Home / QBE / Determination 12-00-1078466

Determination 12-00-1078466

Partial denial of storm claim for foundation and chimney damage attributed to long-term earth movement

FirmQBE
Decided2025-03-13
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Landlord insurer accepted storm damage but denied foundation and chimney damage, relying on engineering evidence of long-term earth movement. AFCA found in favour of the insurer; the accepted repairs remain available as cash settlement or repair.

Complainants failed to establish damage was caused by landslide within 72 hours of the storm, and earth movement over time is excluded under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1078466 | Financial firm | QBE Insurance (Australia) Limited Case number: 12-00-1078466 25 February 2025 Determination overview 1.1 Complaint This complaint relates to a claim by the complainants under their landlord insurance policy held with the financial firm (insurer), for damage to the insured property caused by a storm. The insurer has partially accepted the claim. It has denied liability for the damage to the foundations of the building and the chimney. It says the complainants have not established this is a loss which is covered by the policy. Alternatively, the insurer says that the cause of the damage to the foundations and chimney is excluded from cover under the terms of the policy. 1.2 Issues and key findings Is the insurer entitled to deny liability for the damaged foundations of the building and chimney? Yes. Given the exchanged material the insurer is entitled to rely upon the terms and conditions of the policy to deny the complainants‘ claim for damage to the foundations and chimney. Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainants, regarding the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to cover the claimed damage to the foundations of the building or chimney. Should the complainants accept this determination: if the claim is to be cash settled, the insurer is to pay the complainants $65,571.28 plus 20% within 14 days of being notified of their acceptance of the determination. if the insurer is to undertake repairs, the insurer is to commence work in accordance with the CR scope of works (SOW) as soon as practicable after being notified of the complainants' acceptance of the determination. 2 Reasons for determination 2.1 Is the insurer entitled to deny liability for the damaged foundations of the building and chimney? Yes. Given the exchanged material the insurer is entitled to rely upon the terms and conditions of the policy to deny the complainants‘ claim for damage to the foundations and chimney. Coverage of the policy The complainants‘ home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). The panel is satisfied that the PDS and COI have been provided to the complainants. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainants. Insured events include landslide and subsidence. The PDS details the cover as follows: Landslide or subsidence We will cover Loss or damage as a result of a landslide or subsidence if the loss or damage occurs within 72 hours of an Insured Event being: ... A storm, rainwater, flood or wind ... We won’t cover Any other earth movement General exclusions that apply to all covers under the policy are at page 37 of the PDS as follows: There is no cover under any section of your Policy for any claim, loss, damage, cost, injury, death or legal liability, that is caused by or arises from: ... Earth movement except for under the Insured Event Landslide or subsidence; ... It is accepted insurance law that the complainants carry the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Once the complainants have established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. Circumstances of the loss and claim The complainants lodged their claim with the insurer on 15 February 2023, advising that their property had been damaged by an event that occurred on 6 March 2022. The complainants say there was extremely heavy rain during the storm on 6 March 2022 which caused landslides that destabilised the foundations of the building. They say the excessive rainfall has softened the soil under the house which has destabilized it. The complainants also say the property was impacted by five floods within a three-year period before the date of loss which contributed to the damage. There is no dispute the property was affected by a heavy rainfall storm event on 6 March 2022. The insurer accepted the claim for other damage at the property. The dispute between the parties relates to the damage to the foundations and chimney caused by earth movement. On receipt of the claim the insurer engaged engineer EI to provide an opinion regarding the cause of damage. EI inspected the property and provided a report dated 9 February 2023, although likely this is a typographic error, and the correct date is 9 March 2023. EI noted the following damage at the property: a tree had collapsed and impacted the western external wall a landslide had occurred along the western wall a bedroom and a bathroom had suffered from water ingress during the storm event separation and movement between the western external wall and the chimney and says this is due to the tree impact. The insurer partially accepted the claim based on EI’s report. The insurer denied the claim for movement damage to the foundations and chimney. The insurer engaged a builder CR to quote on the accepted repairs. CR’s quote is for $65,571.28 and includes an allowance for removal and repair of all wall and roof cladding and internal ceiling and wall linings along the western external wall. The complainants disagree with the EI report and also say EI was not a qualified engineer but was a student at the time he provided the report. The complainants engaged their own engineer, PX. PX attended the property and provided a report regarding the cause of the movement-related damage to the building. The report is dated 12 December 2024 and includes the following observations: aerial imagery shows earth slip and tree fall occurred as a result of the storm event there is a significant chimney lean the movement of the chimney is outwards and to the northwest of the building, not in the direction of the tree fall a movement of the west sliding door and spirit level shows the northwest corner of the suspended floor area is tilting downwards and to the north there are various mild to moderate internal cracks in the northwest area of the building the movement of the chimney is not a result of the tree impact. PX concluded that the movement of the chimney and damage at the rear of the building is consistent with and caused by ground movement that resulted from the slip of land to the northwest during the storm. As a result of the conflicting findings, the insurer appointed a forensic structural engineer LC. The insurer engaged LC initially in January 2024 to review the previous reports and then again in February to inspect and report on the damage. LC provided three reports; one on 29 February 2024 and two supplementary reports on 15 July 2024 and 29 July 2024. LC concluded the storms and external land movement caused direct damage to the property, being the damage accepted by the insurer, but that the overall movement of the property was not consistent with a storm event. The LC report made the following conclusions regarding the cause of damage: It is the opinion of [LC] that the observed damages to the building have been caused by stresses induced from building movements due to one or more of the following contributing factors: Long term differential footing movement due to differential moisture content variation in the reactive foundations as a result of one or more of the following contributing factors: > A reduction in moisture content of the reactive clay foundation contributed to by tree root drying effects due to the groups of large sized trees within close proximity to the structure. This is considered a primary contributing factor to footing settlement toward the north and east sides of the building. > Removal of groups of large sized trees within close proximity to the building. > Changes in soil moisture content due to seasonal and climatic effects. > Long term consolidation of the clay foundations. - Inadequate stiffness of the existing footing system to effectively alleviate the effects of foundation reactivity subject to normal soil moisture conditions. - Inadequate founding depth of the existing footing system to alleviate the effects of foundation reactivity subject to abnormal soil moisture conditions caused by the trees within close proximity to the building. - Potential inadequate foundation soils due to site filling resulting in consolidation of the foundation and subsequent footing settlement under load. - Inadequate subfloor bracing resulting in rotation of the subfloor stumps from nominal design actions due to wind pressure and ground movement. - Inadequate lateral restraint between the chimney and building resulting in independent movement and gapping between the structures as the chimney undergoes movement caused by detected differential footing movement issues. - Long-term dilapidation and normal building stress due to one or more of the contributing factors identified [above]. It concluded that there was no evidence of storm-caused landslip under the slab or footings, rather the movement under the house was long-term movement. Based on the LC report the insurer maintained its decision to partially deny the complainants‘ claim. As stated, the complainants have the initial onus to demonstrate a loss that is covered by the terms and conditions of the policy. There is no doubt there is damage to the foundations and chimney, but it is accepted insurance law and consistent with the coverage provided by the policy, that the complainants must establish that the damage was caused by the landslide within 72 hours of the storm event. Once the complainants establish a loss of the type covered by the policy, the onus shifts to the insurer to establish one of the policy exclusions applies entitling it to deny the claim. Information shows movement related damage not covered by the policy The panel is satisfied that the report from engineer LC is thorough, logical, compelling, and contains a detailed analysis and explanation of the mechanisms of the damage, and it is supported by helpful photographs and diagrams. LC's conclusions are supported by soil and slab thickness testing, and floor survey results which seem indicative of a gradual movement and fall from +24mm to -54mm from south to north (front to back), a rotational analysis of the stumps and the chimney and an analysis of the slope stability. LC also points out that the chimney was likely on a separate footing from the house, and it sits at the point where that floor starts to subside from 0mm to 40mm which supports that the chimney damage is more likely related to the settlement at that location. The panel acknowledges the reports from the complainants’ engineer PX suggests that the building movement occurred during the storms, however the PX report is brief and lacks analysis regarding how this conclusion has been reached. One of the complainants is an earthmoving specialist in sub surface water management and relies on his expertise and experience over many years to challenge the findings of the LC reports. He says subsurface water flow travels through the shale and during heavy rain it runs over the shale softening the soil above. He says this has caused the damage to the house as it has removed the stability under the footings. The panel acknowledges the complainant has extensive experience in the earthmoving industry, however the panel is not persuaded by the complainant’s view. It is unclear what the complainant‘s training and qualifications are, and he has not provided any other expert evidence to support his claims. As stated, the panel considers the report from engineer LC to be thorough, logical, compelling, and contained a detailed analysis and explanation of the mechanisms behind the damage. Further, the panel notes LC found no evidence of displaced soil beneath the building. It says the distance of the landslips at the south and northwest of the building is too far to affect the foundations of the building. This is further supported by rotational analysis of the stumps in the north side of the building that shows the pattern of the rotation is not consistent with single direction rotation that could be caused by a landslip. The complainants provided many images and some videos, however there is no clear context to these in terms of the actual events claimed. In these circumstances the panel cannot place much weight on these videos to support that the cause of damage was the storm. It is the panel‘s view that the LC reports have established that the damage at the property has not been caused by earth movement within 72 hours of the storm event, but that it has been caused by earth movement occurring over time. The panel is satisfied that the policy does not provide coverage for this damage, as the cause of the damage, earth movement not occurring within 72 hours of a storm event, is specifically excluded from coverage under the terms and conditions of the policy. The result is that the insurer is to deny liability for the damaged foundations of the building and chimney. Parties to settle claim in accordance with the terms of the policy The insurer accepted all other damage claimed at the property as being caused by the storm. As stated, the insurer engaged builder CR who provided a quote in May 2024 for $65,571.28 for the accepted repairs. Given the quote is from May 2024, if the claim is cash settled, the panel considers an uplift of 20% is reasonable to compensate the complainants for the transfer of the risk of repairs to them and the loss of warranty. Should the complainants accept this determination:  If the claim is to be cash settled, the insurer is to pay the complainants $65,571.28 plus 20% within 14 days of being notified of their acceptance of the determination.  If the insurer is to undertake repairs, the insurer is to commence work in accordance with the CR SOW as soon as practicable after being notified of the complainants' acceptance of the determination. 2.2 Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainants, regarding the claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: an ombudsman a member with significant experience in consumer and small business advocacy a member with extensive experience in the insurance industry We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. The essential factual context that has informed your decision might be drawn from: financial details, such as bank account or insurance claim history reports, statements or correspondence information about the parties, such as age or history, if relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.