Cash settlement for storm damage was inadequate because it did not cover mould remediation in the roof cavity
Text of the determination
Determination
|
Case number
|
12-00-1065174
|
Financial firm
|
AAI Limited
Case number: 12-00-1065174 20 February 2025
Determination overview
Complaint
The complainant holds a home and contents policy with the financial firm (the insurer). On 9 March 2022, the complainant lodged a claim for damage to her property following a storm that occurred on 7 March 2022.
The insurer accepted the claim for damage to home and contents. Following assessments of the damage, the complainant accepted a cash settlement for repairs to the property, including payment for the additional benefit of temporary accommodation from the insurer. The cash settlement included a contingency uplift of 15%, further temporary accommodation (TA) and non-financial loss compensation. Payment was made on 4 October 2023.
The complainant is now dissatisfied with the insurer’s cash settlement. She says that once her appointed builder (BC) commenced remediation works, he identified that mould had spread throughout the roof cavity and roof trusses which he says was outside of the agreed scope of works (SOW).
The complainant seeks an increase in the cash settlement to allow for additional remediation, further TA and compensation for the stress and inconvenience.
Issues and key findings
Is the insurer required to increase its cash settlement?
Yes. The available information supports that the mould in the roof cavity is from the insured event. The complainant was not sufficiently compensated for remediation of this mould in the original cash settlement by the insurer.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer has caused the complainant an unusual degree of stress and inconvenience and should pay the complainant $2,500 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the insurer has not adequately assessed the storm related damage in its cash settlement to the complainant. It is fair that the cash settlement is increased to allow for the mould remediation in the roof cavity. It is also fair that the insurer compensates the complainant in non-financial loss for the further stress and inconvenience caused.
Determination
This determination is in favour of the complainant.
See 2.1 and 2.2 of the determination for how the claim is to be settled.
Reasons for determination
Is the insurer required to increase its cash settlement offer?
Yes. The available information supports that the mould in the roof cavity is from the insured event. The complainant was not sufficiently compensated for remediation of this mould in the original cash settlement by the insurer.
Insurer cash settled the complainant for repairs and remediation
The complainant’s property was inundated with water following a storm on 7 March 2022. The insurer accepted the complainant’s claim for water ingress to the home and contents and paid temporary accommodation. The cash settlement paid to the complainant on 4 October 2023 consisted of the following:
$235,102.02 for building repairs (which included $64,383 for remediation costs)
$35,265.30 for 15% contingency uplift
$14,426.56 for TA until 16 March 2024
$2,000 for contents storage
$2,000 in non-financial loss compensation
less $3,614.40 bond.
The insurer’s documents include an email sent to the complainant dated 1 August 2023. It attached a copy of the redacted SOW from RC dated 25 July 2023. Under 1.01 ‘Restoration’ it notes as part of the SOW:
Site attendance, installation of drying equipment, moisture mapping and tracking, and treatment with antimicrobial solution.
The comments include:
Drying equipment: (7 days capped for 4 days) 21 x Air Moves 6 x Dehumidifiers 10 x AFD’s
There are no costings provided. However, the offer from the insurer provides the total cost of $235,102.02 with an additional 15% contingency uplift.
Complainant says that cash settlement is inadequate
The complainant has provided a letter from her builder AM dated 2 February 2024 who says:
As you are aware during remediation of site and removal of ceiling/wall linings has exposed mould in areas outside scope of works. In particular roof cavity mould being present on underside of roof tiles and timber rafters and beams.
We cannot WARRANT any works being carried out in current scope. As a result of this works have been paused as not to waste resources and for further assessment from a hygienist and insurance assessors for direction and new scope of works.
The complainant says that she was not provided with a SOW prepared by RC for mould remediation. She says that this had a significant impact as she was unable to compare costings from her builder with those from the insurer. She says that she would not have accepted the insurer’s cash settlement offer if she had known of the extent of mould remediation allowed for by RC in their SOW. She says that she would have asked for a roof cavity assessment by a hygienist prior to accepting any cash settlement.
The complainant says that she relied on an undertaking given by the insurer that should further mould have been uncovered once repairs began, she would be able to have the claim re-opened.
Insurer says cash settlement is consistent with policy terms
The insurer says it sought to cash settle the complainant as the property was found to require maintenance works to be undertaken prior to the commencement of repairs. The repairs were to the ridge cap bedding and pointing. The insurer advised the complainant of these maintenance repairs in a letter dated 21 December 2022 and provided a roof report from NP.
The PDS provides that when the insurer is unable to complete the repair, the insured is asked to engage a builder to provide a SOW and a quote on the cost to repair the home on a ‘new for old’ basis. The insurer then arranges for it to be assessed which involves reviewing the quote to determine if it is appropriate and reasonable for the scope of works. If the quote is appropriate and reasonable for the SOW, the policy provides that the insurer will then pay the insured the assessed amount. If it is not deemed reasonable, the quote may be adjusted and the adjusted amount paid to the insured.
The complainant obtained a quote from her builder BC dated 11 June 2023. It was noted that the SOW included:
Removal and reconstruction of internal ceilings and walls due to damaged caused by water leak (damage was caused by a storm event)
The total amount for the quote was $261,700 (excluding GST).
The insurer’s assessor (IA) reviewed BC’s quote and found that it was not fair and reasonable as it did not include a breakdown of material and labour costs for consideration.
The insurer requested that BC provide an itemised quote for the event related damage, however, BC refused.
To assess the adequacy of the quote from BC, the insurer appointed a hygienist MP. MP inspected the property on 23 June 2023 and prepared a report dated 29 June 2023. Indoor air samples returned total mould spore concentrations at 'very high’ levels in bedroom one, front living area and the kitchen/dining area. ‘High’ levels were found in the remaining areas. MP recommended that moisture issues were to addressed prior to the work commencing. MP recommended that remediation works include the removal and replacement of:
all wall linings
ceiling linings
curtains and blinds
windowsills
air conditioning unit and air vents
all doors.
The insurer obtained a quote from BB dated 17 July 2023 for the restoration works to the property based on the report from MP. The quote included remediation of the roof cavity which consisted of:
a HEPA vacuum of surfaces
application of antimicrobial
aggressive cleaning of surfaces- affected timber frame work within the roof space
possible sanding if required
re-HEPA vacuum surfaces
installation of containment to separate the roof cavity from the property internally.
The cost of the remediation was $7,860 (excl GST). The total cost of remediation was $70,821.30 (including GST). This was the estimate used in the SOW provided to the complainant by RC in its quote dated 25 July 2023.
The insurer has acknowledged that BB’s SOW for the restoration works was not sent to the complainant when she was cash settled in October 2023. It was subsequently provided by the insurer to the complainant on 14 May 2024.
The insurer’s internal assessor (IA) says that despite the SOW from BB not being provided, the remediation steps are consistent with those of standard practice that any industry professional would have been aware of. Further, had the complainant requested the SOW, it would have been provided to her.
The insurer says that its settlement offered was sufficient for the mould that was event related. It says that the complainant has not acted in a timely way to manage non-claim related damage that is contributing and shall continue to contribute to the mould. This includes ongoing maintenance issues with regard to the roof (as discussed below).
Further, the insurer says that the complainant’s builder was aware of the condition and situation with the mould and quoted for the same. The insurer says that BC’s quote provides an allowance for:
the demolition of internal ceilings
removal and disposal of internal wall linings
removal and dispose of damaged ceiling and roof timbers
remove and dispose of mouldy insulation.
The insurer says that the claim was appropriately cash settled and included the contingency uplift.
Insurer obtained further expert reports to assess roof cavity
The insurer conducted further assessments of the property following the complainant’s concerns when BC commenced repairs. IA assessed the property on 27 March 2024, together with RC (the builder), BB (the restorer) and MP (the hygienist). IA noted that BC was conducting remediation works in a non-conventional manner with potential issues of cross-contamination noted with stripping of the ceilings being undertaken prior to the removal of kitchen cabinetry and wall lining removal. Further, water damaged ceiling lining in the entry hall remained in place.
RC noted that all the mould to the property had been allowed for in the restoration estimate.
MP provided a report dated 4 April 2024. MP noted:
The dominant genera within the samples collected were Aureobasidium and Cladosporium, which are both associated with water damage in buildings, with Cladosporium also commonly found in soil and plant materials. Due to the fact the roof tiles are external facing and soil/dirt was observed on the underside of the roof tiles during the inspection, it is likely the natural outdoor environment has contributed to mould spore concentration levels on the roof tiles in conjunction with the original water ingress event that occurred in March 2022.
The possibility of mould cross contamination to the roof tiles also cannot be ruled out due to the fact that no containment had been installed prior to works commencing at the property. This is supported by the fact the Cladosporium was one of the dominant genera detected within the property during the previous mould inspection undertaken.
MP confirmed the presence of visible mould on the underside of the roof tiles. No water staining was observed on the roof tiles.
MP recommended remediation of the roof tiles due to the ‘Very High’ and ‘Elevated’ mould spore concentrations detected. MP noted that the mould genera associated with water damage was consistent with the previous mould inspection. MP recommended that a remediation methodology is prepared by a IICRC accredited restoration contractor. The methodology MP suggested would likely include HEPA vacuuming and wet wiping of the roof tiles.
However, MP noted that the IICRC restoration contractor should confirm this and what is the most effective and efficient way to remediate the roof tiles. MP also recommended the engagement of a building consultant to comment on whether the condition of the roof tiles which were noted to be in an ageing condition was contributing to the mould spore concentration in the subject area.
The insurer then appointed IS, a specialist roofing contractor. IS provided a report following a site inspection on 17 May 2024. IS found that the cause of water ingress to the front entry area was due to the non-compliant spreader pipe discharging directly onto the roof tiles. IS also found that the detached, missing sections of bedding and pointing have allowed wind driven rain to enter the ceiling cavity, further contributing to the high humidity within the ceiling. IS says that this recurring water entry is a contributing factor to the long-term pre-event mould growth on the underside of the tiles.
The insurer concluded based on these assessments, that the roof void was affected by mould prior to the claimed event, and subsequent maintenance issues have assisted with the proliferation of the same. However, it says that it has scoped and quoted appropriately for mould remediation.
Insurer should re-open cash settlement
The panel is satisfied that the insurer should re-open the cash settlement to allow for further costs to remediate the roof cavity, including the roof tiles. This is because the insurer:
failed to provide the complainant with the SOW for the mould remediation at the time of settlement
advised the complainant in the Cash Settlement Fact Sheet provided that should further damage be identified, she should contact the insurer immediately, cease any repair work, allow the insurer to assess and if the damage was caused by the insured event and covered under the policy, an additional payment would be made.
While MP could not rule out the possibility of cross-contamination as a cause of damage to the roof tiles, the panel is satisfied that it is more likely from the insured event. This is because:
the genera of mould were consistent with that found previously in the property
the insurer had already been determined that there was mould on the roof trusses, as the SOW from BB allowed for remediation of the timbers
there was no evidence of mould on the interior of the roof tiles when inspected by RC on 16 January 2023, noting that tiles were physically removed and if the mould was because of recurring water entry as suggested by IS, mould would likely to have been present then.
The SOW from BB made an allowance for remediation of the roof cavity. However, it only allowed for cleaning of the surface but contemplated that sanding was possible. Noting that more extensive mould was detected in the roof cavity, it is likely that sanding will be required. The SOW from BB provides that RC was to conduct asbestos testing. BB did not make any allowance for this in its quote. However, RC does not make any allowance for asbestos testing in its quote.
The panel is therefore not satisfied that the cash settlement has adequately allowed for treatment of the roof cavity, particularly as it has not been determined whether asbestos is present.
The complainant has also noted the presence of mould on the interior of the external cladding. The insurer has not commented specifically on this.
The panel is therefore satisfied that the insurer has not provided an adequate allowance for the mould remediation of the roof cavity in its cash settlement.
How the claim is to be settled
The panel is not persuaded by the quote from the complainant’s hygienist KI dated 16 August 2024. KI has not reviewed the most recent report from MP and there are few details of what remediation is required that accounts for the estimate of $108,770 provided.
Should the complainant accept the determination, within 14 days of receiving written notification of her acceptance, the insurer is to:
appoint RC to conduct asbestos testing of the roof cavity
within 14 days of receiving the results of the asbestos testing, the insurer is to appoint BB to prepare a revised SOW and quote based on the results of the asbestos testing for the remediation of the roof cavity, including the roof trusses, roof tiles and the interior of the external cladding. BB should also provide an estimate of how long the remediation will take
within 14 days of receiving the quote from BB, the insurer is to cash settle the complainant based on the quote from BB together with a 10% contingency uplift, minus the sum of $9,942.92 (which includes the initial estimate of $7,860 plus GST and 15% contingency uplift) which it had previously been allowed in the cash settlement based on the SOW from BB for the roof cavity
continue to pay TA until the cash settlement is paid to the complainant
within 14 days of receiving the SOW and quote from BB, pay the complainant the additional TA based on the estimate provided by BB.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer has caused the complainant an unusual degree of stress and inconvenience and should pay the complainant $2,500 in non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
Insurer has caused further stress and inconvenience
There have been repeated delays in the insurer arranging for the property to be assessed by its experts. The complainant contacted the insurer in early January 2024 to advise of further issues found in the roof cavity. However, rather than arranging for experts to re-assess the property, it continued to request information from the complainant. This included information about the extent of mould remediation works completed and/or the application of any cash settlement funds to repairs and mould remediation undertaken by BC.
The insurer says that the lack of information from the complainant as to the nature of work performed and allocation of funds impeded its ability to appropriately respond to the complainant’s situation and make a claims decision.
However, the panel is not persuaded by the insurer’s argument. The insurer should have re-assessed the property in a timely manner while requesting documents from the complainant. A dual assessment was not undertaken until late March 2024.
The panel notes that the roof assessment undertaken by IS failed to address the question which MP had requested, which was whether the roof tiles were contributing to the mould spores.
The panel also notes the repeated contact made by the complainant to obtain progress updates in relation to her claim.
The panel notes that the insurer has continued to provide temporary accommodation while the claim is being reviewed. However, it is satisfied that the insurer’s poor claims handling has caused stress and inconvenience to the complainant and that it should compensate her $2,500 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the insurer has not adequately assessed the storm related damage in its cash settlement to the complainant. It is fair that the cash settlement is increased to allow for the mould remediation in the roof cavity. It is also fair that the insurer compensates the complainant non-financial loss for the further stress and inconvenience caused.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.