Insurer declined a final builder variation of $31,471 after a cash settlement of a hail damage claim, and a claim for non-financial loss for delay
Text of the determination
Determination
|
Case number
|
12-00-1071007
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1071007 25 July 2025
Determination overview
Complaint
The complainant is an incorporated entity. It holds an Industrial Special Risk policy (policy) with the financial firm (insurer). On 14 October 2024, a claim was lodged for hail damage resulting from a storm event on 19 April 2020.
The insurer accepted the claim and was prepared to conduct repairs. However, the complainant opted for a cash settlement. An indemnity payment of $369,790 was made on 20 September 2022 in accordance with policy terms.
The complainant’s builder (AB) submitted three additional payment requests, all approved and paid by the insurer. A final variation was declined, as the insurer considered the items were already covered in the original scope of works (SOW) or were unnecessary.
The complainant now seeks $31,471 for the outstanding variation and $5,000 in compensation for non-financial loss (NFL) for delays.
A representative is assisting the complainant. Any reference within this determination to the complainant includes the representative unless otherwise stated.
Issues and key findings
Is the complainant entitled to the claimed items?
No. This is because the exchanged information shows the items claimed in the final variation were included in the original SOW and SE’s quote or are unsubstantiated.
Is the complainant entitled to NFL?
No. This is because the exchanged information shows the insurer did not take an excessive amount of time to assess the variation or delay additional payments.
Why is the outcome fair?
The outcome is fair because the claimed items were included the original SOW or are unnecessary. It would be unfair to require the insurer to pay for work already included in the SOW or that are unsubstantiated.
The insurer did not unnecessarily delay assessment of the variation or unreasonably delay making progress payments. It would be unfair to require the insurer to pay NFL in this instance.
Determination
This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the variation. It is not required to pay NFL.
Reasons for determination
Is the complainant entitled to the claimed items?
Yes. This is because the exchanged information shows the items claimed in the final variation were included in the original SOW and SE’s quote or are unsubstantiated.
Policy cover is subject to terms, conditions, and exclusions
The policy covers the period from 31 July 2019 to 31 July 2020. Coverage is defined in the policy document (PD) and renewal schedule (RS), which must be read together. Relevant terms are outlined in section 3.2.
There is no dispute among the parties the policyholder received a copy of the policy documents. As such, the insurer is entitled to rely on the terms of the policy in assessing the claim.
The policy is a broad-form commercial property insurance covering physical loss or damage to property (section 1) and resulting business interruption (section 2). Under section 1 settlement can be on one of two bases:
reinstatement/replacement:
> repairs or replaces property to a ‘new’ condition
> payable only if reinstatement occurs
indemnity value:
> depreciated value at the time of loss
> applies if not reinstated or as an interim payment until costs are incurred.
Claim and subsequent payment requests accepted
The insurer appointed CL (loss adjuster) and CR (engineer) to issue the final SOW, and SE to quote for repairs. Although the insurer was willing to proceed with repairs, the complainant opted for a cash settlement. An indemnity payment of $369,790 (excluding GST and net of $5,000 policy excess) was made on 20 September 2022 in line with policy terms.
The complainant engaged AB to assess the SOW and perform repairs. AB requested an additional $183,960 (excluding GST), which the insurer paid on 7 June 2023.
Two further payments were made; $46,758 (excluding GST) on 13 September 2023 and $29,173.49 (excluding GST) on 26 September 2023. A variation of $51,433 was declined as the insurer deemed the items already included or unnecessary. The insurer also declined a revised variation of $31,471 submitted in March 2024 for the same reasons.
Complainant says variation required due to reporting errors
The complainant seeks the amount of $31,471 (including builder’s margin and GST) for the following items:
supply and install of dry-pan flashing for the shed of building six and building seven
scaffolding and wall cladding for the shed of building three
purlin upgrade for building four
The complainant says these are required because of errors in reports by CL, CR, and SE. It maintains CL failed to validate SE’s quote, leading to omissions only discovered during site preparation.
AB relied on SE’s quote, as directed by CL. The inaccuracies originated from CR’s handling, and the settled quote did not reflect the full repair costs.
Insurer says AB did not quote on CR’s SOW
After accepting the claim, the insurer engaged CR to assess the damage and provide a SOW. CR’s report included an initial quote from SE dated 12 November 2021. The insurer supplied these to the complainant so it could obtain its own quote.
The complainant later engaged AB, who based its quote on SE’s initial quote rather than conducting a site visit or using CR’s SOW, despite repeated clarification that SE’s quote was not an approved SOW.
AB initially quoted $615,531. However, it agreed to match SE’s updated quote dated 22 July 2022, signing a contract for $583,469 (excluding GST) in December 2022.
The insurer says the complainant’s representative failed to obtain a quote based on CR’s SOW or arrange for AB to inspect the property and prepare its own.
SE’s updated quote conforms with CR’s SOW
The insurer engaged RI to assess SE’s updated fixed-price quote of $585,134 (including builder’s margin, excluding GST) for alignment with CR’s SOW and Q3 2022 market rates. RI noted the quote itemises major works by building, with quantities and totals. However, no unit rates were listed.
Unit rates were calculated and reviewed for key items like roof cladding, insulation, safety wire, and tie-downs. Lump sum allowances were also evaluated against the scope.
RI based its review on comparable hail-related roof repairs (2020–2022) and industry cost data, concluding the quote aligns with the SOW and reflects reasonable market pricing for the period.
Scaffolding, dry pan flashing, wall cladding and apron flashing included in SOW
The complainant requested a variation for scaffolding, dry pan flashing, wall cladding, and apron flashing. The insurer declined the request, stating these items were already included or foreseeable. It maintains these items were clearly identified in CR’s original SOW and should have been included from the outset.
CR’s SOW includes the supply and installation of all associated access scaffolding towers, safety edge rail and fall protection to comply with the current OHS standards.
SE’s updated quote includes a $120,728 scaffolding allowance (including builder’s margin, excluding GST) across the site, as outlined in CR’s SOW. Of this, $12,781 is allocated specifically for building three.
The insurer says installing a dry-pan flashing is considered best practice; it is not a requirement as stated by AB. CR’s SOW specifies re-roofing must include flashings and comply with current building code regulations, so the works are not a scope change or variation.
The insurer rejects the wall cladding and apron flashing variations, stating they were included in the original SOW, with SE’s quote allowing $11,648 for them. AB does not explain why this allowance is insufficient or identify any building code that would be breached without the variation.
The insurer argues that had CR’s SOW been used, these items would have been captured in AB’s quote.
Purlin upgrade unsubstantiated
AB engaged an engineer (PG) to assess the existing roof cladding supports. In its report, PG confirmed the existing purlins could be reused without affecting performance or lifespan, noting only a negligible 2% strength loss.
Following its review of the variation, RI sent an email to the insurer dated 4 April 2024. It says:
the variation proposes installing 224 purlin brackets where purlins meet roof trusses, at a cost of $15,590 (including margin, excluding GST)
these brackets were not present at the time of the event and would be a compliance upgrade if accepted. However, the PG report (9 Feb 2023) is the only reference to this work
CR’s supplementary report (7 March 2023) states the only required compliance upgrade is cyclonic assemblies; purlin brackets are not required, based on discussions with PG.
No evidence or expert report was provided by the complainant to dispute these findings. As such, the insurer considers the purlin upgrade variation unsubstantiated.
Insurer is entitled to decline variation
I have carefully considered all the exchanged information. I am satisfied, on the balance of probabilities (that is more likely than not), the insurer is entitled to decline the final variation for $31,471.
This is because:
the variations were referenced in CR’s original SOW and SE’s amended quote, so not unforeseeable to AB
the purlin upgrade to building four is unsubstantiated based on CR’s discussions with PG
AB was responsible for ensuring its SOW and quote captured all items in CR’s SOW
the complainant confirmed variations were due to alleged misquoting, not new or worsened damage
insurer communication:
> 1 April 2022: insurer provided CR’s scope and requested a quote
> 21 October 2022: complainant submitted AB’s $615,531.32 (ex GST) quote, based on CR’s scope. It disputed SE’s original quote completeness
> 24 October 2022: CL clarified misunderstandings and shared SE’s updated fixed-price quote, confirming alignment with CR’s scope and remained valid
although shared, neither the insurer nor CL requested a quote based on SE’s update; CL offered SE for repairs
on 24 January 2023, the complainant submitted a signed contract with AB using SE’s updated quote total (less an agreed adjustment), without a revised AB quote
complainant did not compare AB’s quote with CR’s SOW or SE’s quote to identify additional work or materials, nor provide invoices for extra work or materials.
Uplift on indemnity settlement not appropriate
The resolve the complaint, the complainant says the insurer should offer an amount equal to a contingency based on the original claim value (for the transfer of risk) or the variation value, if lower, referencing a previous AFCA decision.
The insurer argues the previous decision is irrelevant, as it did not choose to cash settle the claim. Rather, the complainant’s representative declined repairs and insisted on a cash settlement.
I am not satisfied an uplift on the original cash settlement is appropriate in this instance. This is because an uplift is mainly to address the risk of further costs or variations. However, in this case, I note the following.
The insurer has already allowed for some variations and costs with others unsubstantiated. Further, this dispute was about numerous variations being sought by the complainant to complete the works. There is nothing to indicate there are other possible variations which may occur. In addition, the complainant, through a professional representative, has had sufficient opportunity to identify all the possible risks and variations in the works to support its position.
Therefore, given all this, I do not consider it fair to apply an uplift.
Is the complainant entitled to NFL?
No. This is because the exchanged information shows the insurer did not take an excessive amount of time to assess the variation or delay additional payments.
AFCA’s approach to non-financial loss
AFCA can award non-financial loss in circumstances where an insurer has made an error or mishandled a claim in a way that causes undue stress and inconvenience to an individual. Generally, AFCA would award this kind of compensation to a natural person, such as an individual or sole trader.
The complainant is not entitled to NFL
The complainant is an incorporated entity, legally distinct from its directors, employees, and shareholders. However, AFCA can award NFL to other complainant’s where there has been an unusual degree or extent of time taken to resolve the situation.
The exchanged information shows the insurer received the initial variation on 3 February 2023. On 4 February 2023, CL contacted the complainant, confirming the variation had been reviewed and explained:
the additional scaffolding costs were not accepted
remaining costs were referred to CR for review.
On 26 February 2023, CL advised the complainant that most items in AB’s variation were already included in CR’s SOW.
From February 2023 to November 2023, the complainant continued to dispute the insurer’s assessment of the variation. During this period, the insurer made additional payments upon receiving proof of incurred costs in line with policy terms.
After reviewing all exchanged information, I am not satisfied the insurer mishandled the claim or caused undue delays. The insurer is not required to pay NFL.
Why is the outcome fair?
The outcome is fair because the claimed items were included the original SOW or are unnecessary. It would be unfair to require the insurer to pay for work already included in the SOW or that are unsubstantiated.
The insurer did not unnecessarily delay assessment of the variation or unreasonably delay making progress payments. It would be unfair to require the insurer to pay NFL in this instance.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Policy Terms
|
Page
|
Description
|
4
|
Section 1 – Material Loss or Damage
The Indemnity In the event of any physical loss, destruction or damage (hereinafter in Section 1 referred to as “damage” with “damaged” having a corresponding meaning) not otherwise excluded happening at the Situation to the Property Insured described in Section 1 the Insurer(s) will, subject to the provisions of this Policy including the limitation on the Insurer(s) liability, indemnify the Insured in accordance with the applicable Basis of Settlement
|
5
|
Basis of Settlement
For the purpose of ascertaining the classification under
which any property is insured, the Insurer(s) agree(s) to
accept the designation applied to such property by the
Insured in its records, provided that such property is not
specifically excluded by this Policy.
(a) On buildings, machinery, plant and all other property
and contents (other than those specified below):
The cost of reinstatement, replacement or repair in
accordance with the provisions of the Reinstatement
and Replacement and Extra Cost of Reinstatement
Memoranda as set out herein.
|
6
|
Reinstatement or Replacement
Applicable to buildings, machinery, plant and all other
property and contents; other than those specified in items (b)
to (i) under Basis of Settlement.
The basis upon which the amount payable is to be calculated
shall be the cost of reinstatement of the damaged property
insured at the time of its reinstatement, subject to the
following Provisions and subject also to the terms, Conditions
and Limit(s) or Sub-Limit(s) of Liability of this Policy.
For the purpose of the insurance under this memorandum
“reinstatement” shall mean:
(a) Where property is lost or destroyed:
In the case of a building, the rebuilding thereof or in the
case of property other than a building, the replacement
thereof by similar property: in either case in a condition
equal to, but not better or more extensive than, its
condition when new;
(b) Where property is damaged:
The repair of the damage and the restoration of
the damaged portion of the property to a condition
substantially the same as, but not better or more
extensive than, its condition when new.
Provisions
(i) The work of rebuilding, replacing, repairing or restoring
as the case may be (which may be carried out upon
any other site(s) and in any manner suitable to the
requirements of the Insured, but subject to the liability
of the Insurer(s) not being thereby increased), must be
commenced and carried out with reasonable despatch,
failing which the Insurer(s) shall not be liable to make
any payment greater than the indemnity value of the
damaged property at the time of the happening of the
damage.
(ii) When any property insured to which this
memorandum applies is damaged in part only, the
liability of the Insurer(s) shall not exceed the sum
representing the cost which the Insurer(s) could have
been called upon to pay for reinstatement if such
property had been wholly destroyed.
(iii) Property insured under this memorandum is separately
subject to the following Co-Insurance clause:
In the event of damage to any property insured
hereunder at any situation caused by any event
hereby insured against, the Insurer(s) shall be liable
for no greater proportion of such damage than the
amount that the Insured’s declaration of value of
property insured at such situation on the day of
commencement of the Period of Insurance bears to the
sum representing eighty-five per cent (85%) of the cost
that would have been incurred in reinstatement if the
whole of such property had been destroyed on that day,
but not exceeding the Limit of Liability expressed in the
Schedule.
Provided that if the sum actually incurred or expended
in rebuilding or replacing the damaged property,
within the meaning of sub-paragraph (a) of the
abovementioned definition of reinstatement, exceeds
the amount that would have been payable under this
Policy if this memorandum had not been incorporated
herein, but is less than the cost of reinstatement as
above defined, then the sum so actually incurred or
expended shall, for all purposes of this memorandum,
be deemed to be the cost of reinstatement of the
property.
Provided further that the above clause shall not apply
if the amount of the damage does not exceed five per
cent (5%) of the amount of the Insured’s declaration
aforementioned.
(iv) No payment beyond the amount that would have been
payable under this Policy if this memorandum had not
been incorporated herein shall be made until a sum
equal to the cost of reinstatement shall have been
actually incurred.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.