Partial acceptance of claim for building damage during neighbouring construction; cash settlement disputed; claim handling
Text of the determination
Determination
|
Case number
|
12-00-1065092
|
Financial firm
|
Capricorn Mutual Limited
Case number: 12-00-1065092 27 February 2025
Determination overview
Complaint
The complainants hold a business buildings protection policy with the financial firm which provides cover, at the financial firm’s discretion, for risks located at a building in Lavington, NSW.
The complainants lodged a claim after the building was damaged in April 2023, during construction of a service station at the adjacent property. The financial firm exercised its discretion to partially accepted the claim for impact damage. It has offered the complainants a cash settlement.
The complainants say the cash settlement in insufficient and seek the financial firm pay them to demolish and rebuild the building given the extent of the damage. They also seek compensation for non-financial loss because they say the financial firm mismanaged the claim.
Issues and key findings
Is the financial firm entitled to limit its liability?
Yes. The financial firm is entitled to limit its liability. This is because while the covered building suffered impact damage, the available information shows the remaining damage was due to a combination of pre-existing damage and construction/earth works. These are excluded by the policy.
Are the complainants entitled to non-financial loss compensation?
Yes. The financial firm must pay the complainant $1,000 compensation for non-financial loss.
Determination
This determination is in favour of the financial firm.
However, if the complainants provide written notice they accept this determination, the financial firm is to (within 14 days of being notified of the complainants’ acceptance):
provide the complainants two fresh and actionable quotes for the impact damage and cash settle the complainants based on the highest of the two quotes plus pay a 20% contingency on top of this amount to reflect the transfer of risk;
reimburse the complainants for the invoice from EG in the amount of $649.99
pay the complainants $1,000 compensation for non-financial loss
reimburse the complainants the cost of EE’s report upon production of an invoice or receipt
Reasons for determination
Is the financial firm entitled to limit its liability?
Yes. The financial firm is entitled to limit its liability. This is because while the covered building suffered impact damage, the available information shows the remaining damage was due to a combination of pre-existing damage and construction/earth works. These are excluded by the policy.
Policy covers protected events, subject to exclusions
The cover provided by the policy is set out in the Produce Disclosure Statement (PDS). It is not in dispute the financial firm provided the policy documents to the complainants.
The complainants have cover under the policy for the business building for $284,000. They also have $10,000 cover for accidental damage and $5,000 of cover for loss of rent.
Page 32 of the PDS sets out the cover for business buildings. The financial firm protects the member for loss or damage to the business building and caused by a protected event during the period of protection. The financial firm provides protection on a discretionary basis.
Protected events are defined in the policy and set out on pages 23 and 24, as follows:
Any of the following perils:
fire;
explosion or implosion (but not for loss or damage to boilers, economisers, or vessels under pressure themselves, or their contents);
lightning;
storm, wind, rain or snow;
escape of liquid resulting from discharging, leaking, bursting or overflowing of pipes, tanks, heating or water apparatus (but not for loss or damage to the actual pipes, tanks, heating or water apparatus themselves);
hail (but not for loss or damage to vehicles or watercraft unless specified in your schedule of protection);
impact by vehicles, animals, watercraft, aircraft or other aerial devices, or falling trees or objects;
riots, strikes and civil commotion;
malicious acts; or
earthquake, tsunami, subterranean fire or volcanic eruption.
The financial firm says the relevant protected event in this matter is ‘impact damage’ and has exercised its discretion to partially accepted the claim on this basis. It says that some of the damage to the property is excluded under the policy because it was:
caused by vibration of the building from constructions works which is not a protected event in the policy,
is pre-existing, or
caused by tree roots or earth movement.
As indicated above, the complainants also have cover for accidental loss or damage to a limit of $10,000 which is defined as:
Loss, destruction or damage that is unexpected, unintentional, sudden and unforeseen.
Accident is defined in the policy as
Loss or damage arising out of an unexpected or unintended cause.
Excavation works were being carried on next door
The building is a brick shed used as an auto electrician workshop.
There is also a house at the front of the property, which is covered by an insurer.
It is not in dispute that in April 2023, earthworks and construction works were being carried out at the property adjacent to the building to construct a service station.
The complainants say that the contractors next door were using an industrial grade soil compactor that caused disturbance and shaking of the shed. This resulted in cracking damage.
The complainants contacted the council who asked the contractors to reduce the level of the impact of the machine on three occasions because of the observed vibrations. However, these continued. The contractors also removed very large trees near the boundary line using an excavator.
On 20 April 2023, the complainants sent the owner of the adjacent property an email asking it to cease and desist using the industrial grade soil compactor after they noticed a large crack in the concrete slab of the shed.
The parties disagree on the extent of the damage
The parties have obtained a number of expert reports. The details of these reports are set out in section 3.2 below.
The experts say that a number oof factors have caused damage to the building, being:
impact damage
pre-existing cracking given the age of the building
the construction works next door, including the excessive vibrations
earth movement potentially caused by tree roots and seasonal changes.
Financial firm accepts impact damage caused by heavy machinery
Based on its expert reports, the financial firm accepts that there has been impact from heavy machinery to the footings in one corner of the protected building causing damage.
The financial firm says it is entitled to cash settle the complainant for that damage on the basis of a quote from CM dated 22 August 2023 for the amount of $49,547.08, including GST. In addition to this amount, it has offered the complainants $1,646.70 to account for CPI movement.
The financial firm’s builder (CM) also provided a quote dated 18 August 2023 for $192,609.34 which is to demolish and rebuild the building.
Complainants say proximate cause of damage is the construction works
The complainants dispute the financial firm’s position. They say the building did not have pre-existing cracking and that the damage was due to construction works next door.
In addition to their expert report from EE, the complainants have provided statements from a customer, the tenants living in the house at the front of the property and the property manager. All of the statements say that the vibrations during the construction of the service station next door were severe and that after the works were performed, they noticed cracking which was previously not there.
The complainants also dispute that tree roots have caused any damage to the property. They say that the only tree present was near the fence line and this was ripped out during construction works at the adjacent property. They also say that it would have been prudent for the owners of the adjacent property to investigate if there was any requirement to reinforce or stabilise the ground running along the joint boundary.
The complainants have provided three quotes to repair the damage to the building. However, they say from their discussions with builders, the building cannot be repaired and needs to be demolished and rebuilt.
The complainants have provided three quotes:
NE quote 180 is for the demolition and rebuild of the building in the amount of $266,829.20, including GST
NE quote 181 is to repair the building by removing and rebricking the shed. This quote amounts to $218,289.50, including GST
FB quote dated 24 July 2024 to repair the building by removing and rebricking the shed. This quote amounts to $235,917.00 including GST.
The complainants also say that the previously repaired vertical cracking was work undertaken by the previous owners to remove a door and replace it with a window – hence why there is a combination of new and old brickwork. They also say that the financial firm inspected the property in 2007 before the original policy was incepted when no cracking was identified.
Financial firm is only liable for impact damage
The complainants have lodged a valid claim for impact damage, which is a protected event under the policy. The dispute relates to whether all the damage to the building was caused by impact by a vehicle.
The complainants say that there was no pre-existing damage to the building and that all the damage was caused by construction works. This is supported by their expert, EE. Even if I accept that is likely to be the case, that is not the finding that I need to make. This is because ‘construction works’ are not a protected event under the policy – only impact damage caused by a vehicle is covered, not damage that was caused by vibrations as set out in EE’s report. On that basis, the financial firm is not liable for that damage. The complainants may need to seek recourse elsewhere, such as commencing an action against their neighbour.
The available information supports that there has been impact damage to one corner of the building where the excavation works were carried out. The financial firm’s scope of works prepared by MB is an adequate scope of what damage is covered under the policy caused by impact.
The quote provided by the financial firm to repair the damage is not out of date. On that basis, the financial firm is to provide two new and actionable quotes for the impact damage, based on the scope of works prepared MB. The financial firm is not required to demolish and rebuild the building. The financial firm is to cash settle the complainants based on the highest of the two quotes plus a 20% contingency to reflect the transfer of risk.
I appreciate that this will not cover all of the damage to the building. However, only impact damage is covered under the policy.
The financial firm is required to reimburse repair cost for the garage
The complainants say the garage roller door had to be adjusted to be able to be closed, which they have paid for. The complainants say the financial firm advised that the complainants would be reimbursed for the cost of having to do so. However, the financial firm denies agreeing to meet such costs and maintains that it is not liable for this item as it does not form part of the impact damage.
Based on the available information, the panel accepts that the cause of the garage roller door not closing and having the need to be adjusted is more likely than not to be due to impact damage. As the financial firm exercised its discretion to grant indemnity for damage caused by this protected event, then it should cover this too.
The complainants have provided a receipt from EG to repair the garage door for $649.99. They should be reimbursed for this amount.
Complainants are not entitled to loss of income
The complainants seek compensation for loss of income. However, the panel notes that business interruption is an additional benefit which the complainants have not included in their policy.
Therefore, the complainants are not entitled to compensation for loss of income.
Are the complainants entitled to non-financial loss compensation?
Yes. The financial firm must pay the complainant $1,000 compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA may award compensation for non-financial loss (capped at $6,300) where there has been an unusual amount of physical inconvenience, time taken to resolve the situation or interference with a complaint’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during a claim.
Complainants are entitled to $1,000 non-financial loss compensation
The complainants say the financial firm told them during a phone call on 24 September 2023 that they would decline the claim based on the information available to them.
I have listened to this phone recording. The complainant expressed his frustration that there appeared to be no clear pathway in progressing the matter. He said that he had tried to contact the financial firm’s assessor and that the calls were not returned. He said that the building was unsafe and he was unable to safely have customers in there and he was worried about going broke.
The financial firm denies saying that it would decline the claim. However, the recording clearly demonstrates this. The financial firm’s representative says that based on the current information, the claim would be declined.
The complainant makes other accusations about the financial firm during that phone call which are unsubstantiated. However, I can appreciate how the complainant would experience undue stress and inconvenience being told this. I consider the information available to the financial firm at that time was not supportive of a decline of claim, given that MB had said that some damage was attributable to impact damage.
I have also reviewed the claim notes. The claim notes indicate that the financial firm requested one of its experts amend its report, because it supported the complainants’ findings. I have not been provide with the original report, but consider this kind of conduct appalling.
Having reviewed the file notes, the I accept that there has been delay with obtaining updates from experts, including the final assessment report. There is also a note on the file notes where the complainant says they have been waiting to hear back from the loss adjuster and the last conversation was in excess of 20 days. It is evident from the file notes that it was difficult to get a hold of the assessor. The notes on file note states that the complainants were extremely distressed.
Based on the available information, I am satisfied the financial firm’s poor claims handling has caused the complainants unnecessary stress and inconvenience and impacted the complainants’ peace of mind. On that basis, the financial firm should pay the complainants $1,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because while the protected building suffered impact damage, the remaining damage was due to a combination of pre-existing and construction/earth works, both of which are excluded under the policy. It would therefore be unfair to require the financial firm to accept the claim in full.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Relevant expert reports
MB’s report dated 15 May 2023 says:
upon inspection, he observed a mix of pre-existing cracks and new cracking likely caused by the excavation and soil compaction.
pre-existing cracking may have been worsened by compaction and excavation activities next door.
there are several trees in close proximity to the property and these may have caused some of the cracking damage
Considering the proximity of the machineries to the boundary and the resulting vibration that lasted two days or so, there was a possibility that the fresh cracks might be caused by the rattling and shaking of the structure.
in his opinion, the pre-existing damage was likely caused by soil movement from the surrounding tree root activity. He also observed random, fresh cracks to the slab and walls and opening of pre-existing cracks that may be related to the construction activities at the adjacent property. In his view, this was mainly caused by not providing support for the boundary footing which should have been completed before excavation works took place.
construction activities such as excavation and/or compaction generally require heavy machinery that is capable of damaging unprotected buildings at close proximity, which is the case here. Therefore, there’s a good chance the fresh cracks are caused by these activities.
MB attached a number of photos to his report showing the damage. He also prepared a scope of works for repairing the damage caused by the adjacent construction works.
CM then attended the property and prepared a causation report dated 11 August 2023 that said:
In our professional opinion it was noted during our attendance that the foundations have been compromised prior to the event of machinery use in the neighbouring property, by using near map imagery a large tree was in the proximity of the building but has been removed in the last 2 years, this could have been a cause but not confirmed.
Because of the footing being compromised and rotation of the brickwork noted the heavy machinery use and compaction of the neighbouring property would have been the factor of cracks to the concrete slab and also the brickwork to the shed, with the damage noted to the footings we would not be able to warrant sectional repairs to these areas hence why we have priced full demolition and rebuild of this structure.
It is my opinion Because of the footing being compromised and rotation of the brickwork noted the heavy machinery use and compaction of the neighbouring property would have been the factor of cracks to the concrete slab and also the brickwork to the shed, with the damage noted to the footings we would not be able to warrant sectional repairs to these areas hence why we have priced full demolition and rebuild of this structure.
After this, the complainants believed the damage to the property was worsening. MB attended the property again and provided a report dated 15 September 2023 that said he attended to compare previous photos to see if the cracking at the property was worsening. He did not identify any further damage.
The complainants engaged an engineer, EE, to assess the damage. EE inspected the property on 19 January 2024. EE’s report dated 17 June 2024 says:
when inspecting the building, he noticed multiple instances of cracking and damage
the external wall systems of the workshop are not designed to sustain vibrations associated with construction works
he obtained the geotechnical report for the adjacent property which indicates that the soul bed consists of clayey silty and silty sandy clay. Given that there is no fill in the bore hole site investigations, he is of the view that the cracking to the building is not a consequence of differential settlement.
the proximity of the constructions works has affected the condition of the building via means of accelerating the settlement experienced and subsequent stress of foundations.
the cracks observed were vertical and stair-step cracking which indicates the non-uniform settling of the foundations.
the width and frequency of the cracks observed to the walls increased with the closer proximity to the boundary of the adjacent property. On that basis, he is of the view that there is a direct correlation between the construction works and subsequent damage to the building.
in his opinion, the complainants are not responsible for the reconstruction of the masonry walls. If these walls are not rectified, the issue may further compromise the structural integrity of the building and allow water ingress.
he considers the cause of the damage to the building to be the construction works at the adjacent property because the contractors have failed to provide an install structurally adequate safety measures and maintain a safe distance from the property boundary when construction works took place.
MB prepared a further report dated 9 July 2024, in response to the complainants’ expert advice. The report said:
he has reviewed the geotechnical reports and considers the soil classification is a very reactive site which caused the ground movement
the vibration, although appeared to be extreme, was not the cause of all damage observed during his inspection as there were several pre-existing cracks
the vibration movement may be related to only a few fresh cracks
the cracks observed during his inspection were typical damage which occurred due to general movement. The extensive damage is another indication of ground movement. This type of damage can only occur over time and not due to a single event. The construction work was temporary and over a short period of time compared to the ground movement event
the crack over the garage door is a typical example of a pre-existing crack. The damage to the roller door is related to the subsidence and ground movement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.