appeared to lack formal fixings expected for a sheet roof, elements appeared intact and do not appear to be affected by the tree strike
minor cracking was noted around the external and internal walls and ceilings of the building with cracks generally hairline to approximately 1mm in width
although signs of long-term water ingress and possible mould were noted to a significant portion of the internal linings across the building, this likely relates to signs of the long-term performance and maintenance to the roof surface of the building
some deformation and splitting of the rear awning frame structure with sign of staining from moisture was noted along with signs of movement to some linings of the adjoined soffits
some trees and shrubs were noted growing within their mature height to the building - these can result in differential movement and exacerbate reactive clay movement by generally removing water from their surrounding area to result in settlement of the founding soils
possible poor drainage conditions were noted around the building with possible plumbing leaks. This can also lead to differential movement and exacerbate reactive clay movement.
he recommended considering a leak detection report be undertaken to identify any water ingress to the building.
BE concluded that:
Based on information obtained during our site inspection, we believe the damage to the building occurred to ancillary features, facia and guttering only and not to main structural elements of the building within the area/zone of the tree. Defects noted outside the area / zone of this impact appeared to be long term aging with some ad hoc details noted to the roof framing. Notwithstanding the above, we note that that footing movement recorded around the building will persist and possibly worsen in the future and given that 73mm of footing movement was recorded, this movement will have resulted in some observed cracks and gaps as a result.
As is commonly found on reactive clay sites in particular, ongoing site maintenance is recommended to ensure sound future performance of the footing system. Whilst it may be possible to limit and even reverse observed movement by modifying site features (removal of trees/shrubs, improvements to drainage and repair of any plumbing leaks if these exist in particular) it would take time to assess any recovery (approximately 8-12 months) and we are at this stage unable to confirm how extensive if at all this recovery may be.
PB prepared a further report dated 6 December 2023 that said:
when he attended on 27 November 2023, he found the property undergoing renovation work with all internal walls and ceiling removed, including all power and light cables.
a new roof has been installed over the entire structure with additional strengthening LVL rafters installed because the old hardwood roof trusses were bowed. The back patio which was the main section of the roof that the tree fell on has also been removed.
He says the complainant told him that the property had been suffering water ingress after the impact from the tree but he had not seen any water ingress during his first inspection on 29 June 2022.
PB concluded that:
Based on our site inspection and information obtained [PB] can confirm that the claimed resultant damage has been caused by impact from the tree, however due to the major renovations to the property we could not inspect the property for potential additional damages to the ceiling lining or roof. Due to this with the information from our previous attendance, engineers report obtained and the renovations to the property we cannot advise any further information regarding this claim.
The insurer also says that historical photos it has obtained from realestate.com.au in March 2018 and July 2020 show pre-existing water damage to the ceilings at the property.
The complainant says he is entitled to the total sum insured
The complainant says the make safe by PB was not adequate and as a result of PB’s failure to put a tarp on the roof to prevent water ingress after the tree impact, the property has suffered additional damage.
The complainant says on that basis, he proceeded to undertake the repairs by engaging contractors. He is seeking reimbursement of $256,667.31 from the insurer for repair costs. He has provided the following invoices:
KC for $129,740.39
KA for $31,127.64
NE (Engineering) for $7,315.00
PE (Earthworks) for $11,544.59
RE (Concreting) for $21,570.00
NC for $3,950.54
CA (Asbestos removal) for $19,250.00
GM (Roofing) for $32,169.15.
The complainant says there are more repairs to be undertaken, which includes gyprock installation, electrical works, plumbing repairs, tiling, installation of fixtures and fittings, painting, floor coverings, waste removal services and further engineering assessments.
The complainant seeks the insurer to cash settle the claim as follows:
full sum insured of $315,000.
compensation for 12 months for alternative accommodation costs: $52,000.
further compensation due to negligence and time frames not met: $20,000.
costs for engineer and builders’ reports: $3,000.00
The complainant says:
the impact from the tree damaged the roof trusses
the insurer’s builder and engineer did not inspect the roof trusses or damage inside the roof because of the presence of asbestos
the complainant told the insurer that since the impact of the tree and damage to the roof, water was entering the property, but the insurer took no action
on 14 February 2023, there was a significant storm which resulted in water ingress at the property
as a result of water ingress, the property suffered further damage
given the insurer’s delays, he attended to repairs to prevent further damage occurring.
The complainant has provided expert reports from his builder and engineer.
KC (builder) prepared a report dated 28 May 2024 that said:
he attended the property on 28 October 2022. A roofing contractor he works with GM, attended the property and provided a quote for removal and replacement of the roof.
the complainant mentioned that the insurer had sent out PB and BE to inspect the property.
on 14 December 2022, he received a call from the complainant approving the roof replacement. He told the complainant this work could not commence until February 2023.
In late February 2023, they began removing the roof and straightening the roof battens. It became clear that the roof trusses had sustained extensive damage due to the tree impact and internal linings were damaged due to a storm on 14 February 2023. He was also engaged to de-energise and remove asbestos and water damaged items from the property which occurred during March and June 2023.
in May 2023, the complainant engaged NC (engineer) to assess the damage to the roof trusses. NC provided plans to rectify the damaged roof trusses and replace them with beams to accommodate the new metal roof already installed. The new beams were installed on 27 November 2023
after the weather event on 14 February 2023, the dwelling was uninhabitable because of the damage caused by rain and wind as there was significant damage internally to the structural walls and linings.
An engineer’s report from NC dated 6 June 2024 states:
he was asked to inspect the property after the tree impact. He attended multiple times between April and November 2023, when they could see the roof after the removal of asbestos and the ceiling.
at all times during his site visits the property was uninhabitable.
he understands the complainant undertook temporary works before his design to re-roof and prop the existing roof after the tree was removed.
he understands the insurer’s builder was not able to see the damage because of the presence of asbestos and recommended an engineer be appointed to inspect the roof once it was de-energised.
after the asbestos was removed, he was able to view the roof and found it was indeed damaged. He undertook a design to strengthen the existing roof trusses which allowed the roof to be left in place to reduce construction costs. The design was to install new rafters beside the trusses as well as a new ridge beam to carry the loads back to the walls.
The insurer is not liable for all of the amounts claimed
The insurer has reviewed the complainant’s invoices and says its liability is limited to $44,225.03 for the building damage claim, calculated as follows:
$14,552.25 – PB’s quote for damage from the tree impact
$25,652.33 – complainant’s invoice for LVL beams
$4,020.45 – 10% continency.
It says it is not liable for the amounts claimed by the complainant because the complainant’s builder, KC, has failed to provide sufficient evidence that all roof battens, if any, were damaged by the tree impact which would justify removal and replacement of the whole roof. It says that the original PB report only showed partial damage to the facia and guttering with small dents to the metal roof sheets. This was confirmed by BE when he attended.
The complainant’s experts both say they were present at the property over an extended period of time and that the tree caused the damage to the roof which required a full replacement. However, neither expert has provided photographs to support their view. I am satisfied the complainant’s reports are not persuasive and do not establish the extensive repairs and renovations were directly related to the tree impact damage.
On the contrary, BE’s report noted:
mould and maintenance issues at the time of inspection
cracking damage to the internal walls and ceiling linings adjacent to the impacted area
poor detailing to the roof framing with ad hoc/minimal fixings
signs of long-term water ingress damage
possible mould to a portion of the internal linings across the building, which relates to signs of the long-term performance and maintenance to the roof surface
I note the complainant and his experts have not provided any information to contradict BE’s findings.
The insurer also says the complainant contravened the terms and conditions of the policy because he did not notify it that he was undertaking an entire strip out and rebuild of the property. By the time PB re-attended in November 2023, the insurer was not able to assess what damage, if any, had been caused by the tree impact.
I acknowledge the insurer’s position. However, I do not entirely accept it. The insurer’s expert reports both identify that the property contained asbestos and that the roof could not be properly inspected until the asbestos was removed. However, the insurer took no action in response to this, or do a leak detection test as recommended by BE.
It is not in dispute that the complainant raised issues with the insurer’s handling of the claim in general on 20 December 2022 and said that the roof appeared to be leaking. He said this was consistent with impact from the tree. The available information supports that the insurer acknowledged his complaint but did not take any action, including not contacting him. The insurer eventually approved the claim on 3 February 2023.
The complainant alleges that a storm occurred on 14 February 2023 which allowed water ingress through the roof, which was leaking from the tree impact. I do not entirely accept this. The historical photos provided show water staining to the ceiling throughout the property. The complainant provided no contemporaneous information to support this such as photos/videos during the storm.
On the basis of the available information, I cannot be satisfied that all of the works claimed by the complainant are related to the insured event. In particular, from the photographs provided by PB in November 2023, the property has undergone a complete renovation, including a new roof, the strip out of all wall and ceiling linings, new flooring and cladding. Although not claimed, the property has a new swimming pool, doors and paving. The complainant proceeded with these works without notifying the insurer. I accept that the insurer’s ability to assess what further damage, if any, was covered by the policy was prejudiced because of these works.
Based on the material that it available, I consider the insurer is liable for:
$14,552.25 - PB’s quote for damage caused by the impact
$25,652.33 – complainant’s invoice for LVL beams
$19,250.00 – CA’s quote for asbestos removal.
plus a 10% contingency to reflect the transfer of risk to the complainant. This totals $65,400.
I do not consider the complainant’s experts have provided sufficient explanation for why the other works were required, including the entire roof replacement. This is also supported by the photos provided by the insurer that show the internal ceiling linings were stained, suggesting that there were likely long term issues with water ingress from the roof that pre-dated the impact damage.
I also note the terms of the policy require the complainant to obtain the insurer’s agreement before authorising any repairs or arrange the replacement of any item of your building, contents and/or portable contents unless you are taking reasonable steps to prevent further loss or damage. To replace the entire roof and conduct an entire strip out of the property would not, in my view, be considered a reasonable step to prevent further damage.
Is the insurer required to pay temporary accommodation?
No. That is because the information available does not show the insured event damage caused the complainant’s home to be unliveable or uninhabitable during repairs.
Policy provides cover for temporary accommodation
The policy provides cover for temporary accommodation where the insurer accepts a claim for damage that is so extensive that the complainant can no longer live there. The maximum amount payable is 52 weeks and only payable where the property is unliveable.
Insurer not required to pay for temporary accommodation cost
The complainant seeks that the insurer pay him the maximum available under the policy for temporary accommodation. He says that the property was uninhabitable because water was leaking through the roof and there was the presence of asbestos. As a result, the complainant says he and his family were unable to live in the property and moved into the one bedroom granny flat. He then purchased another property for his family to live in because it was cheaper than renting a house.
The insurer’s position is that the property sustained minor damage and the property was not uninhabitable.
On 10 June 2022, there is a note in the insurer’s contact notes that the complainant told the insurer that its builders had indicated the property was unliveable. However, the insurer could not find this comment in any of the expert reports. On that basis, I understand that temporary accommodation was not offered.
The insurer says, and the contact notes support that the insurer offered the complainant temporary accommodation after becoming aware of his circumstances on 6 December 2023, but the complainant declined this.
The complaint is seeking $52,000 in compensation for 12 months temporary accommodation. He said due to the rain event on 14 February 2023, which caused further damage and rendered his home uninhabitable, he had to move into a ‘one bedroom granny flat’ within the same property.
Having reviewed the exchanged information available, I am not satisfied the complainant is entitled to temporary accommodation. Although the complainant’s expert reports indicate the property was unliveable, this is more likely due to the extensive renovations being carried out at the property (as set out above) rather than damage related to the insured event. On that basis, I do not find the insurer is liable for temporary accommodation.
Is non-financial loss compensation payable?
The insurer has offered the complainant $3,000. I consider it is reasonable for the insurer to pay the proposed amount.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $6,300) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
The insurer has offered $3,000 in compensation
The complainant seeks $20,000 in non-financial loss compensation due to the insurer’s negligence and failure to met time frames.
I am not satisfied the complainant has substantiated his claim for non-financial loss compensation. The contemporaneous exchanged information shows the complainant was not available between July 2022 to November 2022, which prevented the insurer access to the property for further assessment. Further, much of the remedies being sought by the complainant are not substantiated. This contributed to the delays.
I note the insurer has offered to pay the complainant $3,000. I regard the insurer’s offer as quite generous. Therefore, I consider the insurer’s offer to be fair in all the circumstances.
Why is the outcome fair?
The outcome is fair as it recognises the extent of the contribution to the loss or damage by the impact from the tree and the pre-existing damage and/or repairs not related to the claimed event.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Relevant terms of the policy
Page 15:
You must tell us about changes at your address
You must tell us if anything stated on your Certificate of Insurance changes during the Period of Insurance. This includes:
proposed construction work at your insured address, including renovations, alterations, extensions and structural improvements with a total retail value of more than $25,000 (whether or not this is the actual cost to you);
…
What you must do in the event of a claim
You Must
…
take all reasonable steps to prevent further loss or damage occurring to your building, contents and/or portable contents.
be truthful and frank with us at all times, otherwise we may refuse to pay your claim; …
Page 59:
What you must not do
You must not without our agreement:
…
authorise any repairs or arrange the replacement of any item of your building, contents and/or portable contents unless you are taking reasonable steps to prevent further loss or damage.
If you do any of the above, we may reduce the amount we pay you in the event of a claim, potentially to nil.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.