Determination 12-00-1078657

Insurer refused to cover concrete slab underpinning, soil testing, loss of rent and expert costs after fire

FirmStrata Community Insurance Agencies Pty Ltd
Decided2025-04-03
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

A strata-insured investment property was destroyed by fire, and the insurer refused to pay for slab underpinning, soil testing, loss of rent and expert costs. AFCA found for the complainant, requiring the insurer to settle these items with interest and pay $4,000 non-financial loss.

The fire was the proximate cause of the need for slab underpinning before reinstatement, so the cited exclusions did not apply and the insurer was liable for the associated costs.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial loss

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1078657 | Financial firm | Strata Community Insurance Agencies Pty Ltd Case number: 12-00-1078657 1 April 2025 Determination overview Complaint The complainant lodged a claim with the financial firm (insurer) under a residential strata insurance policy. His investment property was destroyed by fire on 31 July 2023. The insurer accepted the claim and agreed to reinstate the property. It however refused to cover the cost of the concrete slab (slab), underpinning works including associated testing and expert costs incurred by the complainant. This is because the fire did not damage the slab, and the issue related to causes excluded under the policy. The complainant seeks the insurer pay for the slab repair and soil testing costs, loss of rent, his expert report costs, interest for the delayed settlement and non-financial loss compensation for its claim handling. Issues and key findings Is the insurer’s settlement fair? No. The complainant established a claimable loss for the fire damaged property. The proximate cause of the slab requiring additional works including soil testing was the fire. The insurer could not reinstate the property before fixing the slab’s level issues as recommended by its engineer T. The policy exclusions referred to by the insurer do not apply, in the circumstances. Given the above, the insurer is obliged to reimburse the complainant for the slab underpinning costs, soil testing that was necessary prior to commencing slab works, loss of rent for the period when slab works were performed, the expert report costs and interest on the settlements. Is the insurer required to pay compensation? Yes. The insurer’s claim handling caused severe stress, inconvenience and financial strain to the complainant. The insurer should therefore pay non-financial loss compensation as it could have managed the claim and its communication better. Why is the outcome fair? It is fair the insurer accepts liability for the claim covered under the policy terms. It is also fair the insurer pays compensation for its claim handling. Determination This determination is in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to settle the claim for the slab, soil testing, loss of rent, expert costs plus interest on the settlement as detailed in section 2.1. The insurer should also pay $4,000 non-financial loss compensation. Reasons for determination Is the insurer’s settlement fair? No. The complainant established a claimable loss for the fire damaged property. The proximate cause of the slab requiring additional works including soil testing was the fire. The insurer could not reinstate the property before fixing the slab’s level issues as recommended by its engineer T. The policy exclusions referred to by the insurer do not apply, in the circumstances. Given the above, the insurer is obliged to reimburse the complainant for the slab underpinning costs, soil testing that was necessary prior to commencing slab works, loss of rent for the period when slab works were performed, the expert report costs and interest on the settlements. Complainant must establish a claimable loss for the slab When making a claim, the complainant has the onus of establishing he suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability. Policy cover is subject to terms and conditions The policy covers Loss or Damage meaning the direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded (see section 3.2). The property was insured on a replacement basis. It allows the insurer to choose (acting reasonably) to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair. Parties provided different views on cover for slab repairs The complainant says: The insurer should accept cover for the slab works and soil testing his civil engineer (O) who concluded that the influence of the fire on the slab, particularly regarding upward deflection, must be acknowledged and not ruled out there was no notable settlement at the property the insurer’s loss adjuster said, ‘We can confirm [insured property] has been completely gutted and will require total rebuild’. This further supports the fire was the root cause why slab rectification was required insurer did not request the fire report to determine the duration of the fire and its impact on the slab before denying the claim the insurer met with T on 15 September 2023, and it took five months to decline cover for slab works. The insurer’s builder’s report dated 15 October 2024 states the insurance is looking for alternative solutions for underpinning workings in an effort to reduce cost T’s statement that the underpinning may have been required at the property, at some stage in the future, does not mean it was immediately required. The insurer says: indemnity is not available under the policy on this occasion for the underpinning of the concrete slab as the underpinning was not directly caused due to the fire damage, but was caused due to gradual deterioration, wear and tear and movement of the slab over its lifetime its engineer (T) said prior to any fire reinstatement building repairs commencing, the slab requires underpinning to correct the slab level O agreed with T’s opinion in respect of the structural integrity of the slab suggesting that there is no notable settlement movement or change in level that would compromise structural integrity. O failed to provide an alternative rectification solution to address the issues relating to the concrete slab previous underpinning repairs have been completed to another unit in the complex and it would appear there are other underpinning issues with other units within the complex the slab did not suffer a direct physical loss of or damage to from any sudden and accidental cause and several policy exclusions (exclusions 1(c)(i), 1(c)(ii) and 1(c)(iii), 1(d) and 1(m)) apply it is also not required to pay for further investigations including soil testing and loss of rent for the period of soil testing and underpinning works, in the circumstances. Insurer liable for concrete slab works and associated testing There is no dispute among the parties the complainant established a claimable loss for the damaged property. The insured property sustained extensive fire damage, and it was required to be reinstated. The parties have shared different causes for the cracking of the slab. The complainant says a serious house fire can generate enough heat to damage and weaken the concrete and steel reinforcement bars in footings, slabs, and footing stem walls. Intense fires can cause the breakdown of the chemical composition of concrete. Spalling, which is the damaging of the structural integrity of concrete, can also occur. While O indicated that the influence of the fire on the slab, particularly regarding upward deflection, T ruled out the slab suffered fire damage. T however confirmed in his various reports that prior to any fire reinstatement building repairs commencing, the insured property requires underpinning to correct the slab level. Underpinning and level correction will be required as part of the rectification work to establish a fit-for-purpose slab level. I am satisfied that there is no evidence that this was required prior to the fire. T says: the residual sections of the building must be fit for purpose to be incorporated in the rectified structure. When a building is constructed new, the elements are required to fall within the construction tolerances specifically set out by industry standards, such as the Queensland Building and Construction Commission (QBCC) Standards and Tolerances Guide, and generally accepted limits established in the construction industry, whether specifically regulated or not it is very difficult to undertake new construction when the starting position for level and height variation of the slab is grossly outside the acceptable limits and tolerances set by the industry underpinning works will be required for the footings and slab, to raise the lower areas of the building to an acceptable level, suitable for new construction. The slab levels vary up to 55mm from the highest to the lowest locations surveyed across the slab area. This amount of slab-level variation is considered unacceptable when assessed against current standards, tolerances, and general building practices the age of the footings and slab to be retained has been considered against the design life requirements of AS2870 Residential Slabs and Footings. It is considered reasonable to reuse the footing and slab system, even though the structural components are approaching the end of their theoretical design life the builder and contractors who are to rectify the building must be able to construct the building in compliance with current standards and ensure the building is to perform adequately under the requirements of their statutory QBCC warranty if the footings and slab are beyond the requirements of the QBCC 3.8 Levelness of Concrete Floors, their work will not comply. If the building was not underpinned and stabilized, and it underwent further subsidence, they may be required to rectify under the QBCC warranty conditions. The policy covered the insured property on a ‘Replacement’ claim settlement basis. This means the insurer is liable for: (a) the reasonable cost of rebuilding, replacing or repairing Your Insured Property to a condition which is equivalent to or substantially the same as but not better nor more extensive than when it was new; and (b) the extra costs necessarily incurred to: (i) alter or upgrade Your Insured Property to comply with Public, Statutory or Environmental Protection Authority requirements; (ii) flush out the air in the repaired, replaced, or rebuilt Insured Property with 100% outside air as required by The Green Building Council of Australia Green Star® or LEED® standards. but does not include any costs that would have been incurred in complying with orders issued prior to the happening of Loss or Damage. The insurer was required to reinstate the damaged property pursuant to the policy terms and conditions. I acknowledge the insurer has referred to several policy exclusions that may apply to the cause of the concrete slab cracking. This however is not relevant to this complaint as the exchanged information shows but for the fire, the insured property’s slab did not require any immediate repair works. It has long been established that the proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause. In this instance, the dominant and effective cause of the insured property damage, is the fire. Other properties in the Unit Complex requiring underpinning works are not relevant to the dispute at hand and the damage requiring reinstatement at the insured property. Further, the decision to use the existing slab instead of constructing a new slab for reinstatement works was the insurer’s decision. While T had initially recommended a screw pier option as the preferred method of underpinning, the insurer and its appointed builder chose the reinject option. The insurer is liable for any issues that may arise from the options it has chosen as part of its building reinstatement. This is because T said: he was not a fan of the resin injection systems but had no reason to object if he was satisfied the system will perform adequately he reviewed the reinject proposal and deemed it ok, provided the piers were founded in competent material, which would provide the required support for the building and prevent any further settlement. The whole purpose of the underpinning and re-levelling is to provide a suitable platform for the reconstruction of the new superstructure the contractor for screw pile underpinning works would provide a Form 15 and Form 12 (Design Certificate and Inspection certificate) for the works. The screw pile contract is a performance-based contract, i.e., the engineer nominates the capacity of the screw pile, and the contractor provides certification that the screw piles meet the design load requirement. The capacity is determined by using the torque readings when the pile is installed this is not the case with the reinject system, as there is no way of testing the capacity of the reinject piles. Therefore, the design engineer needs to satisfy themselves that the soil at the base of the piles, has the bearing capacity required to support the load. Hence, the requirement for the soil test. Given the above, the insurer was required to undertake the slab underpinning works before commencing property reinstatement works. Further, as explained above, its choice of underpinning method required soil testing prior to commencing the underpinning works on the slabs. The insurer is therefore liable to accept the repair cost of the slab works and soil testing cost. Loss of rent The insurer withheld payment for loss of rent for the period when the soil testing and concrete slab underpinning works took place. This is because it held the complainant liable for this part of the building reinstatement costs. Given, the above findings, the insurer is required to pay loss of rent for the period it withheld payment. Reimbursement of expert report costs The insurer incorrectly denied liability for the underpinning costs of the slab and soil testing. The complainant had no choice but to appoint an engineer to support his position and conduct the necessary testing and incur costs in obtaining a copy of the fire report etc. Given the above, including the finding of the slab underpinning costs in favour of the complainant, the insurer is obliged to reimburse the expert costs incurred including O’s report cost and the cost of the fire report. Interest on the settlement The insurer should pay interest on the settlements pursuant to section 57 of the Insurance Contracts Act 1984 from the dates the complainant settled the various suppliers’ invoices or the date the settlement was due to the complainant for loss of rent, until the date of the payment. Is the insurer required to pay compensation? Yes. The insurer’s claim handling caused severe stress, inconvenience and financial strain to the complainant. The insurer should therefore pay non-financial loss compensation as it could have managed the claim and its communication better. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: physical inconvenience time taken to resolve the situation interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Insurer should pay non-financial loss compensation The complainant would have experienced severe stress and inconvenience having to finance and organise the underpinning works for the slab, soil testing and arranging expert reports. It was unfair and unreasonable for the insurer to require the complainant to pay for these works. Its decision to stop paying loss of rent for the period of soil testing slab underpinning works would have caused financial strain on the complainant. The complainant was not pleased that the insurer failed to share T’s preferred initial option of screw pile underpinning system, which was not discussed with him. It is unclear why the insurer may have not discussed the available options for underpinning with the complainant. The insurer’s communication and its overall claim handling could have been better. The complainant also says he did not sign the building completion certificate as the defects were not fixed at the time by the insurer’s appointed builder. The complainant says the insurer making the final payment to the builder and closing the file, did not assist. Given the above, it is fair in all the circumstances the insurer pays the complainant $4,000 non-financial loss compensation. Why is the outcome fair? It is fair the insurer accepts liability for the claim covered under the policy terms. It is also fair the insurer pays compensation for its claim handling. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. PDS You are covered for the following Events.1. We will pay up to the Sum Insured shown on the Schedule for Section 1, against Loss or Damage to Your Insured Property on the basis set out in “Claims - basis of settlement”, including the cost of:… Claims - basis of settlement 1. Replacement If Your Insured Property is damaged, We may choose (acting reasonably) to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair. The amount We pay under Section 1 will be the cost of Replacement at the time of Replacement subject to the following provisions: (a) the necessary work of rebuilding, replacing or repairing (which may be carried out upon another site or in any manner suitable to Your requirements provided Our liability is not increased), must be commenced and carried out without unreasonable delay (provided that You will not be responsible for any delay caused by Us);… We will not pay for the cost to: (i) rebuild or replace Your undamaged Insured Property; (ii) rebuild, replace or repair illegal installations…. Expert Reports | Expert | Key points | Fire Investigation Synopsis Report 19-9-2023 | Due to the extended post-flashover burning in the structure all exposed surfaces were subjected to high temperatures and heat fluxes which effectively erased most useable fire patterns. All exposed combustible materials in the compartment exhibited burn damage. Observations of the location and intensity of the fire patterns within the structure indicated that a high volume of flame and heat had projected from, at or about floor level, within the area of the doorways to the three (3) bedrooms that were located at the south end of the structure. As a result of the continued thermal radiation produced, the intensifying fire causes all combustible surfaces in the compartment to reach their autoignition temperature and spontaneously ignite. This sudden and sustained transition to a fully developed fire is termed flashover. | Insurer’s engineer T Report 14-11-2023 | The slab levels vary up to 55mm from the highest to the lowest locations surveyed across the slab area. This amount of slab-level variation is considered unacceptable when assessed against current standards, tolerances, and general building practices. Underpinning and level correction will be required as part of the rectification work to establish a fit-for-purpose slab level. The age of the footings and slab to be retained has been considered against the design life requirements of AS2870 Residential Slabs and Footings. It is considered reasonable to reuse the footing and slab system, even though the structural components are approaching the end of their theoretical design life. The concrete strength has been assessed, there is no visual indication of any detrimental loss of concrete strength. Fine cracking was evident in the slab. Regarding the slab damage protocol in AS2870, Residential Slabs and Footings, the cracks are considered negligible to slight. It is the author's opinion the slab, when underpinned and level corrected, is fit for purpose to be incorporated in the rectified building. | Complainant’s structural engineer O Report 4-3-2024 | Conclusion: After conducting a detailed on-site inspection and a comprehensive review of relevant literature, it is my conclusion that the influence of the fire on the slab, particularly regarding upward deflection, must be acknowledged and not ruled out. Nevertheless, the theory that level discrepancies stem from foundation settlements seems unlikely. This judgment is grounded in the observed cracks' characteristics and dimensions, which do not align with the typical outcomes of foundation settlement. Should differential levels exceed acceptable thresholds, it is imperative to explore alternative solutions with a focus on cost-efficiency. | Insurer’s engineer T Report 25-3-2024 | The lack of any significant variation in the crack pattern and the fact that the slab cracking is not significantly different from normal shrinkage cracking support my conclusion that the slab is not significantly affected by the fire and is suitable for reuse. The QBCC specification of standards and tolerances details the expectation of the building industry regulator for the maximum variation considered acceptable for construction by industry professionals. Poor construction is typified by random discrepancies across the building footprint and not a pattern as observed in unit 16. The pattern of slab deflection observed and recorded is typical of building subsidence. Based on experience and building practice, it is reasonable to conclude that the footings and slab were not constructed in the deformed and misaligned state indicated by the level survey results. I understand from information provided by the Insurer, that other buildings in the estate have had underpinning works due to subsidence issues. Subsidence is common in floodplain environments such as the Coomera River floodplain. Regardless of how the slab ended up in this state, the rectification works cannot be constructed and warranted on a slab in such a condition without some form of re-levelling and the assurance of adequate ongoing support for the footings.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.