Partial denial of flood claim (termite-damaged timbers, concrete slab), total loss dispute, kitchen cabinetry limit and adequacy of cash settlement
Text of the determination
Determination
|
Case number
|
12-00-1063052
|
Financial firm
|
RAA Insurance Limited
Case number: 12-00-1063052 11 April 2025
Determination overview
Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer) for his holiday home that is located in the State of South Australia (the property). He lodged a claim in February 2023 for damage to the property and its contents following a flood event that occurred in late December 2022 to about the middle of January 2023 (the flood).
The insurer partially accepted the claim subject to further investigation. It also appointed CF, loss adjusters, to assist with the management of the claim.
The claim for damaged and lost contents was settled by agreement in about September 2023. The parties remain in dispute regarding the building damage claim.
The insurer arranged for CR, building consultants and engineers, to assess the property in March 2023. CR reported that some of the claimed damage to the property (in particular, damage to a section of a concrete foundation slab and damage to the structural timber of the dwelling on the property) was not caused by the flood. CR concluded such damage was caused by factors that are excluded from cover under the terms and conditions of the policy. Accordingly, the insurer denied that part of the claim related to the concrete slab damage and the structural timber damage.
In addition, the insurer limited the cover it applied to kitchen cabinetry lost in the flood. It says this cabinetry was uninstalled and unfixed at the time of the insured event.
The insurer ultimately concluded its builders would be unable to warrant repairs due to pre-existing problems with the property. As such, it elected to cash settle the claim for the building damage.
The insurer obtained several quotations for the accepted building damage based upon a comprehensive scope of works (SOW) drawn up by CR. The quotations are:
Builder A: $103,164.47
Builder B: $158,042.32
Builder C: $145,699.62.
The insurer offered the sum of $103,164.47 to the complainant as a cash settlement for the accepted building damage. The complainant rejected this amount, saying it is insufficient to complete the necessary repairs.
The insurer increased its cash settlement offer to $113,480.92 by applying a 10.55% uplift. The complainant also rejected this offer.
Finally, the insurer increased its cash settlement offer to $172,782.55. This offer was also rejected by the complainant.
The complainant says the insurer should accept his claim in total. He says all claimed damage to the property was caused by the flood. Moreover, the complainant says the insurer is required to settle his claim for the full sum insured of $474,261, as the property is a total loss.
Due to the nature of this complaint, it was referred to a panel of three for Determination.
Issues and key findings
Is the insurer entitled to deny the claim for the damaged structural timbers?
Yes. The exchanged material demonstrates the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim for damage to the structural timbers at the property.
Is the insurer entitled to deny the claim for damage to the concrete slab?
No. The exchanged material demonstrates the insurer must accept the claim, in so far as it relates to damage to part of the concrete foundation slab.
Is the property a total loss?
No. The exchanged material shows the property is not a total loss.
Is the insurer’s assessment of cover for the damaged kitchen cabinetry reasonable?
Yes. The exchanged material shows the kitchen cabinetry was not installed when the insured event occurred. It follows the insurer is entitled to limit its cover of this damage in accordance with the terms and conditions of the policy.
Is the insurer’s final cash settlement offer reasonable?
Subject to several adjustments, the panel is satisfied the exchanged material shows the insurer’s final cash settlement is fair and reasonable in this particular instance.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
the damage to the structural timber was not caused by an insured event (that is, the flood)
the insurer is not entitled to rely upon a policy exclusion to deny the claim for damage to part of the concrete foundation slab
the kitchen cabinetry was unfixed and uninstalled when the flood occurred
subject to several amendments, the insurer’s final cash settlement offer fairly and reasonably reflects its obligations pursuant to the terms and conditions of the policy.
Determination
This determination is in favour of the complainant.
The complaint should be resolved in accordance with Section 2.6, below.
Reasons for determination
Is the insurer entitled to deny the claim for the damaged structural timbers?
Yes. The exchanged material demonstrates the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim for damage to the structural timbers at the property.
Parties agree the flood damaged the property
The property includes a single storey, detached dwelling with a corrugated metal roof covering a steel roof frame. Some of the walls of the dwelling are timber-framed, lined with corrugated metal cladding. Other walls are metal framed. The building sits atop a reinforced concrete slab. A detached external bathroom is also present on the property. This structure was renovated by the complainant about 20 years ago.
The interior of the north end of the building was under renovation when the insured event occurred, with several unlined partition wall frames dividing the internal spaces. This was because of, amongst other things, pre-existing termite damage to the structural timbers.
The south part of the building is an open bar/rumpus room lined with fibre-cement sheeting that was built by the complainant about 30 years ago. The complaint also laid down the concrete foundation slab supporting this part of the dwelling.
Some evidence suggests the main part of the dwelling was initially constructed in about 1950, however the Certificate of Insurance states the dwelling was built ‘between 1900 to 1939’.
The complainant says he has owned the property for ‘about 50 years’. He and his family regularly visit the property, using it as a ‘holiday shack’.
The parties agree the flood occurred, with flood levels in local catchment and river systems peaking between late December 2022 and mid-January 2023, before gradually receding. The parties also agree the flood damaged parts of the property and some of the complainant’s contents in the dwelling.
However, the parties disagree about the scope and extent of the flood damage, and whether the property should be deemed a total loss that requires a complete rebuild on stilts to protect it from future flood events.
Scope of the complaint
In particular, several fundamental issues remain in dispute. These include the following:
is the insurer entitled to deny the claim, insofar as it relates to the damaged structural timbers?
is the insurer entitled to deny the claim for the damaged concrete foundation slab?
is the insurer’s assessment of cover for the damaged kitchen cabinetry reasonable?
is the property a total loss that requires a complete rebuild?
is the final cash settlement offer made by the insurer fair and reasonable?
These issues are addressed separately below.
Complainant has the onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Policy covers damage caused by flood, subject to exclusions and limitations
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the documents.
The policy provides cover for damage caused by various insured events, including ‘flood’. Page 36 of the PDS states:
Flood
What we provide
Cover for loss or damage to the Insured Property as a result of Flood.
Pages 73 and 74 of the PDS include the following definition of ‘flood:
Flood means the covering of normally dry land by water that has escaped or been released from the normal confines of:
• any lake, or any river, creek or other natural watercourse, whether or not altered or modified; or
• any reservoir, canal or dam.
The cover for damage caused by a flood is subject to policy exclusions and limitations. The ‘general’ policy exclusions are set out at pages 53 to 60 of the PDS. Relevantly, they include the following:
General Exclusions
In addition to the specific exclusions set out in the explanation of what is covered by this Policy, we may not Cover you for any claim, or may reduce the amount we will pay you for a claim, to the extent the loss, damage or liability caused by, contributed to or arising from any one or more of the following:
[…]
Defects
We will not Cover you for loss, damage or liability caused by, or as a result of:
• an inherent defect;
• a defective or faulty part;
• defective or faulty workmanship;
• defective or faulty design; and/or
• defective or faulty manufacture or construction:
in the Home or in any way related to the Insured Property that you were aware of or should reasonably have been aware of prior to the loss, damage or liability occurring (see page 55 of the PDS).
Vermin and other animals
We will not Cover you for loss, damage or liability caused by vermin (such as rats, rabbits and mice), insects, spiders, reptiles, birds or termites At the Home except to the extent they give rise to fire damage (see page 60 of the PDS).
Wear, tear or deterioration over a period of time
We will not Cover you for loss, damage or liability caused by wear, tear or deterioration over a period of time, mould, mildew, action of light, atmospheric or climatic conditions, rust, corrosion, wet or dry rot (see page 60 of the PDS).
Complainant has established a valid claim
The panel is satisfied the complainant has established a valid claim for the damage to the property. This is because:
the parties agree the flood occurred and caused damage to the property
the damage was extensive
the insurer partially accepted the claim
a cash settlement was paid to the complainant for his damaged and lost contents
the insurer has already offered cash settlements to the complainant for the building damage, albeit these settlement offers have been rejected by the complainant.
As mentioned, the onus now shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny parts of the claim, including the claim for the damaged structural timber and the damage to part of the concrete foundation slab. In light of the extent of the flood damage, the insurer also bears the onus to show the property is not a total loss.
Proximate cause of damage needs to be assessed
Damage can have more than one cause. For instance, in this matter the complainant says the damage to the items in dispute (including the structural timber and part of the concrete foundation slab) was caused by the flood. In contrast, the insurer says the damage to those items was caused a combination of factors, including vermin, inherent defect and faulty workmanship, all of which are causes that are excluded from cover under the terms and conditions of the policy.
In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.
CR inspected the property, including the structural timbers
CR inspected the property on 29 March 2023. CR’s report written pursuant to that assessment is comprehensive and well-reasoned. The report also includes helpful and illustrative photographs.
CR confirmed flood water entered the property to a height of 900mm above floor level. It confirmed the following damage including, but not limited to:
flood debris, residue and staining to external and internal walls, windows and doors, as well as external water tanks
damage to internal fittings and fixtures
undermining of the foundation for the external water tank
undermining of foundation soils under a section of the paving at the northeast corner of the main building.
CR reached the following conclusions:
the corrugated Colorbond cladding and aluminium windows cannot be adequately cleaned and require replacement.
all internal wall linings that were in place prior to the flood require replacement (CR noted some wall linings were absent due to the renovations being undertaken when the insured event occurred).
CR also concluded the dwelling is non-compliant in accordance with current building standards. This means that builders will be unable to warrant any repair works to the structure. The foundation slab height of the dwelling is also unlikely to comply with the local authority’s current flood height requirements.
Based upon these conclusions, CR prepared a comprehensive SOW.
However, in addition, the complainant seeks cover for (amongst other things) the structural timber framework in the original section of the dwelling. He says the framework was damaged by the flood event and therefore required replacing. The complainant confirms he has completed these repairs.
In regard to the structural timbers, CR observed and concluded:
Inspection of the exposed timber framework found that the timber was in poor condition having undergone extensive termite damage… This is considered a pre-existing issue that pre-dates the flood event.
The timber wall framing was irreparable prior to the flood event and therefore has not been included in the [SOW] that accompanies this report.
As mentioned, the insurer denied cover for the damage to the structural timber framework based upon this evidence. In doing so, it relies upon the ‘Vermin and other animals’ policy exclusion set out above.
The complainant does not dispute there was pre-existing termite damage to the structural timber. However, he says the flood also caused damage to the structural timber framework and, therefore, the insurer should provide cover for it.
Insurer is entitled to deny the claim for damage to the structural timbers
The panel is of the opinion the proximate, dominant and operative cause of the damage to the structural timbers is not an insured event. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim, insofar as it relates to this damage. This is because of the following considerations.
First, CR’s conclusions are reasonable and logical, given the totality of the evidence in this complaint and its observations upon inspection of the property. CR says the exposed timber framework was in a poor condition prior to the flood, having undergone extensive termite damage. This is illustrated in the photographs attached to CR’s report.
Second, CR notes the timber frame was observed to be undamaged by the flood event as at the time of inspection. CR provided the following evidence relevant to this observation:
I reference the technical guide titled Impact and Assessment of Moisture affected Timber-framed Construction, prepared by [WS], which states:
Timber and wood-based products that have been totally immersed in water for prolonged periods will not decay or be subject to fungal deterioration due to the lack of available oxygen. When the water has receded, it is important to clean the timber of all silt and mud, etc, as soon as possible and then allow the timber and wood-based products to thoroughly dry out as quickly as possible with good ventilation.
The panel notes the above advice came from WS, a ‘not for profit’ company. It was designed to provide independent, non-proprietary technical information, education, and resources about timber and wood products to professionals and companies involved in building design and construction. WS was established in 2010 as a comprehensive source of information on the use of timber in construction and, since then, it has become an authority in the field.
Third, the complainant has not provided any persuasive expert evidence to support his submission that the structural timber framework was damaged by the flood, or to displace CR’s conclusions.
In the absence of contrary evidence, the panel is satisfied the proximate, effective and dominant cause of the damage to the structural timber framework is termite activity, which is a cause that is excluded from cover under the terms and conditions of the policy. It follows the insurer is entitled to deny this aspect of the overall claim.
Is the insurer entitled to deny the claim for damage to the concrete slab?
No. The exchanged material demonstrates the insurer must accept the claim, in so far as it relates to damage to part of the concrete foundation slab.
Complaint says concrete slab was in good condition pre-flood
The complainant says the flood caused extensive holes and mould throughout the concrete foundation slab in the bar/rumpus room area. He says that part of the concrete slab required complete replacement, which he has already completed himself.
The complainant also advised the insurer:
Concrete in the bar room is really damaged - we had a professional concreter and he said it has to be replaced - parts gone mouldy - other parts have made holes to let the dampness escape.
As mentioned, the insurer denied the claim for the damage to this section of the concrete slab. In doing so, it relies upon the evidence of CR.
Upon inspection, CR initially observed:
The building floor level was noted to be at the same approximate height as the perimeter ground level. This means that the slab height is non-compliant in accordance with the current National Construction Code – Volume 2 (NCC), which requires that the slabs should be at least 100mm above the ground in sandy and well-drained areas. This requirement increases to 150mm where these conditions are not met.
In its supplementary reports dated 15 September 2023 and 27 November 2023, CF agreed the damage to this part of the concrete slab was not caused by the flood. CF noted:
The Insured has provided photo evidence which we have attached for your perusal in relation to the concrete slab in the bar room. This room was added later as an extension to the original build.
The slab does not present with a professional clean finish on the slab. It has air bubbles throughout and since this flood event appears to be slightly discoloured due to mould. Efflorescence is also leeching out of the concrete in areas.
The above issues are concentrated to the bar area only, no efflorescence or mould has been sighted throughout the rest of the concrete slab at the dwelling. The slab which is not showing any signs of issues appears to be professionally laid and finished.
During our site assessment the Insured advised that they laid the slab themselves with assistance of a few experienced friends. [The complainant advised] the slab had held up generally well directly following the event and was not a concern of the Adjuster, Engineer or Insured until time had passed.
CF then concluded:
We agree with the assessment that the damaged slab in the bar area is caused by structural defects and poor workmanship. This is evident as the slab adjoining this area was not affected by the flood event and presents in good condition.
While these damages may not have occurred without the flood event submerging the slabs [it] is clear that a well-constructed slab, complaint with guidelines is not impacted from the flood waters.
In its supplementary report dated 9 November 2023, after having examined the additional photographs of the slab in question, CR concluded:
The issues to the internal slab are consistent with poor construction of the original parts of the slab due to the absence of a damp proof membrane. I note that these issues have arisen since my site inspection indicating that they are ongoing rather than event related.
Moreover, in a letter dated 9 January 2025, the insurer advised that CR had provided it with the following additional opinion.
The moisture retained by the affected section of the slab is not consistent with the concrete slabs to either side, both of which have dried naturally since the event. This indicates that the construction of this section of the slab is not consistent with that of the concrete to either side. The persistent moisture to the affected section of slab is indicative of an ongoing problem consistent with rising damp. Rising damp can only occur when there is no damp-proof membrane (DPM) present, or the DPM has been damaged. Given that the moisture is distributed across this entire section of concrete, I consider that the DPM is not present. Furthermore, the finished surface of the affected section of the slab is poor, indicating poor workmanship during the original construction.
Finally, in a letter dated 9 January 2025 the insurer stated:
On the basis of the above opinion, [the insurer] maintains its position that the expert evidence supports the denial of the claim relating to the concrete slab on the basis that the damage was not caused by an insured event but rather is due to construction/faulty workmanship issues.
The panel notes the complainant has not provided any persuasive evidence to support his contention that the concrete slab in the bar area could not be repaired and required complete replacement.
Insurer must accept the claim for damage to the concrete foundation slab
The panel is of the opinion it is fair and reasonable in this particular instance for the insurer to accept the claim for damage to part of the concrete foundation slab.
This is because of the following considerations.
Whilst the insurer’s evidence likely establishes an inherent defect and faulty workmanship during the construction of the slab, it has not addressed the necessary element of ‘awareness’ in the ‘Defects’ policy exclusion.
As set out above (and at page 55 of the PDS), to successfully establish its entitlement to rely upon the ‘Defects’ policy exclusion, the insurer must be able to show, on balance, the complaint was aware of, or should reasonably have been aware of, the defect and the faulty workmanship prior to the damage occurring.
The panel is not satisfied the insurer has done so. Indeed, the complainant’s evidence in relation to this particular issue includes the following:
the complainant laid down the slab himself, with the help of ‘a few experienced friends’
the slab had been in a reasonable, serviceable condition for several decades prior to the insured event and had not displayed any signs of inherent defects or faulty workmanship.
The panel also notes the insurer has presented no evidence to undermine the credibility of the complainant. The panel therefore has no persuasive reason to doubt the veracity of the complainant’s evidence about the condition of the concrete foundation slab in the bar area of the dwelling, and the probability that he was unaware of any inherent defect or faulty workmanship, before the flood occurred.
On balance, the panel is not satisfied the insurer has established it is entitled to rely upon a policy exclusion to deny the claim for the damage to the concrete foundation slab. It follows the insurer must accept this aspect of the overall claim.
Is the property a total loss?
No. The exchanged material shows the property is not a total loss.
Evidence does not show the property requires demolition
The complainant says the insurer is required to settle the claim for the total building sum insured of $474,261. The complainant says the extent of the flood damage was so significant that it required a complete rebuild of the property. The complainant also says the neighbouring properties required a rebuild and were rebuilt on stilts. He says the owners of those neighbouring properties that were insured have all been ‘paid out in full’. The complainant says, therefore, the insurer is required to pay him the sum insured to enable him to rebuild the property on stilts.
The complainant also says he has almost completed rebuilding the property at the time of this Determination.
The insurer disagrees. It says the fact that owners of neighbouring properties damaged by the flood have all been cash-settled with the total sum insured is of no consequence. The panel agrees and is of the opinion each case is different and must be determined on its own merits.
The insurer also submits the property was not a total loss. It says CR confirms the flood did not cause any substantial structural damage to the property. It also points to the various quotations it obtained based upon the comprehensive SOW drawn up by CR, the most expensive of which was $158,042.32, which is more than $300,000 less than the building sum insured.
Moreover, on page 6 of its report dated 26 June 2023 under the sub-heading ‘Recommendations’ CR states amongst other things:
As no structural repairs are required to repair the flood related damage, I do not consider there to be any requirement to raise the floor level above the potential change in the flood height level.
In all the circumstances, the panel is not satisfied the exchanged material shows the dwelling is a total loss in need of a complete rebuild. It therefore follows the insurer is not required to cash-settle the complaint for the total sum insured. This is because:
whilst the panel accepts the complainant’s evidence that he has almost completed the rebuild of the property himself at this juncture, the panel notes the complainant has not submitted any expert evidence or development approval documents to confirm the property required a complete rebuild due to the flood event
whilst the panel acknowledges the complainant has submitted many receipts from trades and from building stores for the purchase of his own materials, the panel does not consider this is sufficient evidence to support his submission that the property was a total loss because of the insured event
the insurer is not required to fund substantial improvements to the property, such as a rebuild of the dwelling on stilts
the inclusion of the costs associated with works to remediate the concrete foundation slab in part of the dwelling will not cause the total cost of the damage to exceed the total sum insured.
Finally, whilst the complainant says he has completed most of the repairs himself and has already incurred costs (and will incur further costs in the future) in excess of the total sum insured, upon review of the evidence provided by him, the panel is not satisfied it shows the property was a total loss. Indeed, the panel was unable to ascertain what each material was used for, whether it was allowed in the accepted SOW or how it related to the repairs itself. On balance, the panel is of the opinion the evidence provided by the complainant was not sufficient to substantiate how the insurer has under-settled the complainant.
The panel notes the complainant was presented with the opportunity to use his documents to identify areas on the insurer’s SOW where he was under-settled by the insurer. The complainant declined to do so.
Is the insurer’s assessment of cover for the damaged kitchen cabinetry reasonable
Yes. The exchanged material shows the kitchen cabinetry was not installed when the insured event occurred. It follows the insurer is entitled to limit its cover of this damage in accordance with the terms and conditions of the policy.
Kitchen cabinetry was uninstalled when the flood occurred
As mentioned, the complainant says the insurer has not adequately assessed the cover provided for the loss of kitchen cabinetry in the flood. In fact, the complainant submitted a quotation from TK, kitchen specialists, dated 10 November 2023 to replace the kitchen and bar cabinetry in the approximate sum of $42,900.
The insurer disagrees. It notes that CF says the scope of TK’s quotation is vastly different to the pre-existing items and does not represent a like for like replacement (see CF’s report dated 27 November 2023).
More significantly, however, the insurer says the kitchen cabinetry was left unassembled and uninstalled at the time of the flood. Ther insurer says, therefore, it should be assessed under the policy provisions related to unfixed home building materials, which has a cover limit of $1,000 per claim.
Relevantly, page 45 of the PDS includes the following:
Unfixed Home building materials
What we provide
Cover for loss or damage to unfixed Home building materials and uninstalled Home fittings if Home is shown on your Certificate of Insurance.
[…]
Specific Limit
$1,000 for any one Incident.
The panel is satisfied the photographic evidence provided by CF and CR, and the complainant’s own evidence, shows the kitchen cabinetry was left unfixed and uninstalled prior to the flood event. It follows the policy limit of $1,000 for the damage to the kitchen cabinetry should be applied in this particular instance.
Is the insurer’s final cash settlement offer reasonable?
Subject to several adjustments, the panel is satisfied the exchanged material shows the insurer’s final cash settlement is fair and reasonable in this particular instance.
Cash settlement should reflect the reasonable cost of repairs
Under the terms and conditions of the policy, the insurer may settle a claim for damage to the property by either:
repairing the damage, or
paying the complainant the reasonable cost of doing so.
Therefore, in circumstances where a claim is to be settled by way of a cash settlement (as is the case in this claim), the insurer is required to pay the complainant the reasonable cost of repairing the damage to the property. This means the cash settlement amount should be sufficient to ensure the complainant is able to engage his own contractors to complete the necessary repairs.
The insurer’s final cash settlement offer of $172,782.55 is set out in its letter dated 15 July 2024. In the letter the insurer stated:
We remain of the view that the cash settlement offer made by [the insurer] in the amount of $165,645.88 is more than fair and reasonable.
However, in the interests of resolving the claim and the complaint, [the insurer] is prepared to provide a 15% uplift on the quote. That takes [the insurer’s] offer to $172,782.55, calculated as follows:
[CR] quote [dated 31 October 2023]: $145,699.62
Supply and install cupboards: $4,546.08
15% uplift: $22,536.85
Total: $172,782.55.
The complainant rejected this offer. He says, amongst other things:
the insurer’s offer does not adequately account for the cost of all expenses, trades and materials incurred to date
the insurer’s offer does not include an allowance for the cost of his own labour expended to date
the insurer should also pay him the cost of future expenses (including labour costs) to complete the necessary repairs in the approximate sum of $180,000.
The panel is not satisfied the evidence provided by the complainant establishes an entitlement to these additional costs and expenses under the terms of the policy. The panel notes:
the complainant has not provided persuasive expert evidence to support his submission that all such costs and expenses are directly related to the repairs required to remediate the damage caused by the insured event
despite providing many receipts and handwritten notes, and the like, the complaint has declined the opportunity to provide further evidence that shows what each material was used for, whether it was allowed in the accepted SOW, or how it related to the accepted repairs
the complainant has not sufficiently distinguished between those expenses and costs incurred in relation to the repairs of the damage caused by the flood, compared to those costs and expenses incurred because of the renovations that were being undertaken prior to the insured event
the complainant has not established that all materials, fixtures and fittings shown in the many receipts and invoices he provided are, generally, like for like replacements for those that were damaged by the flood.
However, the panel is satisfied it is fair and reasonable that the insurer’s final cash settlement offer should be amended to include the sum of $22,000 (inclusive of GST) to account for the costs associated with the repair/replacement of part of the concrete slab foundation. This sum is based upon a handwritten receipt dated 4 October 2023 provided by the complainant and the assumption the work has already been completed.
In addition, as set out below, the panel is also satisfied the final resolution of this matter should include the payment of interest on the part of the insurer.
Complaint should be resolved in this way
Time is of the essence
Within 21 days’ notice that the complainant accepts this determination, the insurer must:
formally accept the claim (including for claim for the damage to part of the concrete foundation slab) in accordance with the terms and conditions of the policy and the matters set out in this determination
if it has not already paid any building claim settlement monies to the complainant, pay him the sum of $194,782.55 by way of a final cash settlement for the building damage claim (this final cash settlement includes the $22,000 allowance for the cost to repair/replace part of the concrete foundation slab referred to above). If any building claim settlement monies have already been paid to the complainant, these should be subtracted from this final settlement sum of $194,782.55 and the balance paid to the complainant
pay to the complainant interest on the abovementioned sum of $194,782.55 in accordance with section 57 of the Insurance Contracts Act 1984, payable from 15 July 2024, being the date of the insurer’s letter confirming its final cash settlement offer, until settlement is paid
provide to the complainant an explanation, and breakdown, of how the interest has been calculated.
The insurer must also assess whether the complaint requires storage for the remainder of his contents at the dwelling while the repairs and remedial works are being completed and, if so, assess this benefit in accordance with the terms and conditions of the policy.
Why is the outcome fair?
Insurer must accept claim for damage to the concrete slab and include interest
The outcome is fair in all the circumstances because:
it is based upon all evidence and information provided by both parties, including their written submissions, taking into consideration the general AFCA approach and the relevant policy documents
whilst the parties have raised a number of issues in their submissions, the panel has restricted this Determination to the issues that are relevant to the outcome
the damage to the structural timber was not caused by an insured event (that is, the flood)
the insurer is not entitled to rely upon a policy exclusion to deny the claim for the damage to part of the concrete foundation slab
the kitchen cabinetry was unfixed and uninstalled when the flood occurred
subject to several amendments, the insurer’s final cash-settlement fairly and reasonably reflects its obligations pursuant to the terms and conditions of the policy.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as in the field of insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.