Partial storm claim denial, scope of works dispute and handling delays

FirmSuncorp Group
Decided2025-01-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The insurer partly denied a storm claim for media room water damage, attributing it to rising damp, and disputed water tank and roof damage. AFCA accepted the media room cover, ordered revised scopes and cash settlement, rejected the tank, roof and fence claims, and awarded $1,500 non-financial loss.

The insurer failed to prove rising damp as the proximate cause of the media room damage, and the storm damage was otherwise covered while other claimed damage was not established as storm-caused.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claimrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1090383 | Financial firm | AAI Limited Case number: 12-00-1090383 13 November 2024 Determination overview Complaint The complainant lodged a claim against his home building and contents policy for storm damage. The financial firm (insurer) only partially accepted the claim because it says not all damage was caused by the storm. The complainant disputes the insurer's partial cover, and the scope of work for the partial cover. The complainant also raises concern about his claim experience. This includes the time the insurer took to assess the claim, how it did not provide the solar report in a timely manner, which identified a potential fire risk and how it handled the mould and water tank issues. The insurer apologises for the delay in providing the solar report and offers $1,000 in non-financial loss compensation. Issues and key findings What are the insurer’s obligations under the claim? The insurer is required to comply with the provisions of this determination and the terms and conditions of the policy. Is the complainant entitled to non-financial loss compensation? Yes. The insurer is required to pay a total of $1,500 non-financial loss compensation. Why is the outcome fair? The outcome is fair because it is consistent with the exchanged information and terms and conditions of the policy. Determination The determination is substantially in favour of the complainant. Upon acceptance of this determination by the complainant, the insurer is to comply with the provisions of this determination and the terms and conditions of this policy. Reasons for determination What are the insurer’s obligations under the claim? The insurer is required to comply with the provisions of this determination and the terms and conditions of the policy. Background It is not in dispute that there was damage from the storm. The damage includes to the solar system, the spare bedroom water-stained ceiling, broken glass on the sliding door in bedroom three, the metal fence impacted by a falling branch, the pool chlorinator impacted by debris, and shade sail posts. The insurer agreed to accept, as resultant damage from the storm, the fireplace, carpet, wall lining, and ceiling in the media room. The insurer further accepts the cost for mould remediation. The remaining issues relate to the following items: the insurer partially denying cover for the media room, saying it is caused by the rising damp cover for the water tanks, the air conditioning unit, the roof, and the white fence (other damage) the complainant disputing the scope of works (SOW) for the media room. Complainant must show claimable loss The complainant is required to show, on the balance of probabilities (that is, more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers damage to the complainant’s home caused by insured events, including ‘storm’. Page 117 of the PDS defines storm as follows: ‘a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust’. Once the complainant meets the onus to establish the loss, the insurer is liable for the loss, unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, the application of the exclusion or condition. Proximate cause of damage must be determined In a general insurance policy claim, at times, there may be dispute about what caused a loss. In these cases, the proximate cause must be determined. The proximate cause of a loss is the dominant, effective, or operative cause. It does not have to be the first, the last, or the only cause. It is a question of fact that depends on the circumstances of each case. It requires a common-sense evaluation of the evidence. If there are several causes, each should be examined to determine whether it is dominant, effective, or operative cause of the loss. For example, if one cause would have caused the loss on its own, and the other cause would not have caused the loss without the first, then the first is the proximate cause. Parties dispute cause of damage to media room The insurer engaged an engineer (G) to investigate the elevated moisture readings in the media room. G concludes there is higher moisture levels (than the rest of the room) around the front right-hand side, the concrete slab near the external walls, and the area around the bathroom breather pipe. G notes that rising damp refers to moisture being drawn into the walls and floors by capillary action. G says: The noted rising damp is consistent with the absence or poor installation of a damp-proof course (DPC) or waterproofing…. Given the occurrence of moisture in the walls, the site conditions and the building constructions are conducive for rising damp. This is believed to be an issue due to construction methodology and wear of waterproofing materials and is not due to a single event. G further says ‘the section at the front of the media room which appears to be two separate concrete slabs is a potential point of water ingress. Vegetation, soil and previous sealant were noted surrounding the break in the slabs’. The insurer maintains ‘the observed damage and maintenance issues with (the) media room’ were not caused by any listed event and it is ‘not liable to rectify the rising damp issues’. The complainant says: G’s report does not include moisture readings from ‘higher in the ceiling’ where his builder had requested G to check there is no dispute water has come through the roof he did not have any issues before the storm ‘multiple storms, hail, wind and heavy rain fall followed by severe summer heat with strong humidity combined would cause the issues we have with our house now’ [sic] and this is what an insurer should cover. The complainant further refers to comments from a tradesperson (S) who attended to inspect the media room. He says, S advised, if it was rising damp: the skirting boards would have shown damage by warping and showing some sort of water damage, but the skirting boards are in good condition there can be blistering marks on the exterior walls due to the moisture, but there is not. The complainant also notes S commenting that the ableflex between the house wall and the concrete slab ‘should give the weepholes enough room to ventilate’. Following S’s attendance, the complainant with his builder friend (C) cut two inspection holes in the media room wall to investigate. They ‘found that there is DPC correctly installed and appears to be in great condition’. The insurer says it has not received a report from either S or C, and requested information be provided for it to respond. The complainant refused saying he should not be out of pocket for these costs. Limited information to show damage caused by rising damp Having carefully reviewed the exchanged information, on balance, I am not satisfied the insurer has shown the proximate cause of the water damage in and around the media room is the rising damp. When G says ‘the noted rising damp’ to draw the conclusion referred to above, it is not clear what G is referring to: It is not clear how the specific areas of the room with higher level of moisture, as noted by G, is consistent with rising damp, as opposed to another cause; notably, under the section ‘moisture ingress’, G’s report does not distinguish the cause of high moisture from the bathroom breather pipe (later attributed to water ingress due to a gap in the weathered silicone) with other areas of the room. It is further not clear the extent of consideration G had for the roof condition and W’s roof reports. W’s report raises the likelihood of water ingress from the roof as a result of the storm. Further, G draws the inference about the absence or poor installation of the DPC because it says this is ‘consistent with’ the noted rising damp. There is limited observation about the actual state of the DPC with respect to the media room, save for the complainant‘s statement regarding his own observation. It is acknowledged G states the weepholes are not compliant because they are not above ground level in accordance with the relevant code. However, G’s report concludes by saying ‘this [noted rising damp] is believed to be an issue [my emphasis added] due to construction methodology and wear of waterproofing materials and is not due to a single event’. I find there is a lack of detail in G’s reasoning to support his conclusions. This includes the above quote noting a ‘wear’ of waterproofing material, because the body of its report does not consider this. I do not find G’s reports to be persuasive about: the extent of the rising damp and construction issues with the media room the possible link of these issues to the damage, which the insurer denies. It is not in dispute the insurer accepts most damage to the media room as resultant damage caused by the storm. While the insurer’s submissions distinguish the damage caused by the rising damp and the storm, with respect to the timber laminate flooring, I am not satisfied that the reports it relies on do so. In the circumstances, I am not satisfied the insurer has shown it is entitled to limit its liability relying on rising damp issues, this includes damage to the timber laminated flooring. Given this, it is fair the insurer accepts cover for the water damage in and around the media room. However, this does not include any maintenance work or ‘preventative measures’, as identified by G. The insurer’s obligation extends to mould remediation, as required, to the media room and other areas of the home. Parties dispute cover for additional damage The insurer says its investigation does not show the other damage was caused by the storm. The insurer relies on G’s report to say the damage sustained to the tanks was ‘not caused by the storm and had been occurring gradually over time’. Further, G says: given there was not prolonged rain, ‘it is unlikely that there was sufficient time for the reactive clay founding soil to be affected’ ‘on the available evidence, the damage sustained was not due to the event and is due to long-term issues’. G notes issues including limited subbase or footings, vegetation in close proximity and poor site drainage. The insurer says the policy details that earth movement is not covered, unless the loss or damage is ‘caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm’. In response, the complainant says there was no issue before the claimed incident, and emphasises the claimed incident, ‘severe wind, storms, hail and heavy rain (that lasted over a week)’, and other heavy rainfall during the first week of January 2024, to say the rains caused the damage. The complainant says the insurer did not adequately investigate possible mould issue with the air conditioning unit. In response, the insurer says a hygienist was engaged to conduct a visual inspection and confirmed no testing would be required, as there were no visible signs of mould. The complainant says this is not sufficient investigation and the insurer’s restoration service (J) agrees with him. However, the insurer maintains its position and says, should the complainant provide any independent reporting, the insurer can consider this. The complainant claims for contribution to the roof repair. The complainant says there is: possible hail damage, and the insurer has not investigated this adequately foot traffic mentioned in W’s second report, but not the first, which indicates the damage occurred during the time the insurer’s trades attended. The insurer says its trades took due care, the complainant’s trades also went on the roof, and the complainant completed private works without allowing a further opportunity for the insurer to assess the damage. The complainant also claims for movement to the white fence. The insurer’s builder (W) inspected the fence during their attendance on 27 February 2024 and W’s report notes they could not see any damage. The complainant says this fence was recently installed and it has a lean, so it needs to be fixed. Cover for additional damage G’s investigations regarding the water tank conclude ‘the rain event did not continue for weeks’. However, there is no consideration of rainfall data for January 2024. It is further noted L’s report identifies the cause of the issue to be ‘Xmas storm and ongoing weather events since’. This raises questions about the insurer’s scope of investigation, given the claimed incident was on 25 December 2023. Given the complainant has established a valid claim, the onus transfers to the insurer to establish the basis on which it is otherwise entitled to deny the claim. Having reviewed the exchanged information, I am not satisfied that the insurer has met its onus to establish the basis on which it can deny the claim for the water tank. As regards earth movement, at page 42 the PDS details: We don’t cover — ....; — loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not because of erosion, structural fault or design fault; While the complainant says that there was no problem prior to the storm, G is of the view that the damage is not due to the storm but is due to long term issues. Based upon the exchanged information I am not satisfied it has been established that the damage occurred within 72 hours of, and directly because of, the storm. The roof report from W, details maintenance issues. The complainant’s invoice reflects these were the works conducted. I am not satisfied the complainant is entitled to claim cover for maintenance work. This is not a loss caused by the storm or something covered under the policy. To the extent, the complainant claims damage as a result of foot traffic or hail, there is inadequate information to reach a conclusion. In relation to the air conditioning unit I agree with the complainant to the extent a visual inspection is insufficient. While there may not be visual signs of mould, air born particles can lead to its development. The insurer is to further investigate the air conditioning unit as part of its mould remediation. Based on the photographs provided, it is not clear there is a ‘lean’ on the white fence, let alone one which was caused by a storm. Given the lack of supporting material, I am not prepared to require the insurer to repair or replace the white fence. Parties dispute the SOW There is disagreement about the remaining SOW. The complainant says: to deal with the moisture, the wall between the media room and ensuite ‘needs to come down and be replaced to eliminate the mould’ ‘floor prep’ is required to the concrete slab to remove the moisture the stage, and the carpet under the stage needs to be removed the timber laminate flooring needs to be pulled up. the carpet replacement cash settlement offer is not sufficient. The insurer provides its building coordinator report to say: the wall between the media room and ensuite does not need to come down as the frame is ‘steel framing and would not be holding moisture’ the concrete slab has had the carpet removed, which will allow the area to dry it agrees to a variation to remove and reinstate the stage The insurer confirms it can consider the complainant’s quote for the carpet replacement. Insurer is required to review its scope of works Based upon the exchanged information, I am satisfied that the wall between the media room and ensuite needs to come down and be replaced to ensure that there is a complete elimination of the mould. This needs to be part of the general SOW for repair or the SOW dealing with the mould remediation. The SOW dealing with the mould remediation, needs to include an allowance for works required to ensure removal of moisture from the concrete slab. The insure is to provide up to date scopes of work and actionable quotations for repairs and mould removal, based upon the provisions of this determination. The SOW’s are to include the timber laminate flooring, a variation to include removal and reinstatement of the stage and consideration of the complainant’s quote for carpet replacement. The insurer is to cash settle the complainant, under the terms and conditions of the policy and based upon the actionable quotations, together with a contingency uplift of 15% for any unforeseen costs. If the parties cannot agree on the SOW’s they may return to AFCA for further consideration. Is non-financial loss compensation warranted? Yes. The insurer unreasonably caused stress and inconvenience. The complainant is entitled to $1,500 non-financial loss compensation. AFCA can award compensation for poor claim handling Under the AFCA rules, we may award compensation (capped at $6,300) for non-financial loss if the complainant suffers an unusual degree or extent of physical inconvenience, delay or interference with the complainant’s expectation of enjoyment or peace of mind. Under our rules, we cannot award punitive, exemplary or aggravated damages. Insurer caused stress and inconvenience The complainant says the insurer caused delays, failed to adequately respond to communications, did not provide updates or respond to queries in a timely manner. In particular, he expresses frustration about the insurer’s failure to notify him in a timely manner, of the potential fire risk the solar panel posed. During the AFCA complaint, the complainant expressed particular frustration with the lack of make safe work the insurer conducted for the water tanks. As noted above, the insurer acknowledged the solar panel issue and offered an apology and some compensation. It says it has followed up with its trades and provided feedback. The complainant has found this insufficient, and suggested the insurer donate some money to charity instead. Having carefully reviewed the exchanged information, I am satisfied there were times when the insurer did not adequately consider the previous correspondence when responding, and it did not provide prompt responses. I accept these matters would have unreasonably caused the complainant a level of stress and inconvenience. As a result, the insurer is to pay the complainant a total of $1,500 in non-financial loss compensation. The non-financial loss compensation under our Rules does not extend to requiring the insurer to donate to a charity or any third party. Why is the outcome fair? The outcome is fair because it is consistent with the exchanged information and terms and conditions of the policy. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.