Insurer denied the remainder of a storm damage claim, relying on delay in lodging the claim and repairs completed before inspection
Text of the determination
Determination
|
Case number
|
12-00-1089872
|
Financial firm
|
Youi Pty Ltd
Case number: 12-00-1089872 19 May 2025
Determination overview
Complaint
The complainants held a home and contents policy with the financial firm (the insurer). On 24 October 2022, the complainants lodged a claim with the insurer for damages to their home and contents following a storm which occurred on 28 February 2022.
The insurer has partially accepted the claim for repairs to a water damaged lift. However, it says that the complainants have prejudiced its ability to assess many damaged areas due to:
the delay in lodgement of the claim
repairs to areas of damage prior to lodgement of the claim
insufficient evidence as to loss.
The insurer relies on its policy terms to deny the remainder of the claim.
The complainants dispute the insurer’s position and say:
they were required to commence repairs immediately to ensure their family’s safety in the property
the female complainant underwent serious brain surgery and repairs were necessary to ensure her comfort
by undertaking repairs as soon as possible, they mitigated their losses
the complainants have provided necessary information, including photographs and videos of the repairs conducted
there is clear evidence of water ingress following the storm which is covered by the policy
the insurer is not entitled to exclude cover for the damage in the circumstances.
The complainants are represented by ML, a legal representative. For brevity’s sake, ML and the complainants will be referred to below as ‘the complainants’, unless context requires otherwise.
Issues and key findings
Is the insurer entitled to deny the remainder of the claim?
No. On the available information, the panel is satisfied it is fair to consider the complainants have established a claimable loss for the water damage to the stairwell, CBUS system and contents, despite the clear prejudice to the insurer’s position.
However, the insurer is entitled to deny the complainants’ claim for the kitchen, bathroom and media room as the available information shows that there may have been pre-existing maintenance issues and the insurer has been prejudiced by the repairs completed by the complainants prior to its assessment.
Are the complainants entitled to professional costs?
No. The claim and the issues were not complex, and the complainants’ position was not assisted by their legal representation or the report from DC.
Are the complainants entitled to non-financial loss compensation?
No. The available information does not establish the complainants have suffered an undue level of stress, anxiety, inconvenience or delay because the insurer’s claim handling. Accordingly, it would not be fair to require the insurer to pay the complainants non-financial loss compensation.
Why is the outcome fair?
The outcome is fair because the insurer has not established its prejudice to deny the complainants’ claim regarding the stairwell, CBUS system and contents. However, the panel is satisfied that the completion of repairs by the complainants prior to the insurer inspecting the kitchen, bathroom and media room has prejudiced its ability to assess the damage. It would not be fair to require the insurer to pay for these rooms in these circumstances. It is fair that the insurer is not required to pay professional costs or non-financial loss compensation.
Determination
This determination is substantially in favour of the complainants.
Should the complainants accept this determination, within 14 days of receiving written notice of their acceptance, the insurer is to:
pay the complainants $21,454.00 for repairs to the lift if it has not already done so
pay the complainants $3,680.76 for repairs to the stairwell
pay the complainants $156,090 for repairs for the CBUS system
pay the complainants $35,299.43 for replacement of contents
pay interest on each of the above items in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 4 December 2022 until the date the payment is made.
Reasons for determination
Is the insurer entitled to deny the remainder of the claim?
No. On the available information, the panel is satisfied it is fair to consider the complainants have established a claimable loss for the water damage to the stairwell, CBUS system and contents, despite the clear prejudice to the insurer’s position.
However, the insurer is entitled to deny the complainants’ claim for the kitchen, bathroom and media room as the available information shows that there may have been pre-existing maintenance issues and the insurer has been prejudiced by the repairs completed by the complainant prior to its assessment.
Onus on complainants to establish claimable loss
The complainants are required to show, on the balance of probabilities (that is more likely than not), that they suffered a claimable loss under the policy. This means that they must show the loss was caused by a risk for which they are insured.
Once the complainants, on balance, establishes a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on balance, the application of the exclusion or condition.
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). Relevant policy terms are set out in section 3.2 of this determination.
The policy covers damage caused by one of the listed events. It does not provide cover for all damage. Amongst these events is cover for Storm.
The complainants lodged a claim following a severe storm on 28 February 2022. The insurer does not dispute that the property sustained damage following a storm. However, say that the complainants have not established their losses and have prejudiced the insurer position by the late lodgement of the claim and the repairs being undertaken prior to its inspection of the damage.
The insurer relies on the policy conditions to deny the remainder of the claim, having accepted damage to the lift from the insured event. Therefore, the onus rests with the insurer to prove, on balance, the exclusions apply to deny the remainder of the claim.
The complainants say the damage should be covered
On 24 October 2022, the complainants lodged a claim with the insurer, providing the following history:
During the floods the power went out which meant I couldn’t pump water out of the basement flooding the basement. One ceiling collapsed in the bathroom and a couple of other ceilings. External has tile cladding started popping off tiles and render as it was in so much water. There is damage throughout the house in the plasterboards. We had to get a firefighter pump to pump water out a petrol one. I have been chipping away at fixing things but was told I could put in a claim. All the electricals were under water in the basement. The lift in the building is also damaged. 3 ceilings and walls water damaged. Electrical, smoke detectors as well.
In support of their claim, the complainants have provided a document from SB dated 28 June 2022 which purports to be an invoice. The invoice includes repairs to the:
Kitchen
> the removal of all cabinetry
> replacement of all plasterboard
> replacement of ceiling
> new tiling splashback
> new flooring
> painting
stairwell
> remove and replace render patch under the window sill
> painting
media room
> patching plasterboard of ceiling and wall lining
> painting
> replacement of carpet
> painting
bathroom
> replace ceiling
> paint ceiling
> remove all wall linings, including tiles, remove floor tiles, remove shower screens, vanity unit and fixtures to be reinstated
internal
> disconnect all A/C to facilitate repairs
> complete structural drying and mould remediation.
The total cost of the quote was $114,496.52.
The complainants say that because of the insured event, their ‘CBUS’ electrical and automation system failed. They say that it is in the basement which was inundated with the failed automatic pumping system.
The complainants have provided a quote from CE, an electrician. CE says that he attended the property on 6 December 2022 following ongoing electrical and automation system faults. CE notes that there had been moisture ingress to the switches and output units. CE recommended a full replacement. CE also says that there appeared to be water ingress to other items and cablings as some items would not reconnect or pass IR tests or trip circuit protection and recommended further investigation.
CE provided a quote:
Budget for Replacement and Fault-finding repairs.
$129,000 + gst
The complainants claim that the lift was affected by the water ingress when the basement of the home with inundated. They have provided a quote from L in the amount of $21,454.
The complainants have obtained a report from CW, a bricklayer, construction manager and safety consultant. CW attended the property on 4 August 2023 and provided a report dated 21 August 2023. CW says:
Due to the volume of rainfall the water storage tanks under the house overflowed, with the excess water filtering into the already waterlogged sandy sub-based, causing the stormwater to backflow flooding the pump are, with the basement then flooding with stormwater. This also caused the downpipes and gutters to fail due to the amount of rainfall and the water not being able to disperse form the area, causing water to enter view [sic] ceiling areas within the kitchen, living area, media room, bathroom and lift shaft. The excessive rain water also caused internal garden beds to overflow and texture paint to external walls to bubble.
The complainants claim for contents damage in the sum of $35,299.43. The complainants say these contents were tools and exercise equipment which were stored in the basement.
The complainants have also provided some photographs and videos in support of their position.
The complainants say that based on the above information; the insurer should settle their claim by payment to them of $365,000.
Insurer obtained expert reports
Following lodgement of the claim, the insurer appointed a builder, AC to inspect and provide a report. AC attended on 28 October 2022. AC noted:
visual plasterboard damage to the wall and ceiling lining in the cinema
the complainants had installed a new kitchen – complainants advised that the plasterboard linings behind had been mould affected as the complainant advised that a down pipe had rusted
a lift had filled with water.
AC found that the damage was consistent with the claimed event.
AC engaged a licensed plumber to attend a leak detection report. Four leaks were detected in the following areas:
kitchen- no dektite flashing around the vent pipe and poor sealant to roof
office/media area- unfixed flashing and missing fixings and sealant to roof
bathroom – inadequate sealant to dektite flashing, box gutter holding water and fixings and sealant concerns to roof above bathroom
rainwater holding tank with no apparent overflow system.
AC also noted the internal garden bed overflows with excess water and no overflow system.
AC also prepared an electrical report on 5 November 2022. AC inspected the damage to the CBUS system, pool lights, lights on the roof of the house, GPO in basement and A/C isolator. AC found that the CBUS system modules and switches were corroded due to water ingress. AC found that the whole system would require replacement.
AC found:
the HID pool transformer had been under water and shorted out- this would need to be replaced
the lights on the roof were water damaged and require replacement- this would require all glass fencing on the roof to be removed to get to lights and have then reinstalled
the GPO was corroded from water and the weatherproof lights do not work and need replacing.
The insurer appointed CR, a quantity surveyor, to provide a report following a desktop review of the documents. CR says:
the only formal quotation was received from L regarding the lift
the other cost documents do not meet the requirements of a formal cost document
there is an absence of sufficient substantiation of the proposed costs and therefore should not be considered.
CR was also critical of CW’s report which found that due to the volume of rainwater, the overflow system into the saturated sandy subbase failed causing the downpipes and gutter system to fill up with rainwater and fail. CR referred to the plumber’s report from AC who did not identify any overflow system into the sand subbase.
CR was not satisfied that the cause of the CBUS system failure was the insured event. CR says that if the primary fault of the CBUS system was corrosion, which takes time to evolve. CR says that this could have potentially been avoided if the property was correctly remediated following the water ingress event. CR notes that CE did not describe corrosion as the primary fault.
CR says that there is no information to support that the contents were damaged by water ingress.
Insurer says that it requested more information
The insurer says that they have repeatedly requested that the complainants provide them with further information to support their claim, including:
clear images of all damage being claimed
signed contract with SD
evidence of payment of builders’ warranty insurance
the original quote form SD
the original quotes form the sub-trade contractors
original purchase orders from the sub-trade contractors
receipts for the tools being claimed.
The insurer says that without this information, they cannot assess the claim.
Insurer says delays have prejudiced its assessment of the claim
The insurer says that the delays in lodging the claim and addressing various areas of damage has prejudiced the insurer’s ability to mitigate the loss suffered. The insurer cites the CBUS system as an example, saying that prompt remediation could have potentially resolved the issue by preventing corrosion.
Insurer entitled to limit its liability for the kitchen, bathroom and media room
In relation to their delay in lodging a claim with the insurer, the complainants say:
that they were required to repair the damage to make it liveable for their family as it was their primary place of residence
the female complainant was experiencing a number of health issues and that this was their main focus at this time
they were not aware that they were able to lodge a claim.
The panel acknowledges the ill health suffered by the female complainant. The complainants have provided copies of her hospital discharge summary which note that she was admitted for surgery on 20 March 2023 and was discharged on 1 April 2023.
However, the panel is not satisfied that her ill health, or safety concerns of the complainants should have prevented them from lodging a claim with the insurer prior to commencing repairs. The panel notes that the policy provides for temporary accommodation if the property was unliveable. Further, the female complainant was not hospitalised until after the repairs had been completed, arranged by the complainants.
The policy provides that the insured have responsibilities that must be fulfilled when a claim is made, and notes that if they are not fulfilled, the insurer can reduce or refuse the claim. The policy provides that the insurer is to be allowed to view any damaged property (building and/or contents). The insured is not to repair, sell or dispose of any damaged property prior to advising the insurer and allowing them an opportunity to assess the damage.
While SD notes the presence of mould in the kitchen, given the findings of AC’s plumber who also noted maintenance issues in the kitchen area, the panel is not satisfied that the damage relates to the storm event in February 2022.
The complainant has provided a photograph of some water damaged cabinetry, but the insurer is unable to assess this in relation to the established maintenance issues given that the area has now been repaired.
The insurer has been prejudiced in its assessment of this area of damage. The presence of mould, and the likely longer-term processes leading to it, means it is more probable than not that one or more of the exclusions within the policy would apply. However, it is not possible to assess whether that is in fact the case given the repair work including the removal and disposal of damaged items, performed before the insurer was notified.
In relation to both the media room and bathroom, AC confirmed that the ceilings had collapsed. However, these had already been repaired by the complainants prior to the insurer being able to inspect them. The invoice from SD includes the demolition of all wall linings, including tiles, shower screens, vanity unit and fixtures. The complainants have not established how these repairs are necessary for damage to the ceiling. Further AC noted that the complainant had only reported that there was staining to the plasterboard ceiling in the media room. However, SC’s invoice includes repairs to the walls, including painting.
AC’s roof leak detection report found multiple areas of water ingress in relation to both the media room and the bathroom. Over the media room, AC found poor silicon seal, lifted pot rivets which allowed the flashing to be raised and water to enter, rusted fixing points and open conduit. Over the bathroom area, there was poor silicone seal around the vent dektite, box guttering holding water with poor silicone seals and poor silicone seals on the flashing. The insurer is unable to assess whether there was evidence of any longer term process that contributed to the ceilings collapse with the presence of these leaks given that the repairs had already been undertaken.
The panel places little weight on the report from CW. This is because CW inspected the property some 18 months after the event and following the repairs to the property in relation to his assessment of the causation of the damage.
In permitting those works to be done, the complainants have triggered the insuring condition which permits the insurer to reduce the claim. The complainants failed to fulfil their obligations under the policy of permitting the insurer to inspect the damage.
On balance, the panel is satisfied that the insurer is entitled to limit its liability concerning the damage to the kitchen, bathroom and media room. It has been prejudiced by its inability to assess the causation of the damage with an absence of photographs of the damaged areas or of the damaged materials.
The insurer has been unable to establish the extent of the water ingress following the insured event given the delay in lodging the claim and the completion of the repairs prior to the insurer having an opportunity to assess the damage.
The insurer should accept claim for stairwell, CBUS, lift and contents
The insurer has accepted liability for repairs to the lift and has offered to settle the complainants in the sum of $21,454. The panel accepts that it is reasonable that the insurer cash settle the complainants in the sum of $21,454 based on the quote provided by L dated 6 October 2022.
In AC’s report, there are photographs of the damage to the render in the stairwell. AC notes that the complainants had dug out the internal garden bed and had reinstalled waterproofing in the area. The history provided by the complainants was that during the heavy rainfall event, the water overflowed and caused damage to the stairwell and contributed to the basement flooding.
The panel is satisfied that the insurer has had the opportunity to inspect the damage to the stairwell and the damage is consistent with the insured event. Therefore, the insurer is to accept the complainants’ claim in relation to the damage to the stairwell. Based on AC’s quote, the insurer should cash settle the complainants for repairs to the stairwell in the sum of $3,680.76 which includes a 15% contingency uplift.
In relation to the CBUS system, the panel notes that AC’ electrical report noted:
Due to flooding in garage, the water has entered the cbus system resulting in the whole system needing replacement.
AC also reports that the HID pool transformer had been under water and shorted out, the lights of the roof of the house were water damaged. The GPO was corroded and the lights in the basement were found not be working.
CR notes that:
If the primary fault of the CBUS system is corrosion which takes time to evolve. This could have potentially been resolved if the property was correctly remediated directly following the water ingress event.
If remediated correctly the house would have been free of moisture and no corrosion would have initiated.
However, the panel is not satisfied that the insurer can rely on CR’s report to deny liability for the CBUS system which only suggests that correct remediation could have potentially resolved the issue. The insurer has not provided evidence in support of this or describe the mitigation steps that could have been taken.
The panel is satisfied based on AC’s report that the CBUS system was damaged by the insured event with the inundation of the water in the basement. This includes GPO and damage to the pool lights.
The complainants’ have provided a quote form CE for the replacement of the CBUS system, including the pool lighting in the sum of $129,000 plus GST ($141,900). The panel notes that this is less than the insurer’s quote from AB in the sum of $169,654.23. The panel is satisfied that notwithstanding the concerns raised by CR about CE’s quote being informal, that the insurer should settle the complainants based on the lower quote in the amount of $156,090 which includes a 10% contingency uplift.
In relation to the contents, the complainants claim $35,299.43 for damaged contents. They say that these contents were stored in the basement and were damaged by the flooding of the basement.
The insurer says that it has been prejudiced in its ability to inspect and assess these items. Particularly when many of the contents claimed are electrical items. Also, the insurer had requested receipts for the tools being claimed as they noted the male complainant is a builder by trade.
In relation to these items, the panel is satisfied that the complainants have provided sufficient evidence with an itemised list and photographs of the loss of contents. The complainants have provided photographs showing that these items were in the basement which was extensively flooded. The panel is satisfied that it is reasonable that the insurer cash settle the complainants for their contents in the sum of $35,299.43.
Are the complainants entitled to professional costs?
AFCA can require an insurer to contribute to professional costs
The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainants. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim.
Insurer is not required to contribute to the complainants’ professional costs
The panel is not satisfied that legal representation was required in this matter. The matter was not legally complex. Further, the panel did not find that the complainants’ expert reports from CW assisted their position.
Are the complainants entitled to non-financial loss compensation?
No. The insurer is not required to pay the complainants non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
No compensation is warranted
The panel is satisfied that there is no information that demonstrates that any actions of the insurer have caused the complainants to experience an unusual degree of stress, delay or inconvenience.
The insurer is not required to pay the complainants non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the insurer has not established its prejudice to deny the complainants’ claim regarding the stairwell, CBUS system and contents. However, the panel is satisfied that the completion of repairs by the complainants prior to the insurer inspecting the kitchen, bathroom and media room has prejudiced its ability to assess the damage and it would not be fair to require the insurer to pay for these rooms in these circumstances. It is fair that the insurer is not required to pay professional costs or non-financial loss compensation.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Relevant policy terms
Page 6
Your responsibilities
Your responsibilities are important requirements that you must fulfil.
6. Notify us of incidents
You must notify us of any incidents covered by your policy as soon as it is practically possible. Any further loss or damage to the insured property that arises because of your delay in reporting the incident will not be covered.
When you notify us of an incident covered by your policy, the following information will assist us with processing your claim:
The location, date and time of the incident;
A description of the circumstances surrounding the incident; and
The full name, address and phone number of the third party, their driver’s licence number, and (where applicable) the registration number of their vehicle that was involved in the incident.
Page 30
Responsibilities when you make a claim
These responsibilities must be fulfilled when you make a claim; if they are not, we can reduce or refuse your claim.
Allow us to view any damaged property (building and/or contents) that you are claiming for. Do not repair, sell or dispose of any damaged property prior to advising us of the damage and allowing us the opportunity to assess the damage. This includes providing us the opportunity to assess unsatisfactory repairs that need to be rectified, unless emergency repairs are required to prevent further loss or damage to the insured property.
…
8. Give us your full cooperation and comply with all our requests in relation to your claim; for example:
Allowing us to complete repairs or replacements to the insured property as soon as practically possible. Additional costs that arise because you or someone acting on your behalf delays us in completing repairs or replacements, such as not allowing us access to the insured property, will not be covered unless those delays were outside of your control.
Supplying all information to the best of your knowledge, completely and honestly about:
The incident giving rise to the claim; and
You and anyone else to be covered under your policy;
…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.