Home / RACQ / Determination 12-00-1091384

Determination 12-00-1091384

Storm claim for lifted floor damage declined

FirmRACQ
Decided2025-01-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

Two insureds claimed for lifted floors after a December 2023 storm, and the insurer declined on defective workmanship and general exclusions. AFCA found the floor damage was proximately caused by the storm, so the claim is covered, and ordered the insurer to settle the claim under the policy and pay $1,000 non-financial loss compensation.

The insured must establish a claim within the insuring clause, and the insurer must then prove an exclusion; the storm was the proximate cause, so the workmanship and deterioration exclusions did not apply.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1091384 | Financial firm | RACQ Insurance Limited Case number: 12-00-1091384 28 November 2024 Determination overview Complaint The complainant has a home and contents policy with the financial firm (insurer). On 4 January 2024 she lodged a claim with the insurer following a severe storm. The complainant says the storm caused damage including to the roof, windows, walls, fence and caused the floors to lift in areas throughout the suspended construction. The policy includes optional ‘Advanced cover’ which includes accidental damage cover to a fully enclosed and lockable part of the home. The insurer has agreed to cover damage to the house but has declined to cover the lifted flooring (floor damage). It says that damage was not caused by the storm or any other insured event covered by the policy. Therefore, it says, the complainant has not established a valid claim. Further, it says, it is entitled to rely on general exclusions in the policy to decline the claim. The complainant says the insurer should cover the floor damage. Further, she says, the insurer should compensate her for the stress and frustration she experienced that was caused by the insurer’s claim handling. The complaint was lodged by two complainants who are the insured on the policy. For simplicity, I refer to the complainants as ‘the complainant’ or ‘she’. Issues and key findings Is the insurer required to cover further damage? Yes. The insurer is required to cover the floor damage. Is non-financial loss compensation payable? Yes. The insurer is required to pay $1,000 non-financial loss compensation to the complainant. This is additional to the $1,000 excess waiver the insurer has agreed to. Why is the outcome fair? The determination is fair because it requires the insurer to cover damage caused by an insurable event. It is fair that the insurer pays non-financial loss compensation for its unnecessary stress and inconvenience caused during its claims handling process. Determination This determination is in favour of the complainant. If the complainant accepts this determination, the insurer is required to: settle the claim in accordance with the terms and conditions of the policy pay $1,000 non-financial loss compensation, and refund the $1,000 excess, if that has been paid by the complainant but not yet refunded. Reasons for determination Is the insurer required to cover further damage? Yes. The insurer is required to cover the floor damage. Complainant has the onus to establish a valid claim It is established insurance law that an insured has the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of cover. Once established, the onus falls on the insurer to prove the application of any relevant condition or exclusion should it wish to decline the claim. The complainant’s home building policy is an insured events policy that provides cover for a series of insured events, subject to conditions and exclusions. One of the listed events is ‘storm’. The complainant also has optional benefit of Advanced Cover which provides cover for accidental damage to the insured home. The terms of the policy are set out in the Certificate of Insurance and the Product Disclosure Statement (PDS). There is no dispute the insurer sent the policy documents to the complainant. The insurer is entitled to rely on the terms of the policy. It is common ground that a storm occurred on 25 December 2023, causing damage to the house. The question is whether the floor damage is due to storm or accidental damage as defined by the policy and, if so, whether exclusions apply entitling the insurer to deny cover. Policy covers storm damage subject to exclusions The cover provided by the policy is set out in the product disclosure statement (PDS). Relevantly, storm cover is set out as follows: Insured events We cover loss or damage to your home…that is caused by certain events… Storm Included for Home Contents You are covered for: Loss or damage to your home or your contents caused by a storm. For example, a cyclone The PDS defines ‘storm’ as Strong winds that may also involve heavy rain, hail or snow. For example, a cyclone. Relevantly, the PDS includes the following exclusions relied upon by the insurer: Loss not linked to event You are not covered for: Loss or damage to your home or your contents which cannot be linked to any identifiable insured event unless otherwise stated within the benefit. Defective or faulty workmanship You are not covered for: Loss or damage caused by any inherent or built-in or defective or faulty workmanship, design or manufacture. (But we do cover you if you can show that you or your tenant did not know or could not reasonably have been expected to know about the defect or defective or faulty workmanship, design or manufacture). Rust and mould You are not covered for: Rust, corrosion, rot, mould or gradual deterioration Insurer says floor damage is due to defective workmanship The insurer says: while it does not dispute that a storm occurred and caused damage to the house, the storm did not cause the floor damage Bureau of Meteorology (BOM) readings from the local weather station at Beaudesert Brisbane, about 20km from the property record a maximum wind speed of 89km/h for 25 December 2023 its forensic structural engineer, CR says the property has been designed to N3 wind rating, meaning it is expected to withstand a wind speed of approximately 115km/h without damage the damage was due to building defects, in particular the inadequate attachment of the particleboards to the joists and the use of inadequately treated particleboards the damage would have occurred in any event, even in the absence of the storm. The insurer engaged a builder, AR, to inspect the damage and report on the extent of the loss. AR prepared two make safe reports, an assessment report, and a roof report. Relevantly, those reports say: ‘based on the information gathered, the damages to the property are largely the result of the storm event however, we cannot quantify the extent of damages from a structural point of view, as a specialist will be required for this’ the floor appeared to be lifting in the study and bedroom 3 and a floor tile was lifting in the ensuite toilet. CR inspected the site and reported on the cause of damage. CR’s report is dated 27 February 2024 and includes photos. It was followed by a further email to the insurer. CR says: the floor was easily deflected and squeaky throughout the suspended ground floor the squeaky floor is not related to the storm event, it is related to the construction of the residence Australian Standards require particleboard flooring sheets to be attached to the supporting joints or trimmers by the use of adhesives and nails and/or screws. No traces of adhesive residue were observable, indicating that adhesive was not used or inadequately applied during the particleboard installation. Where not properly installed, the shrinkage gap (that occurs following construction) will allow particle boards to move during foot traffic, creating easily deflected and squeaky flooring uniform discolouration of the particleboards joints was found, suggesting prolonged moisture exposure, which will cause the wood fibres to swell and discolour. The house design means the particleboards are exposed to moisture from condensation to the underside of the particleboards. The particleboards have a stamp showing they have been H2 treated. H2 treated timbers are suitable for dry situations and are to be protected from wetting. The H2 treatment is not appropriate for this architectural layout as the particleboards are not protected from wetting. Given the layout, treatment grade H3 or higher would be required the discolouration to the particleboards is not consistent with a storm event, but rather due to moisture during installation particleboard flooring may be exposed to the weather for up to five months. Minor swelling that may result due to prolonged exposure to weathering (resulting from the hygroexpansivity of particleboard) can be removed by sanding following the enclosure of the building QBCC’s guidance on standards and tolerances 15.6 Squeaking structural floors says: Within the first 12 months from completion of the work, floors that squeak excessively in trafficable areas are defective The complainant says the floor damage was caused by the storm The complainant says the storm caused separation of the flooring from the joists due to excessive wind uplift. In particular, she says: there were no problems in the now-identified areas of the floor prior to the storm. Prior to the storm there was an area of squeaking flooring at the base of the stairs, since rectified by the complainant’s builder there are areas of visible adhesive residue on the underside of the particleboards, making it reasonable to assume that adhesive was used in the installation. The complainant provided photos showing adhesive residue installation defects should not be determined solely from an external inspection, but requires removing internal floor coverings which was not done the most likely cause of the flooring uplift was the high wind speeds experienced during the storm, as acknowledged by AR windspeeds during the storm were around 150 kph and well above the threshold for structural damage, particularly to flooring she disputes the use of BOM’s windspeed data from Beaudesert relied on by CR as it is 20 km from the property and was not directly in the storm’s path. The complainant provides links to a range of media and BOM reports including the Queensland Reconstruction Authority website report, Weathering the storm to keep south-east roads open, 25 March 2024, which says: Wind gusts up to 150km/h were recorded at [location of property]. The unwanted Christmas present was described by many as a tornado, brought down almost 11,000 powerlines and countless trees, while widespread rainfall totals of around 100mm triggered flash flooding. Storm damage resulted in 148 km of state roads being either temporarily closed or having access restricted. Complainant has established a valid claim Having considered the exchanged information, I am satisfied that, more likely than not, the proximate cause of the floor damage was the was storm. That is because: I accept the complainant’s information showing that wind gusts up to 150 kph occurred at the property’s location. The information provided shows the storm cell as covering a large area but producing varied damage within local areas including extreme wind, hail, flooding and tornado-like conditions. Numerous reports at the complainant’s location refer to the event being a tornado and ABC news vision provided by the complainant shows the top storey of a house in the complainant’s area destroyed by the event the storm was sufficiently severe to damage cause damage to numerous other parts of the property, including lifting six roof panels I accept the complainant’s statement that the floor had not lifted in the identified areas prior to the storm, but were lifted immediately after the storm I am not persuaded that the floor construction was defective as adhesive was not used or inadequately applied. CR drew this conclusion based on its observation that no residue was found on the underside of the particleboard. However, the complainant has provided photos that show adhesive residue where the particleboards attach to the joists. Therefore, I am not satisfied CR’s conclusion was based on adequate observations. Further, even if adhesive was missing or inadequate in some locations, the information does not show the floor damage was limited to, or worse in, those areas. Accordingly, I am not satisfied that this was a proximate cause of the damage CR has shown that the particleboard used should have been H3 treated, and that the discolouration at the particleboard joints due to prolonged moisture. However, the claimed damage does not relate to discolouration of the particleboards, which, from the information provided, is only visible from the underside of the particleboards. Further, CR has not shown a causal link between this and the floor damage while the Queensland Building and Construction Commission guidelines say that squeaking floors within 12 months of construction are defective, I am satisfied that the exchanged information does not show the claimed floor damage arose within that period. That is because the building certifier’s final inspection took place on 22 November 2022, more than 12 months before the storm. Rather, I am persuaded by the complainant’s submissions that it arose in multiple areas throughout the house immediately after the storm. Therefore, on balance, I am satisfied that the proximate cause of the damage was the storm and the complainant has established a valid claim. Insurer is not entitled to rely upon exclusions The insurer has relied on general exclusions to deny the claim as it says the damage is not linked to an identifiable insured event. However, as stated above, I am satisfied that the claim is linked to the identifiable insured event of storm. To the extent that the insurer seeks to rely upon the exclusion for damage due to defective or faulty workmanship, for the reasons set out above, I am not satisfied that was a proximate cause of the loss. In any event, I accept the complainant’s statement that they were unaware of any defective or faulty workmanship identified by CR. I am not persuaded the exchanged information shows the floor damage was caused by or related to gradual deterioration. The property was a little over 12 months old when the damage occurred. While CR reports staining of the particleboards from weather during construction, as set out above, it has not shown a causal link between staining and the claimed damage. Beyond that, the information does not point to deterioration issues. Therefore, the insurer is not entitled to rely on the policy’s exclusions to decline the claim. As the insurer is required to cover the floor damage under the insured event of storm, this determination does not consider other insured events including the accidental damage cover under ‘Advanced cover’. Damage due to insurer’s service providers Following the storm, the insurer engaged disaster recovery company, FR, to undertake restoration work, including drying. The complainant says that FR left the dehumidifiers run too long causing damage to the property, including warped doors and cracks in frames. AR’s report supports that conclusion. The insurer has repaired the visible damage caused by that. However, the complainant has expressed her concern that this damage allowed water ingress for the five months between FR’s actions and the insurer’s repairs. She says she is concerned whether mould or other damage had occurred behind the walls as a result. Based on the exchanged information, I am not persuaded that mould or other damage has been caused due to FR’s actions. Is non-financial loss compensation payable? Yes. The insurer is required to pay $1,000 non-financial loss compensation to the complainant. This is additional to the $1,000 excess waiver the insurer has agreed to. AFCA can award compensation for poor claims handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $6,300) where the insurer’s actions have caused an unusual amount of: physical inconvenience time taken to resolve the situation interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Complainant says insurer mishandled the claim The complainant says the insurer mishandled her claim. This includes: it did not respond to her requests for claim updates and copies of reports in a timely manner. She has shown she sent multiple emails and made many phone calls to the insurer seeking to resolve the claim despite repeated requests, its Case Manager did not contact the other complainant when she was unavailable due to medical treatment its service provider left dehumidifiers running too long. This excessive drying caused frames to shrink, water ingress and cracking. The water ingress continued for around five months and caused her to worry about the damage caused. She says this added unnecessary stress at an already difficult time the roof rattled until it the insurer repaired it. They say that this took longer than necessary, and the noise and worry impacted the complainant’s ability to sleep. Insurer is required to pay compensation I am satisfied the insurer’s claims handling did not meet the claims handling standards provided by the General Insurance Code of Practice particularly in terms of timeliness and responses to questions, requests and updates. I am satisfied that its service provider caused further damage to the property that, while rectified by the insurer, added to the complainant’s stress, frustration and time spent dealing with the situation. Therefore, I accept the insurer’s claims handling has caused the complainant unnecessary stress, inconvenience and loss of enjoyment of life. I note the insurer has agreed to waive the $1,000 excess the complainant would otherwise be required to pay. In the circumstances, it is fair that the insurer pays an additional $1,000 non-financial loss compensation to the complainant. Why is the outcome fair? The determination is fair because it requires the insurer to cover damage caused by an insurable event. It is fair that the insurer pays non-financial loss compensation for its unnecessary stress and inconvenience caused during its claims handling process. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.