Home / AIG Australia Limited / Determination 12-00-1056515

Determination 12-00-1056515

Hail damage cash settlement amount for roof repairs disputed

FirmAIG Australia Limited
Decided2024-06-25
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$418,301
Non-financial loss—
Amount claimed$474,789
SourceAFCA PDF

Summary

A beneficiary under a strata policy claimed the full roof replacement after hail damage and disputed the insurer's cash settlement. AFCA found the insurer's $418,301 offer, including a 20% contingency uplift, reasonable and ordered that amount paid.

Pre-existing damage, foot traffic and maintenance issues were excluded, so the cash settlement should reflect the reasonable cost of repairs to the hail-damaged scope, which the insurer's quote does.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination | Case number | 1056515 | Financial firm | AIG Australia Limited Case number: 1056515 24 May 2024 Determination overview Complaint The complainant is a beneficiary under a strata insurance policy held with the financial firm (insurer). The complainant lodged a claim for hail damage to the roof of the insured building. The insurer offered a cash settlement which the complainant says is manifestly inadequate. The complaint is regarding the scope of works (SOW) necessary to repair the damage to an appropriate standard and the reasonable cost of repairs. Issues and key findings Is the insurer required to increase the cash settlement? No. The evidence does not establish the complainant’s quotes most accurately reflect the reasonable cost of repairs. The insurer’s offer of $348,584.78 is an appropriate amount for repairs as it reflects the scope of works. The insurer’s proposed 20% contingencies uplift is fair and reasonable. Determination This determination is in favour of the insurer. Within 21 days of receiving notice the complainant accepts this determination, the insurer is to pay the complainant $418,301 for the damage repairs. Reasons for determination Due to the nature of the issues involved we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. There has been a full exchange of all material information relied on for this determination and each party has had the opportunity to address any issues raised by the other. All material provided by the parties has been reviewed and considered. The determination follows review of all relevant material. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The complainant is represented. For simplicity, I will refer to the complainant and his representative as the ‘complainant’. Is the insurer required to increase the cash settlement? No. The evidence does not establish that the complainant’s quotes most accurately reflect the reasonable cost of repairs. The insurer’s offer of $348,584.78 is an appropriate amount for repairs as it reflects the scope of works. The insurer’s proposed 20% contingencies uplift is fair and reasonable. The complainant has shown damage which triggers cover under the policy The complainant is first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. There is no dispute the roofs present with hail damage, which triggers cover under the policy. Therefore, the onus rests with the insurer to show an entitlement to limit its liability under the claim in line with the policy provisions or otherwise. The insurer says the damage assessment report identified pre-existing damage that is excluded from cover and its replacement quote accounted for the excluded factors. The complainant says the insurer’s quote and offer is inadequate to repair the damage to a pre-hail event condition. The complainant says his repair quote is more appropriate and adequate. Cash settlement should reflect reasonable cost of repairs Under the terms of the policy, the insurer may settle a claim for damage by: repairing the damage or rebuilding the property, or paying the complainant, the reasonable cost of doing so. Where a claim is to be settled by a cash settlement, the insurer is required to pay the complainant the reasonable cost of repairing the damage. This means the cash settlement amount should be sufficient to ensure that the complainant is able to engage their own contractors to complete the necessary repairs, to return the property to its pre-loss event condition. Pre-existing maintenance issues contributed to building damage At the request of the complainant, builder CH attended on site on 23 November 2022 and states: During the inspection it was clear that there were substantial hail indentations across 95% of the roof sheetings, flashings & cappings along with hail impact damages to all air conditioning/refrigeration units. In my professional opinion the hail impact sustained has compromised the roof and the air conditioning/refrigeration units integrity allowing it to no longer reflect the elements it is designed to withstand. Our recommendation is for all roof sheetings, flashings and cappings along with all air conditioning/refrigeration units to be replaced to prevent further loss or water leaks occurring. We would like to also note that when it comes to the roof repairs the parapet wall cladding will need to be removed & replaced to facilitate the flashing replacement along with the southern elevation pitched tile roof requiring all 25m2 of tiles to be removed & reinstalled so that the sheeting that goes under the cladding, under the pitched tile roof and into the exterior gutter can be replaced. (sic) CH provided a quote dated 25 January 2023, in the sum of $474,788.92, for the replacement of the entire roof and air-conditioning units. At the insurer’s request building consultant ARC, attended on site on 6 March 2023. ARC confirmed that the roof has sustained a hail damage. It says the major and significant impact is to approximately five roof sheets that require replacement. However, regarding the rest of the minor hail dent, ‘ARC do not believe these minor impacts will affect the material's lifetime or ability to move water away from these areas.’ ARC identified the following maintenance and unrelated damage: considerable foot traffic noted throughout the entire roof. more significant areas had splits in the ridge of the roof profile, several splits have been previously waterproofed. missing dektites throughout poorly sealed flashings poorly installed air condition ducting running perpendicular to roof pans and likely creating an obstruction, an area for debris build up to occur. ARC concluded that it appears the hailstorm event occurred around June 2020. Loss adjuster, CT attended on site. In its report dated 5 May 2023, CT says: a hail storm event occurred on Wednesday, 10 October 2018, causing widespread damage in the region. inspection shows certain areas where hail damage was evident with other areas of the roofing structure not affected by hail impact while there were a few areas that displayed impact damage of significance which appeared to be attributable to hail, the rest of the sheets showed minor hail impact which was barely visible to the eye the roofing plant in the form of air-conditioning condenser units showed signs of hail impact damage to their fins a vast amount of foot traffic damage that was evident across the entire roofing structure, together with poorly sealed flashings and a number of poorly maintained areas almost all the condenser units are beyond economical repair. ARC provided a quote dated 5 April 2023, in the sum of $348,584.78, for replacement of the air-conditioning units, five roof sheets and roof ventilators. In response to the identified pre-existing damage to the roof, the complainant says in his submission to AFCA dated 19 March 2024: As we have made a claim for hail damages and not foot traffic/wear & tear, the foot traffic/general wear present on the roof is irrelevant to this claim. Having carefully reviewed ARC and CT’s reports, I am satisfied both reports establish the building has significant pre-existing damage and maintenance issues. Insurer’s cash settlement offer On 30 October 2023, the insurer offered to pay the complainant $418,301, calculated as follows: $348,584.78 - ARC’s quote for storm damage repairs $69,716.95 - 20% contingencies uplift. The complainant did not accept the offer. Insurer’s cash settlement offer is reasonable Having reviewed all the exchanged information, I am satisfied the insurer’s quote is fair and reasonable. The information available shows the poor and deteriorated condition of the roof. ARC and CT’s reports confirmed pre-existing damage to the roof, significant foot traffic noted throughout the entire roof, evidence of previous poor repairs and poorly sealed flashings, amongst other issues which required maintenance. I accept the insurer is not liable for the pre-existing damage and maintenance issues, hence it is not liable for the entire roof replacement. The complainant does not dispute the pre-existing damages but says it is irrelevant to the claim and seeks the insurer to replacement the entire roof. I do not accept the complainant’s position and it is relevant to note the policy does not cover damage due to deterioration, wear and tear. Further, the policy does not cover a betterment of the insured property. Further, to be entitled to a higher cash settlement amount, the complainant must demonstrate that the insurer’s offer does not reasonably reflect the likely retail costs of hail related repairs. This requires the complainant to show one or more of the following: the SOW the insurer relies on does not adequately encompass the required repairs the quote the insurer relies on is under priced the insurer has failed to include a reasonable contingencies uplift. Given the exchanged information, I am satisfied that the amount ARC has quoted is reasonable. The insurer included in its final offer a 20% contingencies uplift to allow for additional risks assumed by the complainant in undertaking the work directly, including the loss of the insurer’s lifetime guarantee on repairs). I consider that is a reasonable percentage to apply. No information has been provided that suggests otherwise. Accordingly, I am satisfied that the insurer’s $418,301 cash settlement offer is reasonable. Other arguments not considered The parties have raised issue about the policy interpretation and the insurer being prejudice by the complainant’s delay in lodging the claim. I have reviewed the parties’ arguments and consider them not relevant as these arguments would not have changed the outcome of the determination. Outcome is fair in the circumstances The outcome is fair as it recognises the extent of the contribution to the loss or damage by the hail event and the pre-existing damage. I understand the complainant has suffered a loss. However, the information shows there were other causes of damage to the building that are excluded under the policy and it is fair to apportion that loss. Supporting information The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.