Adequacy of storm make-safe, mould damage, scope and cost of repairs, debris removal, contents and temporary accommodation
Text of the determination
Determination
|
Case number
|
12-00-1083900
|
Financial firm
|
AAI Limited
Case number: 12-00-1083900 30 July 2025
1 Determination overview
1.1 Complaint
The complainant has a home and contents insurance policy with the insurer.
There is no dispute the storm caused damage to the house, including damage caused by tree branches falling and damaging the property and a trampoline being blown into the pool area and the fence, causing further damage. The insurer accepted the claim.
Disagreements in relation to repairs or cash settlements of damage to the pool, septic system, flooring, trampoline, garage door, flywire screens (in part) and guttering have been resolved. They are not the subject of this determination.
The remaining disputes concern the adequacy of the make-safe and what the complainant says is consequent mould damage, disagreements about the scope and cost of some repairs, debris removal, contents, temporary accommodation and what the complainant says is poor service.
1.2 Issues and key findings
Was the make-safe for mould adequate?
No. The insurer shall cash settle the complainant for the mould rectification quotation obtained by the complainant.
Has the insurer correctly settled the building damages claim?
In part, yes, although there is a lack of information from both parties to support their respective positions. For each of the disputed items, the parties shall follow the steps at Section 1.3 of this determination.
Has insurer correctly settled the debris removal claim?
No. The parties shall follow the steps at Section 1.3.
Has insurer correctly settled the contents claim?
No. The parties shall follow the steps at Section 1.3.
Has insurer correctly settled the temporary accommodation claim?
No. The parties shall follow the steps at Section 1.3.
Was the claim poorly handled?
In part, yes. However, both parties added to the time required to resolve the matter.
Why is the outcome fair?
In the main, neither party has provided sufficient information to substantiate their respective positions. It is appropriate the parties resolve the claim by following the steps in Section 1.3.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of acceptance of this determination, the insurer shall pay the complainant:
· $6,180 for the flywire screens and include a 5% uplift due to the passage of time
· $3,901 for the plumbing repairs upon receipt from the complainant of proof of payment of that amount, if that has not yet been provided to the insurer, plus interest on that amount in accordance with Section 57 of the Insurance Contracts Act 1984 (Cth) (‘ICA’), from the date the complainant paid the amount until the date of reimbursement
· $5,683.86 as cash settlement of the mould rectification works.
In relation to the window frames and doors, boundary fence and plastering works, the insurer shall appoint a licensed building consultant to attend the premises. The building consultant will provide the complainant with a written report that assesses the extent of the storm damage to these items, and provide a scope of works for their rectification. Based upon that scope of works, the insurer shall then obtain two actionable quotes from builders or other relevant trades for the rectifications works, and add a contingency of 10%. That quotation shall also include new quotations for the works required to the internal iron fence and the timber French doors. An actionable quote means a quote at market-rates which would enable the complainant to engage the trade to complete the works outside of the insurance process.
The insurer shall cash settle the complainant for the higher of the two quotations. The building consultant and trades used to obtain quotes shall have had no previous involvement in this matter.
In relation to the debris removal, after the complainant has confirmed with the insurer that he has removed all debris which was not a consequence of the storm, the insurer shall have the building consultant inspect the yard and include that scope of work within the afore-mentioned quotations.
In relation to the contents claim, the complainant shall submit full details to the insurer of the items he is claiming for contents. The complainant should ensure he reads the policy in relation to what items can be claimed as contents and ensure that he only submits details of items which are like-for-like. The insurer shall settle the claim in accordance with the terms of the policy.
In relation to the temporary accommodation, if in the reasonable written opinion of the complainant’s mould expert, EM, the premises will not be habitable during the mould rectification works, the insurer shall apply the temporary accommodation benefit to such period.
2 Reasons for determination
2.1 Was the make-safe for mould adequate?
No. There is no dispute that make-safe works failed, or the extent of mould damage caused. It is appropriate the insurer cash settle the complainant based upon the complainant’s quotation for mould rectification.
Policy provides for emergency repairs
The policy provides for cover for emergency repairs to be done and paid by the insurer. After the storm, the insurer’s make-safe trade (‘RI’) attended the house at least four times and did works to prevent further rainwater ingress into the home.
Make-safe was inadequate
The complainant says the make-safe works were inadequate because the silicon repairs to roof tiles did not prevent ongoing rainwater ingress, including into the wall cavities. I accept the photographic information shows some on-going water ingress into the home after the make-safe works. In its 30 July 2024 AFCA submission, the insurer acknowledges its ‘failed make-safe’.
The complainant says the make-safe works were severely delayed. I agree with this. This is because, in the same submission, the insurer says despite requesting an update from its make-safe trade on 16 May 2024, as of 29 July 2024 there was no update. When the property is experiencing on-going water ingress, a delay of nearly two months in addressing a failed make-safe is poor service.
Parties agree on extent of mould damage
Based upon the report from RI of 14 October 2024 and the complainant’s SOW and quotation from his mould expert (‘EM’) of 17 April 2025, there appears to be no dispute that the mould damage covers the kitchen/family/meals room, bathroom, study/office and main bathroom.
It is appropriate that the insurer cash settle the complainant for the cost of the EM quotation (which is $4,059.90), plus a 40% uplift to account for contingencies, which equals $5,683.86
2.2 Has insurer correctly settled the building damage claim?
In part, yes, although there is a lack of information from both parties to support their respective positions.
Over the course of the claim, the insurer repaired certain damage and cash settled others. The complainant wishes to be cash settled for the remaining disputed items. For each of the disputed items, the parties shall follow the steps in Section 1.3.
Window frames and doors
The complainant says the window frames and doors covered within his Stegbar quotation for $23,900 were damaged in the storm. Whilst he says the quotation ‘provides a thorough assessment of the property after the storm event’, it is not a report on damage causation but rather a quote for works. The insurer says the quote to replace windows and doors is ‘wildly unnecessary’.
Neither party has produced sufficient information to support their positions in relation to window frames and doors.
In relation to window frames and doors, the parties shall follow the steps in Section 1.3.
Boundary fence and internal iron fence
The complainant says the boundary fence and internal iron fence were damaged in the storm. He requests the insurer cash settle him the cost of repairs based on quotations he has obtained. The insurer says the boundary fence was already rotten and damaged and had no insurable value. The insurer says the quotation for the iron fence is unreasonable.
Neither party has produced sufficient information to support their positions in relation to these fences. The available photographs of the boundary fence appear to show it in good condition, albeit it is unlikely the photographs show the entire length of the fence.
I agree with the insurer the $7,227.27 quotation from the complainant covers the entire cost of the boundary fence, and not 50% which would be the extent of the insurer’s liability. The insurer says the $6,631.82 quotation for the iron fence is double the market rate and provides alternative market pricing which suggests that may be the case.
In relation to the boundary and iron fence, the parties shall follow the steps in Section 1.3.
Timber French doors
The complainant says timber French doors were damaged in the storm. He requests the insurer cash settle him the cost of repairs based on the $11,500 Stegbar quotation he has obtained. The insurer says the quote is not like-for-like, as the existing doors are particle board with laminate veneer whereas the Stegbar doors are solid western red cedar doors.
The information about the type of door shows the insurer’s position is more reasonable.
In relation to the timber French doors, the parties shall follow the steps in Section 1.3.
Flywire screens
The complainant says the flywire screens the subject of his Stegbar quotation for $6,180 were damaged in the storm. Whilst the insurer says not all flywire screens were damaged in the storm, the insurer says ‘for the sake of argument, it is probably best to replace them’. The insurer shall cash settle the complainant $6,180 for the flywire screens, and add a 5% uplift due to the passage of time.
Plastering works
The complainant says his plasterer says plaster linings in the master bedroom, lounge, office, rumpus room and bathroom were water damaged by the storm. The complainant wants to be cash settled for the $4,263 quotation from his plumber. The insurer says the damage in the master bedroom is pre-existing and that the complainant himself caused the damage to the plaster in the lounge.
I am not satisfied the complainant has demonstrated the damage the subject of the quotation was likely caused by the storm. Whilst the quotation says ‘water damage’, there is no discussion about whether the storm caused the water damage.
However, I accept that there may possibly be such damage as it may have been caused or contributed to by the on-going water ingress caused by the failed make-safe.
In relation to the plastering works, the parties shall follow the steps in Section 1.3.
Plumbing repairs
The complainant seeks reimbursement of $3,901 he says he paid his plumber to repair damage the insurer’s plumber caused and to review whether there was any further damage to the house’s plumbing. The complainant say’s the insurer’s plumber cut holes into the plumbing to conduct exploratory testing, but never did this, and that one of these holes caused further water ingress. He also says they damaged one downpipe during the make-safe.
The insurer has not substantially responded to these assertions, other than to say the insurer will not reimburse the complainant and that the plumbing problems were because of ‘several previous reports the customer expelled garden waste into the drains’.
On balance, I accept the complainant’s position. This is because his recollection of these events has been consistent throughout and the insurer has not substantially engaged with the assertions. The insurer shall pay the complainant $3,901 upon receipt from the complainant of proof of payment of that amount, if that has not yet been provided to the insurer.
The insurer is to pay interest, in accordance with Section 57 of the ICA, from the date the complainant paid the amount until the date of reimbursement.
Has insurer correctly settled the debris removal claim?
No. The complainant says an area of his yard has been used to place debris from the storm. He requests the insurer cash settle him the cost of debris removal based on his quotation for $7,480. The insurer says the debris in question is unrelated to the storm event and is normal garden debris and it does not accept indemnity liability. The complainant accepts that to some extent he has used the area to dispose of items not related to the storm event.
I agree with the insurer’s submission that page 56 of the policy does not require the insurer to indemnify the insured for the removal of debris unrelated to the event.
In relation to debris removal, the parties shall follow the steps in Section 1.3.
Has insurer correctly settled the contents claim?
No. There is voluminous correspondence between the parties regarding the contents claim. Over the period since the event, the complainant has provided various lists and details of contents he says were damaged by the storm. The insurer has part settled these claims, and has rejected some items for reasons including because the claimed amounts are excessive (such as $6,000 for children’s play equipment) and not like-for-like.
In relation to the contents, the parties shall follow the steps in Section 1.3.
Has insurer correctly settled the temporary accommodation claim?
To the extent that the mould remediation works to be conducted by the complainant’s expert require the complainant to vacate the house during such works, the insurer shall pay the temporary accommodation costs in accordance with Section 1.3.
The complainant also says he has incurred temporary accommodation costs but has yet to provide details. Once the complainant provides details the insurer is to settle that claim in accordance with the terms and conditions of the policy.
2.3 Was the claim poorly handled?
In part, yes. The make-safe was done poorly. Whilst the insurer is not obliged to attend AFCA conciliations with the complainant, the insurer declined an invitation to attend a conciliation with the complainant because the insurer considered it to be of no benefit.
That said, the complainant has also contributed to the amount of time this claim has taken. As discussed in this determination, he has in large part provided to the insurer competing quotations from his trades without providing a full explanation as to how that quote responds to the storm damage, and why the insurer should accept that quote over the insurer’s proposals.
The insurer has already paid the complainant $1,000 for the complainant’s claims experience. I consider that payment is sufficient to compensate for the stress caused by the poor claims handling.
2.4 Why is the outcome fair?
In the main, neither party has provided sufficient information to substantiate their respective positions. It is appropriate the parties resolve the claim by following the steps in Section 1.3.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.