Storm damage to retaining wall and loss of rent claim declined
Summary
The landlord claimed storm damage to a retaining wall and loss of rent, which the insurer declined. AFCA upheld the decline but ordered the insurer to reimburse $814 for the engineer's report and to make a decision on the malicious damage claim.
The damage developed gradually through many wet weather events rather than within 72 hours of a single storm, so the policy's storm cover was not triggered.
Issues
- Claim denial primary · not upheld“The complainant has not shown that the damage was caused by a single storm event, nor that the structural damage occurred within 72 hours of a storm.”
- Poor claim handling secondary · not upheld“The insurer managed the claim within the timeframes stipulated in the General Insurance Code of Practice.”
Subjects and remedies
home or building damagenatural disasterpay compensationreassess claim
Related
All Allianz Australia determinations · Find similar determinations
Text of the determination
Determination
|
Case number
|
12-00-1084084
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1084084 6 September 2024
Determination overview
Complaint
The complainant held a landlord insurance policy with the financial firm (insurer).
Storm / loss of rent claim
On 21 July 2022, the complainant lodged a claim for loss of rent and storm damage to a retaining brick wall. He says the damage was due to storm events in February 2022, but he only discovered the damage in July 2022, after his tenants vacated the property.
The insurer’s trades did not identify storm damage but did identify elevated moisture and efflorescence. They recommended maintenance works to assist with soil drainage. The insurer declined the claim.
The complainant disputed the claim outcome and advised that he had engaged an engineer. On 14 November 2022, the insurer closed the claim. It advised the complainant that it would re-open the claim when he provided his engineer’s report.
Malicious damage / rent default claim
On 12 July 2022, the complainant called the insurer and discussed lodging a claim for malicious damage and rent default. The complainant advised he had acquired a Notice to Vacate through a Tribunal and he intended to lodge a bond dispute with the Tribunal also. The insurer did not lodge a claim.
On 15 February 2023, the complainant lodged a claim for malicious damage. On 21 April 2023, the insurer withdrew the claim without making a claim decision because the complainant had not provided supporting information.
On 11 April 2024, the complainant lodged a complaint with AFCA seeking that both the storm and malicious damage claims be accepted; that there be reimbursement for works relating to both claims, compensation, and a written apology for the insurer’s handling of the claims.
Issues and key findings
Has the complainant established a claimable loss for storm damage?
No. The complainant has not shown that the damage was caused by a single storm event, nor that the structural damage caused by soil movement occurred within 72 hours of a storm.
The information supports that moisture and soil movement gradually damaged the wall because of many wet weather events.
Is the complainant entitled to loss of rent?
No. The insurer is entitled to decline the storm claim and the complainant’s property was not in an unliveable condition due to the claimed damage. This means the ‘Loss of Rent’ benefit has not been triggered.
Did the insurer mishandle the storm claim?
No. The insurer managed the claim within the timeframes stipulated in the General Insurance Code of Practice (GICOP).
The insurer did not engage in misconduct during the call on 6 August 2022.
Did the insurer mishandle the malicious damage claim?
No. The complainant did not co-operate with the insurer’s requests for information. The insurer withdrew the claim because it did not have enough information to assess the claim.
The insurer did not act inappropriately during the call on 12 July 2022.
Is the complainant entitled to other compensation?
Yes. The insurer should reimburse the complainant for the cost of their engineer’s report. This is because AFCA substantially relied on the report to make its determination and the insurer previously offered to send an engineer to the complainant’s property.
Why is the outcome fair?
The outcome is fair because the terms, conditions and exclusions of the insurance policy have been applied correctly. The complainant has not established the retaining wall damage is a claimable loss. It would therefore be unfair to require the insurer to pay the claim.
The insurer met its obligations under the policy, acted in line with good industry practice, and complied with applicable industry codes. However, it is fair for the insurer to compensate the complainant for the cost of his engineer’s report.
Determination
This determination is substantially in favour of the insurer.
The insurer is entitled to decline the claim for storm damage and loss of rent, but is required to:
reimburse the complainant $814 for his engineer’s report within 14 days of acceptance of this determination; and
make a claim decision about the malicious damage claim within a reasonable timeframe.
If the insurer has made decision about the malicious damage claim prior to the delivery of this determination, and if there is a dispute about that decision, the complainant may lodge a new complaint.
Reasons for determination
Has the complainant established a valid claim for storm?
No. The complainant has not shown that the damage was caused by a single storm event, nor that the structural damage caused by soil movement occurred within 72 hours of a storm.
The information supports a conclusion that that moisture and soil movement gradually damaged the wall because of many wet weather events.
The complainant must establish a valid claim under the policy
It is accepted insurance law that for the complainant to obtain cover under a policy, he must show he has suffered a loss that is covered by the terms of the policy. This is called ‘establishing a valid claim’. If the complainant meets his onus, the onus then shifts to the insurer to show it is not responsible to cover the loss because of a provision or exclusion within the terms of the policy.
The insurer says the complainant has not established a valid claim because the damage is pre-existing, is related to a lack of drainage, and cannot be attributed to an insured event.
The policy covers storm damage in certain circumstances
The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Storm, cyclone, rainwater or run-off’. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS).
There is no dispute regarding the PDS, and certificate of insurance (COI) being provided to the complainant. Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim.
On page 17 of the PDS, it says:
Storm, cyclone, rainwater or run-off
What’s Covered?
Buildings and/ or contents
…
Loss or damage caused by or arising from:
soil movement, including erosion
landslide
mudslide, or
subsidence
If it is caused directly by and occurs within 72 hours of a storm.
This means that, to establish a valid claim, the complainant must show the damage is the result of a singular storm. If the damage was caused by soil movement because of a storm, the complainant must also show that the damage occurred within 72 hours of a single storm event.
The damage did not occur within 72 hours of a single storm
To assess the claim, the insurer engaged a builder (JL) who reported “no visible signs of damage” during its inspection on 3 August 2022. The complainant then engaged their own engineer (HE), who inspected the property on 14 September 2022.
HE reported that the retaining wall was displaced, noting vertical, horizontal and diagonal cracks, and bent tie-down bars:
… due to the extreme weather events starting in January 2022 and continuing with wet weather to this date, the soil became extremely saturated and for a very long period of time, drawing moisture further, than it usually would.
…
from the distortion of the brick wall, it seems that the wall under increased pressure of fully saturated backfill is deflecting, bowing inwards. The wall acting as a retaining wall in full height would be able to sustain a pressure of well drained backfill, but not the weight of the fully saturated soil, with swelling, without the ability to drain fast enough. The vertical lean out of alignment of the wall is approximately 28mm on 1.7m of height, which is unacceptable, as the maximum deviation… is +10mm for full height of the storey.
I am satisfied that HE’s report does not assist the complainant’s position because its conclusion is that the structural damage is the cumulative result of many storm events, and the damage occurred gradually and not within 72 hours of a storm.
I prefer the engineering conclusion to that of the builder as in my view an engineer possesses more appropriate qualifications than a builder to assess the structural condition of a retaining wall and I am therefore more persuaded by HE’s findings of structural damage.
The efflorescence was not caused by a single storm
The reports from HE and JL both noted efflorescence on the complainant’s retaining brick wall. They agree concrete efflorescence, or ‘lime runoff’, is caused by excess moisture, which migrates minerals to the concrete’s surface.
JL reported elevated moisture in the wall, in line with the moisture levels in the soil outside. This is consistent with HE’s explanation for the efflorescence at the complainant’s property:
Efflorescence is highly influenced by the concrete becoming wet and remaining damp for several days, in this case weeks and possibly months
HE also provided images of the property from 2017, where some efflorescence is visible. It said this indicates the retaining brick wall was not adequately moisture sealed. HE also described the efflorescence in 2022 as “severe”, and concluded that this severity would not have occurred, were it not for the persistent wet weather events in 2022.
The expert information therefore shows the efflorescence was not the result of a single storm event. Some was pre-existing, and the efflorescence that likely developed in 2022 was not the result of a single storm event.
The complainant has not established a valid claim
The complainant says the storm events occurred in February, but he did not become aware of the damage until 21 July 2022. Neither party has provided weather data to demonstrate the severity of rainfall experienced at the property.
During a call with the insurer on 6 August 2022 call, the complainant said, “… it’s been this last storm season that we’ve just had. And it’s an investment property so I’m not always up there, I don’t know which particular event caused it…”
In the circumstances, I am not satisfied that the complainant has established that the damage occurred within 72 hours of a specific storm event
The expert information shows that, by the very nature of the damage, it happened over time and not because of a single event storm event. Therefore, the complainant has not established a valid claim for storm damage and the insurer is entitled to decline the claim.
Is the complainant entitled to loss of rent?
No. The ‘Loss of Rent’ benefit has not been triggered because the insurer is entitled to decline the storm claim.
Loss of rent applies when the claim is accepted
Page 31 of the PDS explains that ‘Loss of Rent’ is a benefit under the policy, which is only activated when both of the following conditions are met:
the insured event claim is accepted
the building cannot be lived in by a tenant.
The insurer is entitled to decline the storm claim
Loss of rent cover is an additional benefit, subject to claim acceptance. As the insurer is entitled to decline the claim for storm damage, the loss of rent benefit does not apply.
Did the insurer mishandle the storm claim?
No. The insurer managed the claim within the timeframes stipulated in the General Insurance Code of Practice (GICOP).
The insurer did not engage in misconduct during the call on 6 August 2022.
The complainant seeks compensation for non-financial loss
The complainant says the insurer did not provide him adequate time to provide his own expert report, that it closed the claim prematurely and it excessively contacted him for information. He also says his dealings with the insurer have caused him significant mental distress. For these reasons, he has asked AFCA to consider awarding non-financial loss compensation.
The insurer assessed the claim in accordance with GICOP
I have considered whether the insurer met its obligations under GICOP, to assess the claim within a reasonable timeframe and keep the complainant appropriately informed about its progress.
The complainant lodged the claim for storm damage on 24 July 2022. On 3 August 2022, JL inspected the property on behalf of the insurer’s builder. On 5 August 2022, the insurer received JL’s report. On 15 August 2022, RX performed a make safe at the property.
On 22 August 2022, the complainant advised he had engaged his own engineer. The claim notes show that the insurer paused making a claim decision whilst it awaited this information. On 28 September 2022, the insurer declined the claim, and the complainant raised a concern.
Throughout October and November 2022, the insurer made follow-up enquiries with the complainant. On 14 November 2022, the complainant had yet to provide the engineer’s report. The insurer closed the claim but advised that it could be reopened once the complainant obtained the engineer’s report.
The insurer did not receive the complainant’s engineer’s report until May 2024, when it was exchanged by AFCA.
Given the above, I am satisfied that:
the claim was handled promptly and in accordance with GICOP timeframes
the insurer afforded the complainant a reasonable opportunity to provide his expert report
the insurer made appropriate follow-up enquiries for the report
the insurer did not prejudice the complainant by closing the claim in November 2022
the complainant has suffered no loss because of the insurer closing the claim.
The insurer did not behave inappropriately
The complainant alleges that the insurer behaved inappropriately during a call on 6 August 2022:
[The insurer] verbally said that I could be responsible for the $2000.00 for [RX] attending the property, however, if I dropped the claim [the insurer] would pay for it. They purposefully choose to not make this statement in writing and manipulated a distressed customer in a phone call.
I have reviewed the call recording and disagree with the complainant’s interpretation of events. At timestamp 2:54, the insurer said:
Obviously if we accept the claim, you’re not going to get a bill from him. Usually even if we decline the claim, you don’t get the bill anyway. We still cover that.
At timestamp 14:08, the insurer explained that the claim will likely be declined, due to JL not identifying event related damage during its inspection. The insurer advised that, if he accepts these findings, the complainant can preserve his ‘no claim bonus’ by withdrawing the claim before it is formally declined.
At 22:58, the insurer said the complainant can proceed with the claim and offered to send a different builder or an engineer to the complainant’s property for further assessment. The complainant declined this offer.
At 29:21, the insurer said “there’s no rush” on the complainant’s decision to withdraw the claim or proceed and contest the outcome.
Given the above, I do not agree that the insurer engaged in misconduct during this call. Therefore, it is not appropriate to award non-financial loss compensation for this reason.
Did the insurer mishandle the malicious damage claim?
No. The complainant did not co-operate with the insurer’s requests for information. The insurer closed the claim because it did not have enough information to assess the claim.
The insurer did not act inappropriately during the call on 12 July 2022.
The complainant seeks compensation for non-financial loss
The complainant says the insurer should not have withdrawn the claim for malicious damage and in doing so, has caused unreasonable delays. He also says the insurer behaved inappropriately, particularly during a call that took place on 12 July 2022.
The complainant alleges that during this call, the insurer:
refused to lodge a claim for malicious damage
directed him to lodge a tenancy dispute through a Tribunal instead
shirked its responsibility as his insurer.
The insurer did not behave inappropriately
On 12 July 2022, the complainant called the insurer to enquire about lodging a claim for malicious damage. I have reviewed the recording of this call.
The complainant advised he had obtained a ‘noticed to vacate’ for his tenants via a Tribunal and he intended to lodge another dispute with the Tribunal over the bond. The complainant said he is seeking “guidance” from the insurer. At timestamp 6:11, he asked if it would be better to pursue the Tribunal dispute before lodging an insurance claim.
The insurer advised that some of the items he was seeking compensation for, such as rent default, were covered by the policy, but the damages relating to poor housekeeping were not.
The insurer said it could not progress a malicious damage claim whilst the same loss is being considered by the Tribunal. It recommended that he proceed with his Tribunal dispute and lodge a claim with the insurer once he receives an outcome. The complainant agreed to this.
Having reviewed the call, I do not agree that the insurer provided incorrect advice or behaved inappropriately. The insurer did not direct the complainant to lodge with the Tribunal, the complainant advised he would be doing so regardless of any insurance claim. As such, it was reasonable for the insurer to suggest that the complainant complete this process before lodging a claim
The complainant did not co-operate with the claim assessment
The complainant lodged a claim for malicious damage on 17 February 2023. On 20 February 2023, the insurer and its loss adjuster requested further information about the loss.
Throughout February and March 2023, insurer made reasonable enquires to obtain the information it required to assess the claim. The complainant repeatedly said he did not intend to provide information in the immediate future, that he or his representative “would be in contact in the following months”.
On 20 March 2023, the insurer advised it would close the claim if the complainant did not provide information in the next 14 days. As it did not receive the complainant’s information, the insurer closed the claim on 21 April 2023, without making a claim decision.
This shows the insurer was responsive, provided the complainant with instruction on how to pursue the claim, and does not represent excessive contact, nor an unreasonable delay.
It is therefore not appropriate to award non-financial loss for this reason.
Is the complainant entitled to other compensation?
Yes. The insurer should reimburse the complainant for the cost of his engineer’s report. This is because AFCA substantially relied on the report to make its determination and the insurer previously offered to send an engineer to the complainant’s property.
The insurer must reimburse the complainant
Under D.5.1 of AFCA’s Rules, AFCA may decide that an insurer should reimburse the complainant for costs they incurred, if the costs are reasonable and they assisted to resolve the complaint.
The complainant has provided an invoice for $814, for the engineering report he sought from HE. AFCA heavily relied on the findings of this report to understand the cause of the damage to the complainant’s retaining wall. Further, during the call on 6 August 2022, the insurer offered to send an engineer and therefore agreed to incur this cost.
Given the above, it is reasonable for the insurer to reimburse the complainant the cost of his report.
Why is the outcome fair?
The outcome is fair because the terms, conditions and exclusions of the insurance policy have been applied correctly. The complainant has not established the retaining wall damage is a claimable loss. It would therefore be unfair to require the insurer to pay the claim.
The insurer met its obligations under the policy, acted in line with good industry practice, and complied with applicable industry codes. However, it is fair for the insurer to compensate the complainant for the cost of their engineer’s report.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.