Building sum insured adequacy after fire, claimed underinsurance from online estimate

FirmIAG
Decided2024-10-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$263,528
Non-financial loss$1,000
Amount claimed$749,000
SourceAFCA PDF

Summary

After a fire destroyed his home, the complainant sought an increase in the building sum insured to $749,000 on the basis of an insurer website estimate. AFCA refused the increase but ordered payment of the building sum insured, outstanding additional benefits, counselling costs, interest and $1,000.

The complainant was responsible for choosing a sum insured, the online estimate was clearly a guide only, and the insurer must pay the limits of the policy's benefits and interest on the sum insured.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1057688 | Financial firm | Insurance Australia Limited Case number: 12-00-1057688 16 August 2024 Determination overview Complaint The complainant holds home building and contents insurance with the financial firm (insurer). He lodged a claim after his home and its contents were badly fire damaged in October 2023. The insurer has offered to pay the complainant the $243,108 building sum insured. It has also paid out the contents sum insured and has paid or offered to pay amounts under various policy additional benefits, such as for temporary accommodation (TA) costs. In addition, it has offered to pay outside the policy terms $1,440 for counselling and $1,000 in compensation. The complainant says he selected the building sum insured based on a calculation on the insurer’s website. He says that resulted in him being significantly underinsured. He wants the insurer to increase the sum insured to $749,000 and for additional benefits, including for TA. Issues and key findings Is the insurer entitled to rely on the building sum insured? Yes. As the insurer informed him several times when he took out the policy, the complainant was responsible for selecting a sum insured that suited his needs. It was sufficiently clear that the website estimate was a guide only and there was link that would have enabled an estimate with greater accuracy to be obtained from a more detailed calculator. Is the insurer to pay increased additional benefit amounts? No. The insurer is entitled to rely on the policy terms regarding the limits for additional benefits. However, given the damage to the home, it is reasonable to assume those limits will be required to be paid in full in due course, if they have not been exhausted already. The insurer is therefore required to pay out any outstanding applicable benefits to their limit. Is the insurer required to pay any other amounts? Yes. It is reasonable to require the insurer to pay the offered $1,440 for counselling fees and $1,000 in compensation. It is not required to pay any other amounts outside the policy terms. Why is the outcome fair? It would be unfair to require the insurer to pay more than the sums insured for the building and additional benefits when the complainant was responsible for ensuring the policy suited his needs. However, it is fair that the insurer pays the amounts offered outside the policy. Determination This determination is substantially in favour of insurer. Within 14 days of the complainant providing written notice that he accepts this determination the insurer is to pay him: $243,108, being the building sum insured, plus interest (see section 2.1 below) any applicable additional benefit amounts yet to be paid (see section 2.2 below) if they are yet to be paid, $1,440 for counselling fees and $1,000 in compensation. Reasons for determination Is the insurer entitled to rely on the building sum insured? Yes. As the insurer informed him several times when he took out the policy, the complainant was responsible for selecting a sum insured that suited his needs. It was sufficiently clear that the website estimate was a guide only and there was link that would have enabled an estimate with greater accuracy to be obtained from a more detailed calculator. Background circumstances The complainant purchased the policy via the insurer’s website. Subject to the terms and conditions set out in the certificate of insurance (COI) and the product disclosure statement (PDS), the policy covers the complainant and N for damage to their home and their contents caused by a listed insured event during the policy period. One of the listed events is ‘Fire’. The COI confirms the period of insurance is 17 September 2023 to 17 September 2024. The building sum insured is listed as $243,108 and the contents sum insured as $50,000. The nominated excess is $3,000. On 28 October 2023, a fire caused catastrophic damage to the home. The $50,000 contents sum insured has been paid out after deduction of the $3,000 excess. The insurer has offered to pay the complainant the $243,108 building sum insured. Complainant says insurer caused him to be under insured The complainant says that it will cost at least $749,000 to rebuild the home, meaning he is significantly underinsured. He submits that the insurer is responsible for that as when he selected the $243,108 building sum insured during the online purchase process, he relied on an estimated rebuilding cost calculation on the insurer’s website. The complainant says as a layperson, he lacked the expertise to accurately assess the amount likely to be required to rebuild his home, so he relied on the insurer’s estimate calculation. He submits that: the substantial discrepancy between the provided sum insured and the actual rebuilding cost of my property raises concerns about the adequacy and transparency of the estimation process. He notes that since the fire he has discovered that other online calculators deliver much higher estimates than that he received from the insurer’s website. The complainant also says that the insurer failed to notify him about the risks associated with underinsurance. He submits that failure amounts to a further example of the insurer’s lack of transparency and accountability, as well as a violation of the duty to act in the best interests of the insured. In the circumstances, the complainant says the insurer misled him to underinsure his home such that the building sum insured should be increased to $749,000. Insurer says complainant was obliged to ensure policy suited his needs The insurer maintains that the complainant bears the responsibility to ensure that the insurance policy he arranges is suitable for his needs. Both the insurer and the complainant have provided screenshots of the online purchase journey. After an address and some other information about the home to be insured is entered, the following appears: What is the total cost to rebuild the home at today’s prices? This estimated rebuilding cost is a guide only and is made with the assumption of your home being of standard quality and on a flat/gentle slope. If this assumption is incorrect or you require more accurate estimates you can use a detailed estimating calculator [hyperlink] or check with a suitable qualified professional. Below that information are two boxes, one containing the estimated rebuilding cost (in the complainant’s case, this would have said ‘$243,108 (estimated)’), and the other labelled ‘Enter different sum insured’. Underneath the two boxes is a hyperlink ‘What is considered as rebuilding costs?’. When clicked, the following information appears: What is considered as rebuilding costs? It is for building only not including land value or contents. Includes outbuildings, internal fittings and fixtures such as kitchen cupboards, light fittings, floor tiles and structural improvements such as an in-ground swimming pool, pergolas, decks, fences and tennis courts. If the ‘detailed estimating calculator’ hyperlink is clicked, the user is taken to a third party’s rebuilding cost estimate calculator. That calculator requires input of more extensive information about the home before providing an estimate. The bottom of each page during the online purchase journey includes the statement ‘Any advice provided is of a general nature only and does not take into consideration your objectives, financial situations or needs. Before acting on any advice you should consider its appropriateness’. There are also hyperlinks on each page to documents including the PDS. A separate page on the journey confirms those documents set out the policy terms and conditions. After the complainant purchased the policy, the insurer sent various documents to him, including the COI and the PDS. The insurer notes the COI requested that the complainant check the details of cover provided, and to contact the insurer if anything needed to be changed. There was a further warning to check the sums insured covered the replacement value of the home and its contents, as well as a hyperlink to calculators enabling ‘a detailed calculation of replacement costs’. The insurer refers to similar warnings set out in the PDS, as well as confirmation the sum insured ‘means the replacement cost of your buildings or your contents as shown on your Certificate of Insurance. It includes taxes and charges and is the maximum amount we will pay in settlement of any claim’. In addition, the insurer notes that the PDS confirms that an insured has a 30 day cooling off period, within which they may cancel the policy and receive a full premium refund. The insurer also says the complainant previously held home and contents insurance with it covering the same property. The insurer’s offer to renew that policy for the period 22 August 2023 to 22 August 2024 specified $269,640 for the building sum insured with a $2,000 excess, and $62,400 for the contents sum insured with a $1,300 excess. The complainant did not proceed with the renewal, taking out the current policy instead. In doing so, there was a reduction in the annual premium. The insurer submits that: the Complainant has chosen their sum insured and paid their premium based upon that sum insured. We submit that we should not be required to increase the sum insured only by virtue of the fact that the Complainant has realised after a fire claim that they had underinsured themselves. Insurer is entitled to rely on building sum insured The panel acknowledges that the complainant is in a very difficult position, having ascertained after his home was destroyed by fire that rebuilding costs will likely significantly exceed the building sum insured. However, the panel is not satisfied that the insurer misled the complainant or is otherwise responsible for him being underinsured. The insurer informed the complainant both before and after he purchased the property that he was responsible for selecting a sum insured that suited his needs, and that it covered his home’s replacement cost. Further, the panel considers that it was sufficiently clear that the rebuilding cost calculation was an estimate only based on general assumptions and provided as a guide only. Further, the complainant was given the opportunity to obtain more accurate estimation using a third party’s detailed calculator. The insurer therefore is entitled to limit its liability to the $243,108 building sum insured. The panel notes that the $3,000 policy excess has already been applied to the contents claim. In relation to interest, the panel acknowledges that: the insurer’s claim notes show that on 5 December 2023, it first raised with the complainant that it intended paying out the $243,108 sum insured on 18 January 2024, the insurer sent an email to the complainant’s bank, copied to the complainant, seeking mortgage discharge information to enable it to pay the sum insured on 14 February 2024, the insurer encouraged the complainant to assist with the completion of the mortgage discharge process, and noted payment of the $243,108 would not prejudice his right to pursue the complaint he had lodged with AFCA the insurer is yet to receive the mortgage discharge information. However, the insurer has had the continued benefit of holding the funds. In the circumstances, the panel is satisfied that it is reasonable to require the insurer to pay interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth) on $243,108 from the date this determination is issued to the parties to the date the sum insured is paid. Is the insurer to pay increased additional benefit amounts? No. The insurer is entitled to rely on the policy terms regarding the limits for additional benefits. However, given the damage to the home, it is reasonable to assume those limits will be required to be paid in full in due course, if they have not been exhausted already. The insurer is therefore required to pay out any outstanding applicable benefits to their limit. Insurer has paid and offered additional benefit amounts Based on the exchanged information, it appears that the insurer has paid or offered to pay the following amounts pursuant to the additional benefits included in the policy: | Item | Amount | Additional benefit limit | TA | $20,544.41 | 10% of $243,108 building sum insured | Contents removal/disposal | $5,000.00 | 10% of $50,000 contents sum insured | Professional fees | $9,097.00 | 10% of $243,108 building sum insured | Building demolition | $24,310.80 | 10% of $243,108 building sum insured Each of the additional benefit limits referred to above are payable in addition to the building/contents sum insured on which they are based. Complainant wants additional benefit amounts to be increased The complainant wants the insurer to pay increased additional benefit amounts. In particular, he wants the building demolition limit adjusted to $35,000 so as to align with industry standards, and TA coverage until the home is rebuilt. Insurer is not required to increase additional benefit amounts The panel is satisfied that the insurer is entitled to rely on the policy terms regarding the limits applicable to the additional benefits. It is apparent from the table above that the additional benefits for contents removal/disposal and for building demolition have been reached. The $20,544.41 TA payment was a cash settlement, and it may be that further TA costs were covered previously by the insurer. The professional fees additional benefit limit is yet to be reached. Noting the extent of damage to the home, the panel is satisfied that the limit for each applicable additional benefit will be required to be paid in full in due course. Accordingly, it is reasonable to require the insurer to pay out now what, if anything, remains outstanding of the TA limit (seemingly $3,766.39) and the professional fees limit (seemingly $15,213.80) Is the insurer required to pay any other amounts? Yes. It is reasonable to require the insurer to pay the offered $1,440 for counselling fees and $1,000 in compensation. It is not required to pay any other amounts outside the policy terms. Complainant seeks amounts outside policy terms The complainant wants the insurer to pay for continuing family trauma therapy. He has provided six invoices for therapy up to 6 March 2024, totalling $1,440. He has also provided information confirming his son has developed a serious mental health concern. The complainant says the health issues his family is experiencing have been greatly exacerbated by the insurer’s delays and poor claim handling. Insurer’s offers are reasonable The insurer does not accept that it has caused delays or otherwise mishandled the claim. However, it has offered to reimburse the $1,440 previously incurred in therapy costs, and to pay an additional $1,000 as a gesture of goodwill. The panel acknowledges that the claim event has caused significant distress for the complainant and his family, and that they have found the claim process difficult and upsetting. However, the panel is not satisfied that the insurer mishandled the claim or delayed its progression. In the circumstances, it reasonable to require the insurer to pay (if it has not done so already) the offered $1,440 for counselling fees and $1,000 in compensation. However, it is not required to pay any other amounts outside the policy terms. Why is the outcome fair? It would be unfair to require the insurer to pay more than the sums insured for the building and additional benefits when the complainant was responsible for ensuring the policy suited his needs. However, it is fair that the insurer pays the amounts offered outside the policy. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: an ombudsman a member with significant experience in consumer and small business advocacy a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.