Home / Allianz Australia / Determination 12-00-1081169

Determination 12-00-1081169

Home extension subsidence claim declined

FirmAllianz Australia
Decided2024-10-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed on her home insurance after her extension sank, which she attributed to a leaking stormwater pipe. AFCA found the damage was not caused by an insured event and the insurer was entitled to decline the claim.

The complainant did not discharge the onus of showing the damage was caused by an insured water escape, and the insurer's expert evidence on inadequate design or construction was accepted.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1081169 | Financial firm | Allianz Australia Insurance Limited Case number: 12-00-1081169 15 October 2024 Determination overview Complaint The complainant held a home and contents insurance policy with the financial firm (insurer) for her home in Victoria. The policy period was from 4 October 2022 to 4 October 2023. The sum insured was $314,738 and the basic excess was $600. The home was built in 1992. In 2016 the complainant engaged a builder, BS, to build an extension. On 11 September 2023 the complainant made a claim on her policy with the insurer for damage to the extension. The complainant said that a section of the extension was sinking due to an underground stormwater pipe bursting or leaking. The insurer denied the claim on 25 November 2023 and confirmed its denial on 21 February 2024. This was on the basis the damage was not from an insured event. It also said the damage was due to inherent defects (including faulty design, structural defects or poor workmanship) which was excluded under the policy. Issues and key findings Can the insurer deny the claim? Yes. The complainant has not established that the extension was damaged by an insured event. Is the complainant entitled to compensation for non-financial loss? No. The complainant is not entitled to compensation for non-financial loss. Why is the outcome fair? The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim. Determination The determination is in favour of the insurer. The insurer is not required to take any further action. Reasons for determination Can the insurer deny the claim? Yes. The complainant has not established that the extension was damaged by an insured event. Coverage of the policy The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI) (together referred to as the policy). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant. Complainant has initial onus to establish a valid claim The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy. Water and other liquid damage covered by the policy The policy provided building cover for damage caused by one of more of 11 insured events (page 6) including ‘water or other liquid damage’. The cover was for ‘loss or damage resulting directly from bursting, leaking, discharging or overflowing of any’ listed items which included ‘fixed pipes’ (page 18) (see further Section 3.2 of this Determination). The policy contained a definition regarding ‘What’s a building (and what’s not)’ and it included ‘your home building’ and ‘Other structural improvements’ (page 26). General exclusion for inherent defects The policy also contained general exclusions (pages 54-55) (see further Section 3.2 of this Determination), including ‘Inherent defects’: | General exclusions | Inherent defects Including faulty design, structural defects or poor workmanship Proximate cause of the damage is a question of fact When an insurance policy uses the term ‘caused by’, this typically means proximate cause. Proximate cause is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. Subsequent to the claim the parties engaged experts On 11 September 2023 the complainant made a claim on her policy with the insurer for damage to the extension. The complainant said that a section of the extension was sinking due to an underground stormwater pipe bursting or leaking. Subsequently, the parties both engaged (or requested information from) experts in relation to the claim. It is helpful to the understanding of the issues for determination to identify the experts and the reports or information provided by them. The complainant provided:  a report from W, civil structural engineer, dated 3 February 2024 (based on site visits on 27 January 2024 and 3 February 2024)  comments from A, consulting engineer, dated 2 September 2024 (no site visit)  a statement from BS, builder, dated 3 September 2024 (no site visit). The insurer provided:  three reports from R, building assessor: > a Make Safe Report dated 21 September 2023 (based on a site attendance on 21 September 2023) > a Building Assessment Report, dated 21 September 2023 (based on a site attendance on 21 September 2023) > a Plumbing Specialist Report dated 21 September 2023 (based on site attendance on 21 September 2023)  a report from I, engineer, dated 24 October 2023 (based on a site inspection on 12 October 2023) The relevant sections of the parties’ reports and statements are summarised in Section 3.2 of this Determination. Insurer made-safe the extension After the complainant made the claim, the insurer made-safe the extension. R’s Make Safe Report (based on an inspection on 21 September 2023) stated:  the extension appeared to be unlevel in areas  the repairer propped the front verandah beam in a few places either side of the ramp with support timbers placed on plywood pieces to prevent sinking  the repairer also propped the left hand corner support beam of the unit > ‘in places across the verandah and across the unit are not supported correctly and in places do not run all the way to the house wall’  further inspection of the structure was required R recommended an engineer’s report R’s Building Report also based on an inspection on 21 September 2023 contained recommendations that:  ‘ground movement has occurred in the area where the water had been discharged in the ground due to the dislodged storm water drain’  an engineer be engaged to provide a comprehensive scope of work for the repairs required. Previous plumbing repairs in 2022 at the home and subsequent collapse of stormwater drain R’s Plumbing Specialist Report, also based on an inspection on 21 September 2023, said:  previous plumbing works to the back right side stormwater drain had taken place to repair a fitting as water was failing to discharge through the stormwater drains and was building up underneath the carport at the right side of the dwelling  since the plumbing works have been completed water was discharging  CCTV inspection observed > the sewer was sound > the stormwater drain was sound at locations #4 #5. > a collapsed drain at the back, right side of the dwelling, opposite the extension at location #2 which was ‘allowing water to ingress the soil and cause ground movement’ > a partial collapse of stormwater drain at the back right side of the property near the stormwater inspection riser at location #3 which would ‘cause water ingress into the soil and cause ground movement’ > the downpipe at the back right side of the dwelling was loosely fitted into the stormwater adapter which allowed water to ingress into the soil at the section of the property, causing ground movement The reference in the Report to areas with the “#” symbol were to locations on a property ‘mud map’ prepared by R and contained in the Report. In addition, the report contained photographs which showed:  a collapsed drain: > at location #2 ‘CCTV Inspection of the stormwater drain shows a collapsed section of drain at the back right side of the property opposite the extension. This is allowing water to ingress into the soil’ > at location #3 ‘CCTV inspection of the stormwater drain shows a collapsed, section of the drain at the back right side of the property’  Loose fitted downpipe > to the stormwater adapter is allowing water to ingress into the soil at the back right side of the dwelling Insurer’s engineer determined the cause was not the stormwater drain but inherent defect I’s report dated 24 October 2023 was based on an inspection on 12 October 2023. I’s report stated that its purpose was ‘to ascertain the cause of the reported damage to the extension’. Relevant extracts from I’s findings (supported by photographs) are contained in Section 3.2 of this Determination. I’s conclusions were: 4.0 Conclusion Based on the visual inspection and information obtained to date, [I] confirm[ed] that the distress to the extension is not attributable to the underground stormwater pipe break but rather, is due to inadequate design and/or construction of the extension. With reference to the plumbing report by [R’s Plumbing Report], [I acknowledged] that a break to the underground stormwater pipe was identified to the west of the extension and to the south-west of the dwelling. However, given the natural topography of the site, which falls from the north towards the south, any escaped liquid from the underground break would flow downslope towards the south. With the extension located upslope from the break, there is no evidence to suggest that the escape of liquid downslope from the extension has saturated the soils underneath the northern end of the extension. When structures are subject to an escape of water event saturating clay bearing strata, damage and movement are generally non-uniform and occur local to the escape of water event. The consistent deflection of the entire northern end of the extension, rather than a localised deflection to the north-west corner in close vicinity to the break, is further evidence that the distress recorded to the extension is not due to the saturation of the soils from the stormwater break. Furthermore, given the close proximity of the two structures to the stormwater pipe break, it would be expected for the same distress and movement to occur to the two structures. Referencing the floor level survey conducted by [I], I note[d] that while consistent settlement was observed to the northern end of the extension, no localised settlement was recorded to the southern end of the dwelling, which is directly adjacent to the location of distress to extension. As such, the lack of distress to the internal walls of the dwelling’s southern section or to the external southern brickwork in the same close vicinity to the break as is the extension, is evidence that the stormwater pipe break has had a negligible effect on the structures and the distress is related to a localised issue affecting only the extension. Therefore, [I] confirm[ed] that the distress is consistent with inadequate construction and/or design of the extension. With reference to the floor level survey recorded by [I], it is evident that the lowest levels were recorded at the location where the bearers were cantilevering at the northern ends of the extension (as per photographs 14 to 18 [of I’s Report]). Together with this, the packing to the gaps visible between stumps and the backspan of the bearer confirms that the floor framing of the extension is deflecting excessively at the northern and north-western area, under the loads of the structure. This is further confirmed by the deflection (“curve”) in the bearers being visible even to the naked eye, as can be seen in photograph 11. Subsequently, the inadequate design and/or construction of the floor framing to the northern end of the extension has resulted in the cracking to the north-western corner wall lining and misalignment of the sliding door, as confirmed by the localised distress recorded local to the lowest levels of the extension. In Section 5 of the Report, I provided a summary: 5.0 Summary 5.1 Has the escape of liquid from the stormwater pipe break resulted in distress to the extension? • No. • [I] confirm[ed] that the distress to the extension is not attributable to the underground stormwater pipe break but rather, is due to inadequate design and/or construction of the extension. • With the extension located upslope from the break, there is no evidence to suggest that the escape of liquid downslope from the extension has saturated the soils underneath the northern end of the extension. • The lack of a localised deflection only to the north-west corner of extension in close vicinity to the break, is further evidence that the distress recorded to the extension is not due to the saturation of the soils from the stormwater break. • The lack of distress or localised movement to the southern end of the dwelling, in the same vicinity as the northern end of the extension, is evidence of the stormwater pipe break having a negligible effect on the structures and distress being a localised issue to the extension only. • The low levels and gaps to the backspan of the bearers confirm that the floor framing has deflected excessively at the northern end of the extension due to inadequate connections, subsequently resulting in the localised cracking and misaligned door to the extension. I’s Report also contained a Floor Plan (Appendix A of I’s Report): The complainant’s expert (W) did not address the cause of the damage W’s report dated 3 November 2024 stated that there were 7 potential causes for the damage to the extension:  founding depth of stump pads as determined by the engineer (for the extension) was not deep enough to encounter the required soil layer with design bearing capacity.  builder who installed footings did not bore/drill to required depth as per approved plans and/or carried out the task to required standard  the inspectors who carried out footing inspections failed to measure the required founding depth as per approved plans nor observed any weak soil at founding depth.  stress grade and sections specified by the engineer (for this extension) for floor bearers (to a less extent, the joists) were not adequate to withstand standard live loading as per AS2870  cantilever part of floor bearers at northern edge not been adequately specified by the engineer (for this extension)  builder may have used unspecified material/workmanship to complete the task  saturation of ground due to stormwater, sewer or wastewater ingress whereby movement of stump/pads resulting in current downward movement of sub-floor & frame issue. W noted that I had negated this potential cause in I’s report However, W did not provide any opinion as to which of the above causes was the cause and instead stated that:  none of the above-mentioned potential causes had been ‘determined to be the cause, beyond reasonable doubt and it [was] not necessary to determine the cause(s)’  W did ‘not believe, determining the root cause of current failure [was] the point of debate at the moment. What is important and warranted is to understand that the property owners as the owner builder have completed all the mandatory technical/legal requirements/steps leading up to the issuance of the Certificate of Final Inspection by the relevant building surveyor; they have done everything as legislated’. W’s report does not assist the complainant as W did not provide an opinion regarding the cause of the damage, let alone that it was caused by an insured event. Insurer denied the claim in November 2023 and February 2024 The insurer denied the claim on 25 November 2023 on the basis that the damage was not the result of an insured event but was due to faulty design and workmanship. On 21 February 2024 the insurer reviewed the claim and again declined it on the basis that:  the expert evidence provided by both I (the insurer’s expert engineer) and W (the complainant’s expert engineer) did not establish that ‘movement occurring to the northern side of the extension has been caused by an insured event as defined under [the complainant’s] policy  as the proximate cause of the claimed loss could not be attributed to an insured event, the complainant had not satisfied her onus to establish a valid claim  as the complainant had not established a valid claim, the decision to decline the complainant’s claim was upheld The complainant provided further information in September 2024 On 2 September 2024 the complainant provided further information:  from A, consulting engineer, dated 2 September 2024 (but no site inspection).  a statement from BS, builder, dated 3 September 2024 (attached to an email from the complainant dated 8 September 2024)  an invoice from B, plumber, dated 24 May 2022 for works completed on 15 May 2022 to a broken section of blocked storm water drain The relevant sections of the information provided by the complainant from A, BS and B are summarised in Section 3.2 of this Determination. On 9 September 2024 the insurer advised the Australian Financial Complaints Authority (AFCA) that it would not be providing any further information. No valid claim for damage As referred to above, the onus is on the complainant to establish a valid claim. That is, the damage to the extension arose due to an insured event. The complainant’s experts, in particular W, did not provide an opinion which supported this conclusion. As referred to above:  W said that ‘Saturation of ground due to stormwater, sewer or wastewater ingress whereby movement of stump/pads caused to move resulting in current downward movement of sub-floor & frame issue’ was a possible cause but W noted that I (the insurer’s expert engineer) had ‘negated this potential cause in their report’. Further, W did not give any opinion which contended that loss or damage resulting directly from bursting, leaking, discharging or overflowing of a storm water pipe was the cause of the damage to the extension  W said that none of the 7 potential causes of the damage identified by W had been determined by W to be the cause. It was not of any assistance to the complainant that W’s view in W’s report was that it was ‘not necessary to determine the cause(s)’  the complainant’s builder, BS, stated that the ‘probable cause was a leaking storm water pipe which has now been repaired’ and that ‘Given the nature of the reactive soils in this area [BS] assume[d] movement from saturation would be possible’. However, BS did not inspect the property, did not provide a report and did not provide any further detail or the basis for BS’s opinion  A, the complainant’s engineer, also did not inspect the property, did not provide a report and did not provide any further detail or basis for A’s comments By contrast, the comprehensive opinion by I, the insurer’s expert engineer, did address the cause of the damage which I summarised as follows:  the distress to the extension was not attributable to the underground stormwater pipe break but was due to inadequate design and/or construction of the extension  with the extension located upslope from the break, there was no evidence to suggest that the escape of liquid downslope from the extension had saturated the soils underneath the northern end of the extension  the lack of a localised deflection only to the north-west corner of extension in close vicinity to the break, was further evidence that the distress recorded to the extension is not due to the saturation of the soils from the stormwater break  the lack of distress or localised movement to the southern end of the dwelling, in the same vicinity as the northern end of the extension, was evidence of the stormwater pipe break having a negligible effect on the structures and distress being a localised issue to the extension only  the low levels and gaps to the backspan of the bearers confirm that the floor framing has deflected excessively at the northern end of the extension due to inadequate connections, subsequently resulting in the localised cracking and misaligned door to the extension In I’s report, I said that:  ‘Upon closer inspection, it was noted that the northern ends of the extension’s bearers are effectively cantilevered, with the last supporting stump to the northern end of the bearer being located approximately 500mm from the northern end. One instance of unsupported northern end of bearer was observed underneath the verandah. No visible connection between the northern edge floor joist and the northern end of bearers underneath the verandah was sighted. On the other hand, underneath the eastern section of the extension, the northern-most floor joist had been installed as a wailing plate, such that it was fixed to the brickwork and was supporting the northern ends of the bearers Inspecting the brick veneer of the southern end of the dwelling, in the vicinity to the extension and the underground stormwater break, no cracking or distress was observed.’ Based on the information, I am satisfied that I’s opinions were supported by I’s findings, a reasoned consideration, photographs and a Floor Plan. The Floor Plan showed the location of the extension and the damage to it and the location of breaks to the underground storm water line, the disconnected downpipe and the distress to the extension. I am satisfied that I had conducted a comprehensive site inspection on 12 October 2023. The complainant’s engineer, A, also agreed with I’s report’s conclusion that the existing dwelling (not the extension) was not affected and that it would be expected that both would be affected. This is because it was a conclusion which ‘makes sense, the existing dwelling is completely upslope from the extension and cracked pipe location so it wouldn’t make sense for water to travel uphill’. Accordingly based on the information provided, I am satisfied, and accept, I’s opinion. For the above reasons, the complainant has not discharged the onus of establishing that the damage to the extension was caused by an insured event under the policy. The complainant has not established that the cause of the damage to the extension resulted directly from bursting, leaking, discharging or overflowing of a storm water pipe. Accordingly, the insurer was entitled to decline the claim. Is the complainant entitled to compensation for non-financial loss? No. The complainant is not entitled to compensation for non-financial loss. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. AFCA takes a conservative approach to compensation for non-financial loss and expects complainants to be moderately robust. We will not award compensation for the ordinary degree of inconvenience in making a claim. No compensation for non-financial loss On 11 September 2023 the complainant made a claim. The insurer made safe the extension on 21 September 2023. The insurer denied the claim on 25 November 2023 and confirmed its denial on 21 February 2024. The complainant has expressed extreme disappointment with the insurer’s denial and said that she had showed loyalty to the insurer for over thirty years. However, the complainant has had the benefit of insurance with the insurer over the years in which she has taken out policies with the insurer, subject to the terms and conditions of the policies. In the circumstances and based on the information provided, I am not satisfied that the complainant demonstrated poor claims handling or other actions by the insurer which warrant the award of non-financial loss compensation. Why is the outcome fair? The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Supporting documentation Relevant policy provisions: Building cover (page 18): | What’s covered | What’s not covered | Buildings and/ or contents | | ✔ Loss or damage resulting directly from bursting, leaking, discharging or overflowing of any: • dishwasher, • washing machine, • fixed rainwater or hot water tanks, • radiators and oil heaters, • fixed pipes, • waterbeds, • aquariums designed to hold more than 20L. Buildings only ✔ If we have agreed to pay a claim for water or other liquid damage to your buildings and; • we authorise any exploratory work to locate the source of the damage, we will pay those costs, • we will only pay the reasonable covered costs up to the amount we would have agreed to, had you asked us first. | ✘ Loss or damage: • as a result of gradual escape of water or other liquid over time: - where you or a reasonable person could be expected to have been aware of this, or - from a shower base, shower recess, shower alcove or the walls surrounding the shower, • caused by rust, corrosion, algae, mould or mildew. However, we will cover you for loss or damage when it is a direct result of an insured event. ✘ The cost of repair or replacement of: • a defective part or parts that caused the loss or damage, or • any broken main or pipe. General exclusions (pages 54-55): | General exclusions | Things we won’t cover We want to be clear about what you’re covered and not covered for. In addition to any other exclusions listed for an event or cover section – here’s a list of things we won’t cover under any section of the policy. Always excluded Loss, damage, injury (unless you have chosen the Domestic workers’ compensation option (see page 46) and cover is provided under that option) or legal liability as a result or, caused by or arising from: | Wear and tear Including depreciation, gradual deterioration, wear and tear or lack of maintenance. | Inherent defects Including faulty design, structural defects or poor workmanship | .. | Soil movement Including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood (where your policy schedule shows you have optional cover for flood). Complainant’s reports and information Extracts from W’s Report (complainant’s engineer) W’s report dated 3 November 2024 stated that there were 7 potential causes:  Founding depth of stump pads as determined by the engineer (for the extension) was not deep enough to encounter the required soil layer with design bearing capacity  Builder who installed footings did not bore/drill to required depth as per approved plans and/or carried out the task to required standard  The inspectors who carried out footing inspections failed to measure the required founding depth as per approved plans nor observed any weak soil at founding depth  Stress grade and sections specified by the engineer (for this extension) for floor bearers (to a less extent, the joists) were not adequate to withstand standard live loading as per AS2870  Cantilever part of floor bearers at northern edge not been adequately specified by the engineer (for this extension)  Builder may have used unspecified material/workmanship to complete the task  Saturation of ground due to stormwater, sewer or wastewater ingress whereby movement of stump/pads caused to move resulting in current downward movement of sub-floor & frame issue (W noted that I, the insurer’s expert engineer, has ‘negated this potential cause’ in I’s report) W said: However, none of the above-mentioned potential causes have been determined to be the cause, beyond reasonable doubt and it is not necessary to determine the cause(s). [W] does not believe, determining the root cause of current failure is the point of debate at the moment. What is important and warranted is to understand that the property owners as the owner builder have completed all the mandatory technical/legal requirements/steps leading up to the issuance of the Certificate of Final Inspection by the relevant building surveyor; they have done everything as legislated. Extracts from A’s (complainant’s consulting engineer) A’s report dated 2 September 2024 stated:  I’s Report stated that existing dwelling was not affected and that [I] would expect both to be affected. ‘To [A] this makes sense, the existing dwelling is completely upslope from the extension and cracked pipe location so it wouldn’t make sense for water to travel uphill’  Reference point for floor levels is taken at the middle of the dwelling (which is correct) however this doesn’t necessarily mean that one side has dropped and one side has heaved. It could be that the actual zero point is exactly adjacent to the existing dwelling, meaning that the entire extension would have heaved just the rearsection to a greater extent that the rest of the house.  I’s Report stated that the issues are ‘due to inadequate design or construction but doesn’t make any mention of how this would be the case. For example why would a 1200mm footing sink?’  I’s Report does not take into account time frame. ‘Clogged pipes were noticed approximately 6-8 years after construction, cracked pipe approximately a year or so after that. If the design/construction was inadequate, how come there weren’t any issues in the first 6-8 years before the stormwater works?’ Statement from BS (complainant’s builder) Statement from BS dated 3 September 2024 (attached to an email from the complainant to AFCA dated 8 September 2024) > ‘Be assured all works were conducted to conform to relevant building code. Particular attention was paid to the foundation and sub-floor’. > ‘All stages of the build were inspected and approved’ > It had come to BS’s attention there has ‘been some subsidence of stumps. [BS] was informed that the probable cause was a leaking storm water pipe which has now been repaired’ > ‘Given the nature of the reactive soils in this area [BS] assume[d] movement from saturation would be possible’ > ‘The movement has now been attributed to poor design and construction, if this were the case why would this occur eight years after completion? It seems unlikely the structure would fail to perform as intended without external factors such as periodic saturation’ Invoice from B for plumbing works completed in May 2022 An invoice from B, plumbers, dated 24 May 2022 for works completed on 15 May 2022 to a broken section of blocked storm water drain Insurer’s reports R’s Reports dated 21 September 2023 R’s Building Report contained recommendations that: In [R’s] professional opinion the ground movement has occurred in the area where the water had been discharged in the ground due to the dislodged storm water drain. [R] awaits for an authority to engage an engineer to provide a comprehensive scope of work for the repairs required. R’s Make Safe Report said: On arrival at the property we observed the unit at the back of the property appeared to be unlevel in areas. We have propped the front verandah beam in a few places either side of the ramp with support timbers placed on plywood pieces to prevent sinking. We have also propped the left hand corner support beam of the unit. It appears that in places across the verandah and across the unit are not supported correctly and in places do not run all the way to the house wall. Possible further inspection of structure may be required. R’s Plumbing Specialist Report said: - Attended the property for a CCTV inspection of the sewer and stormwater drains. – The [complainant] has advised of previous plumbing works to the back right side stormwater drain to repair a fitting. – The [complainant] has advised that [she has] noticed that the rear extension is starting to sink in towards the existing dwelling. – The [complainant] has advised that previous to the plumbing works completed, water was failing to discharge through the stormwater drains and was building up underneath the carport at the right side of the dwelling. – The [complainant] has advised that since the plumbing works have been completed. Water is discharging. – CCTV inspection of the sewer is sound. - CCTV inspection of the stormwater drain is sound #4 #5. – CCTV inspection of the stormwater drain has found a collapsed, drain at the back, right side of the dwelling, opposite the extension #2, this is allowing water to ingress the soil and cause ground movement – CCTV inspection of the stormwater drain has found a partially collapsed, drain at the back right side of the property near the stormwater inspection riser #3. this will cause water ingress into the soil and cause ground movement. – The downpipe at the back right side of the dwelling is loosely fitted into the stormwater adapter, this will allow water to ingress into the soil at the section of the property, causing ground movement The reference in R’s Plumbing Report to areas with a the “#” symbol were to locations on a property ‘mud map’ prepared by R. In addition, R’s Plumbing Report contained photographs which showed:  a collapsed drain: > at location #2 ‘CCTV Inspection of the stormwater drain shows a collapsed, section of drain at the back right side of the property opposite the extension. This is allowing water to ingress into the soil’ > at location #3 ‘CCTV inspection of the stormwater drain shows a collapsed, section of the drain at the back right side of the property’  Loose fitted downpipe ‘to the stormwater adapter is allowing water to ingress into the soil at the back right side of the dwelling’ I’s Report (insurer’s expert engineer) ‘3.1 Construction details The single-storey dwelling was of timber-framed construction with a brick veneer founded on a concrete slab. The dwelling had a timber-framed roof, clad with concrete roof tiles. The extension was of timber-framed construction with a lightweight weatherboard cladding, and together with the verandah, was founded on concrete stumps. The extension had timber-framed roof, clad with lightweight roof sheeting. 3.2 Site conditions The natural topography of the land was visually observed to have a fall from the north down towards the south. According to land contour data available on the Land and Survey Spatial Information website, there is a total fall of approximately two metres across the property. The ground adjacent to the majority of the dwelling and extension’s elevations were noted to be lined with uncapped soils, while the soils adjacent to the southern end of west elevation of the dwelling was partially capped by the carport roof. 3.3 External details The inspection began with the [complainant] directing [I’s] attention to the extension. It was immediately evident that as part of the make-safe works, a number of posts and baseplates have been installed to the underside of the bearers at the north-west corner. It was also noted that the sliding door of the extension was out of square and was difficult to open and close. [I] then noted that the northern-most 3m of the extension has visibly settled, as evidenced by the deflection in the bearer visible even to the naked eye. Gaps between the stumps and the bearers were also sighted, with the gaps having been packed. Upon closer inspection, it was noted that the northern ends of the extension’s bearers are effectively cantilevered, with the last supporting stump to the northern end of the bearer being located approximately 500mm from the northern end. One instance of unsupported northern end of bearer was observed underneath the verandah. No visible connection between the northern edge floor joist and the northern end of bearers underneath the verandah was sighted. On the other hand, underneath the eastern section of the extension, the northern-most floor joist had been installed as a wailing plate, such that it was fixed to the brickwork and was supporting the northern ends of the bearers Inspecting the brick veneer of the southern end of the dwelling, in the vicinity to the extension and the underground stormwater break, no cracking or distress was observed. No other notable external damage or other items of interest were sighted or reported during [I’s] inspection. 3.4 Internal details Entering the extension, [I] noted the visible and consistent fall of the entire northern section of the flooring. A diagonal crack of up to approximately 3mm was observed to be propagating from the corner of the door architrave, on the west wall of the lounge area. No other distress was recorded to extension or to the dwelling, in particular Bedroom 2 and 3, which were directly adjacent to the extension. Hydrostatic floor levels were measured across the dwelling and the extension during [I’s] inspection (reference Appendix A for floor levels). The floor levels across the dwelling were noted to vary throughout, with the highest levels. recorded at the north-west corner of Living. A total maximum variation of 42mm was recorded throughout the entire dwelling. The floor levels recorded across the extension were noted to be consistently lower along the northern edge of the structure, with the lowest levels recorded in the north and north-western area. A total maximum variation of 55mm was recorded throughout the entire extension. 4.0 Conclusion [I’s ‘Conclusion’ is set out in Section 2.1 of this Determination] 5.0 Summary [I’s ‘Summary’ is set out in Section 2.1 of this Determination]’

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.