Dispute over cash settlement amount for storm damage, mould remediation, temporary accommodation and costs
Text of the determination
Determination
|
Case number
|
12-00-1058365
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-00-1058365 29 April 2025
Determination overview
Complaint
The complainant holds a home and contents policy with the financial firm (the insurer).
On 9 March 2022, the complainant lodged a claim for damage to her property following a storm which occurred on 4 March 2022.
The insurer initially declined the claim. The complainant disagreed with the decision and lodged a complaint to AFCA, matter 888842. The insurer reversed the claim decline decision and accepted the claim and paid the complainant $3,000 in non-financial loss compensation in the case management stage.
The insurer has now offered a cash settlement for repairs. It says that the builders are unable to warrant the repairs because of the condition of the house.
The complainant disputes the settlement offer from the insurer and wants the insurer to settle her claim based on a quote provided from her preferred builder. She also seeks compensation for her damaged contents and for the stress and inconvenience caused by the insurer’s claims handling.
The complainant is represented by a lawyer. For convenience, any representation made on her behalf is referenced as being from ‘the complainant’.
Issues and key findings
Is the insurer’s offer of settlement fair and reasonable?
No. The insurer is required to increase its settlement to include mould remediation and temporary accommodation (TA).
Is the complainant entitled to professional costs?
Yes. The insurer is to reimburse the complainant’s professional costs for obtaining the reports of BG and MR up to a maximum of $5,000 upon receipt of paid invoices. The insurer is not required to contribute to the complainant’s legal costs.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer should compensate the complainant $4,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the insurer is to increase its cash settlement to include mould remediation and TA. It would not be fair to require the insurer to compensate the complainant for damage to the property which is not from an insured event. It is fair that the insurer compensates the complainant for its poor claim management.
Determination
This determination is substantially in favour of the insurer.
Should the complainant accept the determination, within 14 days of receiving written notice of her acceptance, the insurer is to:
pay the complainant $23,879 for contents if it has not already done so
pay the complainant $74,125.42 for building repairs
pay the complainant $15,756.33 for mould remediation
pay the complainant $20,020 for temporary accommodation costs
pay the complainant up to $5,000 (in total) for professional costs within 14 days of receipt of paid invoices from BG (for report of 25 September 2024) and MR
pay the complainant $4,000 for non-financial loss compensation.
Reasons for determination
Is the insurer’s offer of settlement fair and reasonable?
No. The insurer is required to increase its settlement to include mould remediation and temporary accommodation (TA).
Onus on complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that is more likely than not), that she suffered a claimable loss under the policy. This means that she must show the loss was caused by a risk for which she is insured.
Once the complainant, on balance, establishes a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on balance, the application of the exclusion or condition.
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS).
The policy covers damage caused by one of the listed events. It does not provide cover for all damage. Amongst these events is cover for Storm.
The parties do not dispute that the property sustained damage following a storm on 4 March 2022. However, the parties dispute the extent of the repairs required. The complainant says that the property has sustained further damage because of the insurer’s failure to perform make safe repairs. Further, the delays by the insurer in repairing the property and/or providing a sufficient cash settlement to enable her to undertake repairs to the property caused further damage.
The complainant has therefore established that the loss and damage is of a type covered by the policy. However, the coverage remains subject to the terms, exclusions and conditions of the policy.
Insurer has obtained expert reports
Following lodgement of the claim, the insurer appointed AJ to inspect the property.
AJ attended the property on 25 March 2022 and noted damage to the following areas caused by water:
rear family room
bedroom (kids)
covered outdoor area.
AJ found the cause of the water ingress was because of the roof pitch at the flat areas causing slow drainage off the roof. AJ found that the areas of damage to be long term. AJ noted that overflowing roof gutters and wind driven rain likely caused water to enter the rear living area and buckle the polycarbonate roof.
AJ engaged NL to conduct a roof inspection report. The summary of NL’s report was included in AJ’s report. AJ noted that the corrugated roof areas are non-compliant due to the roof pitch. The roof pitch is under the minimum required pitch of 5o. Structures and battens under the flat areas were found to dip up and down. Downpipes were noted to be broken and falling off. AJ concluded that the roof would need an upgrade and rectification because of these issues.
AJ noted the following maintenance issues at this time:
gutters are holding debris
downpipes are broken and falling off
there is a sliding door towards the front of the rear living area which does not operate due to timber swelling
no over flashings installed over the top end ribs, leaving them open to the weather
deteriorated decking on the front right of the property has an open gutter angle which would drain storm water onto the area.
AJ provided a quote for repairs to the damaged area in the sum of $15,704.15.
The insurer declined the claim on 30 May 2022. Following a complaint being lodged with AFCA, the insurer reversed its claims decision and accepted the claim on 25 May 2023.
The insurer then appointed AC, a builder to inspect and provide a SOW following the complainant rejecting the SOW and quote provided by AJ.
AC attended on 21 September 2023 and found that the damage to the following areas was not consistent with damage from a single event:
lounge room 2
bedroom 4
timber decking
rear outdoor entertainment area
Rather, AC found that the damage had been caused by a combination of general wear and tear, faulty workmanship and building defects occurring over a prolonged period of time.
AC observed:
the skirting boards had high moisture levels due to long term rising damp
the subfloor underneath the loose laid vinyl has deteriorated due to long term rising damp
the loose laid flooring has pre-existing general age, wear and tear where holes have developed over time
the timber window reveal has water damage due to a combination of faulty workmanship and building defects
the ceiling lining had sagged due to faulty workmanship and building defects
the plaster beside the windows and timber window reveals has swelling and has blown out due to long term water ingress from faulty workmanship and building defects
the timber decking has numerous planks that have deteriorated leaving holes due to general age, wear and tear
window set and sliding door to wall 3 and wall 2 have been dislodged and damaged due to a combination of faulty workmanship and building defects
the roofing structure has evidence of multiple areas of sagging due to a combination of fault workmanship and building defects.
AC provided a quote for repairs to the damaged areas in the sum of $46,100.34 for repairs to the lounge room 2, bedroom 4, timber decking and rear outdoor entertainment area.
The insurer also appointed FE, a restorer. FE attended the property on 15 November 2024. FE noted that it was difficult to assess what damage occurred from the insured event, noting that the event occurred more than two years ago. FE noted that there are areas that have had ongoing issues, including leaking when it rains. FE also noted that there is damage to timber building materials, such as base plates, windows, architraves, and this is likely due to termite damage or very long term water ingress.
FE noted that the following rooms were affected:
lounge 1
bedroom
kitchen/dining
sunroom
lounge 2
side room.
Insurer has offered to cash settle
The insurer has offered to settle the complainant’s contents claim in the sum of $23,879 and this is no longer in dispute. If the insurer has not already done so, this should be paid to the complainant.
The insurer says that it has only accepted the claimed area of damage as being:
lounge room 2
bedroom 4
front external timber
rear outdoor entertainment area.
The insurer has offered to cash settle the complainant the following:
AB quote $46,100.34
reimbursement of complainant’s quote from OH $5,100 for replacement of vinyl flooring
reimbursement of complainant’s quote from JH $5,000 for make safe repairs
reimbursement of A/C units x 2 $3,100
contingency 25% $14,825.08
excess waived
Total $74,125.42
Complainant says insurer’s SOW is inadequate
The complainant says that she purchased the property in 2003 and never had issues with the house until the storm damage in 2022. She says that she maintained her house and regularly employed contractors to clean the gutters and maintain the roof.
The complainant has obtained a letter from ZC, a builder, dated 12 July 2024. ZC says that there is damage to the following areas because of the insured event:
roof gutters
roof
plasterworks
floors
framing
skirtings and architraves
flooring boards
insulation
weatherboards
decking
flashing
sealants
mould.
ZC says:
There are leaks in the roof in most locations of the property due to the floods and storms on the property causing plaster board to peel back and also in the chipboard flooring which is deteriorating the floors. Some windows have been smashed from storms.
ZC has provided a quote in the sum of $338,129. However, ZC says that he is unable to complete the work owing to his high workload.
The complainant obtained a quote from PB dated 30 September 2024. The quote from PB is in the sum of $386,259.37.
The complainant has also provided a quote from MR, a mould remediation service dated 25 September 2024. The remediation is for the two-bedroom bungalow. MR notes that the builder will conduct the strip out of affected ceilings, walls and floors.
MR recorded a history that the bungalow had experienced water ingress, potentially caused by issues with the low-pitched corrugated iron roofing. The ingress had resulted in extensive mould growth throughout the property.
The complainant engaged a civil engineer, BG who inspected the property and provided reports dated 17 August 2024 and 20 November 2024. BG records the history given by the complainant that the storm has caused the stormwater downpipe to dislodge. The downpipe was said to have smashed multiple windows.
BG noted:
degradation of the building elements and no signs of physical weather protection
algae has built up on the internal flooring and black mould is present in the plaster walls in multiple areas
fungal black mould was present in the timber elements in multiple locations
surface drainage around the footings was displaying visual signs of pooling in various locations.
BG found that there was high moisture content in the wall framing and floor lining, delamination and warping outside of guidelines in the bracing, and wood rot in the doorways.
BG noted that the subfloor did not meet the required minimum space requirement of not less than 450mm. BG says the entire sub floor to the main dwelling needs to be rectified.
BG found evidence of subsidence on the outer wall and the floor was noted to undulate everywhere.
BG concluded that:
Due to the storm damaged area not being repaired to protect the building materials from weather exposure, the structure has degraded to a point of which replacement is necessary.
Items to be removed and replaced include dismantling the highlighted timber structural elements, being sections of timber walls, timber floors, and wall and ceiling linings.
Stormwater drainage is to be repaired…
BG provided a supplementary report dated 20 November 2024. BG confirmed that it was highly probable that the causation of damage originated from the insured event. Further, BG says that the damage to areas has now degraded. BG says that the mould and wood rot is now throughout the property because of the lack of repairs.
The complainant says that the insurer should cash settle her based on the quote from PB and MR as they are actionable quotes that repairs the damage. She says that as she lives in a regional area, and she will be taking responsibility for the repairs, the quote should be based on those that she has obtained.
Insurer says complainant’s quote include repairs to pre-existing damage
The insurer has provided a report from its internal assessor (IA) who says that the quotes provided by the complainant lack a breakdown of labour and material costs, making it difficult to assess. Additionally, there are no room measurements or dimensions provided to verify the accuracy of the costs. IA says that the amounts are unjustified.
IA says that BG has failed to identify the primary cause of water ingress which it says was not the insured event.
IA says that the complainant’s quotes include costs for repairs that are not related to the insured event. These items include:
repairing external weatherboards
replacing corrugated roofing with Trimdeck sheeting
installing new flashing, cappings, and ridge capping to prevent future flood damage
stripping out and reinstating the bathroom, an area unrelated to the claimed event
painting external areas, which are not related to the claim.
IA concludes that the quotes are not fair and reasonable and that the offer of $64,330.39 (which includes a 15% contingency) remains fair and reasonable.
Complainant’s quotes include damage not related to insured event
The panel is satisfied that the complainant’s quotes include repairs for items that were not damaged by the insured event. The panel accepts the insurer’s submissions that these include external weatherboards, replacing roofing, flashings, capping and ridge cappings, repairs to bathroom and external painting.
The panel acknowledges that the quote from PB proceeds from an incorrect premise in relation to the damage to be repaired as to include all damage. PB has not identified why repairs are required due to the storm event. The quote from PB refers to:
STRIP OUT
…
Checking the sub-floor, stumps, walls and ceilings for any rot, damage or doggy [sic] work (there are a few items that have been noted that need fixing)
FRAME
…
Fix any rotting timbers or dodgy building works in the ceiling of both buildings
ROOF
Roofing contractor to remove the existing corigated [sic] iron roofing (as its to [sic] flat of a pitch for corgiated [sic] iron and install trim deck roofing iron that will allow for adequate fall of the water away from the property.
Such items are not damaged by the insured event but are clearly maintenance issues.
The report from BG confirmed that the damage to the front porch showed evidence of severe wood rot, including the decking boards, joists, bearers and stumps. BG noted that the surface water drainage in the vicinity was contributing to the water ingress and saturation of the timbers over a long period of time as the ground was mostly flat. Further, water saturation had weakened the founding soils, resulting in uneven floor levels. BG confirmed that the ground movement causing distress was likely long term.
The panel is satisfied that consistent with the findings made by IA, such damage is not consistent with the insured event but rather gradual deterioration, faulty workmanship or faulty design. The panel does not accept the complainant’s submission that the damage is consistent with the insured event and the insurer not attending to remediation of the property.
The complainant’s expert ZC concedes that most of the add on roofing needs to be altered and changed due to not having the required pitch to the roofing profiles. ZC’s quote includes the replacement of all roofing and framework. The panel is not satisfied that such damage is consistent with the insured event.
There is no evidence that the storm has caused damage to the roof. Rather, the panel is satisfied based on AB’s inspection of the roof in September 2023, and NL’s inspection in April 2022, that there were many pre-existing issues with the roof. The panel notes that the roof inspection from NL dated 6 April 2022 found that the cause of the water entry to be heavily weighted on the roof pitch at the flat area causing slow drainage off the roof. Further, overflowing gutters and wind driven rain were likely the cause of the water entry to the rear living area and buckled polycarbonate roof sheets installed close to the side of the living area.
ZC says that replacement of new architraves, skirts and floors will rid the area of mould. However, the panel notes that AC found that the subfloor, skirting and lino had deteriorated because of rising damp. However, AC’s quote includes repairs to the flooring in bedroom 4 and lounge room 2, including replacement of the skirting boards.
The panel accepts the assessment by IA of the quotes from the complainant being excessive and including repairs not related to the insured event is fair. The complainant has not responded to IA’s comments in further submissions to AFCA.
Insurer to settle based on quote from AC
The panel is satisfied, having reviewed all the available information, that the quote from AC is fair and reasonable to repair areas damaged by the insured event. The findings from BG largely support the expert opinions obtained from AC and AJ in relation to pre-existing issues with the property’s construction and/or maintenance issues, including gutters.
The complainant has provided a supplementary report from BG dated 20 November 2024 which seeks to clarify the cause of the damage. However, the panel places little weight on this report that seeks to attribute all the damage to the storm event, with no reasoning. This is not consistent with his prior report dated 17 August 2024 which acknowledged the many pre-existing issues at the property which were contributing to the damage.
BG says that wall plaster should be removed to reveal the extent of the black mould in all areas of the structure, including the roof space, the sub-floor and the wall linings. However, this does not take into consideration the pre-existing issues with the roof and the lack of drainage which has contributed to high moisture readings of the sub-floor.
The panel accepts that the quote from AC does not include mould remediation. The insurer has obtained a report from FE in November 2024 which confirms the presence of mould throughout the property. Photographs confirm the presence of mould in the ceiling of the loungeroom and high moisture readings in the flooring. However, no scope of works was provided regarding remediation.
The complainant has obtained a quote from MR for mould remediation in the amount of $13,701.16. The panel accepts that this includes mould remediation for other areas of the property. However, given the insurer’s delays in remediating the property, the panel considers it fair that the insurer’s settlement offer include remediation, together with a contingency uplift of 15%, noting that the quote is now approximately 6 months old. That is, the insurer is to increase its settlement offer by $15,756.33 to allow for mould remediation.
Insurer to include temporary accommodation costs
The complainant says that following advice from PB, BG and MR that the property was uninhabitable because of the mould, she moved out of the property into temporary accommodation (TA).
The complainant has provided a copy of her signed residential tenancy agreement dated August 2024. The agreement provides that she pays rent of $385 per week.
The complainant seeks to be reimbursed TA costs, together with an allowance for TA while the repairs are being undertaken.
The insurer in their submissions to AFCA dated 16 September 2024 and 24 September 2024, advised that they accept TA of $385 per week, so long as it is within its 52 week limit.
There is little information to support how long the repairs would take. However, noting that the insurer failed to undertake any remediation despite being aware of the presence of mould at the property, the panel considers it fair that the insurer continues to pay TA for the full 12 month period. That is, until 23 August 2025. This will allow the complainant to undertake the repairs. That is, the insurer is required to pay the complainant the sum of $20,020 for TA.
Is the complainant entitled to professional costs?
Yes. The insurer is to reimburse the complainant’s professional costs for obtaining the reports of BG and MR up to a maximum of $5,000 upon receipt of paid invoices. The insurer is not required to contribute to the complainant’s legal costs.
AFCA may require insurer to contribute to a complainant’s professional costs
Under Rule D.5, AFCA may determine an insurer contribute to legal or other professional costs incurred by a complainant during a complaint. Unless exceptional circumstances apply, AFCA will not require an insurer to contribute more than $5,000 to these costs.
When determining whether an insurer should contribute to the payment of professional fees incurred, AFCA will consider the complexity of the complaint and whether the costs incurred were because the expert advice was genuinely required.
Insurer not required to contribute to complainant’s legal costs
The complainant has engaged BW as her legal representative. She says that she had difficulty in engaging in the AFCA process and that the legal costs are costs that she has necessarily had to incur because of the insurer’s failure to properly assess her claim.
The complainant says that the insurer’s conduct in this matter warrants an award of professional costs in excess of the AFCA Rules.
The insurer says that it should not be required to reimburse the complainant’s legal costs.
The panel is not satisfied that it was reasonably necessary for the complainant to engage a lawyer given that the complainant’s position has not been advanced by such representation.
Insurer should contribute to costs incurred in obtaining report from BG and MR
The panel accepts that the report from BG dated 25 September 2024 and the report from MR dated 25 September 2024 assisted the panel in the understanding of issues affecting the property. It is reasonable for the insurer to reimburse the complainant for the costs incurred in obtaining these reports. However, the panel is not satisfied that the subsequent report dated 20 November 2024 from BG assisted, and the insurer is not required to reimburse the complainant for this report.
The insurer is to reimburse the complainant for the costs of these reports from BG and MR up to the sum of $5,000 in total upon receipt of paid tax invoices from the complainant for these reports.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer should compensate the complainant $4,000 in non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Complainant seeks $6,300 for stress and inconvenience
The complainant seeks $6,300 from the insurer for non-financial loss compensation. She says that the insurer’s delays in responding to the claim has caused her stress and inconvenience. She says that she was required to live in a property which was affected by mould for a considerable period because of the insurer’s inactions. Further, the insurer has caused delays.
Insurer should compensate the complainant for stress and inconvenience
The insurer has offered to pay the complainant $3,000 in non-financial loss compensation in acknowledgement of its poor claim management.
The panel notes that the insurer did delay its assessment of the damage following its acceptance of the claim. It did not appoint a second panel builder to attend and prepare a SOW and quote for some four months. Despite being aware of the mould issues at the property, it failed to undertake any make safe repairs which has contributed to the development of mould at the property. Further, while the insurer accepted TA, it made no steps to ensure payment to the complainant to minimise her financial commitments.
In all these circumstances, the insurer is to pay the complainant $4,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the insurer is to increase its cash settlement to include mould remediation and TA. It would not be fair to require the insurer to compensate the complainant for damage to the property which is not from an insured event. It is fair that the insurer compensates the complainant for its poor claim management.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.