Cash settlement amount for water damage claim after burst flexi hose, and poor claims handling
Summary
The complainant disputed the insurer's $19,570 cash settlement for water damage from a burst flexi hose and sought $176,457. AFCA partly upheld the complaint, ordering an additional amount, a revised actionable quotation including mould works to be cash settled, and $2,000 non-financial loss.
The complainant's quote was not shown to relate to insured damage, but the insurer had not adequately addressed mould and moisture and mismanaged the claim, so a fair settlement and compensation were ordered.
Issues
- Claim amount dispute primary · upheld
“insurer's offer of settlement not reasonable; must include additional $952 plus 20% contingency and actionable quote for further mould works”
- Poor claim handling secondary · upheld
“The panel is satisfied the insurer mismanaged the claim, and this caused an unusual degree of stress and inconvenience.”
- Inadequate claim investigation secondary · upheld
“insurer has not adequately addressed the issues of moisture and mould; recommended exploratory holes not arranged”
- Delay secondary · upheld
“payment tasks closed before cash settlement issued, about three weeks of delay; delay installing drying equipment”
- Repairs or contractors secondary · not upheld
“not satisfied that the insurer's drying equipment damaged the kitchen cabinetry”
Subjects and remedies
health or medicalhome or building damagepay claimpay non financial lossreassess claim
Text of the determination
Determination
|
Case number
|
12-00-1083647
|
Financial firm
|
Youi Pty Ltd
Case number: 12-00-1083647 12 August 2025
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (the insurer). On 5 January 2024 the complainant lodged a claim following a burst flexi hose, saying the water affected areas and the property cannot be utilised at all due to posing a health and safety risk, with the biggest risk at present being mould growth.
The insurer accepted the claim and organised repairs, but the complainant requested a cash settlement. The insurer says it will cash settle the claim for $19,570.
The complainant says the scope of works (SOW) provided by the insurer is not actionable and would like the insurer to cash settle $176,457 based on his quotes.
1.2 Issues and key findings
Is the insurer’s offer of settlement reasonable?
No. The insurer is to comply with the provisions of this determination.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer’s poor claims handling has caused the complainant an unusual degree of stress and inconvenience.
Why is the outcome fair?
The outcome is fair as it is consistent with the exchanged information and terms and conditions of the policy.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of receiving notice the complainant accepts this determination, the insurer is to comply with the provisions of the determination.
2 Reasons for determination
2.1 Is the insurer’s offer of settlement reasonable?
Complainant has shown a claimable loss
The available information confirms that on 5 January 2024, a flexi hose pipe burst in the bathroom under the vanity resulting in a significant volume of water escaping. The insurer has accepted and agreed to cover the claim.
The panel is satisfied that the complainant has established a claimable loss for which he is insured. However, the coverage remains subject to the terms, exclusions and conditions detailed within the policy documentation.
Once the complainant has established a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Insurer assessed damage and obtained quotes
The insurer appointed LRS to attend the property. It was reported that:
· the bathroom flexi hose has burst flooding through the property
· water flooding into bedrooms 3, 4 and 5 carpets
· moisture remaining in structural materials like plywood, particle board, structural wood and concrete
· flooding to the kitchen, dining, living and lounge.
The panel understands a cash settlement was made in the amount of $5,717 for the carpet replacement in the bedrooms and the contents claim has been resolved.
The insurer appointed AC who inspected the property on 13 January 2024 following the make safe repairs. AC found the damage consistent with the insured event and noted pre-existing, maintenance-related damage to the bathroom. AC confirmed the damaged areas reported by LRS were consistent with the claimed event.
AC prepared a SOW in the amount of $19,570, including a builder’s margin of 19%. The SOW included repairs to:
· hallway
· living room
· dining room
· kitchen
· bedroom 4 and 5 (sic)
· bathroom.
The insurer was to undertake repairs to the property; however the complainant requested a cash settlement, which the insurer agreed to settle for $19,570 plus a 15% uplift for contingencies.
Complainant says that AC’s SOW is incomplete
The complainant says the AC’s SOW does not address the full extent of the damage, especially the unseen issues. He says it should address / include the following:
· full kitchen replacement
· paint matching and repainting
· wardrobe joinery in two bedrooms
· bathroom door
· hidden water damage behind doors
· mould treatment.
The complainant says the drying equipment installed by LRS caused damage to the kitchen cabinetry.
The complainant has not provided any assessment report apart from a quote from NH in the amount of $147,210.
However, the complainant says:
The AC quote appears to be a superficial solution, the lack of proper exploratory work and comprehensive anti-microbial treatment leaves significant long-term risks unresolved, while the unrealistically cheap quote raises questions about the adequacy of repairs. The failure to properly assess and treat water damage behind the walls further exacerbates the potential for mould, wood deterioration, and structural issues.
Based on the complainant’s commentary and quote provided by NH, he says the NH quote is appropriate.
Discussion
Having reviewed the exchanged information, the panel is not satisfied that it has been established that the insurer’s drying equipment damaged the kitchen cabinetry. The panel prefers the detailed causation report from CRD to the effect that the delamination had already occurred/was occurring and not likely caused by the drying equipment.
Section 3.2 of this determination summarises the findings of the report provided by CRD.
Further, the panel is not satisfied that the complainant has established he is entitled to claim for all the items he seeks or the complete demolition and replacement of his bathroom. The quotation provided lacks adequate detail of costings and in the panel’s view includes items that were not damaged in the insured event, including but not limited to, the damage along the rear wall of the living room.
In addition, the policy provisions limiting matching entitlements (to the next architectural break) limit the extent of his claim.
On the other hand, upon reviewing the assessment reports and quotes from AC dated 2 February 2024, it is apparent to the panel that bedroom 3 has damage sustained because of the claimed event.
The quote from AC includes the following items:
· Underlay and smooth edge in bedroom 4.
· Install AFDS in bedroom 4.
· Full mould remediation.
· Paint internal wall.
· Prepare and paint skirting.
The panel regards this as a useful measure for damage to bedroom 3.
Further, having reviewed all the exchanged information, the panel is not satisfied that the insurer’s proposal for resolution of the mould issue, is fair or reasonable.
AC made recommendations, including:
· Exploratory holes placed in wall linings throughout the entire property at spacings of approximately every two studs,
· Complete anti-microbial treatment throughout the property,
· Depending on exploratory works, wall lining strip out to 200-600mm high, and
· Full mould remediation may be required within wall linings.
The complainant says that the insurer has not arranged for the recommended holes to be drilled.
In addition, the panel notes there is an accepted claim event of water leakage and a slow response from the insurer to dry things out and remove carpet.
In those circumstances, the panel accepts that it is likely that the water damage and mould has affected the plasterboard wall lining in the bedroom wall adjoining the bathroom shower recess.
Whilst the insurer’s experts have raised pre-existing, maintenance and drainage issues, in the light of ongoing moisture and mould issues, the panel is not satisfied that the insurer has adequately addressed the issues of moisture and mould.
This is particularly so, given the vulnerabilities of the complainant and his family.
As a result, the insurer is to include within its cash settlement offer the actionable costs to complete the recommendations of AC referred to above, if it has not already done so.
Further, the insurer is to have AC provide an actionable quotation for;
· Removal of the plasterboard wall lining in bedroom 4; wall to bathroom up to a minimum of 300mm from floor level,
· The undertaking of cleaning and sanitization work to all exposed building materials and surfaces in that room,
· Thoroughly clean and sanitize:
- Environmental mould on robe plasterboard wall lining in bedroom 4 behind shelving tower
- Environmental mould on doors and door jambs to bedroom 2, 3 and 4
- Environmental mould on robes in bedroom 2
· Once the unsalvalageable water damaged and mould affected materials have been removed, conduct a thorough assessment and further remediation as required.
Conclusion
The panel is satisfied the quote provided for bedroom 4 should be applied to bedroom 3 as the same damage occurred to both bedrooms and therefore the insurer must allow an additional $952 plus 20% contingency (including the age of the quotation) for this.
Within 14 days of receiving notice the complainant accepts this determination, the insurer is to pay this amount to the complainant.
Within 14 days of receiving notice the complainant accepts this determination, the insurer is to request for AC to prepare an actionable quotation, based upon its original quotation, plus the two lots of additional items referred to above.
The insurer is to provide a copy of that quotation to the complainant.
Within seven days of receipt of the quotation the insurer is to cash settle the complainant for the amount of the quotation, together with an uplift for contingencies of 15%, noting AC’s quotation will be current.
If the complainant does not agree with the quotation he may lodge a further complaint to AFCA. For the sake of clarity, matters resolved by the panel in this determination, can not and will not be the subject of further complaint to AFCA.
2.2 Is the complainant entitled to non-financial loss compensation?
Yes. The insurer has miscommunicated with the complainant and has not handled the claim in a timely manner, which the insurer has acknowledged.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer mismanaged the claim
The complainant says the insurer mismanaged the claim and says:
· six-day delay for the drying equipment to be installed
· prolonged water exposure and mould growth
· delay in organising temporary accommodation
· failure to communicate effectively and delays with communication.
The panel reviewed all the evidence, including correspondence, submissions and claim file notes. The panel is satisfied the insurer mismanaged the claim, and this caused an unusual degree of stress and inconvenience.
The insurer has acknowledged this. The panel notes, for instance, payment tasks being closed before the cash settlement was issued to the complainant, leading to about three weeks of delay. The panel accepts there was also a delay in the drying equipment being installed, which led to the complainant having to do some of the rectification work himself.
It is clear the complainant requested temporary accommodation due to the concerns raised regarding the mould very early on, however this request was not adhered to, leading to the complainant having to organise temporary accommodation himself.
In these circumstances, the panel is satisfied it is fair that the complainant be awarded $2,000 in non-financial loss compensation.
2.3 Why is the outcome fair?
The outcome is fair because it is consistent with the exchanged information and the terms and conditions of the policy.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
This complaint was determined by a panel consisting of an Ombudsman, a representative with extensive experience in consumer claims and a representative with extensive experience in the insurance industry.
3.2 Supporting information
CRD report dated 14 May 2024
· the cabinets presented with pre-existing poor condition of the cabinet carcases and the aged well-worn areas of the exposed MDF substrate indicate that the delamination of the thermo wrap had begun to occur prior to the event
· a photograph provided by AB shows the heat directed at the cabinetry appears to be incorrect, the photograph only shows an air mover within the kitchen area.
· the poor pre-existing condition of the thermo wrapped kitchen cabinetry has caused additional delamination with pre-existing delamination already present. It is my opinion that had the cabinetry been in good condition that accelerated delamination would not have
· occurred.
· leak detection to the bathroom was undertaken which has identified no leaks therefore indicating damage to the surrounding wall and skirting linings is historic.
· the paving and surface drainage at the rear of the residence appears to postdate the construction of the main dwelling.
· there is little reason to add such a long specific surface drain unless there was an underlying moisture ingress issue and may not have been apparent to the Insured and may have occurred prior to their purchase of the property.
· the lack of visible damp proof course within the external brickwork can also lead to moisture ingress as the mortar acts as a bridge for moisture to wick up and past the any dampproof course that may be embedded within the mort.
· The presence of moisture and soil within the rear wall cavity indicates that moisture permeation through the cavity brick wall is occurring. This has not occurred from a one-off event but has existed since construction due to poor building practices.
· The Termite damage within the Hallway is historic as there were no live termites present, and the level of damage was severe. I have been advised (after my inspection) that moisture was found at the base of the plasterboard wall lining.
· The presence of moisture and soil within the rear wall cavity indicates that moisture permeation through the cavity brick wall is occurring. This has not occurred from a one-off event but has in my opinion existed since construction due to poor building practices.