Determination 12-00-1078159

Cash settlement amount for storm and stormwater damage; underpinning repairs declined

FirmIAG
Decided2024-10-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$91,067
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant rejected the insurer's cash settlement offer for stormwater damage to his home and sought underpinning repairs. AFCA accepted cash settlement but ordered a 20% contingency uplift, temporary accommodation and contents removal and storage costs.

Inadequate footings not damaged by the insured event need not be underpinned, but a cash settlement must include contingency and associated costs under the policy's replacement benefit terms.

Issues

Subjects and remedies

home or building damagepay claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1078159 | Financial firm | Insurance Australia Limited Case number: 12-00-1078159 16 September 2024 Determination overview Complaint The complainant, together with his partner, holds a home and contents policy with the financial firm (the insurer). On 19 March 2018 the complainant lodged a claim for damage to his property following a storm on 1 March 2018. Following plumbing investigations, it was determined the cause of damage was due to stormwater escaping from a broken drain. The insurer has accepted the claim and offered a cash settlement. The complainant rejected the cash settlement and wants the insurer to repair the damages. He says that the cash settlement is insufficient to repair the damages and that the insurer should cover the costs to underpin the property. The insurer says that it cannot warrant the repairs due to undersized footings which may result in further movement in the future. The complainant is represented by his broker, VL. The complainant and VL are referred to in this determination as ‘the complainant’, unless context requires otherwise. Issues and key findings Is the insurer’s offer of settlement fair and reasonable? No. The insurer should increase its offers of settlement to include a contingency uplift of 20%, an additional sum for temporary accommodation costs and the removal and storage of contents while the repairs are undertaken. The insurer is otherwise entitled to decline to undertake the repairs given that the footings on the property are inadequate and it is not required to underpin the property. Why is the outcome fair? The insurer has established that the footings are inadequate and therefore it is appropriate that the insurer cash settle the complainant. However, fairness requires that the cash settlement offer is increased to allow for contingencies, temporary accommodation and storage costs. It would be unfair to require the insurer to rectify the footings which were not damaged from the insured event. Determination This determination is substantially in favour of the insurer. Should the complainant accept the determination, within 21 days of receiving written notice of the complainant’s acceptance, the insurer is to: pay the complainant $91,067.14 which includes a 20% uplift pay the complainant 6 weeks of temporary accommodation in accordance with the policy terms obtain a quote for the removal and storage of contents for 6 weeks and cash settle the complainant based on this quote. Reasons for determination Is the insurer’s offer of settlement fair and reasonable? No. The insurer should increase its offers of settlement to include a contingency uplift of 20%, an additional sum for temporary accommodation costs and the removal and storage of contents while the repairs are undertaken. The insurer is otherwise entitled to decline to undertake the repairs given that the footings on the property are inadequate and is not required to underpin the property. Complainant bears onus to establish claimable loss The complainant is required to show, on the balance of probabilities (that is more likely than not), that he suffered a claimable loss under the policy. This means that he must show the loss was caused by a risk for which he is insured. Subject to the terms and conditions set out in the Product Disclosure Statement (PDS), the policy provides cover for accidental loss or damage. Accidental damage is not defined in the PDS and therefore must be given its ordinary and natural meaning. This is to be interpreted as damage that is unexpected or unintended. The insured property is a double storey building built in 2003. The complainant noticed cracking in the walls, parquetry flooring and external cracking to the brickwork. Plumbing investigations confirmed that stormwater had escaped from a broken drain, causing structural damage to the complainant’s property. The parties do not dispute that the damage to the property has been caused by the escape of liquid (stormwater) event that is covered under the policy. The insurer says that it is not required to cover the costs to underpin the property as the footings were not damaged because of the escape of stormwater. Rather, the footings size is inadequate. To the extent that the insurer intends to limit cover under the policy, the onus rests with the insurer to show, on balance, any conditions or exclusions it relies upon apply. Insurer has obtained expert reports The insurer has obtained several expert reports to investigate and assess the damage. Initially after the claim was made, the insurer appointed a builder JP to assess the property. JP arranged for a plumber PB to carry out CCTV inspections to the stormwater and sewer drainage systems. PB confirmed the repairs to a large portion of the stormwater., with approximately 8 metres having been repaired approximately two weeks prior. PB noted that the past defects had caused the stormwater to back up and overflow out of the stormwater pits at the rear left and right of the property. JP observed the damage as including: exterior brickwork to the right-hand elevation of the rear of the property cracked and construction joints had opened gaps had appeared down the sides of the ground floor and first floor windows crack to the granite benchtop gaps between the walls and the over cupboards damage to parquetry flooring cracking to first floor cornice. JP recommended that the property was underpinned as per the recommendation of the engineer and scope of works. However, JP said that the property would require 12 months of drying and for the ground to stabilise. The insurer appointed an engineer, HE to inspect and investigate the stability of the property. HE provided a report dated 27 June 2018. HE noted that according to the geological map the soil in the area is classified as Class M type- moderately reactive clay. HE observed damage in addition to the damage noted by PB, including cracking on the first floor. HE concluded that the cracking and movement occurring was typical of problems that can occur because of differential settlement of the footings. HE noted that Melbourne had been very dry, particularly in the last few summers. Leaks or overflowing pipes can then accentuate the seasonal changes in the moisture content. HE provided an additional report dated 31 January 2020 after a period of drying. HE conducted a floor level survey that found there was a drop in the floor levels around the south-west corner of the property and along the west wall. There was also noted to be a drop from the centre of the property to the front east wall of the property. HE found that the additional damage observed around the front section of the property was a result of seasonal changes which were possibly accentuated by the leaking pipes or inadequate footings. HE did not recommend any releveling of the floor works by resin injection/pressure grouting methods as cosmetic repairs were believed to be adequate to repair the damage. However, noted that this conclusion was subject to geotechnical investigation to investigate the footings and foundation material to determine whether the existing footings were adequate. The insurer then appointed a geotechnical engineer, CT to conduct further testing. The testing found that the existing footings were founded at 350mm depth below the existing surface level. CT concluded after considering the area geology, the soil profile encountered in the bores, the proposed superstructure and the climatic zone of the area, the site was classified as Class H2 with respect to foundation construction. CT says that the relevant Australian Standard (AS) recommends that for a Class H2, the slab on ground should be used at this site with edge beams founded not less than 400mm below the finished surface level surrounding the structure. CT therefore concluded that the existing footing is founded at less than the minimum depth recommended for the site classification. HE provided a further report dated 19 March 2020, following a review of the report from CT and relevant soil testing results. HE noted that for soil classified as H2- highly reactive soil, seasonal changes in moisture content can cause up to 75mm of movement at the surface of the soil (as compared to the original expected movement of 25mm as noted in the original report dated 27 June 2018). HE concluded that the inadequate footings made the property a brittle structure that is susceptible to cracking/movement occurring. HE did not believe that the observed damage at the front of the property was from an escape of liquid but rather was from seasonal movement. HE provided a further response to the insurer dated 18 November 2022 saying that it does not recommend underpinning of concrete slabs as it forms a void under the slab and can also create additional stresses at the junctions of the internal slab beams and the edge beams, particularly when jacking is used. The insurer says that the builders, both JL and JP, are unable to warrant the repairs due to the undersized footings. The insurer has offered to cash settle the complainant based on a quote provided by JP. The quote includes damage to the front of the property. The insurer has offered a further 10% contingency uplift to the quote to the sum of $83,473.21. Complainant says that insurer should cover underpinning costs The complainant relies on a Slab scan (SS) report dated 3 February 2021. He says that this supports that the footings are compliant as they are at a depth of 400mm. The complainant has also obtained a report from an engineer, JK dated 21 November 2023. JK recommends that the property is underpinned to prevent further movement and deterioration. JK says that the most cost-effective method of rectification would be mass concrete underpins to the areas that have been affected. This would bring the building back to its original situation. The complainant has obtained a quote from VM for the injection of resin in the amount of $12,320. He has also provided a further quote from VM for underpinning of the property in the amount of $67,485. The resin quote was sited as an additional requirement to elevate specific areas where levels have dropped. The complainant says that they have always been advised since the first assessment by JP and JL that underpinning by either underpinning or pressure grout injection or a combination of both was required. The complainant says that the offer from the insurer is inadequate and that if the complainant were to engage a private builder, the costs would be three to five times more expensive. Insurer not required to cover costs of underpinning I am not satisfied that the insurer is required to undertake the underpinning or the costs of underpinning. HE has noted that it does not recommend underpinning saying that this forms larger voids under the slab and can create additional stresses at the junctions of the internal slab beams, particularly when jacking is used. HE recommends removing all external influences on the slab, as much as possible, and then relevelling back to a reasonable position using resin injection/pressure grouting methods. While the complainant’s engineer JK has proposed underpinning, it is noted that this is also for the purpose of preventing further movement and deterioration. JK has not responded to HE’s concerns about the use of the underpinning method. JK’s report is brief and does not include any analysis of the soil type or reasoning why it considers underpinning to be the most effective repair method. I prefer the opinion of HE who has assessed the property with reference to the testing results from CT in reaching its conclusion. Further, JK has not commented whether underpinning is necessary to address the inadequate footings size. While the complainant says that the footings are compliant with AS based on the SS report, the complainant has not considered the findings from CT who found that the test pit revealed an existing footing of 350mm below the existing surface. There are some variances in the footing depth at various locations, and the SS report notes that the depth is an estimate. The insurer’s quotes from JF and JP include the cost of resin injection. JP’s quote allows for $15,900 which is more than the complainant’s quote from VM. Insurer can cash settle but should increase the contingency uplift Page 30 of the PDS provides: When your schedule shows ‘including replacement benefit’ When loss or damage occurs to your buildings, we will pay the cost of rebuilding your buildings or repairing the damaged portions to the same condition as when they were new. We will only do this when your schedule shows ‘including replacement benefit’. The complainant’s COI confirms that they held the ‘including replacement benefit’ option. It further provides: Rebuilding or repairing your building must commence within six months of the loss or damage occurring. If it does not commence within six months, we will do one of the following: - reinstate or repair your buildings to the condition they were in just before the loss or damage occurred - pay you the cost of reinstating or repairing your buildings to the condition they were in just before the loss or damage occurred - pay you the value of the land and your buildings just before the loss or damage occurred. We will reduce this payment by the value of your land and your buildings after the loss or damage occurred. We decide which one we will do. The insurer says that both builders JP and JL are unable to warrant the repairs as the footings are inadequate. Further movement was noted to be likely. I am satisfied based on the report from CT, who commissioned the scan survey of the slab, that the footings do not comply with current standards for the soil conditions and therefore the builders are unable to warrant repairs. I am satisfied in the circumstances that it is appropriate for the insurer to cash settle the complainant. The complainant has not provided evidence to substantiate his claims that he would be unable to engage a private builder to undertake the works for the costs of the insurer’s builders. The insurer’s builder JL has confirmed that the quote remains current and actionable. However, for a cash settlement, the insurer is required to provide an uplift for contingencies. In the SOW prepared by both JP and JL there are noted to be several variables. This includes that the west external brickwork can be adequately repaired by locally raking out and repointing the affected brickwork and sealing and remaining gaps. Noting that the quote is also now dated, it is appropriate to increase the contingency uplift to 20%. That is, based on the quote from JP, the insurer is to cash settle the complainant in the sum of $91,067.14. The quote from JL noted that the complainant would require approximately 12 days of temporary accommodation. When responding to the question posed by AFCA in relation to temporary accommodation, the insurer provided an estimate of 6-8 weeks. Noting the limited time suggested by JL, I am satisfied that an estimate of 6 weeks TA would be sufficient. No details have been provided by the parties of the cost of a suitable rental property. This is to be determined in accordance with the policy terms. The quote from JL on which the insurer has based its cash settlement offer does not allow for the removal of contents to facilitate the works. The insurer is to obtain a quote for the removal and storage of contents for a period of six weeks and cash settle the complainant these costs. Why is the outcome fair? The insurer has established that the footings are inadequate and therefore it is appropriate that the insurer cash settle the complainant. However, fairness requires that the cash settlement offer is increased to allow for contingencies, temporary accommodation and storage costs. It would be unfair to require the insurer to rectify the footings which were not damaged from the insured event. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.