Home / RACQ / Determination 12-00-1056128

Determination 12-00-1056128

Flood damage claim settlement scope and amount

FirmRACQ
Decided2024-09-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$242,473
Non-financial loss$4,000
Amount claimed$267,000
SourceAFCA PDF

Summary

The complainant sought the $267,000 sum insured for her flood-damaged rental home and disputed the insurer's repair scope and handling. AFCA ordered a cash settlement of $215,773.16 including contingency, lost rent of $26,700, $4,000 non-financial loss, expert costs up to $5,000, and further engineering and mould inspections.

The home was not a total loss on the exchanged information, but the foundations and mould were not properly investigated, so further assessment and a cash settlement with contingency were required.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossreassess claim

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1056128 | Financial firm | RACQ Insurance Limited Case number: 12-00-1056128 5 September 2024 Determination overview Complaint The complainant holds a home building insurance policy with the financial firm (insurer) for her tenanted investment home, which was damaged by flooding on 17 December 2023. The insurer accepted liability for flood damage and offered to cash settle the claim. However, the complainant is unhappy with the scope of work (SOW), the extent of covered damage and the handling of the claim. She wants a payout of the sum insured for the home ($267,000). Issues and key findings How should the claim be resolved? The insurer is required to obtain a further engineering report and a mould report. It must cash settle the complainant $215,773.16 plus any additional amounts determined by these inspections, in accordance with the findings in section 2 of this determination. Is it appropriate for the insurer to pay lost rent? Yes. As no estimate was provided for the time to repair the home and the tenants will need to move out, it is fair the insurer pays the policy limit of $26,700 for lost rent. Is an award of compensation warranted? Yes. The insurer handled the matter poorly. The insurer must pay compensation of $4,000. Why is the outcome fair? There remains some concern about the extent of mould contamination and whether the foundations were impacted by the event. The insurer must pay $215,773.16 in addition to any additional amounts deemed payable through the further obtained reports, subject to the policy limits. It is also fair it covers lost rent whilst the repairs are done and pays compensation. Determination This determination is in favour of the complainant. Should the complainant accept the determination, the insurer is required to pay her $215,773.16 within 14 days of receiving notification from AFCA. It must then appoint a new engineer and new mould expert to inspect the home. If they report that further work is necessary due to the claim event, the insurer must pay any additional costs, as set out in section 2 of this determination. In total, the insurer must pay: $215,773.16, inclusive of a 30% contingency uplift, plus additional costs as determined, or if the policy limit is exceeded, the insurer must pay $267,000 plus interest calculated from 9 July 2024 (the date of the JL quote), with no contingency uplift. The insurer is also required to pay $26,700 for lost rent and $4,000 compensation for non-financial loss. If it has not already done so, it is also required to reimburse the complainant for her reasonably incurred expert expenses, up to a limit of $5,000. Reasons for determination How should the claim be resolved? The insurer is required to obtain a further engineering report and a mould report. It must cash settle the complainant $215,773.16 plus any additional amounts determined by these inspections, in accordance with the findings in section 2 of this determination. Complainant seeks payout of sum insured for investment home The complainant seeks a payout of the sum insured for her tenanted investment home. The home was built in or about 1975 and subject to ‘an extreme flooding event’. The insurer arranged for numerous experts to inspect the damage. Builder JL confirmed water ingress affected the timber floors, the study, two bedrooms and the main bathroom. It also affected external areas of the home. Restorer CR sanitised the affected areas of the home. It confirmed there had been category 3 water inundation (black water, or hazardous water with harmful bacteria and/or pathogens). CR treated the affected areas and deemed the building habitable on 1 February 2024. The parties disagreed over several elements of the claim, assessment and repair of the home. Amongst these issues, the complainant was dissatisfied with the insurer’s: response time alleged failure to properly investigate the stumps, and the scope of its repairs. The insurer considers the home repairable. Its experts submitted numerous quotes. The complainant wants the insurer to pay her the sum insured under the policy ($267,000). Damage in the home proved to be more extensive than first thought Whilst the insurer initially considered the inundation of the home and subsequent damage was relatively minor, it has since accepted the required work will be extensive. A dispute arose over whether there was asbestos in the building and whether this would impact repairs. The insurer’s builder AB conducted a crude inspection, which (according to the complainant) involved punching a hole in a wall. The insurer does not refute or challenge this account. AB subsequently informed the tenants there was no asbestos in the home. Dissatisfied with AB’s methods and conclusion, the complainant arranged her own testing, which later proved: there was asbestos present (albeit in a different part of the home), and it would need to be removed as part of the repair work. Asbestos in the home meant any invasive repair work to these areas would involve asbestos removal. Whilst the insurer’s initial quotes ranged between around $6,000 and $45,000, the knowledge it would have to remove asbestos significantly changed the repair scope. JL’s final repair estimate on 9 July 2024 was $165,979.35. Engineer’s assessment of the foundations is not persuasive The complainant remains dissatisfied with JL’s final repair quote. She raised concerns over damage she believes is not included in the quote or not adequately addressed by it. However, except for the foundations and the mould infestation, I am not satisfied there is sufficient evidence provided to show other aspects of the repair quote are deficient. The complainant maintains the stumps were likely damaged in the claimed event and says the insurer has not adequately investigated this. Whilst I am not convinced the stumps were damaged by the event, I agree the issue has not been properly investigated. The insurer had previously arranged for forensic engineer PG to inspect the property and report on the effect the claimed event had on the foundations. PG found no ‘evidence that the house stumps are moving’ during its inspection. PG wrote: Steel columns have replaced some timber stumps around the perimeter of the residence and underneath what is believed to be an extension. It was difficult to inspect all stumps due to limited access, however no noticeable damage or movement was observed. The complainant was dissatisfied with this report and considers PG did not inspect the damage properly. She also raised concerns with mould infestation in the home. PG’s analysis of the damage to the foundations was limited. Whilst I accept it is the complainant’s onus to prove the foundations were damaged in the claimed event, the insurer should have done more to ensure the issue was properly investigated. JL’s SOW provides for an engineer to check the home’s stumps as part of the repair, however no financial allowance was made for the inspection. This implies JL remains concerned about the possibility of foundation damage. In my view, PG’s report did not adequately address this issue either, as: it did not properly or thoroughly review the damage to the foundations whilst it recommended the stumps be replaced, it did not adequately explain why this was necessary, other than attributing it to ‘a maintenance precaution’ PG further recommended that any claim repairs be cash settled but did not explain why the language used in the report implies the inspection was cursory and not thorough. I am not persuaded the insurer has adequately inspected this aspect of the damage. Exchanged information not sufficient to determine home is a total loss The complainant expressed in her submissions that she has lost complete faith in the insurer and its ability to repair the damage at the home. I accept and understand why, given the: insurer apparently failed to inform the tenants of the category 3 water inundation and associated risks to the health of their children poor and superficial initial inspection of the damage, meaning the initial repair quotes were insufficient and not representative of the loss failure to properly investigate the impact the loss had on the foundations, and the reportedly appalling behaviour of AB, for which the insurer has provided no explanation. In recent months, the complainant has expressed concerns about mould damage in the home. Her tenant reported this was extensive and spreading. She believed it had affected the health of her children. However, the insurer says it has not had an opportunity to re-inspect the home to confirm this, as the complainant and/or the tenant did not want it to. Based on the exchanged information, I am not satisfied the insurer has properly ascertained whether the home’s foundations were damaged by the claim event (and to what extent). It also needs to further investigate the mould damage. Until this is done, I am not satisfied a final repair estimate can be accurately made. It remains possible, if not probable, the scope of repairs may increase. However, the exchanged information does not persuade me the insured building is or should be classified as a total loss. The current quoted repair amount is about $100,000 less than this figure. I accept there may be additional damage to consider but I am not yet persuaded the full sum insured should be paid. The true extent of damage caused is not yet known. Noting the preference of the parties, I accept once a final repair amount can be fairly ascertained, the matter should be cash settled. New engineer and mould expert to inspect further damage As there remains uncertainty about whether there was damage to the home’s foundations and the extent of mould damage, I consider the insurer must conduct further investigations. It is fair that the insurer covers the cost to arrange another engineer’s report and a mould report. The complainant and the tenant will need to permit the insurer’s agents access to the property to undertake these investigations. The insurer must select three suitable engineers and permit the complainant to choose the one she wants the insurer to engage. This engineer should then inspect the home’s foundations to ascertain if the stumps or any other part of the foundations were damaged in the claimed event. Should the chosen engineer identify claim-related work which requires attention, it must prepare a SOW for JL to quote on. This can then be added to the cost of repairs. The insurer must also arrange for a mould remediation expert to inspect the home and determine if further work is required. This expert may (at the complainant’s discretion) either: remediate any additional mould found at the home and deemed to have been caused in or by the claimed event, or provide an actionable quote to remediate this additional damage, which may be added to the JL quote for settlement. The complainant and the tenant will need to permit these experts access to the property so that the matter may be resolved. I remind both parties of their mutual duty to act in utmost good faith with respect to the investigation and settlement of the claim. It will require both parties (and the tenants) to make allowances for this be successfully achieved. Insurer can then cash settle the complainant for the claimed damage Within 14 days of being notified of the complainant’s acceptance of the determination, the insurer must pay her $165,979.35 plus a 30% contingency uplift. This means a payment of $215,773.16 is to be made. The contingency amount is to compensate the complainant for the loss of the lifetime guarantee and the transfer of risk in having to arrange her own repairs. Noting: the time which has elapsed since the loss the confusion and inconsistency over quoting, and the likelihood of additional damage, it is fair that a higher contingency than normal is paid. The insurer is also to undertake the additional assessment work mentioned above. To the extent this results in additional amounts being required to address the damage, the insurer must pay these amounts to the complainant. These amounts will also require the inclusion of a 30% contingency uplift for any cash settlement paid to the complainant. For clarity, the JL SOW (and any additional SOW required and relied upon for settlement) must be actionable. That is, the complainant must be able to retain JL or the relevant expert to undertake the work for the amount quoted if she chooses. If JL (or the other expert) is not prepared to do this, the quote will not be actionable. If this occurs, I consider it is fair that the home be considered a total loss. The insurer will then be required to pay the complainant the building sum insured as part of the settlement. It will also have to pay interest under section 57 of the Insurance Contracts Act 1984 , calculated from 9 July 2024 (the date of the JL quote) until the date it pays the settlement. The same will also apply if, after the subsequent investigations are complete, the total sum to repair the home (including the contingency uplift) exceeds the sum insured. The insurer should not be required to pay more than the sum insured under the policy. However, it is fair that it pays interest to compensate the complainant for the delay in processing the settlement. No interest will apply with a settlement based on actionable quotes as the quotes can be used to have the repairs completed. In those circumstance, the complainant will receive the benefit of a contingency uplift. Insurer is to cover the costs the complainant reasonably incurred for experts Through the course of the claim, the complainant retained an asbestos expert to review the home, after the insurer said there was no asbestos. I am satisfied the insurer must indemnify the complainant for this, and any other reasonably incurred expert expenses. This will be up to a total limit of $5,000, as provided for in the AFCA Rules. Is it appropriate for the insurer to pay lost rent? Yes. As no estimate was provided for the time to repair the home and the tenants will need to move out, it is fair the insurer pays the policy limit of $26,700 for lost rent. Policy provides cover for lost rent It is not in dispute that the proposed repair work is extensive and the tenants will have to vacate the property whilst these repairs are undertaken. Without tenants in the property, the complainant will incur lost rent. The terms of the policy include the Certificate of Insurance and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy covers ‘Lost rent’ incurred whilst the home is being rebuilt or repaired for up to 12 months. A limit on the amount payable is set at 10% of the building sum insured. Fair that the insurer pays out the sum insured for lost rent The complainant confirmed her tenants pay rent of $550 per week under the current arrangement. The insurer has not challenged this. Should the repair of the home take 12 months, the policy limit for lost rent ($26,700) would likely be exceeded. I am satisfied any repairs will take a considerable amount of time. Further mould remediation is likely, and the removal of asbestos will be delicate and potentially time consuming. It is not inconceivable that an extensive repair of the home may take up to 12 months. Noting the insurer made no submissions on this issue, it is not possible to estimate how long the repairs will likely take. To avoid further complication and calculation, I consider it is fairer to nominate a payable amount for lost rent, rather than have the parties try to negotiate this. I am satisfied any estimation must be generous, noting the problems incurred to date, the likely scope of the repairs and the absence of an estimated repair time. Given this, and noting the policy limits what is payable, I am satisfied the insurer must pay the maximum amount. It is not unreasonable to believe the repairs may take up to 12 months to complete, noting the complainant will likely have to retain her own repairer. Paying the maximum amount is fair in these circumstances, noting the poor handling of the claim and the delays encountered to date. This means the insurer must pay the complainant $26,700 for lost rent. Is an award of compensation warranted? Yes. The insurer handled the matter poorly. The insurer must pay compensation of $4,000. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Fair that the insurer pays compensation for non-financial loss The complainant raised numerous concerns relating to the impact this claim had on her and the tenants. The tenants are not a party to this complaint and not covered by the policy. Therefore, I can only consider the claim for non-financial loss compensation from the complainant. This relates to the insurer’s handling of the claim and its direct impact on the complainant only. Amongst her other concerns, the complainant says the insurer: did not immediately inform her the home was unliveable and this meant she could not inform her tenants compiled numerous SOWs for the damage and failed to account for necessary expenses like the foundations and (until very late) the asbestos failed to handle the matter within an appropriate timeframe, and failed to assess the property properly. Whilst the complainant acknowledges the insurer was not required to re-house or compensate the tenants, she considers its failure to inform them of the contamination left them at risk. She also notes she is a single mother and relies on the rental income for her family. The insurer says the claim was for a significant event and its resources were stretched. It acknowledged some failures in its claims handling, including that there were avoidable delays, gaps in communication and other issues. I accept the insurer’s handling fell well short of an acceptable standard. The insurer offered the complainant $2,000 compensation for non-financial loss on 28 March 2024. I consider the effect of the insurer’s poor handling of the complaint went beyond this. There have been significant delays, concerns over the nature of the damage, the extent of damage and a failure to properly investigate. I accept this poor handling of the claim caused: an unusual degree or extent of inconvenience, time taken to resolve the matter, and interference with the complainant’s expectation of enjoyment or peace of mind. Based on this, I am satisfied a substantial compensatory award is appropriate. I am, however, mindful of the substantial (and policy maximum) amount paid for lost rent. To this end, I consider the insurer must pay the complainant non-financial loss compensation of $4,000. Why is the outcome fair? There remains some concern about the extent of mould contamination and whether the foundations were impacted by the event. The insurer must pay $215,773 in addition to any additional amounts deemed payable through the further obtained reports, subject to the policy limits. It is also fair it covers lost rent whilst the repairs are done and pays compensation. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. Due to the nature and complexity of this complaint, AFCA has considered it appropriate to expedite it in accordance with the Operational Guidelines to the AFCA Rules. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.