Home / Allianz Australia / Determination 12-00-1089972

Determination 12-00-1089972

Partial decline of storm damage claim to building and contents, plus claim handling and failed make-safe works

FirmAllianz Australia
Decided2025-06-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,349
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed storm damage; the insurer accepted part and declined floor, slab, paths, decking and shotcrete as pre-existing. AFCA largely upheld the insurer's decline but ordered further assessments, contents settlement, $880 expert cost reimbursement and $4,000 non-financial loss.

Complainants bear the onus of showing damage was caused by an insured event and failed to for most items, but the insurer's failed make-safe works and poor handling warranted further assessment and compensation.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossreassess claimrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1089972 | Financial firm | Allianz Australia Insurance Limited Case number: 12-00-1089972 27 May 2025 Determination overview Complaint The complainants hold a home and contents insurance policy (policy) with the financial firm (the insurer), which was incepted on 10 July 2023. They lodged a claim with the insurer for storm damage to their home, which they say is due to extreme weather event(s) in December 2023. The insurer has partially accepted the claim. However, it has limited cover to loss and damage it has assessed to be consistent with storm damage. The insurer has declined cover for some areas of damage on the basis this was not caused by the storm or any other insured event. The complainants disagree with the insurer’s decision, firmly believing all the damage was caused by the storm. Additionally, the complainants say the insurer mishandled their claim, causing them unnecessary stress, inconvenience and delay in bring the claim to conclusion. Issues and key findings Is the insurer entitled to limit its liability for the building part of the claim? Yes. The complainants have not shown it is more likely than not that all the damage to the home is due to the insured event. Rather, it is more likely that most of the excluded damage is due to circumstances not covered under the policy. Is the insurer’s assessment and settlement of the contents reasonable? Yes. Without persuasive information to the contrary, it is reasonable to accept the insurer’s assessment of and settlement offer for the complainants’ damaged contents is fair. Are the complainants entitled to reimbursement for their own expert report? Yes. The insurer is to cover the complainants for the expense incurred in arranging LO’s assessment and associated report dated 22 April 2024. Are the complainants entitled to non-financial loss compensation (NFL)? Yes. The insurer is required to compensate the complainants $4,000 in NFL for the stress, anxiety, inconvenience and delays experienced by the complainants. Why is the outcome fair? The outcome is fair because it is based on the information from the parties and the policy. The available information for the most part supports the insurer’s assessment of its liability for the building and contents damage. However, it is also fair that the insurer be required to arrange further assessments to fairly finalise the extent of its liability under the policy. The complainants have not been successful in showing all the loss and damage claimed is due to the claimed storm or any other insured event covered under the policy. Finally, it is fair that the insurer be required to pay the complainants NFL for their poor experience over the life of the claim. Determination The determination is substantially in favour of the insurer. Subject to the insurer receiving confirmation of the complainants’ acceptance of the determination, the insurer is required to:  within 21 days of receiving notice of the complainants’ acceptance of this determination arrange for suitably qualified consultants to: > inspect the insured dwelling roof and ceiling cavity to determine, if and to what extent, the roof tile clips have been damaged > inspect the sarking within the ceiling cavity to determine, if and to what extent, the said tile clips have damaged the sarking > inspect the ceiling cavity and surrounding areas to determine, if and to what extent, there is further water ingress damage due to the failed make safe works > determine whether there exists any mould within the insured dwelling, and if so, complete the necessary mould remediation works and provide necessary temporary accommodation for the period needed to remediate the mould, if required.  settle the building part of the claim by either: > authorising the repairs based on the insurer’s appointed consultants’ ‘AB’s’ amended scope of works and quote, after having arranged the above assessments and including any additional repair/remediation works necessary in line with this determination, or > if the complainants insist on a cash settlement, the building damage claim is to be settled based on AB’s amended scope of works and quote, after having arranged the above noted further assessments and including any additional repair/remediation works/temporary accommodation necessary in line with this determination > the final cash settlement for the building damage and associated works is to be increased by a further 15% to allow for contingencies. Within 14 days of receiving notice of the complainants’ acceptance of this determination, the insurer is to:  cash settle the non-restorable contents, amounting to $2,913.00  cash settle the restorable contents, amounting to $8,204.85, with an additional 15% uplift, totalling $9,435.58  arrange a further inspection to the air-conditioning system to determine if it is impacted by mould. If so, the parties must work together to settle this part of the claim  reimburse the complainants $880 towards costs incurred in appointing their preferred consultant ‘LO’. The insurer is to pay interest on this amount in line with section 57 of the Insurance Contracts Act 1984, from the date of the invoice to the date payment is made to the complainants  pay the complainants $4,000 in NFL in line with the AFCA Rules. Reasons for determination The complainants lodged a claim with the insurer following a storm in December 2023. There is no dispute the home and contents present with damage in various locations. The insurer partially accepted the claim but declined the following items:  the floor tiles and concrete slab in the main residence  the external concrete path adjacent to the garage  the external timber decking area  the external concrete path, fencing and area in the vicinity of the Bali hut  the shotcrete on the slope to the southern side of the property. The insurer says the above items were not caused by storm or any other insured event. The complainants disagree. The insurer also limited its liability for the roof damage, while the complainants believe the insurer is required to fully replace the roof. The complainants say the insurer incorrectly assessed the roof damage, which led to further water ingress and mould issues. Additionally, the complainants claim the insurer mishandled and inadequately assessed their contents claim. They believe the contents were mould-affected, causing their property to be uninhabitable until the affected contents are replaced. The complainants say they require the insurer to provide further temporary accommodation, which the insurer has declined. Lastly, the complainants say that the insurer mishandled their claim throughout the process. They say that the insurer ignored the following factors:  they are a newly wedded couple  the father and the son have experienced health issues due to mould exposure  the family has had to live apart in different locations for the entirety of the claim. As a result, the complainants say the insurer's handling of the claim caused them significant stress, inconvenience, delays and health risks. Is the insurer entitled to limit its liability for the building damage part of the claim? Yes. The complainants have not shown it is more likely than not that all the damage to the insured building is due to the insured event. Rather, it is more likely that most of the excluded damage is due to circumstances not covered under the policy. Complainants have the onus to establish a valid claim Insurance policies do not cover all losses. It is established insurance law that the complainants have the initial onus to prove, on the balance of probabilities (that is more likely than not), that the claimed loss and damage occurred during the insured period and falls within the terms of cover provided by the policy. This is commonly called a valid claim. Only once this is established does the onus shift to the insurer to prove, on balance, the application of any policy exclusion or that it is otherwise entitled to deny or limit its liability under the claim. The complainants’ policy covers listed events, including storm. As noted, there is no dispute the home presents with extensive damage to various areas of the building. However, the panel accepts to establish an entitlement to cover under the policy, it is not enough for the complainants to show their property is damaged. Rather, it is necessary for the complainants to show, on balance, that all the damage they are claiming was caused by one or more of the listed events, during their insured period. There is no dispute the insured provided the complainants with the relevant policy documentation, including the certificate of insurance (COI) and product disclosure statement (PDS). The panel is satisfied the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Insurer says not all damage is covered The available information shows the property was built after 2003, and the main residence is located on a relatively steep slope on the south side. A concrete pathway adjacent to the garage is situated at the southwest corner of the residence, on top of the slope. A decking area and fencing supported by timber posts is located at the southeast corner of the property, also above the slope. Shotcrete has been applied to most of the slope. Additionally, two sheds are built downslope, south of the main residence. The complainants purchased the property in July 2023, and the policy commenced on 10 July 2023. There is no dispute that the home suffered some damage due to the significant weather events experienced in December 2023 and January 2024. However, the insurer says not all the damage claimed was caused by the storm or any other event covered under the policy. The insurer appointed an engineer, CR, to inspect the property. CR provided a report dated 6 March 2024, saying:  the cracks in the concrete floor slab of the main residence were caused by long-term drying shrinkage, exacerbated by prolonged ground movement. The damage existed before the claimed storm  the cracks and separations in the floor tiles were caused by the absence of perimeter joints, which is non-compliant with Australian Standard AS 3958.1:1991. Long-term expansion of the tiles caused a buildup of differential movement stress between the tiles and the concrete slab substrate. The damage to the floor tiles was not caused by a one-off event and is an exacerbation of pre-existing cracks (present prior to policy inception)  the concrete path was constructed on a steep slope, and information from the Gold Coast City Council indicates that the site is in a moderate-to-high landslide hazard area. Shotcrete was applied to stabilise the slope. However, it was not reinforced, with no evidence of anchors installed to secure it to the slope  the shotcrete shows signs of previous damage and attempted repairs, indicating pre-existing damage. CR noted that concrete is naturally prone to shrinkage and, according to AS 3727-1997, control joint spacing is required, which was not implemented at the property. CR concluded that damage to the concrete path resulted from long-term shrinkage cracking and slope instability  the timber decking at the southeast corner of the property, adjacent to the slope, is in poor condition, with long-term decay in the timber posts, bearers, joists, and deck boards. The deck post footings settled due to inadequate slope stability. C concluded that the decking and vertical stepping in this area were damaged due to decay and insufficient slope stability, which caused settlement. Based on this information, the insurer says that these areas were not damaged by an insured event and are therefore not covered by the policy. Complainants believe all the damage is covered under the policy The complainants say CR’s report does not provide sufficient evidence to support its conclusions and is not reliable. Further, they rely on the reports and opinions provided by their appointed engineering consultant ‘LO’, historical data for the site and video/audio evidence compiled by the complainants in support of their position. The panel notes LO was appointed by the complainants to complete a pre-purchase inspection of the home after which a report dated 9 May 2023 was provided. LO was also appointed to complete a further assessment in response to CR’s assessment and after which LO provided a report dated 22 April 2024. The panel has carefully reviewed the pre-purchase report from LO and notes that it is very limited in its scope. This is because LO did not complete an assessment of the whole insured property with its assessment limited to specific areas of the home in line with instructions from the complainants. In this report LO noted:  cracking consistent with differential footing settlement to the external walls of the single garage closest to the large slope  evidence of lateral movement of the pavement adjacent to the single garage  the gap between the pavement and the garage indicates that there had been evidence of lateral movement  the construction of the spray wall (shotcrete) is not consistent with an engineered design solution that could be certified as a permanent batter support preventing slope instabilities  the slope stability assessment prepared by geotech consultants ‘PG’ in May 2022 pertains solely to the slope stability in the area of the large shed at the rear of the home and not to the location upon which the main residence is constructed. The panel notes in its report dated 22 April 2024 based on a reinspection completed on 19 March 2024, LO found/states:  evidence of movement of the slab to the right hand side of the garage had increased since its last assessment  evidence of movement in the shotcrete had increased on the batter side beside the garage since its previous assessment  there was a noticeable increase in the extent of floor tile cracking in the home since its previous assessment  it did not assess the pool gazebo deck, path or synthetic turf in its previous assessment as the complainant did not instruct it to do so  the damage to the tiles is due to cracking of the concrete slab and not perimeter joint treatment  there is no sign of failure due to decay of the support structure of the timber decking that could have caused settlement  in summary, there had been an obvious and significant increase in the settlement and cracking since its pre-purchase inspection. The most likely cause for the damage is water softening of the foundation soils during the period of heavy rainfall in December 2023. LO says that all the damage claimed is due to the storm event. However, it has not provided any detailed discussion, basis or persuasive information in support of its position. As noted, both of its reports are quite basic, lack detail and do not cover all the damaged areas in dispute. Information from the insurer is more persuasive After carefully considering the available information, including a large number of photos, audio, and video files provided by the complainants, the panel finds the information from the insurer to be more persuasive. The panel accepts the insurer’s appointed consultants are adequately qualified to complete the required assessments. Further, that findings of these consultants are supported by persuasive detailed explanations, supporting evidence and for the most part are consistent with the available photos and videos available. The panel accepts the videos and photos provided by the complainants do reasonably raise some concerns about the insurer’s position regarding the roof, sarking, water ingress damage and mould. This will be discussed in more detail later in the determination. The panel is satisfied it is reasonable to conclude from LO’s reports that the home presented with evidence of pre-existing foundation movement damage to various areas. This includes cracking to the concrete slab, tiles and external concrete paths. Further, that construction of the shotcrete was not consistent with an engineered design solution, which is also identified by CR in its information. The panel will consider each of the areas of damage in dispute in more detail under the below sub-headings. Floor tiles and concrete slab inside the main residence During CR’s inspection on 6 March 2024, C found:  significant separation of the floor tiles at the control joints adjacent to the front entry door, with cracks found throughout the tiled area. The cracked tiles were extensions of the cracking in the concrete slab  the perimeter joints of the floor tiles adjacent to the living and lounge areas were filled with grout, with no flexible sealant applied in the joints where the tiles met fixed elements such as door frames and wall linings, restricting the ability of the tiling to move laterally due to temperature changes and expansion  tiles were laid underneath the skirting boards throughout the residence, hard against the wall lining underneath the skirting board  a total floor level variation of 30mm was observed across the floor slabs, indicating widespread movement throughout the floor  the highest point was observed at the dining area adjacent to the stripped flooring of the living area. The lowest point was observed at bedroom one at the front side of the residence and on the opposite side to where the steep slope is situated  this confirms the concrete slab had developed a mound shaped formation, which occurs over a long period of time and is not consistent with settlement towards the steep slope  there was evidence of paint within some cracks to the concrete slab that were below carpet, and which supports the cracks were pre-existing. CR concluded the damage to the floor tiles was due to the lack of the perimeter joints to relieve stresses; and the damage to the concrete floor slab is consistent with long-term drying shrinkage, exacerbated by ground movement. The panel is not persuaded the complainants have shown the storm caused damage to main residence concrete slab and internal floor tiles. The evidence from CR and LO both establish, on balance, the concrete slab and tiles presented with pre-existing cracking damage (prior to policy inception). It may well be that this pre-existing damage was further exacerbated since it was purchased however this does not bring it within cover under the policy. The panel acknowledges the complainants’ videos show limited areas where there is a small gap between tiles and the wall lining underneath the skirting board. The panel is not satisfied this sufficiently contradicts C’s findings and supporting evidence. Concrete path adjacent to the garage and shotcrete on the slope CR found cracks in the concrete path and significant separation between the concrete path and the adjacent garage. The concrete path was built on top of the steep slope, with signs of previous silicone repairs at the gap between the path and the garage slab. There were also signs of previous repairs to the cracks throughout the shotcrete applied to the slope. C provided a screenshot with information from the local council showing that the land the property is built on has a landslip hazard, rated moderate to high. The panel acknowledges the complainants have provided a site report from CG dated 17 March 2003 which states the risk of slope instability for the site is low with construction of a dwelling above the mid-slope access track feasible. However, this is a report from over 20 years prior to the claimed date of loss. Further, the panel notes the report from PB, however, this report as correctly noted by LO is limited to the lower area where the shed is constructed and not the area of the main residence. CR, similar to LO, notes the shotcrete on the slope is not reinforced and there is no evidence of any anchors applied into the slope. CR says concrete will naturally shrink during the curing process, and sufficient expansion joints and/or control joints should be applied to allow for this, which was not the case here. CR concluded damage to the shotcrete is pre-existing, and the cracking and separation of the concrete path were caused by long-term shrinkage in the absence of control joints, exacerbated by instability in the slope. The panel notes the complainants disagree with CR findings, however, they have not provided any persuasive contrary evidence which can reasonably be preferred over CR reports. As noted, even LO’s reports are supportive of the concerns raised by CR regarding the pre-existing and ongoing movement damage and issues with the shotcrete. The panel notes the complainants’ concerns regarding the site classification by CR and the reference to foundation soils it is reports. The complainants say the foundation of the home sits on rock and sand which are not subject to heave or shrinkage. However, the panel note that LO’s reports, which the complainants rely on, also refer to the movement damage being due to stormwater saturating the foundation soils. Given this, it is reasonable to accept the foundations of the home are most likely susceptible to the effects of moisture and drying. Given all the above, the panel is not satisfied that the damage to these items was caused by the storm or any other insured event. Timber decking area CR assessed the timber deck to be in a poor condition with long-term decaying of the posts, bearers, joists and deck boards. CR says the post footings have settled over time due to inadequate slope stability caused by the ongoing issues and associated movement caused over time through failure of the shotcrete to stablise the slope. The complainants say there was no decay or structural issues with the decking area, and they believe the stabilisation of the slope is adequate. The panel is not satisfied the cause of damage to this area was the storm or any other insured event. This is because the panel is not persuaded the slope was adequately stabilised. Further, that the available photos of the timber decking boards, posts, bearers and joists support CR’s findings that they are subject to long term decay and deterioration. The panel accepts there is no evidence pest (termite) damage consistent with a report provided by the complainants dated 3 May 2023. However, this same report does comment that the decking and pool shed presented with evidence of wood decay, which is prior to policy inception. Photos of the damaged timber fencing near the gazebo and deck also clearly show wood decay and deterioration. Further, that it most likely the damage is the result of instability of the slope as discussed above contributed by the poor condition of the timber. LO did not provide sufficient information to support the conclusion that the storm was the dominant cause of the damage to these areas. The panel again notes that it is the complainants and not the insurer that first need to establish the loss and damage triggers cover under the policy. The panel is not satisfied the complainants have been successful in establishing this, on balance, for the above discussed loss and damage to the home. It is fair that the insurer be permitted to decline indemnity for this loss and damage in line with its entitlement under the policy. Insurer is not required to cover a full roof replacement The complainants say the roof was damaged by the storm, causing ongoing water ingress through the roof. They are seeking a full roof replacement from the insurer and provided a quote amounting to $65,529.20. The insurer declined this request, saying only a limited area of the roof was damaged by the storm, which does not warrant a full replacement. Instead, the insurer proposes to settle the roof damage based on its builder, AB’s revised scope of work (SOW), which includes:  replacement of 30 roof tiles and nine skylight tiles  replacement two whirlybirds. The insurer provided a report from AB, dated 19 August 2024, saying:  the roof is in poor condition  around 20 tiles were broken  two whirlybirds were damaged by the storm  water entered roof cavity via broken tiles and wind-driven rain. However, AB did not inspect the cavity area due to concerns relating to the presence of mould within the ceiling cavity. The complainants provided a report from DA, dated 12 September 2024. DA’s findings are generally consistent with AB’s report, saying:  around 30 tiles were broken, and other tiles in other areas of the roof sustained micro fractures  skylights tiles are broken  two whirlybirds damaged and need to be replaced. DA recommended fully replacing the roof to prevent further water ingress and to ensure warranty for the works could be provided. The complainants have also provided videos showing the inside of the cavity, indicating widespread holes in the sarking and continued water ingress during periods of rain. Having carefully considered all this information, the panel is not satisfied the complainants have shown it would be fair to require the insurer to cover the cost of a full roof replacement. This is because:  there is no information showing the condition of the roof and the cavity area before the policy started. LO’s pre-purchase report does not cover the roof nor is there any other information from the complainant in this regard  consultants appointed by both parties found only a limited number of roof tiles were storm damaged  DA generally says micro fractures in various areas of the roof without providing support or explaining the cause of these fractures  DA recommended replacing the roof for preventative purposes, which the policy does not cover. However, the panel is satisfied that the videos from the complainants do show there is still water ingress occurring within the ceiling cavity, which indicates failed make safe works by the insurer and ongoing water ingress damage (and possibly mould). Further, that there is clear evidence of widespread damage (holes) to the sarking within the ceiling cavity. The complainants say this is consistent with being due to damage to tile clips from the storm lifting roof tiles. The insurer has failed to acknowledge and/or respond to the complainants’ position in this regard. Therefore, in the absence of persuasive information to the contrary, the panel is satisfied it is fair that the insurer be required to arrange a further assessment of the roof. This is to determine the extent of, if any, damage to the roof clips and if this is indeed the cause for the damage to the sarking. If found to be consistent with lifting of roof tiles and associated storm damage to the roof clips and sarking, this is to be accepted under the claim. With respect to the ongoing continued water ingress because of failed make safe works, the insurer is to include any additional water ingress damage due to its scope of works. With respect to this ongoing water ingress resulting in or contributing to further mould within the dwelling, this will be address below. The insurer confirmed AB is willing and ready to carry out the repairs. The panel accepts that AB’s quote is actionable. Therefore, if the complainants are to push for a cash settlement, it is reasonable that the insurer be allowed to cash settle the complainants based on an updated scope of works and repair quote from AB. The scope of works is to be updated once the insurer has arranged the additional assessment of the roof (clips and sarking), possible further water ingress damage and mould remediation, if required. Mould damage, air-conditioning system and remediation The insurer initially appointed EL to assess the mould issue at the property following the claimed storm. EL provided a report on 21 March 2024, concluding that mould was found in limited areas of the property. The insurer also appointed AE to inspect the mould issue in the complainants’ air-conditioning system on 2 April 2024. AE found that the air-conditioning was working but noted mould growing on the metal parts of the return system. AE also found that three motors had failed in the zoning system, which it believes were likely damaged by a lightning strike. AE recommended replacing the zoning system of the air-conditioning. Due to the complainants’ health concerns, EL suggested they avoid using the master bedroom, bedroom three, and the air-conditioning system until the mould issue was resolved. The complainants disagreed with EL’s findings and requested that the insurer pay for their own expert and hygienist to address the mould issue at the property. The complainants also provided a quote from CM, amounting to $16,790.40, which appears to be the full replacement cost of the air-conditioning system. Eventually, the insurer agreed and paid for this part of the claim based on the complainants’ quote from S and the hygienist, K (the air-conditioning issue was not included). The information shows that the mould remediation has been completed by S. However, in S’s completion report, dated 9 August 2024, it is indicated no work was done regarding the air-conditioning system and further specialists are needed to address this issue. The panel as discussed above is also satisfied the complainants have shown water ingress through the roof has continued due to failed make safe works by the insurer. Given this, the panel is satisfied it is fair that the insurer be required to arrange further assessments of the dwelling and air-conditioning system. This is to confirm whether there exists any evidence of mould due to the ongoing water ingress issue and determine if replacement of the air-conditioning system is required. The panel notes AB’s quote includes a further inspection of the air-conditioning system to determine whether replacement is required. Therefore, the insurer is to ensure this scope of works also includes an assessment by a suitably qualified mould remediation consultant of the home. The parties will need to reasonably cooperate and work together in this regard. The panel acknowledges that the complainants claim some of their contents were mould-affected. This will be addressed in the sections below. Temporary accommodation The parties dispute whether the insurer’s offer of $3,000 per week for three weeks of temporary accommodation (TA) was adequate. The information shows the complainants were subsequently placed into TA whilst S completed its mould remediation works. The panel acknowledges that the complainants say the insurer’s handling of the TA claim was poor and caused them stress and inconvenience. The complainants say the property is still uninhabitable due to mould affecting their contents, particularly their bedframes, mattresses, and lounges. They say this issue has not been addressed. The complainants request TA be extended until the mould-affected items are replaced, which the insurer declined. The panel will address this part (contents) of the dispute in section 2.2 below. The panel notes that the air-conditioning system issue has not been fully addressed yet. Also, that there is the risk of the insured dwelling again being infested with mould due to the failed make safe works and ongoing water ingress within the ceiling cavity. The panel notes the insurer has paid for the complainants’ hygienist, K’s, costs. There is an absence of any information from K or otherwise which can reasonably be relied on to find the insured dwelling is still uninhabitable due to the mould issue. Without persuasive supporting information the panel is not satisfied the complainants have shown the home remains uninhabitable. The panel acknowledges the complainants have raised concerns of the family, including the complainant, suffering medical conditions due to the mould. The panel acknowledges the pictures and videos provided in support of this, however, this is not enough to link the claimed conditions to mould or alternatively a failure on the part of the insurer. The information indicates the complainants failed to reasonably cooperate with the insurer’s requests to assess the claimed contents, said to be mould damaged. This may have assisted the complainants establish their contents such as beds, mattresses, lounges etc., were mould damaged and not fit for purpose. In the absence of such information, and based on the available information showing the insured dwelling as habitable after the mould remediation works were completed, it would not be fair to determine the insurer was required or failed to provide TA. However, if the further assessments the insurer is required to arrange in line with this determination find that the insured dwelling is presenting with mould the insurer will be required to cover the cost of necessary TA for the period needed to remediate the mould. Is the insurer’s assessment and settlement of the contents reasonable? Yes. Without persuasive information to the contrary, it is reasonable to accept the insurer’s assessment of and settlement for the complainants’ damaged contents is fair. Complainants’ claim for contents The information shows the insurer previously paid a cash settlement of $17,285.13 for the complainants' contents with an additional payment of $3,652 for their alarm system. The complainants say there were additional items that had not been paid for by the insurer, including:  carpets  lounges  mattresses  suits and shirts  numerous cushions  rugs  bedframes. The complainants say the above items were damaged by the storm and affected by mould. The insurer appointed its expert, ST, to inspect the claimed contents. However, the inspection did not take place. The insurer says the complainants rejected the inspection. The complainants do not dispute this. Instead, they say they received one call from ST but did not know who they were or what inspection needed to be completed. The complainants say that the insurer should have sufficient information from previous inspections to make a decision on this part of the claim. The insurer eventually proposed to settle the additional claimed contents with an amount of $2,913 for non-restorable items and $8,204.85 for restorable item, based on a desktop inspection using a spreadsheet provided by the complainants' expert, S. The spreadsheet includes more contents than the items listed above. The insurer’s settlement offer does not include carpets. Insurer’s offer is fair The panel reviewed all the available information and found no reports were provided by either party regarding the damage to the contents. The relevant information regarding the mould remediation includes:  EL’s report dated 21 March 2024  S’s report dated 21 June 2024  S’s completion of works report dated 9 August 2024. None of these reports, or any other information, indicate the additional contents were damaged by the storm or affected by mould. S provided a spreadsheet containing 57 items with comments on the condition of each item, indicating most items are salvageable. For the remaining items, a professional opinion is required to determine whether they are salvageable. S and the complainants also provided photos of the contents. However, the panel could not identify any damage or mould on these items in the photos. Based on the limited information, the panel cannot fairly conclude:  the insurer’s settlement offer for the contents is inadequate  additional TA is warranted due to the contents being affected by mould. Additionally, the complainants say their carpets were damaged by their cat’s urination. The information shows the carpets were removed before notifying the insurer. The insurer says the policy does not cover damage caused by animals or domestic pets, which is consistent with the PDS. The panel notes that the complainants say the damage was caused by the insurer’s mishandling of the claim, which resulted in stress not only to them but also to their cat. They say the stress caused the cat to act abnormally, resulting in the damage. However, there is insufficient information to support the complainants’ assertion. The complainants also requested the insurer provide a dump bin, seemingly for the disposal of the carpets. The insurer declined this request. As explained above, the panel does not consider the insurer should be responsible for the carpet damage. Therefore, the insurer is not required to arrange for a dump bin. Without persuasive information to the contrary, and based on the limited information available, the panel finds the insurer’s settlement proposal for the contents to be consistent with its obligations under the policy. If the complainants are able to provide the insurer with evidence of storm/mould damage to their contents and/or are willing to permit the insurer to inspect the claimed items, the insurer is to consider and/or assess its liability in this regard. Are the complainants entitled to reimbursement for their own expert report? Yes. The insurer is to cover the complainants for the expense incurred in arranging LO’s assessment and associated report dated 22 April 2024. Insurer is required to pay for professional fees Under the AFCA rules, we can ask the insurer to reimburse a complainant for costs incurred in making the complaint. This may include fees for paid representation and/or expert reports. If a complainant requests that the insurer contribute to these costs, we will consider whether the costs were reasonable and whether they helped resolve the complaint. Unless there are exceptional circumstances, we will not ask the insurer to contribute more than $5,000 toward these costs. The information shows the complainants incurred $880 to engage LO. The panel is satisfied the information provided by LO, although has not assisted the complainants, it has assisted the panel in coming to an informed decision on the complaint. The information from LO has assisted the panel in understanding the pre-purchase and therefore condition of the dwelling prior to inception of the policy. Therefore, the panel is satisfied it is fair that the insurer be required to reimburse the complainants $880 towards the cost of appointing LO. This is to be paid within 14 days of receiving notice of the complainants’ acceptance of this determination. The insurer is to pay interest on this amount in line with section 57 of the Insurance Contracts Act 1984, from the date of the invoice to the date payment is made to the complainants. Are the complainants entitled to any compensation? Yes. The insurer is required to compensate the complainants $4,000 in NFL for the stress, anxiety, inconvenience and delays experienced by the complainants. Complainants are entitled to NFL Under the AFCA Rules, we can award up to $6,300 compensation per claim for non-financial loss. We will only award this type of compensation if the complainant(s) suffer an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim. AFCA recognises making a claim can be stressful and time-consuming, even if the insurer manages the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim. The complainants are seeking the maximum amount of NFL AFCA can award, saying the insurer:  mishandled and delayed their claim throughout the process  failed to consider that they are a newly wedded couple  failed to consider their health issues when assessing their TA benefit  incorrectly limited their TA benefit  incorrectly assessed their claim regarding the building and contents  breached the General Insurance Code of Practice (GICOP). The panel is satisfied the available information shows the insurer was put on notice from very early on in the claim about the complainant’s health conditions and the fact the complainants were due to be married and were planning to move into the insured dwelling. The panel is of the view that the insurer’s overall management of the claim was not to the standard expected of a professional organisation. It is reasonable to expect the insurer to have treated the claim and especially the TA aspect with reasonable urgency, which has not been the case. The available information also shows repeated failures by the insurer to adequately make safe the roof which resulted in continued ongoing water ingress and associated mould infestation of the insured dwelling. The insurer delayed its assessment, acceptance and therefore remediation of the mould within the dwelling. The panel accepts this has been a significant contributing factor to the stress, anxiety and inconvenience suffered by the complainants in their particular circumstances. This includes having to live away from each other and their children for an extended period of time. In saying that, the panel accepts the insurer is not solely responsible for all the delays experienced and the breakdown in the parties’ relationship. The available information supports the view that the complainants have also contributed to delays through a failure to reasonably cooperate with the insurer and its agents. The panel accepts this was for the most part due to the complainants’ losing faith and trust in the insurer. However, the fact remains the complainants are obliged under the policy to reasonably cooperate with the insurer, which was not always the case. Therefore, for these reasons, the panel is not satisfied the complainants are entitled to the maximum award of NFL, but the insurer is to pay them $4,000 in NFL. This is to be paid within 14 days of receiving notice of the complainants’ acceptance of this determination. Why is the outcome fair? The outcome is fair because it is based on the information from the parties and the policy. The available information for the most part supports the insurer’s assessment of its liability for the building and contents damage. However, it is also fair that the insurer be required further assessments to fairly finalise the extent of its liability under the policy. The complainants have not been successful in showing all the loss and damage claimed is due to the claimed storm or any other insured event covered under the policy. Finally, it is fair that the insurer be required to pay the complainants non-financial loss compensation for their poor experience over the life of the claim. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with considerable experience in consumer and small business advocacy  a member with extensive experience in the relevant industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.