Home / Allianz Australia / Determination 12-00-1077521

Determination 12-00-1077521

Partial denial of flood damage claim, debris removal and temporary accommodation benefits, and cash settlement amount

FirmAllianz Australia
Decided2024-12-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$185,681
Non-financial loss$2,500
Amount claimed$396,645
SourceAFCA PDF

Summary

A homeowner claimed flood damage including floors, decks, pool area and debris removal, and the insurer partially denied it and offered $181,881.12. AFCA found most disputed damage was excluded as wear, deterioration or soil movement, but ordered a cash settlement of $185,680.52 plus a gyprock quote, interest and $2,500 non-financial loss.

The complainant must prove a covered loss, and the insurer may rely on exclusions for wear and tear and soil movement, though it must pay for the damage it accepted.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossreassess claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1077521 | Financial firm | Allianz Australia Insurance Limited Case number: 12-00-1077521 29 November 2024 Determination overview Complaint This complaint relates to a claim by the complainant under his home and contents insurance policy held with the financial firm (insurer), for damage to the insured property caused by flood. The insurer has partially accepted the claim but has denied the claim for some damage. It says that the complainant has not established the disputed damage is covered by the policy. Alternatively, the insurer says that the cause of the disputed damage is excluded from cover under the terms of the policy. The complainant says the insurer should accept all the claimed damage. He also says the insurer should pay the temporary accommodation and debris removal benefits under the policy. 1.2 Issues and key findings Is the insurer entitled to partially deny the complainant’s claim? Yes. Given the exchanged material the insurer is entitled to rely upon the terms and conditions of the policy to partially deny the complainant’s claim. Is the complainant entitled to additional benefits under the policy? No. The information shows that the complainant is not entitled to the temporary accommodation additional benefit or debris removal additional benefit under the policy. Did the insurer mishandle the claim? Yes. The panel is satisfied the insurer mishandled the claim causing undue stress to the complainant, and that compensation for non-financial loss of $2,500 is warranted. Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim. Where the insurer’s actions have caused undue stress and delay it is fair to require it to pay the complainant compensation for his non-financial loss. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is entitled to partially deny the complainant’s claim. Should the complainant accept this determination, within 14 days of being notified of his acceptance, the insurer is to:  pay the complainant the cash settlement as follows: > $153,617 (for the damage detailed in SOW 2 plus $2500 for tile sealing), less any applicable policy excess, (if it has not already done so) > $30,063.52 - 20% contingency > $2,000 - allowance for professional fees.  obtain an actionable quote for demolition, debris removal and replacement of the gyprock lining (including plastering and painting) for the downstairs storeroom and pay the complainant that amount plus 20%.  pay the complainant interest on the tile sealing costs and gyprock removal and replacement costs pursuant to section 57 of the Insurance Contracts Act (1984) from the date the insurer made the settlement offer to the complainant, until the date payment is made by the insurer.  pay the complainant $2,500 compensation for non-financial loss. 2 Reasons for determination 2.1 Is the insurer entitled to partially deny the complainant’s claim? Yes. Given the exchanged material the insurer is entitled to rely upon the terms and conditions of the policy to partially deny the complainant’s claim. Coverage of the policy The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. Insured events include ’flood.’ The PDS details the flood cover at page 23 of the PDS as follows: What’s covered Loss or damage caused by: • flood* ... Loss or damage caused by or arising from: • soil movement, including erosion ... • subsidence if it is caused directly by and occurs within 72 hours of a flood What’s not covered Loss or damage caused by: ... • soil movement including erosion, landslide, mudslide or subsidence – unless it is directly caused by, and occurs within 72 hours of the flood • by shrinkage or expansion of earth or land • hydrostatic pressure. Loss or damage to: • gates or fences that aren’t well maintained and are in poor condition to the extent that the condition caused or contributed to the loss or damage • retaining walls, pontoons, jetties or bridges • swimming pool and spa covers, their liners or their solar domes. The cost of cleaning mud or debris out of tanks, swimming pools or spas. The policy has several general exclusions that apply to all cover. These are detailed from page 53 of the PDS and include the following: Things we won’t cover ... Wear and tear Including depreciation, gradual deterioration, wear and tear or lack of maintenance. Inherent defects Including faulty design or materials, structural defects or poor workmanship. ... Soil movement Including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. Circumstances of the loss and claim The complainant lodged his claim with the insurer on 19 December 2022 advising that the property had been damaged by a flood event that occurred on 28 February 2022. It is not in dispute between the parties that the property was damaged by flood. The flood waters inundated the subfloor of the dwelling, and fully submerged the pool area, however, did not reach the upper level of the dwelling. The parties dispute the extent of the damage caused by the flood, in particular damage to the timber deck and walls of the pool area, and cracking damage to the upper level of the house. On receipt of the claim, the insurer engaged building consultant MK to report on the cause of damage. MK attended the property on 31 January 2023 and noted damage to several areas of the property and recommended assessment of the damage by a structural engineer. The insurer appointed a structural engineer (ME) to report on the cause of damage to the pool area and paving tiles and the cracking to the internal floor tiles in lounge/dining/kitchen areas. ME attended the property and provided a report dated 28 February 2023. ME says the various cracking and gaps to the internal and external linings, floor tiles, slabs and concrete are all consistent with the effects of normal long-term differential movements. ME says the following regarding the cause of damage: The scraping to the sliding door is consistent with normal long term deflection of the lintel bearing onto the door frame. The gap between the western side of the pool and the timber decking is consistent with the distortion to the timber bearer under the deck adjacent to the pool shell. The distortion to this bearer has occurred as a result of a lack of fixing to the timber posts below and normal age related movements, such as timber shrinkage as described above and is unrelated to the flood event. The decay to the pool decking on the western side of the pool and to the timber bearer on the western side of this deck is consistent with exposure to normal environmental conditions.... This process of decay occurs over a long period of time and would not be affected by a one-off flood event. The cracking to the concrete bases of the stumps beneath the deck is consistent with normal movements, such as concrete shrinkage as described above. The fretting to the cracks indicates that the cracks have occurred prior to the February 2022 flood event. ... MK provided a SOW and quote for repairs for $366,945.46 (SOW 1) which included all damage to the property. A second engineer‘s report was arranged and a site inspection undertaken on 23 September 2023 by engineers SB. This was to determine the cause of damage to the pool area tiles and to the internal floor tiles in the lounge/dining/kitchen areas which was included in SOW 1. SB noted the cracking to the floor tiles, and that cracking was more prominent in the dining/lounge which is supported on a timber flooring system. SB says: the proximate cause of cracking to the floor tiles at the transition between the slab-on-ground portion of the residence and the suspended timber floor system to the dining/lounge is differential movement between two different footing systems. The general cracking to the floor tiles in the kitchen/dining/lounge is not consistent with foundation movement from the flood event. Regarding the external damage, SB says:  the adhesive failure of the stair and floor tiles of the pool area was occurring over time, although it could have been exacerbated by the inundation over 2 – 3 days  the pool coping tiles were damaged when the fencing collapsed during the flood  the sandstone wall at the eastern end of the pool was heavily deteriorated and not flood damaged  localised cracking to floor tiles at the transition between the pool area and western timber deck is not the result of a single flood event. Following receipt of the SB engineering report, the insurer obtained an updated SOW and quote from MK for $150,317.60 (SOW 2) for repairs to the damage caused by flood identified by its experts during the assessment. SOW 2 includes replacement of pool coping tiles and the tiles surrounding the pool but excludes the damage in the second story of the house, the damage to the timber deck and sandstone wall in the pool area. The complainant was dissatisfied with SOW 2. He says it does not cover all the damage caused by the flood, and that because the insurer said it would cash settle the claim based on SOW 1 it was obliged to do so. The insurer appointed building consultant JG to further report on the cause of damage to the pool area tiles and to the internal floor tiles in the lounge/dining/kitchen areas. JG attended the site on 2 November 2023 and was instructed not to review the previous reports so that he could provide an independent view regarding the damage. JG concluded the following regarding the cause of damage to the internal tile cracking and rear timber structure: It is our opinion that the cracking to the floor tiles is not related to the event and is the result of overall movement in the suspended timber floor below and differential movement between the concrete slab and suspended timber floor. ... Multiple issues to the timber section, such as post/beam connections, decay to floor joists, cracks to supporting walls, large holes in supporting walls, and excavation around the supporting wall’s footings, are all considered to be contributing to this movement within the timber structure and are not related to the event. It is our opinion that the cracks and gaps seen are not related to the event and are indicative of long-term movement in the timber section consistent with our expectations as well as consideration of the unrelated contributing issues The timber deck is in a deteriorated state due to its age, with signs of long-term cracks and movement. No signs of damage from the event was seen. Based on its expert reports the insurer maintained its partial denial of the claim saying the cracking to the kitchen floor, damage to the rear timber deck and sandstone walls of the pool area was caused by wear and tear, gradual deterioration and soil movement, which are excluded under the policy. The insurer says the repairs cannot be warranted due to the construction of the property, being half concrete slab bearers and joists. It says the transition from the concrete slab to bearers and joists has ongoing movement related issues. The insurer offered to cash settle the claim and pay the complainant $181,881.12, calculated as follows: $150,317.60 – for the damage detailed in SOW 2 $30,063.52 - 20% contingency $2,000 - allowance for professional fees. Complainant says cash settlement offer is not reasonable The complainant rejected the insurer’s cash settlement offer. The complainant says that the insurer’s cash settlement offer was inadequate as it did not represent a reasonable assessment of the cost of repairing the claimed damage, and that the disputed damage to the deck and pool area and internal floor tiles were caused by the flood event in February 2022. The complainant also says because MK advised him that the insurer accepted a settlement amount of $366,945,46 based on SOW 1, and that the insurer is now obliged to pay him that amount. Further, he says the insurer’s employee advised on a phone conversation that:  she has reviewed the expert report and decided not to use the report  she will approve the claim in full to include all damaged areas  she will approve his claim and instruct MK to be a cash settlement quote  she offered to send a copy of the report to him, but he said ‘no need seeing [she is] approving my claim in full’  MK would contact him ‘to make sure everything was covered.’ The complainant also disputes the suitability of JG‘s qualifications, saying their ‘LinkedIn’ information indicates they do not have any relevant building qualification and have only been a project manager in their current role for about a year. The insurer denies it offered to settle the claim for the higher amount and says it has searched its recorded calls and there is no recorded call to support that it did. The insurer acknowledges that a higher scope of works amount was relayed to the complainant by its loss adjuster via SMS from MK on 24 November 2024, however it says it is not bound by SOW 1 and its settlement offer is fair and reasonable. Complainant bears onus of showing proximate cause of damage is flood As stated, the complainant has the initial onus to demonstrate a loss that is covered by the terms and conditions of the policy. There is no doubt there is damage, but it is accepted insurance law and consistent with the coverage provided by the policy, that the complainant must establish that the damage was caused by a flood, as detailed within the terms and conditions of the policy. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause causes loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause. Information shows, on balance, downstairs storge area was lined with gyprock The complainant says the downstairs storage room was lined with gyprock, and that after the flood he stripped the damaged gyprock out. The complainant works stripping out buildings, so he says he attended to doing this straight away rather than waiting for the insurer. The complainant says he did not take any photos of the damage, but he has provided photographs showing the glue remnants where the gyprock sheets were glued to the timber structure. The panel is satisfied, on balance, the downstairs storage area was likely lined with gyprock which was damaged by the flood. The photos show that the fixing points for the gyprock are still on the timber support structure, and because his room is part of the main house dwelling, although downstairs, it more likely than not was lined. The result is that this damage is covered by the policy. Information shows, on balance, some damage is excluded from cover The complainant has not provided any information to support that the cracking damage inside the house and the disputed damage to the timber deck and deck and walls of the pool area was caused by the flood. The panel is satisfied the reports from engineers ME, SB and building consultant JG are thorough, logical, compelling, and supported by helpful photographs. It is the panel‘s view that these reports establish that the proximate cause of the damage to the living room area, timber deck and walls of the pool area was not the flood event. Rather, these reports have established that the damage has been caused by wear and tear, gradual deterioration and soil movement which are excluded under the policy. Regarding the pool area, the insurer accepted the claim for damage to the coping tiles and pool area floor tiling based on the SB report. However, SOW 2 omits the $2500 cost of polishing and sealing the travertine sandstone floor tiles which was included in SOW 1. Given the insurer has accepted the claim for damage to these tiles, it must add $2500 to the subtotal amount for the quote at 4.1 of page 6 of SOW 2, which brings the quote amount to $153,617. The panel is not satisfied the complainant has shown JG is not suitably qualified to provide an opinion regarding the cause of damage. The LinkedIn information provided by the complainant shows JG has extensive experience in the building and insurance industries. Further, the JG report aligns with the views of engineers ME and SB. Given the above, the complainant has not met his onus to establish a loss covered by the terms and conditions of the policy for the disputed damage. Further, the cause of the damage, being wear and tear, gradual deterioration, and soil movement, is specifically excluded from coverage under the terms and conditions of the policy. The result is that the insurer is entitled to partially deny the complainant’s claim. Should the complainant accept this determination, within 14 days of being notified of his acceptance, the insurer is to:  pay the complainant the cash settlement as follows: > $153,617– for the damage detailed in SOW 2 plus $2500 for sealing and polishing the floor tiles in the pool area, less any applicable policy excess, (if it has not already done so) > $30,063.52 - 20% contingency > $2,000 - allowance for professional fees.  obtain an actionable quote for demolition, debris removal and replacement of the gyprock lining (including plastering and painting) for the downstairs storeroom, and pay the complainant that amount plus 20% Because the tile sealing costs and gyprock removal and replacement costs were not part of the insurer’s settlement offer to the complainant, the complainant is also entitled to interest on this sum pursuant to section 57 of the Insurance Contracts Act (1984). Interest is payable from the date the insurer made the settlement offer to the complainant, until the date payment is made by the insurer. Insurer not bound by earlier representation that cash settlement amount would be $366,945 As stated, the exchanged material shows the initial quote and SOW 1 included damage not caused by the flood event. SOW 1 included costs related to work in the pool area and internal tiles in the lounge, dining and kitchen areas which are excluded from cover. The complainant received a text message from MK, who was acting on the insurer‘s behalf as its agent, indicating SOW 1 would form the basis of the settlement. The panel acknowledges the complainant was disappointed to find out the settlement offer related to the repairs detailed in SOW 2 and was substantially less than MK had indicated. Despite this, the insurer can depart from earlier representations made regarding the availability of cover. It is not a breach of its duty of utmost good faith to the complainant to do so where the complainant has not shown that he suffered any detriment in reliance on the promise of the higher cash settlement amount. The insurer is entitled to review the SOW and quote in line with the experts’ reports and findings. The insurer’s extent of liability is to the damage caused by an insured event under terms of the policy. The insurer is not liable for any damage not related to the claimed event. The panel does not consider it would be fair to require the insurer to pay a cash settlement based on SOW 1 in the circumstances. The panel is satisfied the cash settlement offer from the insurer, which includes a 20% uplift for contingencies and the loss of a lifetime guarantee on repairs, is fair and reasonable. 2.2 Is the complainant entitled to additional benefits under the policy? No. The information shows that the complainant is not entitled to the temporary accommodation additional benefit or debris removal additional benefit under the policy. Policy has additional benefits for temporary accommodation In addition to cover for damage to the insured property caused by flood, the policy has an additional benefit for temporary accommodation. The benefit is detailed at page 28 of the PDS as follows: When we pay We will pay this benefit when: • you were living in the buildings when the event took place, and • the loss or damage means your home buildings are unable to be lived in. ... We will consider your home is unable to be lived in when it is so damaged that normal domestic activities like cooking, sanitation and personal hygiene cannot take place, and you cannot live in the home. The information shows the damage to the complainant’s property is limited to the lower level of the property and the external pool area. The lower level includes a gym, storage area and ski shed. The main dwelling is situated on the upper level and remains unaffected. As stated, the panel is satisfied the cracking damage to the upper level of the property has not been caused by the insured event. The complainant has not provided any information to support his claim for temporary accommodation, and the available information does not show that normal domestic activities, such as cooking, sanitation, and personal hygiene, cannot be performed at the house and the complainant and his family are unable to live in it. Given the above, the panel is not satisfied the insurer required to pay the temporary accommodation benefit under the policy. Policy has additional benefit for debris removal The policy also has an additional benefit for debris removal. The benefit is detailed on page 29 of the PDS as follows: When we pay We will pay this benefit when we have approved these costs before they are incurred. Please contact us to confirm approval. ... What's covered Costs that relate directly to removing debris from the destroyed or damaged part of the buildings. We will not pay for the cost of cleaning mud or debris out of tanks, swimming pools or spas after a storm, cyclone, rainwater or run-off. The complainant is seeking a reimbursement of $29,700 for debris removal. He says he incurred this cost to remove 2 steel walkways from the property after they washed up during the flood. He has provided an invoice for this cost from his own company, and he has provided photographs of the walkway. The insurer says there is no evidence to show a connection between the gangways/walkways and any damage to the insured property which is required by the policy. The policy provides the insurer will pay the costs of removing debris from the destroyed or damaged parts of the building. The walkway is not from the destroyed or damaged parts of the building, and therefore the panel does not consider the policy covers the cost of its removal. The panel notes that the cash settlement amount includes the costs of demolition and debris removal of the damaged parts of the property, however the policy does not cover the cost to remove and dispose of the walkway from the property. Given the above, the panel is not satisfied, on balance, the complainant is entitled under the policy to be reimbursed for the costs of disposing of the walkway. 2.3 Did the insurer mishandle the claim? Yes. The panel is satisfied the insurer mishandled the claim causing undue stress to the complainant, and that compensation for non-financial loss of $2,500 is warranted. AFCA can award up to $6,400 compensation for non-financial loss Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $6,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. Information shows insurer misrepresented cash settlement amount As stated, the panel accepts that MK did at least imply, in their capacity as agent for the insurer, that the claim would be cash settled on the basis of SOW 1 for $366,945. While it is established that there is no duty not to resile from a previous representation, the panel considers the insurer’s conduct in doing so has caused undue stress to the complainant, and that it unnecessarily prolonged the claim. In the circumstances, the panel considers payment of compensation for non-financial loss of $2,500 is warranted. 2.4 Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim. Where the insurer’s actions have caused undue stress and delay it is fair to require it to pay the complainant compensation for his non-financial loss. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.