Home / Allianz Australia / Determination 12-00-1073260
Determination 12-00-1073260
Storm damage to septic soakage trench claim declined
Summary
A homeowner claimed storm damage to a failed septic soakage trench after June 2022 storms. AFCA found he had not shown the damage was caused by an insured storm or rainwater runoff, so the insurer need not cover it.
The insured bears the initial onus to show on the balance of probabilities that the loss falls within an insured event, and the expert evidence did not establish that link.
Issues
- Claim denial primary · not upheld“The insurer is not required to cover the claimed damage as the complainant has not established a valid claim for the claimed damage.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Allianz Australia determinations · Find similar determinations
Text of the determination
Determination
|
Case number
|
12-00-1073260
|
Financial firm
|
RAA Insurance Limited
Case number: 12-00-1073260 30 September 2024
Determination overview
Complaint
The complainant holds a home and contents policy with the financial firm (insurer). Following storms in June 2022, the complainant lodged a claim for damage to the soakage trench forming part of his property’s septic system, which he says is due to storm or rainwater runoff.
The insurer has declined the claim. It says the complainant has not shown that the damage is due to storm or rainwater runoff. Rather, it says the damage was caused by inadequate capacity and design issues, faulty installation, groundwater flowing to the trench site, and failure due to the trench reaching the end of its usable life.
The complainant disagrees and says that the insurer should cover the damage.
Issues and key findings
Is the insurer required to cover the claimed damage?
No. The insurer is not required to cover the claimed damage as the complainant has not established a valid claim for the claimed damage.
Why is the outcome fair
The outcome is fair because, considering all the available information, the complainant has not satisfied his onus to show a valid claim under the policy terms for the damage to the trench.
Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in respect of this claim.
Reasons for determination
Is the insurer required to cover the claimed damage?
No. The insurer is not required to cover the claimed damage as the complainant has not established a valid claim for the claimed damage.
Onus on complainant to establish a valid claim
It is established insurance law that an insured has the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of cover. Once that is established, the onus falls on the insurer to prove on the balance of probabilities the application of any relevant condition or exclusion should it wish to decline the claim.
The complainant’s home building policy is an insured events policy that provides cover for a series of insured events, subject to conditions and exclusions. The listed events include ‘storm and rainwater runoff’. The complainant also has optional accidental damage cover, however it is limited to contents cover and therefore not relevant to this complaint.
The terms of the policy are set out in the Certificate of Insurance and the Product Disclosure Statement. There is no dispute the insurer sent the policy documents to the complainant. The insurer is entitled to rely on the terms of the policy.
Insurer says the damage was not caused by storm and rainwater runoff
The insurer says the complainant has not shown he has a valid claim for damage caused by storm or rainwater runoff. Rather, it says, the loss was due to other factors including ‘natural’ failure of the trench, and factors excluded by the policy including defective or faulty design and/or construction.
The insurer arranged for plumber, PP, to inspect the damage. PP provided a report dated 28 July 2023 and further email advice on 25 June 2024. PP says:
it observed that water was escaping out of the ground…suggesting the entire trench is full and has not collapsed in any area. This means it cannot be inspected without being pumped out, and possibly partly excavated
there is a high likelihood that the trench would have become inundated as there is a significant amount of ground water runoff that is directed through this area even under general weather/rain conditions
the lid for the septic tank is installed lower than ground level and is not sealed, therefore any water run off from rain events can enter the septic tank and will overload the system
there was an overflow pipe from the rainwater tank which discharges directly to ground just uphill of the septic tank which would discharge excessive water to the surrounding ground in heavy rain events
the soakage trench is installed near the base of a hill, the positioning of this trench would make it subject to excessive water run off in rain events and the ability for any ground water which tracks through the higher ground above to ever it, which would silt up the system and further overload it.
The insurer engaged wastewater engineer, AE, to attend the site and provide an engineer’s report and sewage system failure report dated 12 January 2024 and further specific advice. AE says:
the soaking trench has failed and standing water was found at ground level
the trench has failed prematurely after five years of service and the probability of this occurring ‘naturally’ in 2023 is about 18%
the trench has failed because the hydraulic loading on the trench is too high
a massive groundwater dampness issue hydraulically upstream of the trench is causing dampness issues in the house. The cause of the dampness is not fully understood, AE suggests it is flow of groundwater through the site
the repairs to the septic system (including trench) undertaken by the complainant required a wastewater engineer report which complies with the SA Health On-site Wastewater Systems Code 2013 and local council approval. The non-compliant design contributed to the failure. In particular, the design loading (soakage) rate was too high, and there was possible stormwater intrusion through the septic tank lid into the eastern end of the trench.
The complainant says the damage is due to storm and rainwater runoff
The complainant disputes the insurer’s decision. He says the insurer has based its decision on speculation that the damage was caused by groundwater in circumstances where that had not been proven. In particular, he says:
heavy rain/storms in 2022 caused a large amount of water to sit and soak into the septic system causing the soakage pit to fail
he became aware of the problem after he had the septic system pumped out for the second time within several months
the nature of septic systems means that it is difficult to establish storm damage
AE finding that ground water was present is speculation based on assumptions and no actual tests
AE and PP have been unable to 100% confirm the cause of the damage
while he accepts that the septic tank lid was lower than ground level, it is less than 2m2 which would allow only very small amounts of water to enter
his repairs to the septic system did not require an engineer report or council approval.
The complainant arranged a plumber, TB, to inspect the property on 29 May 2023 and prepare a report. That report says ‘the existing soakage has failed and collapsed possibly due to excess rains from last winter’.
The complainant has also provided a media report dated 5 June 2022 reporting heavy rainfall and flooding in and around Adelaide.
Complainant has not shown damage was due to an insured event
Having considered the exchanged information, I am not satisfied the complainant has shown, more likely than not, that storm and rainwater runoff, or another insured event, caused the damage to the trench. That is because:
the expert information does not, on balance, show a causal connection between the June 2022 storm event relied upon and the claimed damage
at its strongest, the information in support of the damage being caused by storm is that of plumber, TB, who says the damage is ‘possibly due to excess rains from last winter’. I am not satisfied the complainant has shown a nexus with an ‘incident’ as required by the policy terms
the experts have identified design issues that could have caused the failure including non-compliant design and excessive design loading rate
I do not accept the complainant’s position that the insurer needs to show that the damage was not due to storm. That is because the initial onus of establishing the loss is borne by the complainant.
Accordingly, I am not satisfied that the complainant has established, on the balance of probabilities, that the loss or damage claimed falls within the terms of cover. As the complainant has not met his onus, I am not required to consider whether the insurer is entitled to rely upon exclusions to decline the claim.
Why is the outcome fair?
The outcome is fair because, considering all the available information, the complainant has not satisfied his onus to show a valid claim under the policy terms for the damage to the trench.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.