Determination 12-00-1080242
Declined claim for building defects and workmanship after storm water ingress
Summary
The insurer accepted storm damage to contents and mould but declined building defects from a 2019 extension as faulty workmanship. AFCA found the defects excluded and the lifetime guarantee inapplicable, but required prompt settlement of the accepted loss as offered.
Expert evidence showed defective workmanship excluded under the policy, and the 2017 claim was cash settled so the lifetime guarantee did not apply.
Issues
- Claim denial primary · not upheld“The insurer is not liable for the building defects/poor workmanship identified, as that is excluded under the terms of the policy.”
- Product terms interpretation secondary · not upheld“The 2017 claim was cash settled, and the insurer's lifetime guarantee does not apply to the repair work carried out by the complainant's builder.”
- Repairs or contractors secondary · not upheld“The damage is primarily due to initial building defects during the extension, particularly related to drainage system issues.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
|
Case number
|
12-00-1080242
|
Financial firm
|
AAI Limited
Case number: 12-00-1080242 12 September 2024
Determination overview
Complaint
The complainant holds a home building insurance policy with the financial firm (insurer). In December 2023 he made a claim for damage believed to have been from a storm.
The insurer accepted liability for contents, as well as for mould remediation and necessary reinstatement. However it declined cover for certain building issues identified. That was on the basis the water ingress was from defective workmanship in part of a building extension (sunroom/studio).
The complainant does not accept the insurer’s decision. He says the building work had been undertaken in response to a claim made (and accepted by the insurer) in 2017, and so the insurer should cover any defects and resulting damage.
The insurer maintains it is not liable for the claimed building issues as it had not authorised or arranged those previous repairs, but had instead cash settled the 2017 claim.
Issues and key findings
Is insurer liable for building defects/poor workmanship?
No. The insurer is not liable for the building defects/poor workmanship identified, as that is excluded under the terms of the policy.
Nor is the insurer liable under its lifetime guarantee because the 2017 claim was cash settled, with the work in question being completed by the complainant‘s builder.
Why is the outcome fair?
It would not be fair to require the insurer to cover a claim for damage which is excluded under the terms of the policy, and for which it is not liable under its lifetime guarantee, or otherwise.
Determination
This determination is in favour of the insurer.
It is required to promptly settle the complainant for the accepted damage (contents, mould remediation and reinstatement) as offered and in accordance with the policy terms and conditions. To be clear, any cash settlement should be based on a quote(s) actionable by the complainant as a retail customer.
It is not required to take any other action.
Reasons for determination
Is the insurer liable for building defects/poor workmanship?
Onus is on complainant to establish a ’valid’ claim
The complainant’s policy covers listed insured events, subject to terms, conditions and exclusions.
The onus is on the complainant to show, on the balance of probabilities (that it is more likely than not), the damage being claimed was caused by one of the listed insured events. That is, he needs to show he has a ’valid’ claim under the policy.
If the complainant establishes a valid claim, then the onus shifts to the insurer to show that an exclusion applies, or that it is otherwise entitled to decline the claim.
Amongst the insured events covered under the policy is ’loss or damage to the building caused by a storm’. That is the original basis for the ’2023 claim’.
Insurer identified defective/faulty workmanship issues in response to 2023 claim
In early 2024, the insurer appointed builder KBA and engineer MCS to assess and report on the claimed storm damage.
There is no dispute that storm water entered the building. This was recorded as occurring in a 2019 extension to the existing building (identified in the various reports as either ’newly built studio’, ’front room (extension to the existing building in 2019)’, ’sunroom’). I note, however, the complainant has explained that was simply the area damaged in 2017, but not repaired until 2019.
The insurer accepted liability for damaged contents (including carpet), and that is not in dispute. While no visible building damage was identified, the insurer did acknowledge there could be mould inside the walls. So it agreed to remediation work and offered to cash settle the complainant for the cost to re-instate the area that was remediated. It has provided a remediation report and scope/estimate for the reinstatement.
The insurer explained a cash settlement was offered since the complainant would first need to arrange for other building repairs to be completed. Those other repairs were to address the construction defects and compliance issues which engineer MCS had identified.
The complainant’s policy specifically excludes cover for:
...any component of the building that was not built, constructed, renovated, altered, or repaired in compliance with the applying local council requirements or relevant building laws or regulations (non-complying building component) except those laws or regulations introduced after the building was originally built or when construction, repairs, renovations, or alterations were undertaken.
The policy also provides there is no cover for:
...any loss or damage to the part of the building with an inherent defect, faulty design, structural defect or faulty/poor workmanship, whether or not you knew about it.
In their report, MCS concluded:
The damage is primarily due to initial building defects during the extension of the new room to the existing building, particularly related to drainage system issues, such as improper installation of eaves, downpipes, sealing, flashing, and gaps between windows and walls.
The complainant has queried some of the building issues raised by MCS. However, he has not provided expert or other compelling evidence to show MCS‘ conclusions were incorrect. In the absence of evidence refuting the insurer’s expert findings, I am satisfied the insurer is entitled to decline liability for the building defects/faulty workmanship identified, in accordance with the policy exclusions (as it has done). That means the complainant is responsible for remedying the issues identified, in order to mitigate the risk of any future loss or damage.
I note the complainant has requested confirmation that the property is ’fully insured’. He says he wants that confirmation so he can be confident the insurer ’will not in future be able to make the same claims about these claimed defects’. However, such a blanket assurance is not possible. That is because any future claim will need to be considered on its own facts and circumstances, by reference to the terms and conditions of the insurance policy in place at the time.
Insurer settled a previous claim (the 2017 claim)
However, the complainant’s position is that the insurer should still be liable for any such issues because of the repair work undertaken in response to a previous ’escape of liquid’ claim made in 2017.
The 2017 claim was the subject of a determination issued by AFCA’s predecessor scheme, which required the insurer to accept and settle the claim in accordance with the policy terms and conditions.
Under the policy, the insurer had the option of either completing repairs itself or cash settling, in which case the complainant would be responsible for the necessary repairs. In the former case, the policy (on page 50 of the product disclosure statement) provides a lifetime guarantee on the building repairs if the insurer:
authorised;
arranged; and
paid the builder or repairer directly for this work.
The policy goes on to make it clear (on page 51 of the product disclosure statement) that the lifetime guarantee did not apply in certain situations: namely, where repairs were authorised or made by the complainant himself; or where the insurer agreed with a repair quote and gave the complainant, or the builder or repairer, payment for the cost of the repairs and the complainant arranged the repairs.
The complainant does not dispute receiving the policy documents, and so is regarded as having been informed of these provisions.
The question in dispute is whether the insurer had cash settled the claim, or whether it retained responsibility for the quality of the repair work undertaken following the 2017 claim (in which case the lifetime guarantee would apply).
Evidence shows the 2017 claim was effectively cash settled
The complainant maintains he never agreed to a cash settlement for the accepted 2017 claim repairs. He submits there is no reference to ’cash settlement’ in relevant notes. He acknowledges the insurer’s Terms of Settlement and Release document (with its offer of ’payment of the settlement amount’) was ’most likely sent’ to him, however he says he explicitly declined that.
The insurer confirms it agreed not to bind the complainant to the Terms of Settlement and Release, but instead agreed to ’work with‘ him throughout the repair of his property to ensure the scope of work and settlement issued was ’reflective of his loss‘ (in other words, to be able to deal with any possible variations or contingencies which might arise and make additional payments, as appropriate).
The claim and contact notes indicate the complainant had lost confidence in the insurer’s builders and assessors. He accepts that he engaged his own builder to complete the 2017 claim-related repairs. The evidence shows there was ongoing contact between the complainant and insurer with regard to the timing, costs and scope of the work. The insurer made several cash payments to the complainant, who in turn paid his builder.
The complainant submits it was never explicitly stated that the claim was being cash settled, and he states that at no point did he request a cash settlement. However, I consider that the course of conduct between himself and the insurer reflects the policy provision referred to above (at pages 50 and 51 of the product disclosure statement): it was the case that the complainant engaged his own builder and arranged the repairs through that builder, the insurer considered repair quotes submitted by the complainant and gave the complainant payment for the cost of the repairs.
On that basis I am satisfied the 2017 claim was cash settled, and the insurer’s lifetime guarantee does not apply to the repair work which was carried out by the complainant’s builder.
That means the insurer is not liable for repair of any defective work or poor workmanship identified by its experts.
Nor does the evidence show the insurer acted other than in the utmost good faith in its handling of the claim(s): it accepted liability under the policy for the 2017 claim-related damage; exercised its right to cash settle (taking account of the complainant’s own concerns about using the insurer’s repairers); and then made reasonable efforts to assist the complainant in his completion of the 2017 claim-related work, and in its handling of the claims overall.
Insurer required to promptly settle the accepted loss and damage
For completeness, I note the insurer has accepted certain loss and damage to contents, including flooring. It has also provided a report with regard to proposed mould remediation, and a scope of work for reinstatement of the property following that remediation.
In this complaint, the complainant has not specifically disputed either the cover for damaged contents, or that remediation report and scope. He has simply confirmed that he wants affected flooring dealt with, reinstatement of areas affected by the mould remediation (walls, painting, and reconnection of service outlets), as well as appropriate certification once mould remediation has been completed. On the evidence that has been provided, the insurer‘s proposed remediation and reinstatement work appears to address that, although it is up to the parties to finalise the specifics (if not already agreed), and it is also not clear what the insurer‘s actual cash settlement offer would be.
The insurer is required to cover the claim-related loss and damage, which it has offered to do. To be clear, any cash settlement for the accepted damage/repairs needs to be based on a quote(s) actionable by the complainant as a retail customer. That is to ensure the settlement is sufficient to allow the complainant to complete the necessary work.
Why is the outcome fair?
It would not be fair to require the insurer to cover a claim for damage which is excluded under the terms of the policy, and for which it is not liable under its lifetime guarantee, or otherwise.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.