Determination 12-00-1074626

Partial denial of storm damage to unit door frame and facade

FirmQBE
Decided2024-12-18
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$32,064
SourceAFCA PDF

Summary

The complainant claimed storm damage to her commercial unit's door, frame and facade. AFCA found the door and frame damage covered but the facade damage gradual and excluded, and ordered the insurer to obtain a quote and pay it plus a 15% uplift less excess, with no figure stated.

Policy cover is limited to damage from a sudden and accidental cause, so gradual deterioration of the facade is excluded while the wind-caused frame damage is covered.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1074626 | Financial firm | QBE Insurance (Australia) Limited Case number: 12-00-1074626 16 December 2024 Determination overview Complaint The complainant is a beneficiary under a commercial strata insurance policy. On 13 February 2023, the complainant lodged a claim with the financial firm (the insurer) for damage to her unit caused by strong winds on 3 August 2022. The insurer has partially denied the claim. It has offered to pay to replace the front door. The insurer says the damage to the door frame, and front facade was not caused by a single insured event, but rather, was the result of gradual deterioration over time and is not covered under the policy. The complainant says that an effective repair requires replacement of the door, door frame and facade. Issues and key findings Is the insurer entitled to limit its payment of the claim to replacing the door? No, the insurer must also cover the cost of replacing the door frame as it was most likely caused by the winds of 3 August 2022. It has not been established that damage to the facade resulted from a ‘sudden and unexpected cause’ as required by the policy. It was more likely to be long term damage and the insurer is entitled to deny liability for it. Is the complainant entitled to compensation for non-financial loss? No, the insurer has handled the claim within reasonable timeframes and its decision making has been reasonable. Most of the delay experienced arose from a delay in the complainant lodging the claim and then changes to the claim as the complainant’s understanding of the damage evolved. Why is the outcome fair? This outcome is fair because the policy clearly limits its cover to damage from sudden and unexpected causes. It is fair that payment is limited to the damage which was from a sudden and unexpected cause. It is fair that no compensation for non-financial loss is awarded because the insurer’s handling of the claim has been reasonable and has not caused delay. Determination This determination is substantially in favour of the financial firm. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to: contract a qualified builder to provide a scope of works and actionable quote to replace the door, and door frame; and within 7 days of receiving that quote, pay to the complainant the quoted cost, plus a 15% uplift for transfer of risk, less the applicable excess, with any necessary adjustment for GST liability according to General Condition 4 on page 13 of the policy terms. Reasons for determination Is the insurer entitled to limit its payment of the claim to replacing the door? No, the insurer must also cover the cost of replacing the door frame as damage to the frame was most likely caused by the winds of 3 August 2022. Damage to the facade was more likely to be long term damage and the insurer is entitled to deny liability for it. Circumstances of the claim The complainant’s property is one in a row of 5 commercial units that have an aluminium and glass facade. In strong winds on 23 August 2022, the front door of the complainant’s unit was blown off its hinges. The complainant had a builder, AP, attend and he did temporary repairs. As the cost was below the policy excess no claim was made at that stage. Over time the complainant had increasing problems closing the door. AP again attended and a claim for the damage was lodged on 13 February 2023. The insurer accepted the claim and offered to settle it based on a quote from AP for $5,419.70 to replace the door less a $1000 excess. AP had problems with the alignment when attempting to replace the door. On 23 July 2023, the complainant provided to the insurer a revised quote from AP to replace the door, door frame and the facade. It was for $32,064.44. In August and October 2023, there were exchanges between the parties, the strata manager and a site visit with both side’s experts was arranged. On 21 November 2023, the insurer wrote to the complainant partially denying the claim and limiting its offer of settlement to the cost of replacing the door. The policy covers damage from a sudden and accidental cause, subject to exclusions It is established insurance law that an insured must first establish, on the balance of probabilities (that is more likely than not), that the loss or damage claimed falls within the policy cover. If that is done, the burden then shifts to the insurer to establish, again on the balance of probabilities, the application of any exclusion in the policy should it want to deny the claim. The policy covers damage to the insured property during the period of insurance. The word “Damage” is specifically defined in the policy as follows: Damage, Damaged means any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy. Under the heading “Exclusions” the policy relevantly states: 1. We will not pay for Damage caused by or arising directly or indirectly from: (a) ……; (b) lack of maintenance, rust, oxidation, corrosion, mould, Wear and Tear, fading, concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or gradual deterioration or, failure to maintain Your Insured Property in a reasonably good state of repair. This includes when the Damage to the Insured Property is caused by light, air, sand, the climate (which includes wind or rain) or the passage of time; The parties agree that the replacement of the door is covered by the policy. The question to be determined is whether the damage to the door frame and the facade comes within the terms of the policy. That is, was that damage, in the terms of the policy, a result of a “sudden and unexpected cause not otherwise excluded by the terms of the policy”. Complainant’s expert says strong winds damaged the door, its frame and the facade AP initially did a temporary repair. In its invoice for those repairs, AP stated: - Door was hanging by 1 hinge caused by wind - Hinges pulled screw out of aluminium frame and some failed to hold, - Incorrect screws had been used… too small of a head to hold hinge - Door frame had been pulled out of shape and had to be reattached by hammering into place - Replace hinges Heavy Duty - Replace screws with Heavy Duty Stainless screw to attach the stainless insert nut on the other side of door frame adjacent to the window - Refitted door and tested works great Please note that upgrade of door closer is required to hold door against the wind Having done the temporary repair, AP determined that the door and lock required replacement to address the damage. Subsequently AP, working with the manufacture of the new door, found that it could not fit the door properly because the door frame was no longer aligned with the front facade. By email of 14 June 2024, AP summarised why it now considers the replacement of the door frame and facade are necessary: Over the past two years, we've provided temporary fixes while negotiations and assessments were ongoing. However, these interim measures have proven inadequate, leaving the property vulnerable to more strong winds and compromising its security and safety of staff and customers who frequent. After thorough evaluation by our expert team on multiple occasions, we've proposed a comprehensive solution that addresses the root cause of the problem, minimises future expenses, and ensures the safety of employees and customers. It's evident that the door frame and surrounding structures are misaligned, necessitating more than just door replacement. In addition to the twisted door frame, the front façade has suffered damage from strong winds. Insurer’s experts say damage was not the result of one insured event The insurer relies on a report from a builder, S, whose report of 13 November 2023, concluded: Following our site attendance we are of the opinion that the deformation of the frame would have occurred over a period of time from multiple wind strikes. It is believed with the door continuing to open in heavy wind that the frame would be pulled more and more each time leaving it with the damages we observed on site. The insurer also relies on a report from an engineer, L, dated 15 December 2023, which states: - the building’s aluminium frame was designed to withstand wind gusts up to 134 kilometres per hour. As such, wind gusts experienced on the day of the event could not deform the aluminium frame. - wind gusts forced the door open. This pressure is transferred to the mullion that attaches the door to its frame. Inspection of the mullion found no distortion or rotation. The absence of any distortions shows the incident did not damage the frame. - save for one, all door mullions are not rotated or deflected. The minor rotation of the single door mullion does not affect the operation of the door because it is not connected to the door - the door jams at the base. If this was caused by the rotation of a mullion, jamming is expected around the top. L concluded that the ongoing jamming of the door and deflection of the frame was not caused by wind gusts. It says the issues identified are all long term. In concluding the issue is long term, L points to evidence of prior repairs with multiple old holes in the frame for door hinges and notes the tenant of the adjacent unit said their door had been jamming since 2000 when they moved in. The insurer’s assessor attended the property and reported that the door frame was significantly distorted. The report states: The reported distortion to the entry door frame resulting in the outward bow is regarded as significant, and understandably causing intermittent failure of the door lock mechanism. Notwithstanding, the degree of distortion is extensive, which given the numerous attempts to reinstall the existing door has created numerous screw hole penetrations, therefore reaffirming previous instances to address damage arising from wind strikes. The assessor says the building experiences high exposure to strong winds which has distorted the frame and facade over time. Assessment of the evidence and conclusion I generally accept that the building was well constructed and designed to withstand strong winds. In relation to the door itself, there is clear evidence linking its damage to the strong winds on 3 August 2022. It was blown off its hinges as reported by the complainant. AP confirmed that it was hanging from one hinge. AP replaced both the screws and the hinges with more heavy duty ones. Thus, I agree with the parties that the damage to the door is covered by the policy. It arose from a sudden and unexpected cause. AP also reported at the time of doing the initial repair that the doorframe had been pulled out of shape and had to be reattached and hammered back into shape. As a contemporaneous first hand report, this carries significant weight and suggests the winds of 3 August 2022 damaged the door frame. In contrast, the insurer’s builder and engineer consider the cause of the damage was long term. The builder says it was repeated episodes of high wind over time particularly if the door was left open. The engineer considers it may be from some inherent flaw. Whilst slightly inconsistent as to the actual cause, both say it was not caused by the high winds on one particular day. On this issue I am convinced by AP’s contemporaneous observations and expert view. It seems to me likely that the wind pulling against the door to the point where screws were torn from the frame would in doing so have also damaged the frame. The insurer’s assessor stated the bow to the frame was significant and measured it at five millimetres at its maximum. Whilst the reports and photos of multiple holes for hinge screws suggests prior repairs these may be explained in whole or in part by the fixes done by AP since the door was blown off. On balance, I find that the cause of the damage to the frame was the high winds tearing off the door on 3 August 2022. That was a sudden, unexpected cause and the resulting damage is covered by the policy. In relation to the facade, the evidence from AP is less persuasive. AP did not report seeing any damage to the facade when doing the initial repairs. In AP’s June 2024 summary of why all 3 elements, door, door frame and facade, need to be replaced, he states that “the front facade has suffered damage from strong winds”. This is ambiguous as to whether the damage is due specifically to the 3 August 2022 wind events or due to repeated wind events over time. For the door frame the forces created by the door being torn off may help explain why winds which were strong, but within the building’s tolerances, could have caused the damage. However, no explanation or theory has been put forward as to why the facade might have been damaged by the winds involved. On balance, I am not satisfied that the damage to the facade was caused by a sudden and unexpected cause. It is more likely that the damage is gradual and longer term. Thus, it is not covered by the policy. I acknowledge it may be case where the door and doorframe cannot be adequately repaired without also undertaking repairs to, or replacing the facade. However, in the interest of completeness and to avoid confusion moving forward, the intention of this determination is to permit the insurer to limit its liability to the fair and reasonable cost to repair the door and doorframe only. In the instance the facade also needs to be repaired, the complainant and not the insurer is responsible for these additional repair costs. The terms of the policy, at page 21, provide the insurer with a discretion to either arrange the repairs directly with a builder or cash settle. In this case the insurer wants to cash settle. I consider the insurer’s exercise of its discretion in this way is reasonable. This is because, as I have found above, there are additional repairs needed to the facade beyond those the insurer is liable for. Engaging a builder to do only part of the overall repairs necessary may be difficult. The complainant has also raised concerns about liability for Goods and Services Tax if the claim is cash settled. I note this eventuality is dealt with at page 13 of the policy terms. Is the complainant entitled to compensation for non-financial loss No, the insurer has handled the claim within reasonable timeframes and its decision making has been reasonable. Most of the delay experienced arose from delay in the complainant lodging the claim and then changes to the claim as the complainant’s understanding of the damage evolved. AFCA has power to award compensation for non-financial loss Under the AFCA Rules, we may award compensation (capped at $6,300) for non-financial loss. This is where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind due to the insurer’s conduct. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Circumstances and handling of the claim do not justify compensation The damage occurred to the complainant’s property on 3 August 2022. It has taken a significant time for it to be resolved. The complainant says that she has found it very difficult, stressful and time consuming. I accept that as true. However, the claim was not lodged until February 2023. This was explicable because the complainant thought the repair costs would not justify paying the excess. When the claim was lodged, for replacement of the door only, the insurer promptly agreed to it, offering to cash settle based on a quote provided by the complainant’s builder. There was again a further delay until the complainant lodged the quote from her builder for the cost of repairing the door, door frame and facade on 20 July 2023. There was then a period whilst the insurer got expert reports, and there were exchanges between the parties and a joint site visit. The insurer then provided its decision to partly deny the claim in November 2023. The insurer’s handling of the claim was generally within reasonable timeframes. I acknowledge the complainant actively followed up with the insurer and spent time to resolve the complaint. However, I do not consider this is outside of the normal degree of inconvenience that is to be expected when making a claim. Further, I do not consider the insurer denying the claim is enough to warrant compensation in the circumstances. It was a technical claim and the views on what repairs were needed, most especially the views of the complainant’s builder, evolved over time. Why is the outcome fair? This outcome is fair because the policy clearly limits its cover to damage arising from sudden and unexpected causes. The damage to the door and door frame was most likely caused by the sudden and unexpected winds of 3 August 2022 and so it is fair that the insurer be liable for that damage. The damage to the facade is more likely to be long term and gradual, and it is fair that the insurer be entitled to deny liability for it. Whilst the claim has been lengthy, difficult and stressful for the complainant, this is largely due to the nature and circumstances of the damage and not due to any mishandling or delays by the insurer. It is thus fair that no compensation for non-financial loss is awarded. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.