Storm damage to deck framing declined; cash settlement amount for accepted damage
Text of the determination
Determination
|
Case number
|
12-00-1057694
|
Financial firm
|
Youi Pty Ltd
Case number: 12-00-1057694 31 July 2024
Determination overview
Complaint
The complainant holds a home and contents policy with the financial firm (insurer) and lodged a claim after his property sustained damage in a storm.
The insurer assessed and partially accepted the claim. However, it declined the damage to the complainant’s decking frame/subframe (framing). The insurer says it is entitled to decline the damage to the framing as it was caused over time due to wear, tear and deterioration rather than from a single storm event.
The complainant disagrees and says the cause of the damage to the framing was the storm in conjunction with the incorrect construction method of the framing, which he was not aware of. The complainant says that damage caused by defects he was unaware of, or a storm, is covered by the policy and wants the insurer to repair all damage at the property.
Issues and key findings
Is the insurer entitled to limit its liability?
Yes. Based on the exchanged information I am persuaded the damage to the framing was caused over time due to wear, tear and deterioration, so is excluded by the policy. However, I am persuaded the insurer should increase the settlement for the accepted damage by including a cash settlement contingency uplift.
Why is the outcome fair?
The outcome is fair as the insurer has accepted the damage caused by the storm and has established the declined damage does not fall within the scope of the policy. It would be unfair to make the insurer accept the declined damage when it is not covered by the policy.
Determination
The determination is in favour of the insurer.
If the complainant accepts the determination the insurer is to pay $12,532.45. The insurer is to pay this amount less any applicable excess within 14 days of the complainant accepting this determination.
Reasons for determination
Is the insurer entitled to limit its liability?
Yes. Based on the exchanged information I am persuaded the damage to the framing was caused over time due to wear, tear and gradual deterioration, so is excluded by the policy. However, I am persuaded the insurer should increase the settlement for the accepted damage by including a cash settlement contingency uplift.
Onus on the complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that it is more likely than not), a loss occurred because of an event covered under the terms and conditions of the policy. This is known as establishing a valid claim.
If the complainant can establish a valid claim, the burden shifts to the insurer to establish on the balance of probabilities an exclusion applies or that it is otherwise entitled to decline the claim.
The complainant holds a listed events policy, which covers the complainant for a range of listed events including storm, subject to exclusions.
There is no dispute the complainant’s property sustained damage in a storm event in December 2023. However, whether the damage to the deck’s framing at the property was caused by the storm is in dispute.
Complainant says damage is covered by the policy
The complainant says the damage to the framing has been caused by the storm and the policy should respond. The complainant says that during the storm event four glass fencing panels were blown over onto the deck and that they each weighed 50kgs.
The complainant says the force of these glass panels landing on the deck is what caused the framing to collapse and give way in the area above the connection between the joist and bearer.
Further, the complainant says that the deck was constructed in breach of regulations and compliance, which has contributed to the damage. However, the complainant says that he was not aware of the construction defects prior to the loss and that the policy responds in these circumstances.
The complainant accepts there is some deterioration, rot and corrosion present on the deck, which occurred over time. However, the complainant says that the deterioration has been significantly accelerated due to the non-compliant construction methods used.
The complainant says the deck still would have collapsed even if there was no deterioration, rot or corrosion because of nature of the storm and the manner in which the deck was constructed.
To support his position the policy responds the complainant relies on:
a report from his builder
a pre inspection report of the property
information from an engineer he spoke with, and
the reports from the insurer.
Insurer says the damage to the framing is wear and tear
The insurer says the complainant holds a listed events policy which covers damage caused by a single insurable event, including storm. The insurer says the damage to the framing has not been caused by a single storm event. Rather, it has been caused over a prolonged period due to wear, tear, rot, corrosion and deterioration which are excluded by the policy.
The insurer relies on a report from its assessor and its engineer. The insurer says the information in the reports conclude:
the timber deck framing, including all noggins, have rotted over time
the steel connection bolts which support the deck frame had corroded over time
the timber bearers have begun to collapse due to corroded brackets
the impact of the glass panels would not cause the collapse of the deck
the damage to the deck is due to its condition and had the condition been in a better state the failure (collapse) of the deck would not have occurred.
The insurer says this shows that the damage to the framing has occurred over a period of time and not from a single storm event, as required by the policy. Further, the insurer says it has not declined the claim due to the complainant’s (lack of) awareness of the construction method of the deck. It has declined the claim as the damage has occurred over time due to wear and tear, rather than the storm.
Insurer has not relied on the defect exclusion
I acknowledge the policy does contain an awareness provision (writeback) however it is limited to loss or damage caused by ‘poor or faulty design specification, materials, planning or workmanship, or by a defect’.
While the insurer has said parts of the deck had not been built in accordance with the relevant standards and sections are non-compliant, it has not relied on this when declining the damage to the deck. Rather, it has stated the damage has occurred over time due to deterioration and wear and tear.
I acknowledge the complainant stated that even if there was no gradual deterioration present the damage to the deck would have occurred during the storm because of the defects and the falling glass panels. I also acknowledge the complainant says the deterioration has been accelerated due to the non-compliant construction of the deck.
However, I am not persuaded on balance the complainant has established this. This is because he has not provided any compelling information to support:
the manner in which the deck was constructed accelerated the deterioration or,
the defects would have caused the damage even if there was no deterioration.
Given this I am not persuaded the writeback in the defect exclusion assists to provide relief because:
there is no compelling information to show the cause of the damage (failed framing) was the defects, and
the insurer has not relied on defects when declining the claim.
There are clear signs of wear, tear and deterioration
I have carefully considered the exchanged information and the parties’ submissions which has been assisted by numerous helpful colour photographs. When doing so I am persuaded the exchanged information shows the area in which the deck failed/collapsed had significant deterioration and wear and tear in the form of wood decay/rot and corrosion.
This is because there are multiple images provide of the affected area and other areas of the deck which show decay to the timber framing including at the main point of collapse and corrosion to the metal fixings and brackets of the deck.
I am persuaded that this type of damage occurs over time and is a gradual process. I am also persuaded that this would be considered deterioration, wear, tear, or corrosion (gradual deterioration) under the policy.
However, while I accept there is clear evidence of gradual deterioration, it does not mean of itself that I am satisfied that the insurer is entitled to decline the claim. This is because based on the exchanged information there are multiple factors or causes that may have caused the failure/collapse of the framing.
Given this consideration needs to be given to what the proximate cause of the damage to the framing was.
On balance the proximate cause was the gradual deterioration
To reach a conclusion regarding the coverage provided by the policy, it is necessary to determine the proximate cause of the loss and damage to the complainant’s property.
The proximate cause of the loss is a question of fact, depending on the circumstances in each case. It is well established law that the proximate cause is not necessarily the first or the last or the sole cause of loss. It is the effective or dominant or operative cause of the loss.
If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active, efficient cause that sets a relevant chain of events in motion.
To determine the dominant cause, each cause must be examined. If one cause (gradual deterioration or the storm) would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause.
Based on the available information I am not persuaded it has been shown that the storm is the proximate cause of the damage to the framing. On balance, I am persuaded the damage to the framing occurred because of the overall condition (gradual deterioration) of the deck.
I accept the storm knocked over a number of glass panels on to the deck, I am not satisfied this is what caused the framing to fail. This is because there is no compelling information provided that outlines why the falling panels caused the deck framing to collapse in the absence of the deterioration.
Further, based on the exchange information the main point of failure (near the pool skimmer box) is away from the areas in which the panels fell. The exchanged information details clear signs of deterioration and rot in the location of this failure.
I also accept there were winds in excess of 100km/h during the storm, but I am not persuaded this was the cause of the failure. The damage to the framing is to an area where the deck joins the pool. The images show the fixings are rusted and have failed, rather than being ripped/torn out because of extreme wind.
On balance if the fixings were not rusted and the deck was not in a deteriorated state, I am persuaded it would not have failed in the storm event.
For these reasons I am persuaded the proximate cause of the damage is the gradual deterioration of the deck which has occurred over time and not from a single storm.
Damage caused over time rather than from a single event is not covered by the policy. Further, the policy does not cover damage caused by wear, tear or gradual deterioration.
Accordingly, the insurer is entitled to decline the claim for the framing.
Insurer to increase the settlement amount by 15%
The insurer says it has assessed the accepted damage to be $10,897.78 and wants to cash settle the amount due to the issues with the deck’s sub frame
I acknowledge and accept a cash settlement is appropriate in the circumstances, as covered repairs overlap with the declined damage. However, I am not persuaded that the insurer’s current offer is fair in all the circumstances.
This is because a cash settlement should consider possible variations and contingencies which may arise once repairs begin. Further, a cash settlement transfers all the risk to the complainant, and this should be considered when making a cash settlement.
I acknowledge the complainant has provided multiple quotes; however, they are to repair the entire deck and not the accepted damage. Given this they are not a like for like comparison and I am persuaded that settlement should be based off a quote for the accepted repairs.
In the circumstances, having considered the material provided by the parties I am a satisfied a fair cash settlement would include an uplift. I am satisfied that a 15% contingency is fair in the circumstances as the quote is relatively current (January 2024).
I am persuaded a 15% uplift will account for contingencies and the transfer of risk.
When the 15% ($1,634.67) uplift is included, the total amount is $12,532.45. The insurer is to pay this amount less any applicable excess within 14 days of the complainant accepting this determination.
Why is the outcome fair?
The outcome is fair as the insurer has accepted the damage caused by the storm and has established the declined damage does not fall with the scope of the policy. It would be unfair to make the insurer accept the declined damage when it is not covered by the policy.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Relevant policy wording
|
Keu wording
|
6. Storm
What is covered?
Loss or damage to the insured property caused by:
• storm, lightning, wind, hail, snow and storm water overflow from roof
gutters and their downpipes or from the area immediately around the
premises. This includes instances where the storm causes
mechanical, electrical or electronic (including computer software)
breakdown or failure; or
• landslip or subsidence that occurs within 72 hours of, and directly
because of, a storm that occurred within the contract period.
Where you have increased your sum insured or reduced your excess
within 72 hours (or other period noted on your policy schedule) of a
storm occurring, cover will be limited to the amounts that were effective
prior to the change
..
|
General exclusions
These general exclusions apply to all sections of your policy.
..
We will not pay for death or bodily injury to any person, or loss or damage to property, caused by, resulting or arising from:
..
37. wear and tear, rust, corrosion, or deterioration
38. rising damp or seepage; for example, water from the ground;
39. mould, rot, damp, or the effects of the climate or weather, unless as a direct result of an incident for which we have accepted a claim;
..
42. poor or faulty design specification, materials, planning or workmanship, or by a defect, unless you were not and could not reasonably have been aware of the problem prior to the incident; for example, if the defect was identified in any report that you received about the condition of your
insured property or was reported to you in connection with previous work carried out on your buildings;