Claim declined for pool slab, retaining wall and boundary wall damage said to be caused by storm; also claim delay and expert report costs
Text of the determination
Determination
|
Case number
|
12-00-1087342
|
Financial firm
|
Auto & General Services Pty Ltd
Case number: 12-00-1087342 31 March 2025
Determination overview
Complaint
The complainant holds a home and contents insurance policy underwritten by the financial firm (insurer). On 6 December 2023, the complainant lodged a claim for damage to his swimming pool and the surrounding area, which he says was caused by a storm in December 2023.
The insurer declined the claim because it says the damage was not caused by an insured event. The complainant wants the insurer to, among other things, accept the claim, pay him non-financial loss compensation and cover the expert report costs he incurred.
Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The complainant has not established a loss of a type covered by the policy. The insurer is entitled to decline the claim.
Is the complainant entitled to reimbursement of his expert report costs?
It is fair for the insurer to reimburse the complainant for the costs he incurred to obtain an engineer’s report, up to $5,000.
Did the insurer handle the claim appropriately?
No. It is not in dispute:
the insurer’s conduct delayed the progression of the claim, and caused the complainant unnecessary stress and inconvenience, and
the downpipe clip does not match the paintwork on the downpipe.
The insurer’s offer of $500 to repair the downpipe paintwork is fair. The insurer must also pay the complainant $3,000 compensation for the non-financial loss its conduct caused him.
Why is the outcome fair?
The outcome is fair because the complainant has not established, on balance, the claimed damage was caused by a storm or rainwater. It would be unfair to require the insurer to accept the claim.
It is fair, however, to require the insurer to:
pay the complainant a total of $3,500 compensation for rectification of the paintwork on the downpipe, and the non-financial loss its claims handling caused him, and
reimburse the complainant’s expert report costs (up to $5,000).
Determination
This determination is substantially in favour of the insurer. If the complainant accepts this determination, within:
14 days of receiving the complainant’s acceptance, the insurer must pay the complainant $3,500 compensation
7 days of accepting the determination, the complainant must give the insurer the invoice for the engineer’s report he obtained, and
7 days of receiving the complainant’s invoice, the insurer must reimburse the complainant for the report costs (up to $5,000).
Reasons for determination
Is the insurer entitled to decline the claim?
It is fair for the insurer to reimburse the complainant for the costs he incurred to obtain an engineer’s report, up to $5,000.
Complainant must establish a claimable loss
The complainant lodged a claim for damage to the pool slab, retaining wall, boundary wall and pool tiles at the insured property which he says was caused by a storm and rainwater in December 2023.
It is established insurance law that the complainant carries the initial onus to show a loss of a type covered by their policy. The complainant must show this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is shown, the onus shifts to the insurer to show the loss is not covered, either by way of one of the policy exclusions or on some other basis.
The terms of the policy include the Insurance Certificate and the Product Disclosure Statement (PDS). There is no dispute the insurer provided the policy documents to the complainant. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
The policy covers loss or damage caused by insured events, including storms and rainwater. The relevant section of the policy is set out below in section 3.2 of this determination.
The policy defines ‘insured event’ as:
Any event listed in the 'Your Insurance Cover' section of this Product Disclosure Statement that is covered by our insurance agreement.
The insurer says, among other things:
the exchanged information confirms structural deterioration has occurred over time, and
the damage was not caused by an insured event, but rather, causes which are excluded by the policy (including earth movement, gradual deterioration, hydrostatic pressure).
Insurer says damage was not caused by an insured event
The insurer obtained various reports to establish the likely cause of the damage.
The building assessment report completed by OSB dated 11 December 2023 (building report) says:
OSB identified the ground underneath the pool concrete slab is being washed away, allowing the concrete to undergo extended deflection forces due to the bending movement created
the cause of the damage is the escape of water from the pool and rain, making its way through the pool-slab join and washing away the ground underneath pool slab, and
the underside of the pool slab is exposed to the elements allowing displacement of earth/fill and movement in the concrete slab, which is a contributing condition related to the event.
The engineer’s report completed by NCE dated 15 March 2024 (engineer’s report) says, among other things:
there is evidence of movement and separation, such as the large gap between the pool and the slab edge, as well as the separation of the pool slab from the retaining wall. Since the pool slab is supported by the external retaining wall, this suggests possible movement of the retaining wall and/or its footings
it seems the retaining wall was initially designed and constructed with weep holes but lacked waterproofing measures
the backfill material used appears to be fine clayey sand. The absence of waterproofing allowed moisture ingress into the retaining wall, potentially leading to deterioration over time like efflorescence (white staining) seen
the use of clayey sand as backfill over time has clogged the weep holes, diminishing their effectiveness in draining water from behind the wall
as the weepholes have limited effectiveness, water can be trapped behind the wall, adding to hydrostatic pressure on the wall that aged and may not have had such a load accounted for in the original design
the cracking along the base of the wall and the shifted bottom course of masonry indicates movement within the footings. This movement is likely the result of soil settlement and scouring of the soil around the footings, which has undermined the wall support system
NCE lacked information about the stormwater plumbing of the surrounding property, how overland flow occurs between the adjoining properties, or the presence of potential leaks or gaps that could permit stormwater infiltration beneath the slab
NCE was unable to conclusively ascertain whether the weather event of 2023 directly contributed to the observed issues. However, given the magnitude of the rain event that transpired, it is conceivable that:
> the ageing wall could have been overwhelmed, showing the damage seen in the pool slab, had water found a means of ingress
> the amount of water from the December 2023 event could have scoured the end of the footings to the masonry wall.
The supplementary report NCE provided dated 24 May 2024 (supplementary engineer’s report) shows NCE believes:
there is evidence to suggest the damage is primarily due to the combination of a deteriorating infrastructure due to a lack of water proofing and poor drainage over a long period of repeated weather cycles contributing to the issues
the damage to the masonry wall is due to improper drainage around the wall which, over time, would lead to scouring of the surround soils and subsequent footing movement of the masonry wall, and
a combination of ageing infrastructure and improper drainage over a long period has contributed significantly to the structural issues.
NCE also provided additional commentary on the waterproofing measures referred to in its initial report, as follows:
The engineer is referring to items that would prevent water meeting the soil under the pool slab. These items would include but are not limited to, an ag drain system which is like a gravel pit in the ground with a slotted pipe designed to divert groundwater away from potential problem areas. Additional structures with external membranes to keep the water out or other storm water drainage.
[…]
The engineer is asserting that water is running along the ground and the slots in the front side of the wall on the canal side of the property are not sufficient to release the water when there is surface run-off (is my understanding).
The insurer arranged for a CCTV inspection of the site drainage which confirmed there were no breakages or blockages in the drainage at the property. The CCTV report says:
Found an Agi drain discharging onto the rocks by the jetty on boundary fence which turned out to be a sub-surface water catchment run off drain which runs past the pool and towards the driveway.
[…]
No additional drains to catch ground water are going to rectify this problem as the outdoor floor area by the pool is tiles and concrete which have sufficient fall making the water track and run away from both the house and the pool and run off the retaining wall back into the canal. No ground water or surface water will be causing the damage as it can’t sink in through the concrete and tiles instead it runs off as it should.
Complainant says storm significantly contributed to damage
The complainant says:
he discovered damage to the pool area on 6 December 2023 after a major rainstorm in the previous week
the insurer’s engineer’s report acknowledges a severe weather event of December 2023 could have provided the water ingress and pressure that overwhelmed the retaining wall, leading directly to the observed cracking and movement
the PDS explicitly states that earth movement is covered if it is the direct result of a storm occurring within 72 hours prior. Here, it is highly likely the intense rain caused soil erosion or settlement under the pool slab, which in turn led to the cracking
even if there were pre-existing vulnerabilities in the pool area, the policy provides that when multiple causes contribute to damage, the insurer will cover the portion of damage attributable to an insured event
any gradual issues, like moisture over time or an aging wall, were latent conditions that were suddenly triggered into actual damage by the December 2023 storm
without the heavy rainfall, it is unlikely the cracking and tile upheaval would have manifested when it did
at minimum, the significant rainwater ingress and resulting soil movement should have been covered as a storm insured event, and
the insurer never addressed the engineer’s comment that there was no information on stormwater drainage or infiltration paths, leaving uncertainty as to the storm’s impact.
The complainant provided an engineer’s report dated 15 October 2024 in support of his position (complainant’s report) which says, among other things:
it is evident that the tile cracking reported by the complainant is the result of movement in the concrete slab of the pool surrounds
the expert noted a clear separation between the external retaining wall and the concrete slab surrounding the pool
the structural movement involves both differential movement in the retaining wall, evidenced by vertical cracking, and separation between the retaining wall and the slab, evidenced by horizontal cracking
the soil beneath the pool surrounds slab has eroded, resulting in the slab becoming structurally unsound
the side fence retaining wall adjacent to the neighbour exhibits signs of footing movement. However, the type of movement observed in this wall is believed to be caused by different factors than those affecting the cracking of the revamp retaining wall
the revamp retaining wall construction and engineering presumably have been approved and certified by the council as compliant with the Building Code of Australia and relevant Australian Standards prior to permitting the site’s development in 1992/1993
the movement of the retaining wall is attributable to the pool’s concrete surround slab being placed on top of the retaining wall without proper engineering calculations to ensure the wall’s design loading capacity could bear both the static and dynamic loads of the pool surrounds slab. This assessment is further supported by the inspection findings, specifically:
> the visible horizontal separation between the slab and the retaining wall
> the lack of evidence of any reinforcement connection between the retaining wall structure and the slab structure, and/or
> the pool construction within the influence zone of the revamp retaining wall
the observed soil erosion underneath the surrounds slab may be attributed to one or more of the following factors:
> insufficient compaction prior to the construction of the concrete slab
> soil erosion over time, particularly given the property's location in a flood-prone area
> a lack of vapour barrier between the soil and the slab, and/or
> accessibility of rain and flood water to underneath the slab during natural weather events.
The complainant says, in relation to the above report:
This [report] reinforces that the structural integrity of the pool surrounds and retaining wall has been compromised and needs urgent repair. Importantly, the independent engineer concluded that the primary cause of the movement was the pool surround slab being built (by a previous owner/builder) atop the existing revetment retaining wall without proper load engineering. He also identified factors such as insufficient soil compaction and possible erosion over time in a flood-prone area contributing to voids under the slab. These findings correlate with the notion that heavy water influx (from rain or any source) could readily exploit those construction weaknesses. In other words, the poor construction alone might not cause sudden failure after 30 years – the catalyst was likely a surge of water. This aligns with my claim that the storm was the tipping point. The insurer has not provided any expert opinion to refute this possibility; they simply chose to ignore it.
In response to the complainant’s report, the insurer obtained NCE’s commentary. NCE largely agrees with the findings in the complainant’s report, however, says:
a lack of maintenance and ongoing deterioration due to age and poor drainage conditions contributed significantly to its current state. NCE did not challenge the compliance of the retaining wall.
the pool design plans indicated that the retaining wall and boundary brick wall were existing prior to the pool’s construction, providing evidence that the revetment wall and boundary masonry wall are at least 30 years old. This aligns with NCE’s report, which suggests that the wall's aged condition and prolonged exposure to adverse environmental factors likely played a role in its structural decline
the degree of separation at the pool slab to pool edge the retaining wall is one of the main contributors to the overall damages, and
soil erosion over time and accessibility of rain and flood water to underneath the slab during weather events are the more likely factors attributable to the damage, and any compaction or barrier would be ineffective without addressing these factors.
Necessary to consider the proximate cause of the damage
Damage can have more than one cause. In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.
Complainant has not established damage to the slab caused by storm
The insurer provided Bureau of Meteorology (BOM) data it obtained from the closest weather station to the complainant’s address for 1 December 2023 to 6 December 2023 (which is when the complainant lodged the claim), which shows:
on 2 December 2023, the area experienced 10.2 millimetres of rainfall, and
the maximum wind speed observed in that timeframe was 54 kilometres per hour.
This is inconsistent with the complainant’s claim that a storm in December 2023 caused the damage.
However, the BOM data for November 2023 does show there was heavy rainfall on various days throughout the month. This is consistent with the engineer’s report which refers to ‘the magnitude of the rain event’, purportedly in 2023. In any event, the BOM data alone is insufficient to establish the damage was caused by a storm.
The complainant says:
the rainwater caused water ingress, exacerbating structural issues
hydrostatic pressure from trapped water due to heavy rainfall is an indirect result of an extreme weather event, which should reasonably be covered under policies allowing for natural weather-related damages
the insurer’s decline is based on subjective interpretations of exclusions and construction inadequacies. However, the information shows the December 2023 weather event played a substantial role, which should qualify the damages as an insurable event.
In relation to the slab, the complainant’s report does not sufficiently conclude the soil erosion was, on balance, caused by a storm or rainwater. Rather:
the report provides four different factors for why water may be entering underneath the pool
only one of the proposed factors relates to the insured event the complainant is claiming under, and
the report refers to the accessibility of rain/flood water during natural weather events, not a single weather event in or around December 2023.
This suggests, on balance, the soil erosion (if I accept it was caused by rainwater) has occurred as a result of normal rainfall over time. The above conclusions do not support a finding that a single storm event caused the soil to erode to such an extent that caused the damage to the slab (even within 72 hours of the claimed storm event), absent pre-existing soil erosion.
The complainant’s commentary about his report also does not support a finding that the proximate cause of the damage was a storm. This is because the complainant’s commentary suggests the proximate cause of the damage is the existing issues with the pool.
Even if a storm exploited the weaknesses/issues identified in the exchanged, on balance, the damage would likely not have manifested had the pool and the surrounding area been free of existing issues.
I am not persuaded that, absent the issues identified in the exchanged reports, rainwater from a single storm event would have been able to cause damage to the slab. I am therefore not persuaded the proximate cause of the damage was a storm or rainwater.
For this reason, it is not necessary for me to consider the gradual deterioration exclusion the complainant has referred to in his submissions.
The complainant’s report also establishes the damage to the pool tiles was likely caused by the slab movement. As the complainant has not established the slab movement was caused by a storm or rainwater, I am also not persuaded the damage to the tiles was caused by a storm or rainwater.
Complainant has not established damage to the walls caused by storm
In relation to the damage to the retaining wall, the insurer’s expert agreed with the complainant’s expert that the structural movement of the retaining wall is likely attributable to the construction of the slab on top of the retaining wall.
The complainant’s report also establishes the structural movement involves both:
differential movement in the retaining wall, evidenced by vertical cracking, and
separation between the retaining wall and the slab, evidenced by horizontal cracking.
This shows the cracking in the retaining wall is, on balance, due to the structural movement caused by the construction of the slab.
Therefore, the complainant has not established the cracking in the retaining wall was caused by a storm.
In relation to the masonry boundary wall, the insurer’s engineer’s report says the damage was likely caused by improper drainage around the wall, which would lead to scouring of the surround soils and footing movement over time.
The complainant’s report does not refute this finding or address the damage to the boundary wall. Even if I accept rainwater has contributed to the scouring of the soil around the wall, I am not persuaded a single storm or rainwater event likely caused this damage. Rather, I am persuaded by the insurer’s report that such damage was caused over time.
Insurer is entitled to decline the claim
As stated above, the onus is on the complainant to establish the claimed damage was caused by an insured event.
As the complainant has not established a loss of a type covered by the policy, the insurer is entitled to deny the claim.
Is the complainant entitled to reimbursement of his expert report costs?
It is fair for the insurer to reimburse the complainant for the costs he incurred to obtain an engineer’s report, up to $5,000.
Insurer should reimburse the complainant’s report costs
The complainant is seeking reimbursement for the cost of the engineer’s report he obtained.
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply.
I acknowledge the complainant’s report did not assist him in establishing the damage was caused by an insured event. However, it assisted in clarifying other issues relevant to the claim, and the likely proximate cause of the damage.
The exchanged expert reports show the issues involved in determining causation were complex, and I am satisfied it was reasonable for the complainant to obtain the report to help him understand the issues and the claim.
In these circumstances, I consider it fair for the insurer to reimburse the complainant for the costs he incurred to obtain the engineer’s report, subject to:
the complainant giving the insurer an invoice for the costs, and
the AFCA compensation limit of $5,000.
Did the insurer handle the claim appropriately?
No. It is not in dispute:
the insurer’s conduct delayed the progression of the claim, and caused the complainant unnecessary stress and inconvenience, and
the downpipe clip does not match the paintwork on the downpipe.
The insurer’s offer of $500 to repair the downpipe paintwork is fair. The insurer must also pay the complainant $3,000 compensation for the non-financial loss its conduct caused him.
AFCA may award non-financial loss compensation
Under the AFCA Rules, we may award up to $6,300 compensation for non-financial loss for complaints lodged on or after 1 January 2024. AFCA takes a conservative approach to awarding this compensation. We will only award this compensation if the complainant has suffered an unusual degree of stress, inconvenience or delay due the insurer’s conduct (e.g. unreasonably handling the claim).
Insurer’s offer is fair and reasonable
The complainant says, among other things:
the unrepaired damage to the pool is a safety risk, which has caused significant stress and anxiety
he and his family have been unable to use the pool and the surrounding area for over a year
the insurer caused delays in the progression of the claim
he had to engage an independent engineer to provide a report on the damage because the insurer’s answers were unsatisfactory
he had to follow up the insurer for updates on the claim
the insurer’s conduct caused him anxiety, unnecessary stress and inconvenience, which affected his mental health, and
the insurer’s trades person caused damage to a downpipe clip on 26 September 2024 and the insurer delayed repairing it to the condition it was in before it was damaged
The insurer accepts:
it delayed obtaining engineer’s reports, and
there was an issue with the paintwork completed when the downpipe clip was repaired (which has since been rectified).
The insurer has offered the complainant $1,000 compensation for the claims handling issues and $500 compensation for the paintwork on the down pipe.
The complainant does not dispute $500 would sufficiently cover the paintwork rectification.
The exchanged information shows:
the insurer approved an engineer to attend the property on 16 December 2023
the engineer attended the property on or around 15 March 2024, after multiple follow ups from the complainant to the insurer
the insurer declined the claim on 26 April 2024 based on incomplete information
the insurer arranged for further inspection of the damage only after the complainant lodged the AFCA complaint, and
the insurer arranged for the downpipe clip to be repaired on or around 15 January 2025, which was approximately four months after it was damaged.
Considering the above, I accept:
the insurer did not progress the claim in a timely manner, or arrange for the downpipe clip to be repaired in a timely manner
the complainant suffered unnecessary stress and inconvenience because of the insurer’s conduct, particularly as he had to keep following up about the claim, and
the fact that the insurer continued to cause delays even after the complainant lodged the AFCA complaint likely compounded the anxiety and stress the complainant was experiencing.
In these circumstances, I consider:
the insurer’s offer of $500 for the paintwork on the down pipe to be fair and reasonable, and
$3,000 non-financial loss compensation to be a fair and reasonable award for the unnecessary stress and inconvenience the insurer’s conduct caused the complainant.
Why is the outcome fair?
Outcome is fair in the circumstances
The outcome is fair because the complainant has not established, on balance, the claimed damage was caused by a storm or rainwater. It would be unfair to require the insurer to accept the claim.
It is fair, however, to require the insurer to:
pay the complainant a total of $3,500 compensation for rectification of the paintwork on the downpipe, and the non-financial loss its claims handling caused him, and
reimburse the complainant’s expert report costs (up to $5,000).
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Extract of the policy
Storms and Rainwater
You are covered for
Loss or damage caused by storms and rainwater, including from:
earth movement that occurs within 72 hours of a storm or heavy rain, and as a result of that storm or heavy rain
surface run-off rainwater from surrounding areas that occurs within 24 hours of a storm or heavy rain
the escape of rainwater from any water pipe, drain, or gutter
wind damage caused by storms or heavy rain.
You are not covered for
Loss or damage caused by:
storm (including cyclone) during the uninsured period page 65
flood
rain, hail, wind, snow, or dust due to:
an opening that was not created by the storm or any other insured event
defects in design, structure, materials, workmanship, or construction that you knew about or should reasonably have known about
rain entering the building due to construction, alteration, or renovation work being carried out
the home not being in good condition, including guttering and drain pipes. See conditions of your cover on page 15.
Loss or damage to:
artificial grass or turf
courts designed for sports with fixed surfaces (such as a hard court)
fences and gates that are not in good condition
garden borders, driveways of any length, paths, or gardens
jetties, wharves, and pontoons
retaining walls
water in a swimming pool or spa, and their liners and/or covers.