Denial of escape of liquid and storm claims for building and pool damage, reliance on inherent defects exclusion, and claim amount
Text of the determination
Determination
|
Case number
|
12-00-1089052
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1089052 23 September 2025
1 Determination overview
1.1 Complaint
The complainant is represented by BR, solicitor. Unless otherwise indicated, both the complainant and BR will be referred to as ‘the complainant’.
The complainant holds an events-based home and contents policy with the financial firm (the insurer) for his home which is located in the State of Victoria (the property). The first period of insurance is 22 October 2020 to 22 October 2021. The policy was then renewed, extending the period of insurance to 22 October 2022.
In September 2021, he lodged a claim for damage to the property caused by an ‘escape of liquid’ (EOL) insured event (the first claim).
Subsequently, while the complainant was in the process of installing additional foundational stumps to prevent further damage to the dwelling on the property, a storm occurred (the storm). The complainant says he was installing additional foundation stumps due to incorrect advice received from GM, the insurer’s engineer.
The complainant then lodged a separate claim for storm damage on 10 January 2022 (the second claim).
In addition, the complainant says he discovered the swimming pool (the pool) on the property was damaged shortly after he lodged the first claim. He also noticed damage to the concrete floor of the garage.
The insurer investigated the claims and the circumstances of the loss and damage. It denied parts of the claims on the basis some of the damage was not caused by the insured events (that is, the EOL insured event and the storm) but were due to inherent defects, and poor and non-compliant workmanship. The insurer says damage caused in this manner is excluded from cover under the terms of the policy.
The complainant engaged his own experts in support of the claims. He says the insurer should cover all claimed damage (including the damage to the pool and the garage) which, he says, was caused by the insured events. In addition, the complainant says the insurer should provide cover for the costs related to the incorrect foundation repairs, temporary accommodation and contingencies. The complainant wants a total amount of $912,542.52 to settle the claims, including temporary accommodation, storage and professional costs.
Given the nature of this complaint, it was referred to a panel for determination.
1.2 Issues and key findings
Is the insurer entitled to deny the first and second claims?
No. The exchanged information shows the EOL insured event, as well as the storm, occurred during the periods of insurance and damaged the property.
Is the insurer entitled to deny the claim for the pool?
No. the exchanged material demonstrates the pool was damaged by the insured events.
Is the insurer liable to pay for restumping costs or a foundation upgrade?
No. The foundation upgrade (restumping costs) is not due to the insured events or the fault of the insurer. The insurer is entitled to rely on the terms of the policy to deny this part of the claims.
Is the insurer entitled to deny the claim for the garage damage?
Yes. The exchanged material shows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim for the damage to the garage.
Is the insurer required to pay temporary accommodation, storage and expert/professional costs?
Yes. The insurer is required to pay these costs in accordance with the terms and conditions of the policy and the matters set out in this determination, in particular, section 2.7, below.
Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay the complainant the sum of $2,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has established a valid claim for some of the claimed building damage
· the insurer is not entitled to rely upon policy exclusions to deny the claim for the pool
· the insurer is entitled to rely upon the terms and conditions of the policy to deny cover for the costs associated with the restumping works and any foundation upgrade
· the exchanged material shows the damage to the garage was not caused by an insured event
· it is reasonable and appropriate that the insurer cover the complainant’s temporary accommodation costs and storage costs in accordance with the terms and conditions of the policy
· it is reasonable and appropriate that the insurer contributes to the complainant’s professional costs
· an award of non-financial loss compensation is reasonable and fair in this particular instance.
1.3 Determination
The determination is substantially in favour of the complainant.
The complaint should be resolved in accordance with section 2.7, below.
2 Reasons for determination
2.1 Is the insurer entitled to deny the first and second claims?
No. The exchanged information shows the EOL insured event, as well as the storm, occurred during the periods of insurance and damaged the property.
Circumstances of the first claim
The complainant is a qualified owner-builder.
The property includes a large, single storey detached dwelling with rendered Masterwall-100mm foam cladding over a timber frame, with metal roof cladding. The dwelling sits upon concrete foundation stumps in a large, semi-rural allotment. The dwelling was constructed by the complainant in about 2019.
The property also includes an inground fibreglass pool, a pool BBQ area, a double garage incorporated into the dwelling, a large steel shed and perimeter and internal fencing.
On 13 September 2021 the complainant lodged the first claim in relation to a burst water pipe. He advised the insurer:
Storm water pipe has broken and caused hairline cracking to the cladding externally and cracking in the main living area internally. l have not had the storm water pipe fixed the water is going to a trench and l am trying to drain it. We noticed movement within the last 3 to 4 months. The storm water pipe issue l found on Saturday, as there was a lot of water in the garden and l found the source to be the storm water pipe.
Shortly after the first claim was lodged the insurer appointed CR, loss adjuster to assist with claim management. CR first inspected the property on 14 September 2021. CR reported:
· the complainant had exposed the storm water plumbing that runs between the pool and the house, locating where a star picket post had been driven into the pipes. With the very good winter rains, the complainant considered this may have been the source of the high levels of moisture under the dwelling
· upon inspection the ground moisture level was noted to be very high
· testing indicated an affected area of ground of at least 6m to 8m long
· there is evidence of movement to the alfresco area of the dwelling, the internal wall lining in the dining area backing on to the alfresco area, and in the kitchen. These damages are presently considered minor, however, they could easily develop further with more water inundation or drying out of the clay-based soils.
The insurer then arranged for WA. leak detection specialist, to inspect the property on 27 September 2021. WA reported:
· there was damp soil to the middle, east and west of the property
· the complainant confirmed he repaired the punctured drainpipes at the southeast of the property
· holes in the drainage pipes at the northeast of the property were seen on CCTV
· the rectification works required are to be determined by other experts.
Subsequently, the insurer arranged for GM to inspect the property on 4 November 2021. GM did not provide a comprehensive report at that stage, however, in an email to the insurer it did provide photographs with descriptions and a general overview of the property. GM noted the complainant advised his plumber had located and repaired two punctured PVC stormwater drainage pipes. The photographs show:
· the offending drainpipes have holes in the shape of a star picket
· cracked external paving
· cracks in the garage floor
· cracked exterior render on the dwelling
· internal cracking in the dwelling
· evidence of foundation movement.
In GM’s correspondence of November 2021, it noted:
The [complainant] queried if the observed movement damages in the load bearing walls had been precipitated by the wet ground. I agreed that was possible due to the proximity of the wall to the punctured pipes.
Circumstances of the second claim
The storm of January 2022 occurred when the first claim was still under assessment. In addition, the complainant was installing additional foundation stumps to the dwelling when the storm happened.
The complainant lodged the second claim on 11 January 2022. He advised the insurer:
Storm water run-off underneath the house. As there is a maintenance issue being addressed which is to add additional stumps as per [GM’s] recommendation from [the first] claim… but got flooded by a storm last night.
The complainant says the storm caused an excessive amount of rainwater to enter the subfloor space of the dwelling and cause additional damage, particularly because he was in the process of adding additional foundation stumps and the holes prepared for the new stumps were open to the elements.
On 15 January 2022 the complainant sent a series of photographs depicting new damage to various internal plasterboard wall linings to the insurer. Moreover, ST, restoration specialists, undertook mitigation works at the property after the storm, including drying the subfloor space under the dwelling. In its report dated 22 February 2022, ST summarised the damage caused by the storm as:
· the majority of the crawl space is water damaged
· recently dug stump holes have excess water
· the soil is wet and has turned to mud.
However, since then, the parties have generally assessed any damage caused by the two insured events together. Indeed, the insurer did not accept the first claim until 6 December 2022, almost 11 months after the storm occurred. Furthermore, much of the expert reporting from January 2022 onwards does not clearly and sufficiently differentiate between the damage caused by the EOL insured event, compared to the damage caused by the storm.
Complainant has the onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event (or events) covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim (or valid claims), the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim(s), either wholly or in part.
Policy covers damage caused by EOL insured events
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy.
The policy is an ‘insured events’ policy, meaning not all damage is covered. In fact, the policy only covers damage caused by specific insured events. These include EOL insured events under the heading, ‘Water and other liquid damage’. Page 18 of the Product Disclosure Statement (PDS) states:
Water or other liquid damage
What’s covered?
Buildings and/or contents
✔ Loss or damage resulting directly from bursting, leaking, discharging or overflowing of any:
• domestic home appliances – for example a dishwasher or
washing machine,
• fixed rainwater or hot water tanks,
• radiators and oil heaters,
• fixed pipes, gutters or drainpipes, sinks, baths or water carrying apparatus,
• waterbeds,
• aquariums designed to hold more than 20L,
• swimming pools or spas.
Policy also provides cover for damage caused by storms
The policy also covers damage caused by the insured event, ‘Storm, cyclone, rainwater or run-off’. Page 17 of the PDS states:
Storm, cyclone, rainwater or run-off
What’s covered?
Buildings and/or contents
✔ Loss or damage caused by:
• storm
• cyclone*
• rainwater
• run-off (provided run-off is not combined with flood waters).
*A 72-hour exclusion period applies for loss or damage caused by cyclone – see page 11 for details.
✔ Loss or damage caused by or arising from:
• soil movement, including erosion
• landslide
• mudslide
• subsidence
if it is caused directly by and occurs within 72 hours of a storm
Cover is subject to limitations, conditions and policy exclusions
The cover provided by the policy for damage caused by EOL and storm insured events is subject to limitations, conditions and policy exclusions. Relevantly, the insurer relies upon the following general policy exclusion to deny the first claim:
General exclusions
Things we won’t cover
We want to be clear about what you’re covered and not covered for. In addition to any other exclusions listed for an event or cover section – here’s a list of things we won’t cover under any section of the policy.
Always excluded
Loss, damage, injury or legal liability as a result or, caused by or arising from:
[…]
Inherent defects - Including faulty design or materials, structural defects or poor workmanship [see page 53 of the PDS].
Insurer’s experts inspected the property
GM inspected the property again on 16 February 2022. GM reported:
· the complainant had completed several improvements to the property since their first visit, including the installation of new subfloor vents and additional foundation stumps along the load bearing walls, as well as the application of sealants to repair external damage in some areas of the dwelling
· new internal and external cracking and movement associated damages around the dwelling are the result of water entering the subfloor space and causing the supporting ground to become over wet
· none of the new damages observed were evident at the time of GM’s first inspection in November 2021.
In a more detailed, comprehensive and well-reasoned report dated 21 June 2022, GM noted:
· whilst the insurer has opted to treat the two claims as two separate events for administrative purposes, the two claims are closely related, and it is not practical to separate the damage from the two insured events (being the EOL insured event and the storm)
· the water from the punctured drainage pipe has caused the ground in the subfloor to become ‘over wet’
· the observed damage during its first inspection (in November 2021 after the EOL insured event occurred) was along the east side of the house adjacent to the punctured pipes
· the observed damage includes opening joints in skirtings and architraves, sticking doors, inoperable latches and cracks to plasterboards and external cladding
· the likely cause of damage is the result of water entering the subfloor of the dwelling which caused movement related damage
· this damage was then worsened significantly by the subsequent storm
· the observed damages at this property would have been lessened if there had been improved drainage arrangements in place, particularly in the subfloor space and the ground surfaces surrounding the dwelling
· the extended duration of the water presence in the subfloor space is likely have exacerbated ground infiltration and possibly worsened the damages
· further, enhanced subfloor ventilation would have accelerated the drying out process for the water impacted ground in the subfloor space.
· inadequate surface drainage, subfloor drainage and subfloor ventilation are contributing effects and have exacerbated the damage.
GM’s report dated 21 June 2022 also includes the following observations in relation to the storm:
· Bureau of Meteorology (BOM) data shows local rainfall in January 2022 was 149.1mm. Such rainfall is a significant event
· the rain events might have involved short-burst high intensity rainfall which exceed the capacity of the gutters and downpipes of the dwelling, resulting in overflows.
In addition, the insurer appointed AA, building consultants and engineers to inspect the property on 16 June 2023 and again on 25 July 2023. In its report dated 24 August 2023, AA stated:
· the dwelling had been subjected to two inundation events and there was considerable rainfall
· construction deficiencies are apparent, including an inadequate number of foundation stumps, insufficient founding depth of stump footings, and the subfloor soil being lower than the surrounding soil (which is not consistent with Australian building requirements)
· if the founding depth of the stump footings is found to be approximately 500mm, then this is a major contributing factor that caused the building movement
· stormwater drainage has been installed which is non-compliant with AS 3500.3, including an inadequate grade provided to hold water through multiple areas of the drainage system.
IT, consulting engineers, inspected the property on 25 July 2023. They also drilled a number of bore holes to determine soil characteristics.
IT found the property is underlain by highly reactive clays with seasonal shrink-swell movements of between 40 to 60 mm with deep seated movement due to the climatic region. IT noted the seasonal shrink-swell movement can be exacerbated when the soil is exposed to abnormal moisture conditions.
IT also observed the original stump footings under the dwelling were founded approximately 500mm depth below ground level, which is shallower than the recommended 800mm depth specified in AS2870-2011.
Complainant’s experts also inspected the property
The complainant arranged for CF, builders and engineers, to inspect the property on 15 February 2023 and provide a report and a SOW. Unfortunately, CF did not provide a detailed analysis of the issue causation. For instance, in relation to the claimed damage to the interior and exterior of the dwelling, CF stated:
The observed cracking is consistent with building movement attributed to moist founding soils.
The complainant then arranged for CS, engineer, to inspect the property after both claims had been lodged. Indeed, CS inspected the property on four occasions, being 13 June 2023, 6 July 2023, 28 July 2023 and, finally, on 28 July 2024. CS’s report written pursuant to those inspections and dated 9 May 2024 is comprehensive and logical and includes helpful diagrams and illustrative photographs.
CS’s conclusions include the following:
It is my opinion that Event 1 [the EOL insured event] would have resulted in the following:
- Far greater variation in soil moisture contents in comparison to those caused by Event 2 [the storm]. This is due to the following reasons:
1. Prior to puncturing of the stormwater line, dry or equilibrium soil conditions would most likely have been present. The escape of liquid occurring due to Event 1, contributes to a [relatively] more drastic change in the soil moisture profile.
2. The punctures (whilst reasonably unknown) to the stormwater pipe allows repeated exposure of the reactive clay soils to abnormal wetting following rain events.
- Less opportunity for beneficial effects of subfloor ventilation provisions to facilitate expedited drying of the reactive clay soils, noting that infiltration of water into the soils occurred at below surface level as a result of Event 1, whereas Event 2 infiltrated the soils at the surface.
- The formation of initial stresses within the building fabric from the differential movement of the building’s footings occurring due to the abnormal soil moisture conditions caused by Event 1.
Based on the above, it is my opinion that Event 1 would have contributed to cause a more significant proportion of the observed damages to subject dwelling.
In its report, CS also stated:
· the damage to the building is a result of both insured events. The EOL insured event caused more substantial damage, in comparison to degree of damage caused by the storm
· non-compliant construction works were observed. These include non-compliant subfloor ventilation and storm water drainage provisions
· the observed damage caused by abnormal soil moisture from the EOL insured event would still likely have occurred, even in the absence of the non-compliant building works
· the EOL insured event is the proximate cause of the damage
· the EOL insured event was a subterranean event. Therefore, any inadequate surface grading or ventilation provisions would not have prevented the building damage
· the local area around property received 816mm of total rainfall between May 2020 and September 2021, according to the BOM data
· using calculations of the local catchment area, it is estimated that 101,000 litres of water entered the stormwater drainage pipe along the eastern side of the property
· the stormwater would have then drained into the subsoil when the pipe was compromised (punctured).
During its inspection CS also found two original stump footings to be at least 800mm below ground. CS also noted the footing design requirements under AS2870 do not provide for abnormal soil moisture, such as that caused by the EOL insured event, Therefore, regardless of the stump footings (800mm or 1000mm deep), the damage would still have likely occurred.
In regard to the claimed storm related damage, CS reported:
· the storm event occurred while the holes for additional stump footings were being excavated
· the holes would have provided a sump for runoff to be collected
· stormwater drainage systems are required to accommodate storms of high intensity
· the tabulated 1% various annual exceedance probabilities (AEP) for design rainfall at the site at would be 50.4mm in one hour
· the rain gauge on the property shows approximately 47mm of rain was collected. It therefore closely matches the above 1% AEP design rainfall event
· flooding of the stump holes would likely have occurred even with a suitably graded compliant surface drainage provision.
CS’s report also includes photographs of the inundations, as well as a mud map to show how the subfloor space was inundated during the storm event.
CS then provided a supplementary report dated 5 November 2024 in response to GM’s evidence. CS addressed each of GM’s conclusions in detail. CS then reiterated its conclusions as follows:
• Event 1 relates to a subterranean escape of liquid event. As such, both surface grading and ventilation provisions within the subfloor space are irrelevant and would not have prevented exposure of the reactive clay founding materials to abnormal soil moisture conditions which have caused differential movement of the building’s footings and subsequent building damage.
As such, I would consider it appropriate that the inherent defects are considered as contributing casual factors to Event 2 only.
• Damage observed to the dwelling was generally concentrated along the eastern side of the dwelling which correlates with the known locations of the damage to the stormwater line along the eastern side of the dwelling.
Event 1 has had a greater contribution to the observed damages to the dwelling relative to Event 2.
Moreover, regarding the storm related damage, CS noted that GM’s response did not consider that open foundation excavations were in place which allowed moisture to enter the soil at depth with no opportunity to grade away.
BR also made submissions on behalf of the complainant. BR stated, amongst other things:
It is accepted that there has been an insured peril – leaking of water from a punctured drain over 12 – 16 months – for the exclusion to apply, the insurer has to establish that the same loss and damage was caused by the insured peril as the uninsured peril. Put another way, that the internal cracking to the house would have occurred in any event, regardless of the water ingress.
BR says it was the leaking storm water drainage that occurred over 12 to 16 months that caused the damage. BR says, had the stormwater drainage been undamaged and functioned normally, there would have been no compromise to the foundations of the dwelling.
Insurer re-inspected the property in response to the complainant’s evidence
Following receipt of the complainant’s evidence, the insurer arranged for GM to inspect the property again on 18 May 2023, this time focussing upon the claimed damage to the pool, the garage and the foundation stumps. Matters regarding the pool and the garage are discussed below.
In relation to the foundation stumps and the consequential subfloor movement in the dwelling that appears to have continued unabated, GM concluded:
The [complainant] makes reference to various damages associated with continued movement of the subfloor frame in response to foundation movement.
Our observations confirm that the subfloor space continues to be damp and remains undrained. It is my view that this building remains vulnerable to surface water ingress and retention. The surrounding surfaces to not have sufficient slope to prevent surplus surface water entering the subfloor space. As reported previously, this property is situated within an area subject to inundation.
The [complainant] has not identified any verifiable event which can be associated with these damages. The supporting ground within the subfloor remains susceptible to ongoing continued changes in ground moisture and resultant building movement. This building is likely to continue to experience continued movement related damages.
GM also concluded that, had the dwelling been constructed in accordance with the Building Code of Australia (BCA), the property would not have been impacted by either of the insured events. GM stated:
· the foundation design of the dwelling was inadequate, as it did not differentiate between load bearing areas
· the additional damage noted after the storm event in January 2022 was not considered to be storm damage, but due to defective and non-compliant construction
· the subfloor space did not drain freely
· storm water drainage at the property did not comply with the BCA or the Australian standard (AS 3500)
· the subfloor ventilation of the dwelling was inadequate, and the floor level was too low to allow water to drain freely.
Insured events damaged the property
The panel is satisfied the complainant has established a valid claim for part of the claimed building damage caused by both the EOL insured event and the storm. Moreover, the panel is not satisfied the insurer has established, on balance, it is entitled to rely upon policy exclusions to deny the first and second claims in their entirety. This is because of the following considerations.
First, the leak detection report from WA and photographs show there was an escape of liquid from the damaged drainpipes. It also reported the soil was moist when it detected the leak.
GM’s earlier report dated 21 June 2022 included the same findings and confirmed the drainpipes were damaged and caused the ground to become ‘over wet’. As such, there is evidence which shows it was the punctured pipes that caused the subfloor to become saturated.
Second, although GM identified inadequate surface and subfloor drainage, as well as ventilation issues, it initially said these were contributing causes. The likely primary cause of the damage is the EOL insured event, worsened by the subsequent storm.
Third, the panel notes GM subsequently changed its view, saying the complainant is responsible for all damage due to the defective and non-compliant construction. However, the panel is of the opinion GM did not provide a sufficient explanation regarding its change of view. GM did not explain why its earlier findings regarding the significant rainfall and reported damaged pipe, could not damage the property.
Fourth, CS noted the findings regarding defective construction, but concluded the abnormal soil moisture would still have occurred, even if the construction was compliant. The panel is satisfied CS’s analysis in this regard is rational and well-balanced. CS concluded the EOL insured event was a subterranean event. Therefore, logically, a compliant and adequate surface grading and subfloor ventilation would not have prevented the damage that originated underground. This is particularly relevant given the history of the two insured events is incorrectly recorded in AA’s report dated 24 August 2023. AA fails to mention the subterranean EOL insured event, instead describing the event which preceded the first claim as follows:
During August 2021, a major storm event passed over the area resulting in major inundation into subfloor area of the dwelling and alfresco areas.
Fifth, based on the exchanged information, the panel is satisfied the storm caused additional damage to the property. In fact, the panel accepts the storm damage would still have occurred even if there were adequate drainage provisions. This is because the photographs show the rainfall intensity caused the surface surrounding the property to be flooded. Considering the subfloor of the dwelling was excavated at the time when (while new stumps were being installed) and the intensity of the rain reached the 1% AEP rainfall event, it is reasonable to conclude that the subfloor would also be impacted by the storm.
In summary, the panel is satisfied the exchanged material shows the saturation of the soil was initially caused by the EOL insured event from damaged subterranean drainpipes. This situation was exacerbated by the storm.
It follows the insurer should resolve the claim for building damage in accordance with the terms and conditions of the policy and the matters set out in section 2.7, below.
2.2 Is the Insurer entitled to deny the claim for the pool?
No. the exchanged material demonstrates the pool was damaged by the insured events.
Complainant says pool damage occurred after insured events
The complainant says the pool damage was caused by the insured events, in particular the EOL insured event.
Page 18 of the PDS shows the policy cover for ‘Water or other liquid damage’ extends to ‘buildings’ such as the pool.
The complainant reported damage to the pool in November 2022.
As mentioned, GM reattended the property on 18 May 2023, in part, to assess the pool damage. GM reported:
· the pool, pavement and surroundings appear to be well maintained and in good order
· testing indicated the majority of fibreglass making up the pool steps is not well supported
· testing also indicated the pavement around the pool was well supported, and not subject to subsidence
· the perimeter paving has a high quality exposed aggregate finish and slopes away from the pool
· testing did not detect any ripples or bumps to the surface of the pool floor
· the damage could not have been caused by water displacing the stabilised sand, as the sand would be detectable and there would also be subsidence around the pool’s surface
· the pool damage related to its original construction and was not attributed to any previous or recent insured events.
The insurer also arranged for SF, plumber, to assess the pool. SF reported:
· the pool installation requires a backfilling process
· the pool base was uneven, and the deviation was approximately 3-5mm
· the deviation in the pool floor is likely to relate to the installation process, as opposed to hydrostatic pressure.
The insurer therefore denied the claim for the pool damage. It says the damage would not have occurred if the pool had been constructed in accordance with the requirements of the BCA and the relevant standards.
In support of his claims, the complainant engaged several experts to assess the pool damage. These include the pool installer, PP, and a swimming pool leak specialist, AL. In addition, CS inspected the pool.
PP reported:
· the steps and seat in the pool lack support from the packed stabilised sand
· it found rippling to both ends of the pool
· considering the close proximity of the leaking pipe, it is plausible that the backfilling of the pool acted as a highway to inundate the lowest point (the pool)
· the pool needs to be replaced, as it will crack in coming years if left un-treated.
AL reported:
· the middle of the pool has lifted due to ground water
· the step area has no support, as it has been washed away due to the storm
· the ground underneath the pool needs to be re-supported, otherwise the fiberglass will crack under normal usage
· it cannot recommend how to rectify the issue, but suspects the pool will need to be removed and replaced.
CS made enquires with the complainant and PP to identify the sequence of construction events during the pool’s installation.
CS confirmed the following:
· the pool shell was lowered into the excavated area to check that it sat level on the bedding material and a discrepancy of 20-30mm was discovered.
· the pool shell was then removed, and the bedding material was re-graded to achieve a level finish to the four corners of the pool
· the leveling of the pool and the regrading of the bedding material was completed prior to backfilling between the pool excavation and pool shell.
CS then reported:
· the damage to the pool includes hollowing steps and rippling of the base of the pool shell
· the pool walls are ‘drummy’, which indicate voids present between the pool shell and backfill material
· some cracking was identified at the control joints installed to the footpath west of the pool
· the construction sequence would not have posed any issues regarding the stablished sand backfill
· it is possible poor placement of stablished sand during installation may have contributed to presence of voids, but such voids would have been present immediately upon construction had that occurred
· no defects were reported by the complainant following construction of the pool
· the impact of the swelling strains in the reactive clay soils should be a critical consideration in determining the cause of the damage
· it is rare for pool structures to return to the original position and shape once reactive clay soils surrounding the pool have been impacted by abnormal soil moisture conditions
· the damage to the pool is likely due to the reactive clay soils of the site impacted by abnormal soil moisture.
Pool damaged by insured events
The panel is satisfied the exchanged material shows the pool damage was caused by the insured events. It follows the insurer must accept the claim for the pool damage and process it in accordance with the terms of the policy and the matters set out in this determination. This is because of the following considerations.
First, the complainant’s expert evidence is generally thorough, rational and well-balanced. It provides well-reasoned and logical explanations about the how the particular type of pool damage observed was caused by the insured events. In the case of CS, it is also based upon a comprehensive history of the pool construction process.
Second, PP, AL, SF and CS all found rippling and deviation to the pool’s floor. However, GM was unable to detect this damage. Moreover, whilst GM concluded the damage was caused by the reinstallation of the pool (based on a discussion it had with the complainant), it did not follow up this line of inquiry to obtain further clarification. It then erroneously concluded the pool was ‘installed’ twice.
In fact, the panel accepts the complainant’s submission that the pool was not installed ‘twice’. This is because the act of lifting the pool to ensure the bedding material is graded correctly is part of the normal construction process.
Third, the absence of damage after the construction of the pool had been completed adds weight to CS’s conclusion that the damage is not the result of the installation process.
Fourth, CS provided a detailed explanation (with a diagram) to show how abnormal soil moisture can cause swelling strains in the reactive clay soils. The diagram shows the originally concave profile of the pool base has inverted to a convex profile. GM did not provide any persuasive response to displace CS’s conclusions, except a comment that CS’s explanation is generally unrelated to the pool damage.
In all the circumstances, the panel is satisfied the insurer should accept the claim for the pool damage and resolve it in accordance with the terms and conditions of the policy and the matters set out in section 2.7, below.
2.3 Is the Insurer liable to pay for restumping costs or a foundation upgrade?
No. The foundation upgrade (restumping costs) is not due to the insured events or the fault of the insurer. The insurer is entitled to rely on the terms of the policy to deny this part of the claims.
Exchanged material shows existing stumps were inadequate
The complainant says he installed additional stumps to the property as recommended by GM during an onsite discussion and the insurer paid for these costs.
As indicated, AA reported the number of stumps were inadequate in depth, and a structural engineer should be consulted. AA noted IT’s report that the soil classification should be classed as H1-D and identified one of the stumps to be at a depth of 500mm.
The complainant relies on the report from IT to argue that GM’s recommendation to install additional stumps was incorrect. He engaged a foundation specialist, BM, to redesign the foundation in accordance with a H1-D soil profile and obtained a quotation to remove the old stumps and install new stumps to a depth of 1.2m.
GM’s report dated 21 June 2022 acknowledged there was a discussion about adding additional stumps. GM’s report states:
· it expected the stump spacing to be closer under the load bearing walls but the spacing appeared to be uniform
· the complainant supported its observation, and he had already installed additional stumps in at least two locations
· it explained a practical solution may be to add additional stumps between the existing stumps along the load bearing walls
· there was no discussion on the precise number of stumps or vents required
· it was aware the complainant had commenced installing additional stumps, but it elected not to respond to the complainant’s email pending further consideration of the circumstances.
GM’s supplementary reports maintain it did not give express instructions to the complainant to install additional stumps.
The foundation upgrade is not due to the insured events or incorrect advice
The panel has carefully reviewed all exchanged material. It notes the new foundation design and associated quotation provided by the complainant is an upgrade from the existing design. The new foundation requires the stumps to be excavated to a depth of 1.2m, whereas the existing stumps are at a depth of 800mm.
Moreover, whilst GM gave advice to the complainant, the panel accepts such advice was not an express direction or instruction, but merely a suggestion about how the existing foundation can be improved.
Further, there is no evidence to suggest the additional stump installations caused additional damage. The panel also notes the insurer paid for the additional stumps and the complainant engaged his own trades to carry out the works.
In summary, the panel is not satisfied the insurer is responsible for any further foundation upgrades. The decision to install additional stumps was made by the complainant, not GM. Moreover, the complainant appears to accept IT’s report that the stumps should have been installed to a depth of 1.2m, as he provided a quotation for the redesign of the foundation based upon, amongst other things, IT’s classification of the soil. This indicates the new foundation is designed to address the inadequacy of the existing foundation structure, and is not required because of the insured events or advice from GM.
It follows the insurer is entitled to deny the claim for restumping or further foundation upgrades.
2.4 Is the insurer entitled to deny the claim for the garage damage?
Yes. The exchanged material shows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim for the damage to the garage.
Exchanged material shows garage damage caused by inherent defects
The exchanged material shows BR appeared to partially withdraw this aspect of the overall claim, but it does recur in the complainant’s ‘Summary of events and damages’ final document.
In any event, the panel is of the opinion the expert evidence clearly supports the proposition that defective construction and inherent defects are the main causes of the damage to the garage slab floor. For instance, in its report dated 26 May 2023, GM found that the broken edges at the front of the concrete slab floor in the garage are the result of poor original construction. The concrete fragments and surfaces examined onsite consisted of sand cement only and did not contain aggregate. GM concluded the concrete placement, spreading and consolidation processes segregated the aggregate from the mix, resulting in a substantially weakened concrete mix.
Moreover, the complainant's submissions regarding the garage relate to investigations/tests he says the insurer should have carried out.
In summary, the panel is not satisfied the complainant has established a valid claim for the damage to the garage. Indeed, the exchanged material shows the cracking in the garage is not the result of an insured event. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny this aspect of the claims.
2.5 Is the insurer required to pay temporary accommodation, storage and professional costs?
Yes. The insurer is required to pay these costs in accordance with the terms and conditions of the policy and the matters set out in this determination, in particular, section 2.7, below.
Accommodation and storage
The panel accepts the damage caused by the EOL insured event and the storm is extensive and temporary accommodation and storage of contents is required.
The complainant and insurer are to work together to establish the temporary accommodation and storage costs required during the repairs of the accepted damage. The insurer is to pay these costs in accordance with the terms of the policy. However, the insurer is entitled to deny any claim for temporary accommodation and storage costs that directly relates to the restumping works (that is, the foundation upgrade).
Professional costs
The AFCA Rules provide that an insurer may be required to contribute up to $5,000 towards the legal or other professional costs incurred by the complainant in the course of the complaint.
The panel is satisfied some of the complainant’s experts, in particular CS, assisted in the resolution of this complaint. CS provided a detailed, comprehensive and well-balanced analysis of the cause of the damage.
Therefore, subject to the production of suitable evidence showing the professional costs incurred by the complainant (such as invoices, receipts, etc.), the insurer is required to pay the complainant a sum up to a maximum of $5,000 for such costs, in addition to any professional costs the insurer has already reimbursed to the complainant.
2.6 Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay the complainant the sum of $2,000 in non-financial loss compensation.
Complainant and his family endured stress, anxiety and inconvenience
Under the AFCA rules, non-financial loss compensation (capped at $5,400) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
I accept the complainant in this matter has suffered an unusual degree of physical inconvenience and interference with his expectation of enjoyment and peace of mind.
For instance, ongoing disputes about the many issues involved in the two claims have delayed the satisfactory resolution of these matters. Indeed, the complainant stated in his ‘Summary of events and damage’:
[It has been] 35 months of torment, stress and anguish [that] these claims have brought to our family. This mismanagement and neglect has caused significant distress on both of us, as we have had to put countless time, energy and resources into trying to rectify our claims, all whilst trying to raise our young family.
The handling of our claim has been nothing short of appalling.
[The insurer has] bounced our claim from department to department, each time we were left to explain our situation to the new claims managers… and numerous assessors. The more specialists that were engaged, the more complex our claim became.
There has been an array of specialists engaged to assess our claims, a multitude of 23 different businesses have been involved in assessing the damages and the scope of works. Of those businesses, some approximately 46 different people have been engaged.
Understandably, the complainant now feels aggrieved.
Given these considerations, the insurer should pay to the complainant the sum of $2,000 in non-financial loss compensation.
This payment is in addition to any sums the insurer has already paid to the complainant as compensation for problems regarding delays and claim management, and the like.
2.7 Claim should be resolved in this way
Dispute about quantum
There is a dispute about the quantum of cash settlements related to the claimed building damage.
The complainant provided the following table in his ‘Summary of events and damages’ (undated):
Our Trade Quotations
|
Cost for reimbursement incurred costs
|
Total
|
Insurance Claims assist incurred fees for their initial engagement
|
$1,062.51
|
AL leak detection assessment
|
$503.00
|
Incurred Engineering costs from the CS
|
$8,250.00
|
BM Civil Engineering design for the foundations
|
$600.00
|
Costs incurred by the Complainant - Sub total
|
$10,415.51
|
Contents pack out and pack in
|
|
ST pack out and pack in costings
|
$19,507.13
|
Contents Sub total
|
$19,507.13
|
Building reinstatement
|
|
M Engineering resin injection
|
$37,268.00
|
NX quotation Storm NG15309 (storm reinstatement previously used by the insurer)
|
$84,988.86
|
NX quotation Escape of Liquid NG15309- (Escape of Liquid reinstatement previously used by the insurer)
|
$133,758.37
|
NX quotation Pool NG15309- (Pool replacement and repairs)
|
$216,478.02
|
LB quotation LBS03192- (Foundation repairs including the removal of the old stumps recommended by GM)
|
$299,262.44
|
Building works and incurred costs Sub total
|
$771,755.69
|
Accommodation Air BnB 01/01/2025 until 01/10/2025-10 months
|
$85,098.97
|
Contingency for unforeseen works and discrepancies in the PC/PS allowances made throughout the claimed quotations. 20%
|
$154,351.13
|
Accommodation and Contingency Sub total
|
$239,450.10
|
Total claimed amount
|
$997,493.54
The panel considers the complainant’s proposed settlement to be excessive. Moreover, several of the key claims made by the complainant are not supported by the exchanged material that is currently to hand.
In relation to the costs of repairs for the damage caused by the insured events, two companies made relevant tenders, being NX, builders ($117,732.48 for the first claim and $76,217.15 for the second claim) and PR, builders ($222,942.32 for the first claim and $72,422.56 for the second claim). Unfortunately, these quotations are problematic, in that they variously include:
· costings for works which the insurer is entitled to deny, including the garage and the foundation stumps
· duplicate costings for various items including, but limited to, preparation, clean-up, worksite insurance, and associated costs, and the like
· costings for the pool which the panel has determined should be dealt with separately.
In its ninth report for the insurer, CR reviewed the SOWs and excluded various items as being either not damage linked to the insured events or unnecessary or improvements. CR considered the cost of the insurable damage from the EOL insured event was $41,291.48 and from the storm was $42,938.16. This totals $84,229.64.
The complainant disagrees. He says:
This [ninth C] report excluded the cladding and pitched that a good painter could “match” paintwork. It should be noted that the dwelling is 5 years old and there has been cracking to the square set wall to ceiling junction, therefore the ceilings and walls cannot be patch painted. We refer to the [GM] report which states: “No patch or spot repair painting is acceptable. The contractor shall allow for the repainting of entire walls or ceilings, ie. from edge to edge and corner to corner” [emphasis added].
This seems to only respond to CR's exclusions for internal painting it did not consider claim-related, not the cladding, or the internal woodwork repairs (skirting, architraves, window reveal, door and frame) or the ‘alfresco’ works. In addition, the comment quoted from GM appears to be a generic description of the way the work should be undertaken.
It follows the panel is not satisfied the complainant has effectively refuted CR's exclusions from the SOWs. It finds the settlement sum for the building damage caused by the EOL insured event to be $41,291.48 and for the damage caused by the storm to be $42,938.16, subject to the matters set out below.
Time is of the essence
The insurer should settle the claims and the complaint as follows. Within 21 days’ notice that the complainant accepts this determination, the insurer must:
· pay cash settlements for the first claim in the sum of $41,291.48 and the second claim in the sum of $42,938.16
· pay a 20% contingency on the above cash settlement amounts to factor in the risk of the works passing to the complainant, the likely possibility that further works may be required and the age of the quotations (thereby allowing for increases in the price of labour and materials)
· in addition, engage a suitably qualified builder or engineer (who has not previously inspected the property) to attend the property and draw up a SOW specifically regarding the repair of the external cladding on the main dwelling. The panel notes the cladding has been installed below ground level and/or paving and, thus, not accordance with manufacturing installation specifications. Therefore, the SOW should cover repair of only that portion of the external cladding that was originally installed in accordance with the manufacturer’s specifications. After receipt of the SOW, the insurer must promptly obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. Within seven days of receipt of the associated quotation(s), the insurer must offer a cash settlement to the complainant based upon the preferred actionable quotation, but in accordance with the terms and conditions of the policy, plus a 5% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required
· engage a suitably qualified swimming pool specialist, manufacturer or installer (who has not previously inspected the property) to attend the property and draw up a SOW regarding the removal and replacement of the pool and any other necessary works which must be undertaken to the pool surrounds during the replacement process. After receipt of the SOW, the insurer must promptly obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. Within seven days of receipt of the associated quotation(s), the insurer must offer a cash settlement to the complainant based upon the preferred actionable quotation, but in accordance with the terms and conditions of the policy, plus a 10% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required
· pay the complainant the sum of $2,000 in non-financial loss compensation
· contribute to the complainant’s professional costs in pursuing the complaint up to the maximum amount of $5,000. This amount is in addition to any sums already reimbursed to the complainant during the course of the claims for his professional costs.
The complainant and the insurer must also work together to assess the reasonable temporary accommodation and storage costs required during the repairs, noting the matters set out in section 2.5, above. The insurer is to pay these costs in accordance with the terms and conditions of the policy.
2.8 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has established a valid claim for the some of the claimed building damage
· the insurer is not entitled to rely upon policy exclusions to deny the claim for the pool
· the insurer is entitled to rely upon the terms and conditions of the policy to deny cover for the costs associated with the restumping works and any foundation upgrade
· the exchanged material shows the damage to the garage was not caused by an insured event
· it is reasonable and appropriate that the insurer cover the complainant’s temporary accommodation costs and storage costs in accordance with the terms and conditions of the policy
· it is reasonable and appropriate that the insurer contributes to the complainant’s professional costs
· an award of non-financial loss compensation is reasonable and fair in this particular instance.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.