Home / RACQ / Determination 12-00-1088882
Determination 12-00-1088882
Storm damage claim settlement for highset barn, temporary accommodation and additional non-financial loss
Summary
The complainant claimed storm damage to a tobacco shed, breezeway and highset barn and sought higher cash settlement, 12 months temporary accommodation and additional non-financial loss. AFCA found the insurer's cash settlement offer of $153,219 fair, refused temporary accommodation and additional non-financial loss.
The insurer need only return the highset barn to its pre-loss condition, so the complainant's dwelling-upgrade scope is betterment, and the primary dwelling was not damaged by the storm so temporary accommodation is not payable.
Issues
- Claim amount dispute primary · not upheld
“Offer of $153,219 based on JL quote from TG's SOW plus 30% uplift is reasonable; PC's upgrade to a dwelling is betterment beyond pre-loss condition.”
- Claim denial secondary · not upheld
“Insurer maintained acceptance of the claim and accepted subsequent damage to breezeway and highset barn under the claim.”
- Delay secondary · not upheld
“Insurer paid $1,000 NFL in acknowledgement of delays in responding to the complainant's concerns; no additional NFL warranted.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
|
Case number
|
12-00-1088882
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-00-1088882 11 April 2025
Determination overview
Complaint
The complainant holds home building and contents insurance policy (policy) with the financial firm (insurer). She lodged a claim on 8 January 2024 for storm damage to a tobacco shed, breezeway/horse shelter (breezeway) and highset barn on her property that occurred on 24 and 26 December 2023.
The insurer accepted the claim and assessed the damage. In August 2024 the insurer cash settled the claim for the tobacco shed and breezeway for $188,119 based on the complainant’s quote.
The insurer also paid her $1,000 compensation for non-financial loss (NFL) and waived her excess. The insurer cash settled a further $68,877 in January 2025. However, there is an ongoing dispute about the repairs to the highset barn and temporary accommodation (TA).
The insurer offered to cash settle repairs to the highset barn based on a quote from its panel builder’s (JL) plus a 30% uplift. This quote is in accordance with the complainant’s engineer’s scope of works (SOW). It denies the complainant is entitled to TA.
The complainant rejects the offer. She wants the claim cash settled for a higher amount. She also wants payment of 12 months TA and additional compensation for stress and inconvenience caused by the insurer’s claims handling.
Issues and key findings
Is the insurers offer reasonable?
Yes. This is because the exchanged information shows the offer is based on the complainant’s engineers SOW to return the highset barn to its pre-loss condition. The insurer has offered a 30% uplift to compensate her for the transfer of the risk associated with performing the works.
Is the complainant entitled to TA?
No. This is because the exchanged information shows the complainants primary dwelling was not damaged because of the storm event.
Is the complainant entitled to additional NFL?
No. This is because the exchanged information shows the insurer did not mishandle the claim to the extent that would warrant additional NFL.
Why is the outcome fair?
The outcome is fair because the insurer is only obliged to return the highset shed to its pre-loss condition. Its offer is based the complainant’s engineer’s SOW.
The complainant’s SOW is to upgrade the highset shed to a dwelling. This constitutes betterment. It would be unfair to require the insurer to pay more.
The complainant’s primary dwelling was not damaged by the storm. It would be unfair to require the insurer to pay TA.
The exchanged information shows the insurer did not mishandle the claim to the extent that would warrant additional NFL. It would be unfair to require the insurer to pay more.
Determination
This determination is substantially in favour of the insurer. Within 14 days of receiving notice the complainant accepts this offer the insurer is required to pay the complainant $153,219 in full and final settlement of the claim.
Reasons for determination
Is the insurer’s offer reasonable?
Yes. This is because the exchanged information shows the offer is based on the complainant’s engineers SOW to return the highset barn to its pre-loss condition. The insurer has offered a 30% uplift to compensate her for the transfer of the risk associated with performing the works.
Complainant must establish claimable loss
A party making an insurance claim must establish they suffered a loss that is covered under the insurance policy. They must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer must accept the claim, unless it can establish the application of a relevant exclusion. The insurer must establish the exclusion on the balance of probabilities.
Policy cover is subject to terms and conditions
The full terms and conditions of cover are set out in the product disclosure statement (PDS) and certificate of insurance (COI) (policy). Relevant policy terms are included in section 3.2 below.
There is no dispute among the parties that the complainant received a copy of the policy documents. As such, the insurer is entitled to rely on the terms of the policy in assessing the claim.
Insurer has not caused consequential loss
The complainant says the insurer caused consequential damage to the breezeway and highset barn. This is because it was negligent by not performing emergency make safe and stabilisation work to the tobacco shed in January 2024.
I am not satisfied the insurer’s actions were negligent nor did it cause consequential damage to the breezeway and highset barn. This is because the exchanged information shows the insurer’s builder (JL) attempted to contact the complainant on 10 January 2024 for a make safe and building assessment. However, the complainant would not speak to JL’s representative.
JL attended the site on 30 January 2024 to attempt a make safe. However, it could not proceed because it found:
while the storm may have caused the tobacco shed to partially collapse; the primary cause of damage is due the age of the dwelling and its compliance over time
make safe could not be performed due to the site being unsafe for manual handling
asbestos is present requiring specialist trades to remove
due to the structure’s integrity, full controlled demolition may be required.
Based on the available information, the insurer accepted the claim for storm damage on 1 February 2024. On 6 February 2024, JL notified the insurer of a possible issue with the structure. An engineer’s report was required to assist with preparing a repair estimate.
On 21 February 2024, the insurers engineer (IL) attended the property and provided a report. About the tobacco shed it states:
there is no evidence to indicate the damage has been caused by a single one-off event; rather it is the result of long-term deterioration. The structure is no longer fit for use and will require a complete demolition
the shed’s structure was compromised; it was standing precariously at a lean with multiple broken studs scattered throughout the shed
the structure exhibited extensive historic deterioration and damage, with evidence of past fire incidents predating the current ownership
wood rot has deteriorated the bottom plate to the extent of complete loss of structural cross-section
the observed decay and rot has been induced by continuous wetting and drying cycles over a prolonged period of time
immediate demolition of the shed is recommended to eliminate the associated risks of collapse.
Before the insurer could arrange for asbestos removal and demolition; the complainant notified the insurer on 11 March 2024 the tobacco shed had collapsed during another weather event. Subsequent damage was caused to the breezeway and highset barn.
Irrespective of IL’s findings the insurer maintained its acceptance of the damage to the tobacco shed. This is because it had already communicated the claim acceptance to the complainant.
Following the collapse of the tobacco shed the insurer accepted the subsequent damage to the breezeway and highset barn. In addition, the insurer paid the complainant $1,000 NFL in acknowledgement of the delays in responding to the complainant’s concerns and offered an apology for any additional stress or inconvenience she had experienced.
I am satisfied, on balance, the insurer acted reasonably in the circumstances because it:
maintained its acceptance of the claim when it arguably had grounds of denial based on JL’s and IL’s findings
accepted the damage to the breezeway and highset barn under the claim when there was arguably a break in the chain of causation between the initial storm event and the subsequent damage
waived the $1,000 excess, offered an apology and paid $1,000 NLF to the complainant.
Complainant wants highset barn upgraded to a dwelling
The complainant has provided various quotes from different builders totalling $527,635.33 to repair the highset barn. The insurer has cash settled the complainant for five items totalling $68,877.
The complainant says her repair costs are based on the expert report she obtained from an engineer (TG). In its report dated 8 October 2024 TG says:
the attached awning has collapsed and caused a rotational at the face of the shed on the awning side. This has caused an outward load on the shed structure and resulted in minor slant to the shed building
the lack of bracing to the stumped area has resulted in minor slope to concrete piers which has contributed to the slant on the building
the slant of shed towards the awning is evident in the staircase and minor localised buckling to fascia panels on the awning on the front elevation of the shed
TG provided a remediation SOW:
stairs and railing need to be replaced
cladding removed to ascertain the extent of the damage to the barn
replace damaged framing
straighten and re-align structure
replace interior and exterior lining and cladding
bracing introduced into base frame of highset shed structure.
replace collapsed awning
Apart from replacing the interior lining, TG’s SOW does not include any works to the interior of the highset barn.
The complainant has provided a SOW and a range of estimated costings from a building consultant PC. This is not an actionable quote. The complainant has included the high range estimate in the amount of $331,461 in her costings to repair the highset shed.
PC’s SOW includes:
5m2 renovation area
Decking/outdoor slab/concrete driveway
Glass doors/windows
Outdoor roof
Wet area appliances
Bathroom/ensuite fit out
Kitchen fit out
Solar panel and battery
Roof attic with drop down ladder.
The complainant says she intended to convert the highset barn into a dwelling and spent a significant amount of money on restoration work prior to the storm event. To prove this, she has provided images of cabinetry, a vanity and appliances she purchased which remain in storage.
PC’s quote is for an upgrade
The insurer accepts TG’s SOW. However, the insurer says:
the complainant has not provided any reports to support her quotes
PC’s quote shows the complainant is attempting to upgrade the barn to a dwelling
this is regarded as an upgrade and not supported by the policy
The insurer is only obliged to return the highset barn to its pre-loss condition. Having carefully considered all the exchanged information, I am satisfied PC’s SOW is to upgrade the barn to a dwelling; not to return the barn to its pre-loss condition.
This is because:
it is clear the work described above is to convert the highset barn to a dwelling
IL attended site on 21 February 2024. Its report dated 29 February 2024 records:
> new top hats and sarking was installed to the roof, with some loose strapping haphazardly installed through the roof between the ridge board and hanging beam
> the tie-down to the top plate consisted of a strap installed over the rafter and into the top of the top plate
> the timber floorboards showed multiple instances of timber loss. The complainant said this damage was caused by termites
> bolts protruding from the wall along the west side of the dwelling were noted
> no other notable internal damage or other items of interest was sighted or reported during its inspection.
I consider IL’s report persuasive because it includes numerous images of the interior of the highset barn. The images show no internal renovation works had commenced at the time of IL’s inspection.
The complainant says she performed a significant amount of renovation work in the 18 days between IL’s inspection and the collapse of the tobacco shed reported on 11 March 2024. In the absence of any persuasive supporting information, I am not persuaded by the complainant’s submission.
This is because, apart from images of fittings and appliances, she has not provided evidence (for example; internal images of the barn, quotes, invoices, receipts, plans or building contracts) to show any internal renovation works had been performed prior to 11 March 2024.
Insurer’s settlement offer is far
The insurer accepts TG’s SOW. It obtained a quote from JL dated 20 January 2025 based on TG’s SOW in the amount of $146,528. This includes the replacement fencing which has been cash settled to the complainant.
On 6 February 2025, the insurer extended a cash settlement offer in the amount of $153,219 to the complainant calculated as:
JL Quote $146,528
Less Fencing $ 28,667
Plus 30% uplift $ 35,358
Total $153,219
I am satisfied, on balance, the insurer’s offer is fair in all the circumstances. This is because:
it is based on TG’s SOW which is limited to returning the highset barn to its pre-loss condition
the insurer is entitled to deduct the fencing because this has been cash settled to the complainant
the quote has been uplifted by 30% to compensate the complainant for the transfer of risk associated with performing the works.
Within 14 days of receiving notice the complainant accepts this offer the insurer is required to pay the complainant $153,219 in full and final settlement of the claim.
Is the complainant entitled to TA?
No. This is because the exchanged information shows the complainants primary dwelling was not damaged because of the storm event.
Policy stipulates when TA is payable
The policy benefit for TA is detailed on Page 66 of the PDS.
The costs of temporary accommodation after an insured event happens that makes your home unfit to live in. These costs include:
short term accommodation costs (such as a hotel, motel or serviced apartment) for up to 14 days from when the insured event happened,
ongoing accommodation costs, while your home is being rebuilt or repaired for up to 12 months from when the insured event happened until your home is fit to live in.
As the policy does not define “unfit to live in” the ordinary meaning of the words apply. The Macquarie Dictionary provides the following definitions.
Unfit - adjective 3. not physically fit or in due condition.
Live in - phrase a. to reside at the place of one’s work or study.
Simply put, “unfit to live in” generally describes a building that is unfit for human habitation. In general terms, a building is deemed unfit for human habitation due to structural damage, health hazards or a lack of basic amenities such as water, electricity or gas.
I accept the policy provides cover for TA following an insured event. However, this does not mean that the complainant is automatically entitled to this benefit
The parties agree the complainant’s primary residence was not damaged by the storm. Prima facie; she is not entitled to TA.
Is the complainant entitled to additional NFL?
No. This is because the exchanged information shows the insurer did not mishandle the claim to the extent that would warrant additional NFL.
AFCA approach to non-financial loss
Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if the loss was partially caused by the complainant’s actions or by factors outside the insurer’s control.
Insurers offer of $1,000 NFL is reasonable
The complainant says she has suffered additional damage to her property, increased levels of stress and significant inconvenience. This is because the insurer did not perform a make safe in January 2024.
The insurer has paid the complainant $1,000 NFL, waived her excess and offered her an apology for the delays in responding to her concerns. In addition, it has agreed to accept the damage to the breezeway and highset barn under this claim.
The insurer paid two cash settlement payment to the complainant. The exchanged claim notes show both payments were delayed because:
Cash Settlement (1)
> the insurer sent an electronic acceptance request to the complainant
> the complainant says she rejected this because it did not contain the terms and conditions
> at her request the cash settlement fact sheet was sent by mail
> monies were remitted when the complainant confirmed she accepted the cash settlement offer.
Cash Settlement (2) payment was delayed as the insurer was waiting for the complainant to accept the cash settlement offer by returning a signed cash settlement fact sheet.
Given the above I am satisfied, on balance, the insurer’s offer of $1,000 is fair in all the circumstances. The insurer is not required to compensate the complainant more.
Why is the outcome fair?
The outcome is fair because the insurer is only obliged to return the highset shed to its pre-loss condition. Its offer is based on the complainant’s engineer’s SOW.
The complainant SOW is to upgrade the highset shed to a dwelling. This constitutes betterment. It would be unfair to require the insurer to pay more.
The complainant’s primary dwelling was not damaged by the storm. It would be unfair to require the insurer to pay TA.
The exchanged information shows the insurer did not mishandle the claim to the extent that would warrant additional NFL. It would be unfair to require the insurer to pay more.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Policy Terms
|
Page
|
Description
|
84 - 86
|
General Exclusions
Further loss or damage
You are not covered for: Loss or damage if you don’t do everything you reasonably can do to limit and prevent further loss or damage to your home or contents
Indirect loss
You are not covered for:
Any indirect loss. Any loss or extra expense which indirectly results from an event we cover under your policy. For example:
any lost productivity from the loss or damage to your mobile phone,
you purchased an extended warranty for a television or DVD player which is destroyed by an insured event – we’ll replace the item but we won’t give you a new extended warranty,
the drop in an item’s value after it has been repaired or replaced,
lost pay because you are unable to get to work because of an insured event.
Loss not linked to event
You are not covered for:
Loss or damage to your home or your contents which cannot be linked to any identifiable insured event unless otherwise stated within the benefit.
Wear and tear
You are not covered for:
Loss or damage caused by wear and tear through normal use.
Your responsibility
You are not covered for:
Loss or damage caused by you not maintaining your home and contents in good condition or not keeping your home and your contents safe and secure
|
97
|
Claim responsibilities
You must co-operate with us fully, even if we have already paid your claim.
This includes
if required, allow us reasonable access to your property to assess your claim,
|
98
|
What can affect your claim
You don’t cooperate with us.
You don’t comply with any condition of your policy or Certificate of Insurance.
You don’t keep your home and your contents in good condition and don’t take reasonable care to protect them from loss or damage.
You don’t provide adequate proof of ownership or value of an item.
When an incident occurs
What you need to do You must:
do everything you reasonably can to limit the loss or damage and stop more loss or damage,