Determination 12-00-1076650

Dispute over cash settlement offer for defective roof rectification works and claim handling

FirmHollard
Decided2025-11-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$48,509
Non-financial loss$6,300
Amount claimed$125,180
SourceAFCA PDF

Summary

The insurer's contractor repaired a storm-damaged roof defectively, causing internal damage, and the parties disputed the cash settlement. AFCA found neither quote fair for the roof, set an independent expert scope process with cash settlement plus 10% uplift, required payment of $48,508.89 for internal works and accommodation, and awarded $6,300 non-financial loss.

Neither party's roof quote was fair so an independent scope of works was required, the internal and accommodation offer was fair, and the poor claim experience warranted maximum non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1076650 | Financial firm | Hollard Insurance Partners Limited Case number: 12-00-1076650 31 October 2025 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer). A claim was lodged around 30 March 2022 for storm damage to the roof that occurred on or around 31 October 2020. The insurer initially accepted the claim, and a roof replacement was authorised. It was discovered the roof replacement was not done correctly. This has caused resultant damage to the internal property. The insurer has sought to cash settle the outstanding works and has made an offer. The complainant disputes this saying the amount is inadequate. The complainant is also dissatisfied with the insurer’s claims handling. 1.2 Issues and key findings Is the insurer’s offer fair? No. This is because there are discrepancies in the insurer’s scope of works and it is clear its quote is not actionable. However, the information does not show the complainant’s quotes are fair either. Therefore, the roof repairs should be settled in the manner set out in section 2.1. The insurer’s offer for the internal damage and temporary accommodation is fair. Is the complainant entitled to compensation? Yes. The information shows the insurer mismanaged the rectification work and has failed to offer a fair settlement for this. The insurer is to pay $6,300 in total for non-financial loss compensation to the complainant. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to do the following: · settle the roof, internal damage and temporary accommodation in the manner set out in section 2.1 · pay $6,300 in non-financial loss compensation to the complainant within 14 days of receiving notice he accepts the determination – in doing so, the insurer can deduct any monies it has already paid towards this during the course of the claim. 2 Reasons for determination 2.1 Is the insurer’s offer fair? Various issues with the roof repairs have been identified There is no dispute rectification works are required. Further, because of the poor roof repairs, internal damage has been sustained. The parties dispute the extent of the works required, particularly for the roof. The insurer engaged S to inspect the roof works and provide a report about its workmanship. S provided a report dated 10 April 2024 and reported several issues with the works, including the following: · failing to properly seal the heater flue dektite · a wide roof capping was not secured at 500mm intervals and therefore not creating a watertight seal · apron flashing was not installed correctly · lack of edge flashing · transverse longitude roof flashing was installed that sits atop the top sheets by about 130mm – this needed to be 150mm · discolouring and stains were evident S also identified issues with the guttering. However, as this was done as private works, this was not the insurer’s responsibility. Another issue identified by the complainant is the insurer’s contractor failing to replace the roof sheets with the same material. This was not commented on in S’s report. There is a large discrepancy between the quotes provided Both parties have provided quotes. There is a large discrepancy between the two amounts. For instance, the complainant’s latest quote from A totals $125,180. The insurer has obtained a ‘liability quote’ from J, who arranged the initial repair works, for around $21,714.55. The insurer, having reviewed, the complainant’s quote, said it is not like for like. This is because the complainant’s quote includes works not claimable such as: · seeking 240 square metres of colorbond roofing but only 159 square metres is required · the supply and installation of insulation at a cost of $11,050. The complainant maintains his quote will fairly reflect the roof works. Neither party’s quotes are fair Having carefully reviewed the above, as well as all the exchanged information, I note the following. S did not provide a scope of works for the roof. The only scope of works provided was from J regarding the roof repairs. This was not confirmed by S, or any other expert, as being sufficient to rectify all the issues. It is also not clear whose measurements of roof material is correct. For instance, the insurer says only 159 square metres is required. However, in the original claim related repairs, 220 square metres was allowed for replacing ‘all existing custom orb zincalume roof sheeting and associated cappings/flashings’. This supports neither quote, although the complainant’s measurement is closer. I accept the insurer’s position that it is unclear why the insulation needs to be re-installed. This undermines the complainant’s quote on that point as S did not say this required rectification. The insurer’s quote also excludes the ‘15sqm roof under decking’. It is not clear if this should be excluded if that roof was part of the claim related works and requires rectification. The insurer’s quote is clearly not actionable. J has stated it is not prepared to do the works. In contrast, the only actionable quote presented is much higher. There is therefore a legitimate concern the complainant will not be able to match the insurer’s rates. Roof repairs to be settled this way Given all this, I am not persuaded either party’s quote is fair for the roof. There are several discrepancies in both that cannot be readily reconciled. Their difference is significant. As such, I propose the roof repairs be settled in the following way. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to provide a list of three experts, who are independent and who have not previously been involved with the complaint, to the complainant. The expert must be one able to provide a full scope of works for all the roof repairs. This can be a building consultant or structural engineer. Within 7 days of receiving the list of experts, the complainant is required to communicate his choice to the insurer. Within 14 days of being notified of the complainant’s chosen expert, the insurer is required to engage the expert to provide a scope of works. The scope of works should not address the guttering given these works were done privately. The scope of works must include the following: · all the works required to address the defects set out in S’s report dated 10 April 2024 · include the replacement of all the roof sheets that are the incorrect material – in doing so, the expert should clarify how many metres should be allowed in this regard · any other works the expert considers necessary to rectify all the issues with the roof that has been caused by the insurer’s works. Within 14 days of receiving the scope of works, the insurer is required to engage a builder to provide an actionable quote. Within 14 days of receiving the quote, the insurer is to cash settle the complainant based on this quote with a 10% uplift for the transfer of risk. The risk would be to address the potential for further works and costs that may be identified once the works begin. No interest is payable given the amount payable should be based on current rates. Offer for internal damage and temporary accommodation is fair The insurer’s offer also included a scope of works and quote for the internal repairs. This amounted to $33,542.52. The insurer added a 15% contingency with a total allowance of $38,573.89. The complainant has provided no information to dispute or suggest this scope of works or allowance are insufficient. Therefore, I accept it is fair for the insurer to pay this for the internal works. The insurer also included five weeks temporary accommodation whilst the works are being done totalling $9,935. The complainant has not indicated a different period or rate. Therefore, it is fair the insurer pays this too. Accordingly, it is fair in all the circumstances the insurer pays $48,508.89 for these items. In the event this money has not been paid on or around when the insurer’s assessment was made, then interest is payable pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from 17 December 2024, being around two weeks after the insurer assessed its liability, until payment is issued. The total amount above should be paid within 14 days of the insurer receiving notice the complainant accepts this determination. 2.2 Is the complainant entitled to compensation? Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $6,300) for non-financial loss. This is where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind due to the insurer’s conduct. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer should pay $6,300 in total for the complainant’s claim experience The complainant says the insurer caused extensive delays and mismanaged the claim. The insurer has offered $5,000 in non-financial loss compensation to the complainant. However, I consider it fair to award the maximum amount ($6,300) given the following factors: · there were substantive defective or inadequate repairs done by the contractors – this included using the wrong, or inferior, material as well as poor works · these works remain outstanding more than two years after the claim · the poor works has resulted in additional water damage and mould, which remain unaddressed · the insurer’s offer for the roof repairs remains inadequate · all of this would have likely caused a substantive degree of inconvenience and interference to the complainant. 2.3 Why is the outcome fair? Whilst roof rectification is required, neither party’s quote nor scope of works fairly reflects the works required to address the roof. Therefore, it is fair an independent expert be engaged to provide a full scope of works for the roof repairs and a cash settlement be based on this. The insurer’s offer for temporary accommodation and internal repairs is fair given there is no information to suggest otherwise. Due to the complainant’s poor claims experience, it is fair he receives the maximum amount of non-financial loss for this. 3 Supporting information 3.1 AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Supporting information SLA report dated 10 April 2024 4.8. During the rectification works, it was revealed the Insured engaged the builders roofing contractor to install/upgrade the guttering and leaf guard system to the residence at their own expense, therefore not part of the rectifying builder’s scope of works. 4.9. The inspection of the eastern high set eave guttering revealed a defective fall to the opposite side away from the downpipe. 4.10. The digital level recorded a defective 15mm fall for every 1m towards the opposite end of the gutter (above the loungeroom leak) from where the southern point of discharge (downpipe) is positioned. 4.11. We consider the during heavy rain periods excess rainwater is not escaping in a timely manner towards the point of discharge, resulting in the eastern guttering to fill, subsequently allowing the opportunity for windblown rain to enter the internal roof area, subsequently tracking down the wall of the loungeroom resulting in damage and stains to the plasterboard wall lining. 4.12. We consider the guttering is not the responsibility of the rectifying builder and therefore liability cannot be established against the builder. A breach of statutory warranty has not been proven. 4.13. We recommend for the Insured to contact the roofing contractor and request they reattend and rectify the defect.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.