Poor claim management and failure to remediate mould after storm damage caused additional contents damage
Text of the determination
Determination
|
Case number
|
12-00-1074828
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1074828 17 April 2025
Determination overview
Complaint
The complainants hold a home insurance policy with the financial firm (insurer). On 2 January 2024, a claim was lodged for damage caused by stormwater ingress. The insurer has accepted the claim.
The complainants remain dissatisfied with the insurer’s management of the claim. They say poor management of the claim and associated delays have resulted in severe mould infestation and associated additional damage to their contents items (contents). The complainants also seek non-financial loss compensation for the undue levels of stress, anxiety, inconvenience and delays experienced over the life of the claim.
The insurer argues the additional contents damage was not due to its handling of the claim. Further, that in the alternative, even if it were to be accepted the additional contents damage was due to its negligence, this would be considered indirect financial loss and is subject to the $6,300 limit provided in the AFCA Rules.
Issues and key findings
Did the insurer’s management of the claim result in additional damage?
Yes. Based on the exchanged information, it is fair in all the circumstances to accept the insurer’s poor management and failure to remediate the mould infestation at the insured property in a timely manner caused significant additional damage throughout the property.
Is the insurer required to cover the additional contents damage?
Yes. Subject to reasonable information establishing the extent of the additional contents damage, the insurer is to cover the complainants for this loss in line with this determination.
Are the complainants entitled to NFL?
Yes. The insurer is to pay the complainants a further $6,300 in NFL.
Why is the outcome fair?
The outcome is fair as the additional damage would not have occurred had the insurer fulfilled its obligations under the policy. It has failed to arrange the necessary and recommended make safe works and mould remediation in a timely manner.
Determination
This determination is in favour of the complainants. The insurer is to cover the complainants for the additional contents loss and damage as set out in section 2.2 of this determination.
The insurer is to also pay the complainant a further $6,300 in NFL.
Reasons for determination
The panel notes at the time the complainants referred this complaint to AFCA there were several components of additional loss and damage being claimed, including motor vehicles and personal injury. However, since then, the complainants have withdrawn their claims relating to motor vehicles and personal injury and will be seeking their own independent legal advice in this regard.
The complainants have requested that AFCA’s consideration of this complaint be limited to the additional loss and damage to their contents and NFL. Given this, the consideration of this complaint is limited to the issues in dispute regarding the claimed additional loss and damage to the complainants’ contents and NFL in line with the AFCA Rules.
The panel notes that both parties have provided a considerable amount of information in support of their positions. All this information has been exchanged with the parties, each party having had the opportunity to respond. This includes the insurer obtaining legal advice from its appointed legal professionals ‘H’ dated 24 March 2025.
On 14 April 2025, the insurer made an offer to the complainants to resolve their complaint by way of paying them an additional $17,921.07 towards contents loss and damage as well as a $6,300 in NFL ($24,221.07). The complainants have rejected the insurer’s offer.
All this information has been considered by the panel in providing this determination. However, the panel does not intend on reiterating and/or referring to each piece of evidence provided by the parties in this determination.
Did the insurer’s management of the claim cause additional loss and damage?
Yes. Based on the exchanged information, it is fair to accept the insurer’s poor management and failure to remediate the mould infestation at the insured property in a timely manner caused significant additional damage throughout the property.
The policy is an insured events contract of insurance
The insurer provided the complainants with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). The panel accepts the insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Storm, cyclone, rainwater and run-off.’ Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
The complainants have shown damage that triggers cover under the policy
The complainants are first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainants can do this will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
It is not in dispute the insured building and contents presented with stormwater ingress damage due to a significant weather event between 31 December 2023 and 2 January 2024. This includes damage on all three levels of the home including the lower level of the property, where the on-site drainage system was overwhelmed.
The insurer does not dispute the insured building and contents suffered storm damage. It has assessed the claim and since AFCA’s involvement has cash settled/accepted to cover the complainants for the following under the policy:
the building damage
contents damage up to the sum insured of $75,000
temporary accommodation
cost to remediate the mould
compensation for non-financial loss ($6,300).
The panel is satisfied the exchanged information shows the complainants have accepted the insurer’s cash settlement for the above noted items based on the policy provisions. Given this, the panel accepts these items and/or components of the claim stand as resolved between the parties.
Consideration of this complaint is limited to the damage that the complainants say has occurred in addition to the storm damage, and due to the insurer’s failure and negligence in addressing the mould infestation within their home. This relates to significant additional mould damage to the complainants’ contents. The complainants say the insurer’s failure to remediate the mould in a timely manner is the cause for the additional damage.
Insurer was aware of concerns relating to mould early in the claim process
The exchanged information shows that after lodgement of the claim on 2 January 2024, the insurer arranged for consultant’s ‘PP’ to assess the home and complete make safe works. In its report dated 8 January 2024, PP confirms the presence of mould. PP recommends the insurer appoint a remediation team as soon as possible to ensure no further mould growth in the home.
The report also notes concerns raised by the complainants regarding the presence of mosquitos due to the saturated carpets and associated health concerns for the female complainant (who was pregnant) and the complainants’ one year old child. The panel notes there is no information in this report or otherwise to indicate PP undertook any reasonable or adequate make safe works at this time.
The insurer has provided a report from consultants ‘LX’ dated 12 January 2024. This report again confirms the presence of mould and the need to prepare a scope of works relating to the mould damaged contents. This was to allow non-salvageable mould contaminated contents to be removed from the home.
Building and restoration consultants ‘K’ attended the property on 24 January 2024 and in a report dated 6 February 2024, confirm the presence of a musty odour, microbial damage to contents, microbial growth on carpets, smooth edges, underlays, mattresses, bedding and ceilings. K confirms mould remediation was required and says the property was not deemed habitable due to the complainants’ vulnerable health conditions. K provided the below detailed recommendations in terms of necessary mould remediation works:
install containment to isolate affected areas and prevent cross contamination
install containment overall air-conditioning units to prevent cross contamination
engage plumber and electrician to conduct isolate and make safe to services in affected areas
install HEPA Air Filtration to affected areas
move and relocate unaffected contents to an unaffected area
inventory, remove and dispose of affected contents
remove, double bag, and dispose of carpets, underlay and smooth edge throughout lounge and family room
remove, double bag, and dispose of skirting boards, door architraves and wall linings up to 600mm high or as required throughout the lower level
conduct mould inspection of all frames and cavities, reporting on damages
remove, double bag, and dispose of non-restorable vanity cabinet in bathroom
erect mobile scaffolding for ceiling works in family room
remove, double bag, and dispose of affected ceilings and cornices in family and lounge room
HEPA VAC, sand and treat mould affected trusses and joists
install drying equipment
encapsulate heavily stained materials post treatment
conduct condition II clean throughout lower and middle levels
appoint a hygienist inspection and a leak detection.
After receiving K ‘s report, the complainants asked to be moved to temporary accommodation. The insurer refused this request since some areas within the home are deemed to still be habitable. The complainants were not moved to temporary accommodation until 14 February 2024, after one of the complainants was hospitalised and subsequently experienced a miscarriage.
Mould and moisture expert ‘J’ attended the insured property on 20 February 2024. It confirmed the presence of mould and that it had become airborne and was moving to other areas of the home. J confirmed there were different species of mould including mould known to cause allergenic reactions in susceptible or immunocompromised individuals. J notes that these results were not acceptable.
J recommended removal of all mould damaged materials. It noted that there were unaffected areas within the home and recommended that adequate engineering controls be implemented and maintained throughout the recommended remediation process. Further, that all exposed surfaces needed to be cleaned and to ensure all areas are dried by installing dehumidifiers and air movers.
A second report from K dated 28 February 2024, after attending the insured home the previous day, confirms it noted additional damage throughout the property. This included:
microbial growth present to benchtops in kitchen and rumpus
microbial staining present to ceilings on lower and middle level
moisture present on grout to tiles in entry, dining and kitchen
tiles drummy and hollow in entry and kitchen
ground movement around pool causing cracking
heavy damp odour present
heavy mould growth to carpets and underlay in middle level.
The panel notes the insurer conceded in its notice of response that it was aware of the presence of mould within the insured home from around 18th to 19th January 2024. In line with the above, the panel is satisfied that not only was the insurer aware of the presence of mould from very early in the claim, but it was also aware of:
the clearly advised high level of concerns regarding the presence of mould
the health concerns relating to presence of mould
the fact it was airborne, spreading and causing additional damage
the urgency of initiating and completing the recommended mould remediation plan
that the home was not considered habitable and the health implications/concerns raised by the complainants and its appointed consultants.
The exchanged information also shows that both complainants and their one year old child suffered health issues over the life of the claim. This includes their child having to be taken for medical attention due to excessive mosquito bites. One of the complainants (male) developing breathing complications and the second complainant (female) suffered two miscarriages, one in February 2024 and the other in June 2024. The complainants believe these are most likely due to their exposure to mould, the insurer’s delay in agreeing to provide temporary accommodation and the significant stress and anxiety experienced over the course of the claim.
Insurer failed to action the recommendations by its consultants
The panel is satisfied:
there is no information in the PP report showing it completed any reasonable or adequate make safe works to prevent, isolate or reduce the water ingress issues or mould. This is despite PP being appointed to complete make safe works
there is no evidence of LX having undertaken any make safe or mould remediation works in its report dated 12 January 2024
despite being put on notice, receiving recommendations from its consultants and acknowledging being aware of concerns regarding the presence of mould, the insurer appears to have only acted on one or two of the approximately 17 to 20 recommendations
these being appointment of a mould expert (J) and installation of drying equipment, which the panel notes was minimal i.e. one dehumidifier and two air movers only in a three level property
K’s final scope of works and quote for mould remediation works, based on which the insurer finally cash settled the complainant six months later, notes the requirement for seven dehumidifiers, 24 air movers and six air scrubbers i.e. 37 machines in total compared to only three machines installed by the insurer over the life of the claim.
The panel is satisfied the exchanged information shows that the insurer totally failed to arrange and/or complete any reasonable and adequate make safe works or mould remediation measures at all over the life of the claim. This is despite:
being put on notice of these issues from the very start of the claim
having been informed of the urgency of these works
receiving detailed and in-depth recommendations from its consultants of the steps and measures that were required to be completed as soon as possible
being aware the insured building and contents were suffering additional damage as a result of the spread of mould and water ingress
being placed on notice regarding the health concerns raised by the complainants and the insurer’s consultants.
The panel notes the insurer appeared to be more focused on the assessments into the points of water ingress and the extent to which this may assist in establishing the degree of its liability i.e. reduce its liability under the policy. The panel accepts these assessments, determining its liability and preparing scopes of work are all crucial parts of the claim assessment process.
However, the panel does not accept that it is fair or reasonable for the insurer to ignore or overlook its obligations and responsibilities regarding other equally important aspects of the claim management process. These include make safe works, ensuring the health and safety of its customers, actioning the recommendations of its consultants and making reasonable efforts to mitigate further loss or damage.
The panel is satisfied the exchanged information establishes the insurer failed to complete any meaningful or adequate make safe or mould remediation works over the life of the claim. The panel notes the insurer’s poor and unreasonable attempts to shift its responsibilities in this regard onto the complainants. The panel is not satisfied this is fair or reasonable in the circumstances.
The panel is satisfied the exchanged information shows the complainants did make and continued to be actively willing to assist with steps to mitigate further loss or damage. This includes the complainants stripping and removing carpets, digging trenches, trying to clean/salvage contents and all the while seeking guidance from the insurer as to what could be done.
Delays and a failure to act by the insurer allowed the spread of mould
The severe storm was the predominant factor in causing the initial water ingress and damage to the property. This extreme weather event overwhelmed the property’s ability to manage and drain water, leading to substantial water damage and associated initial minor indications of mould being present.
The panel notes there is no persuasive information to suggest the property displayed any previous water ingress issues until the event giving rise to the claim in January 2024. Further, there is also no evidence of the property experiencing issues relating to mould prior to the said storm event.
The panel accepts the insurer is entitled to arrange and complete reasonable and fair assessments of the cause and extent of damage subject of a claim. This allows the insurer and claimants to establish the extent of their obligations, entitlements and liability under the policy.
Given this, the panel accepts it was reasonable the insurer appointed experts to assess the cause and extent of the loss or damage from the storm, as well as provide their recommendations on next steps. The panel accepts these assessments include the experts determining the extent of loss or damage arising from the storm event, preparing scopes of work and providing the insurer with the estimated cost of repairs.
However, the panel believes the insurer is expected to complete these assessments and associated steps fairly and efficiently. This means the insurer is expected to take into consideration the individual circumstances relevant to each claim. Relevant to this complaint, the panel believes this would include the insurer considering and arranging necessary make safe works, steps to isolate and prevent mould spreading and ensuring the health and safety of the complainants.
The panel is satisfied that in line with several initial reports provided to the insurer by PP, LX, J and K, it is fair to accept the insurer was clearly placed on notice about the concerns relating to and need to address the mould issue. However, despite this, the insurer appears to have ignored these recommendations in favour of trying to determine the reasons for the water ingress and the impact this may have on its liability under the policy.
The insurer failed to act on the clear and necessary recommendations of its consultants. It was not until around three months after claim lodgement that the insurer decided it would cash settle the complainants. It then took another three months before the insurer was ready to arrange the cash settlements to the complainants.
The panel is satisfied over this time, the insurer elected not to undertake or authorise any necessary mould remediation works but rather continued appointing various consultants to complete assessments and investigations. No clear guidance was provided to the complainants. The panel accepts it is fair to conclude that these ongoing assessments of the areas of concern did not reasonably allow the complainants to engage in any meaningful maintenance works.
The panel is satisfied that it is most likely the mould has spread throughout the home and garages within the first two months of claim lodgement. Further, it was due to the poor reporting by its appointed consultants that the insurer had to continue appointing new consultants and arranging additional assessments to try and determine its liability under the policy. This resulted in undue delays in bringing the claim to conclusion.
During this time mould spread throughout the home, in the absence of any reasonable mould remediation works.
Parties disagree on the cause of the additional damage
The parties remain in dispute as to the cause of additional loss and damage to contents. The insurer accepts the storm's role in causing damage but also notes the property’s existing maintenance issues played a part in the extent of mould growth. The insurer says the mould damage was caused by the event and not the result of any unreasonable delay and/or its poor management of the claim.
The insurer says water ingress continued following the storm event. Therefore, its ability to remediate the moisture that caused the mould to spread was compromised. The insurer has accepted liability for storm-related damage. In excluding cover for the additional damage to contents, the insurer says it has settled its liability in line with the terms and conditions of the policy.
The complainants say the insurer failed to address the mould issues at the property within a timely manner as recommended by its appointed consultants. The complainants say this failure caused mould to spread throughout their home causing a significant amount of additional damage to their contents. Further, the insurer failed to identify and arrange the necessary make safe works, which is what allowed further instances of water ingress into their home.
The panel does not accept, with respect to the additional damage to the contents, that the insurer is entitled to limit its liability to the terms and conditions of the policy. This is because the question before the panel relates not to loss or damage caused by the storm, but the subsequent damage caused after the original storm damage. The panel accepts the damage in dispute is more likely than not due to the insurer’s failure to remediate the mould and to arrange necessary make safe works in a timely fashion.
The insurer was clearly on notice from early to mid-January 2024 that mould was present in the home and there was a very real and present risk of it spreading. By early February 2024, the insurer had been given advice in writing from its consultants that there were close to 20 remediation actions that should be taking place (should have already been taking place) to prevent the spread of the mould. The only mould remediation or containment attempt by the insurer was to instal 3 drying machines (one month apart) and appointing J.
The panel believes that these actions were not only delayed but substantively insufficient considering the size of the house, the extent of the storm damage and the extent and nature of the mould identified. The exchanged information shows that K’s later remediation scope of works and costing necessitated 37 machines as opposed to the three that were originally installed in the three-level insured building.
The panel finds the insurer’s lack of action to contain or remediate the mould in January to February 2024 extremely concerning. The panel is not satisfied the insurer has provided any persuasive, reasonable or acceptable explanation for its complete failure in this regard. The panel notes the insurer has attempted to shift the blame to the complainants on the issues of make safe works and a failure to mitigate their loss. However, the panel finds these attempts both unpersuasive and inexplicable.
The panel notes the insurer says it received advice from its consultants not to commence repairs to the home and a preference to cash settle the claim. This may be the case. However, the insurer must still act fairly and reasonably and in line with its duty of utmost good faith. In these particular circumstances, that would include arranging the necessary and recommended make safe and mould remediation works given the imminent risks of not doing so. Also, the panel believes, it is not for the consultants to decide what is fair, reasonable and necessary in any given situation. They provide the information, but it is the insurer that bears the responsibility to make decisions having regard to each individual circumstance.
The exchanged information shows the insurer never arranged any reasonable or necessary make safe works, delayed removal of wet carpets, failed to arrange or authorise any reasonable mould remediation works for the compete life of the claim. The insurer did not provide meaningful assistance to the complainants to relocate and store their uncontaminated property or to isolate the unaffected areas from airborne mould and cross contamination.
The panel is satisfied there is no evidence of any mould at the insured property prior to the storm event resulting in the claim. It is logical to accept the mould, and associated damage, has occurred after the date of loss. The panel is not satisfied the insurer’s reference to the climate and environment as probable causes for the mould are reasonable or supported by compelling information.
The panel accepts an insurer may require the claimant to arrange and/or contribute towards maintenance works prior to arranging claim related repairs (including any mould remediation). However, in coming to a decision in this regard, the panel believes the insurer is obliged to act fairly, reasonably and professionally. Its actions and decisions should be based on the circumstances before it.
Given the presence of mould and clear indications from its consultants regarding the urgent need to remediate/isolate the mould, it is fair to expect the insurer to have prioritised the necessary make safe and mould remediation works. The panel is satisfied the insurer failed to do so. This has more likely than not resulted in mould spreading throughout the home, causing the additional contents loss and damage.
The panel accepts the insurer should reasonably be aware of the potential impact of mould and the need to act quickly in arranging remediation. However, the insurer unreasonably and irresponsibly delayed taking any reasonable or adequate mitigating actions. This makes its decisions and management of the complainants’ claim unacceptable and concerning.
The panel is satisfied the exchanged information supports the view that the insurer’s actions (or inaction) led to unnecessary delays allowing the mould to spread into all areas throughout the insured building. The panel accepts that had the insurer acted reasonably and quickly, the mould could have been contained preventing the significant additional damage. The panel is satisfied it is fair in all the circumstances to accept that the additional contents loss and damage is direct financial loss for the purpose of the AFCA Rules.
Is the insurer required to cover the additional contents loss and damage?
Yes. Subject to reasonable information establishing the extent of the additional contents damage, the insurer is to cover the complainants for this loss in line with this determination.
The insurer is liable for additional damage
The insurer says the damage occurred as a result of mould growth attributed to the storm event. In maintaining this position, the insurer says the policy does not cover consequential losses of any kind.
The panel does not accept the insurer’s position that the additional damage claimed is due to the storm event, or that the insurer is entitled to assess its liability for the additional damage against the policy provisions. The panel believes that the insurer’s conduct, rather than the nature of the claim itself, caused the additional damage.
The panel acknowledges the presence of some maintenance related issues. However, the panel is not satisfied these have been shown to be the dominant cause for the additional damage. The panel is satisfied the extensive mould infestation that spread throughout the home resulting in considerable additional damage to contents is due to the insurer’s failures as discussed above under section 2.1.
The insurer's failure to act promptly and adequately to mitigate the mould growth, due to delayed or insufficient remediation actions, represents negligence that falls outside the policy's intended coverage. Effective management of such claims requires immediate and thorough remediation efforts to prevent further damage. This was reflected in the insurer’s own consultants’ reports and recommendations.
The panel is satisfied it would not be fair in these circumstances to permit the insurer to rely on the policy limits, conditions and exclusions for the additional damage caused by its negligence. The insurer is to accept its responsibility for the full extent of the damage caused by its conduct.
Insurer to cover the value of the additional contents loss and damage
The panel accepts the exchanged information shows the complainants were under insured for their contents at the time of the loss. However, it is clear the policy insured all of the complainants’ contents at the insured property subject to the policy limit. That is, any contents damaged by an insured event and not excluded are covered by the policy up to the policy limit.
The panel accepts the insurer is entitled to rely on the policy and limit its liability to the contents sum insured of $75,000 when assessing its liability for the storm damage. However, this policy limit does not apply to damaged contents caused by the insurer’s failures and negligence in the management of the claim.
The issue of underinsurance is not a relevant factor in determining whether a loss is direct or not. This is because the complainants are claiming for additional damage to their contents (being insured property) caused by the insurer’s failures and negligence following an accepted/successful claim under the policy. The panel is satisfied this is a normal loss that most insureds under this policy, and in the complainants’ circumstances, would have suffered.
Given the above, the panel does not accept the damage is correctly classified as indirect financial loss. In saying that, the panel notes neither of the parties has provided persuasive information to establish the extent of the additional contents loss and damage.
The complainants say the total value of the additional contents loss and damage sits at around $300,000. The insurer on the other hand seeks to rely on a contents schedule of loss dated 27 February 2024 placing the value of damaged contents items at $100,421.07. However, the complainants have clarified that this is not a complete list of the damaged contents given it was prepared when seeking cover for storm damage. Further, that this list was prepared in February 2024, which is before the full extent of the mould infestation had spread throughout the home.
Given the sum insured was $75,000, the complainants and loss adjuster stopped noting items and their values once the list reached the $100,000 mark/estimate. The insurer has failed to assess all the resultant additional contents loss and damage. The panel is not satisfied the insurer is in a position to provide a fair and reasonable account or value of the additional contents’ loss and damage.
Similarly, the panel is not satisfied the complainants have yet provided adequate persuasive supporting information to establish the additional contents loss and damage equate to $300,000. In the absence of supporting information the panel is not satisfied it would be fair to require the insure to pay the complainants $300,000 towards the additional contents loss and damage.
The panel is not in a position to provide an informed decision on what a fair cash settlement amount is for the additional damage to the complainants’ contents. Therefore, the panel finds it is fair that the parties be required to co-operate and work towards determining a fair final cash settlement amount for the additional damage to the contents. Within 14 days of receiving notice of the complainants’ acceptance of this determination:
the insurer is to arrange for a suitably qualified and experienced consultant to attend the complainants’ home to assess all the damaged contents that remain onsite and have not been discarded - the panel accepts water and mould damaged items need to be disposed of
the complainants are to provide this consultant or the insurer with reasonably persuasive information in support of the extent of additional contents loss or damage they are claiming
given the time lapsed, the fact items will have been disposed of and storm damage to the complainants’ property, the insurer is to be reasonably flexible and fair in its assessment of and expectations relating to supporting information from the complainants
this consultant is to prepare a detailed report on the extent of loss and damage to the contents identifying which items are salvageable and/or are unsalvageable
within 21 days of receiving this report, the insurer it to obtain fair and actionable quotes for the cost to repair/restore the salvageable items as well as the cost to replace the unsalvageable items
on receiving this information, the insurer is to arrange payment to the complainants equal to the quotes for the repair, restoration and replacement of the additional damaged contents. This is separate to and in addition to the storm damaged contents and any associated payment made under the claim.
The insurer is to pay interest on the cash settlement payment for the contents in line with section 57 of the Insurance Contracts Act 1984. This is to be calculated from 27 June 2024 (date of the AFCA conciliation between the parties) until the dates on which the insurer pays the cash settlement to the complainants in line with this determination.
Are the complainants entitled to NFL?
Yes. The insurer is to pay a further $6,300 in NFL in addition to its offer to pay $6,300 in line with this determination.
AFCA Rules allow and award of compensation in certain circumstances
The AFCA Rule D 3.3 allows for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation.
An award of non-financial loss compensation under the Rules is based on an unusual degree or extent. This would not encompass the normal degree of inconvenience a person would suffer when lodging an insurance claim or in a dispute with their insurer.
The insurer is to pay an additional $6,300 in NFL to the complainants
The panel notes that the insurer has already accepted/offered to pay the complainants $6,300 in NFL. It is not clear whether the insurer has yet arranged this payment to the complainants. If it has not, it is to pay this within 14 days of receiving notice of the complainants’ acceptance of this determination.
The AFCA Rules allow for NFL to awarded to each complainant under a complaint. For the same reasons, and in line with the matters discussed above, the panel is satisfied it is fair that the insurer be required to pay $6,300 in NFL to each of the complainants. Therefore, within 14 days of receiving notice of the complainants’ acceptance of this determination, the insurer is to arrange a second payment of $6,300 to the complainants in line with the AFCA Rules.
In the instance the insurer has not yet arranged payment of the first $6,300 to the complainants, it is reasonable it arranges a total of $12,600 for NFL to the complainants within the stated 14 days.
Why is the outcome fair?
The outcome is fair as the additional damage would not have occurred had the insurer fulfilled its obligations under the policy. It has failed to arrange the necessary and recommended makes safe works and mould remediation in a timely manner.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.