Home / Auto & General / Determination 12-00-1054535

Determination 12-00-1054535

Claim decline for flood-caused damage and loss of rent, with delay in expert clarification

FirmAuto & General
Decided2024-09-06
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's investment property was inundated in a February 2022 storm. AFCA found the damage was caused by floodwater, which is excluded, so the decline was upheld, but ordered $1,500 for non-financial loss due to delay.

The policy excludes flood damage and the complainant did not select flood cover, and the expert evidence showed the inundation above floor level was floodwater from Cudgen Lake.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination | Case number | 1054535 | Financial firm | Auto & General Services Pty Ltd Case number: 1054535 9 July 2024 Determination overview Complaint The complainant holds a Home Insurance policy with the financial firm (insurer) covering their investment property in NSW. On 28 February 2022, the complainant lodged a claim on the policy for damage to the home following several days of heavy rainfall in late February 2022. The insurer accepted liability for water staining to an upstairs bedroom caused by the storm and settled the damage for $778.80. The insurer denied liability for the remaining damage relying on a hydrologist report from WMA. WMA considered the inundation of the home was caused by floodwater and not stormwater. The complainant’s policy does not cover flood damage. The complainant does not dispute the home was inundated by flood waters but maintains it was inundated by rainwater and storm water runoff prior to the flood. The complainant seeks compensation for the damage caused by the rainfall and storm water inundating the property before the flood waters arrived including cover for lost rental income. Issues and key findings Is the insurer entitled to decline the claim? Yes. The available information indicates the proximate cause of damage other than the water staining to the upstairs bedroom was most likely floodwater from a nearby lake. As the policy excludes damage caused by flood, the insurer is entitled to decline the claim. Is the complainant entitled to compensation for non-financial loss? Yes. I accept there were some delays in the insurer seeking clarification from its experts as to the cause of the damage. Compensation of $1,500 for non-financial loss is fair in the circumstances Why is the outcome fair? This outcome is fair because the insurers decision is supported by an expert report which shows on the balance of probabilities, the damage was caused by flooding and not rainwater. The information provided by the complainant is not sufficient to support the argument that the damage was caused by rainwater runoff. Determination This determination is in favour of the insurer. Within 14 days of receiving notice the complainant accepts this determination the insurer is to: pay the complainant $1,500.00 compensation for non-financial loss notification The insurer is otherwise entitled to rely on the terms of the policy to limit liability to the damage caused by storm. Reasons for determination Is the insurer entitled to partially decline the claim? Yes. The available information indicates the proximate cause of damage other than the water staining to the upstairs bedroom was most likely floodwater from a nearby lake. As the policy excludes damage caused by flood, the insurer is entitled to decline the claim. Th Complainant has onus to prove claim falls within terms of policy? It is established insurance law that the complainant has the initial onus to show, on the balance of probabilities (that is more likely than not), that the loss or damage claimed falls within the cover provided under the terms of the policy. The complainant’s policy covers loss or damage to the insured property caused by an insured event during the period of insurance. The policy lists the insured events which are covered, including ‘Storms and rainwater’. The policy also includes cover for Landlord loss of rental income during the period the home is unliveable, due to a covered event, up to a maximum of $15,000. Under ‘Storms and rainwater,’ loss or damage caused by storms and rainwater is covered, including damage from surface run-off rainwater within 24 hours of a storm, and the escape of rainwater from any water pipe, drain or gutter. Damage caused by flood is excluded under Storm and rainwater cover unless the optional flood cover offer has been selected. The policy defines flood as: The covering of normally dry land by water that has escaped or been released from the normal confines of any of the following:  a lake, river, creek, or other natural watercourse (whether or not any of them have been altered or modified).  a reservoir, canal or dam. The complainant did not select flood cover. The certificate of insurance clearly identifies flood is not included. This is not disputed. As flood damage is excluded from cover, the onus is on the complainant to establish the damage claimed was due to stormwater runoff. Circumstances of the loss The complainant property is in Bogangar, NSW. There is no dispute that significant heavy rainfall was recorded in the area prior to the inundation. In the 24 hours from 9.00am on 26 February 2022, 127mmm of rain was recorded and a further 157mm of rain recorded from 9.00 am on 27 February 2022. Heavy rainfall continued throughout 28 February 2022. The complainant lodged the claim on 28 February 2022. He was overseas at the time but reported: “Due to excessive rain the back yard is flooded, the lower level is flood as well. The tenant's had to be evacuated by the SES. They don’t have access to the property.” The complainant says the initial inundation in the immediate vicinity of his property was stormwater. The complainant provided a video taken by the tenants to support his position that the inundation was rainwater. He argues that the time stamp on the recording proves the water inundation occurred before the flood water reached the property. Expert reports suggest inundation caused by floodwaters. The insurer appointed a Hydrologist, WMA to assess the damage. WMA’s first report is dated 4 July 2022. The report focuses on the peak level on inundation. WMA noted the peak level of the nearby Cudgen Lake at 7.00pm on 28 February 2022 was 3.65mAHD with the ground level of the property 2.9mAHD. WMA considered the property was inundated by flood waters from the Cudgen Lake. While the report comments on the peak level inundation it failed to comment on the initial inundation. The complainant says the report from WMA is not reliable. It contains numerous errors including: the ground level at the site is 2.8mAHD. The complainant says the ground level varies from 3 – 3.5mAHD the house is a slab on ground house. The complainant says the house is built on timber joists and the floor level is .6m higher, making the floor level 3.6m – 4.1mAHD. The complainants video taken at 9.39am shows water entering the property around a structural support column and under the kitchen island bench. The video provided by the tenants records the tenants comment that the water was rising. In response on 26 July 2022 WMA noted the water observed in the video appears to have come from a roof or support beam. WMA did not address the initial inundation. Following further requests WMA advised on 14 September 2022 that: based on Lidar reports the ground level at the site was 2.8 to 2.9 mAHD the relevant gauge shows the Cudgen Lake exceeded 2.8 to 2.9mAHD around 6.00 to 7.00am on 28 February 2022 the water levels at the site would have exceeded ground level soon after this. with the floor level higher than ground level the water would have entered the home later. based on this, the water observed in the video was most likely caused by the rapidly rising levels of the lake. In a final supplementary report dated 12 April 2024, WMA notes the ground elevation across the property to be 2.8 to 3.00 m AHD. Based on photographs provided the floor level of the home was 3.1mAHD. The higher level of the floor reduces the likelihood of stormwater inundation. WMA concluded: with the floor level of the property approximately 3.1mAHD the water from Cudgen Lake reached this level slightly before 9am on 28 February 2022, meaning the inundation recorded by the tenants was floodwater. The complainant says WMA has not allowed sufficient adjustment for the floor height. He says there are two steps up and boards are typically 0.3m (30cm) wide, adding 0.6m to the ground level. I note the photograph provided shows the top of the step is the floor level and is level with the top of the first board. If the board is 30cm wide, then the floor level is approximately 0.3m (30cm) above ground level. I am satisfied that the floor level is at the most 3.2m AHD. Excluded damage caused by floodwater While I acknowledge some of the information provided by WMA is confusing, the complainant has not provided any persuasive evidence to dispute the conclusions reached by WMA. I accept there was some initial storm related damage to the ceiling in the upstairs bathroom. This is not disputed and has been settled. There is no evidence any inundation through the roof caused any further damage. It is accepted that there was heavy rainfall with 157mm recorded in the 24 hours prior to the inundation. WMA explains that any rainfall would also have fallen on Cudgen Lake and the impact of localised rainfall would have been minimal. The graphs provided by WMA show the height of the water in Cudgen Lake. Figure 7 is difficult to decipher because it covers a 10-day period making the time markings too broad to pinpoint the point where it reached 3.2mAHD. An alternative version of the figure 7 graph is provided in WMA’s supplementary report as figure 2. This graph provides clearer detail and shows the flood level reaching 3.2mAHD slightly before 9am. At the time of the video recording the flood level had reached slightly below 3.25m AHD which is approximately 5cm higher than the floor level and consistent with the inundation as shown. Having reviewed all the available information, I am satisfied the inundation of the home, above floor level, was flood water from Cudgen Lake. The insurer is entitled to rely on the terms of the policy to deny liability as the policy excludes cover for flood damage. Floodwater made the home uninhabitable The policy provides cover for loss of rental income if the property is uninhabitable because of an insured event. The accepted storm damage was minimal, and the available information indicates it was the flood water damage that made the house uninhabitable. As explained above, the insurer is not required to cover the flood damage, therefore the complainant is also not covered for loss of rent. Is the complainant entitled to compensation for non-financial loss? Yes. I accept there were some delays in the insurer seeking clarification from its experts as to the cause of the damage. Compensation of $1,500 for non-financial loss is fair in the circumstances AFCA can award compensation for non-financial loss Under its Rules, AFCA can award non-financial loss compensation of up to $5,400 in circumstances where actions or errors of the insurer has caused an unusual degree of physical inconvenience or time taken to resolve a situation. AFCA takes a conservative approach to awarding compensation for non-financial loss. We expect a person to be moderately robust in dealing with the normal stresses and delays associated with a claim. Delays in clarification of hydrologist report The complainant argues that the hydrologist should have been appointed earlier and this delayed the outcome for his claim. The available information shows the insurer initially arranged for a builder to attend, assess the damage, and make the site safe. The builder attended on 11 March 2022 and following their report the insurer arranged for a hydrologist to attend. This was a reasonable approach. Given the demand on hydrologists during flood catastrophes is it fair and reasonable for an insurer to assess the damage before deciding if a hydrologist is required. The claim outcome was given on 12 July 2022 which is less than 6 months from the date the claim was lodged. I accept this is a reasonable time frame in the circumstances given demands on insurers and experts at the time. No doubt the complainant was frustrated by the perceived errors in the report from WMA. I accept the complainant raised several valid concerns with the accuracy of some of the information provided by WMA. I also acknowledge that WMA did not immediately address the timing of the initial inundation. This is a failing in the reports. While the insurer acted sought clarification of the issues, it should have requested clarification of the timing of the initial inundation earlier. This should have been addressed in the first report from WMA. This was the central issue in dispute. It was not until AFCA requested clarification of this issue that a response was provided in April 2024. I am satisfied this delay has caused an unusual degree of inconvenience or time taken to resolve the situation. It has impacted the complainants' expectations of enjoyment or peace of mind. In the circumstances I am satisfied a moderate level of compensation for non-financial loss is appropriate. I determine the insurer should pay the complainant compensation for non-financial loss of $1,500.00. Supporting information The AFCAFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Summary of expert reports | Record | Key points | Financial firm’s expert (WMA) Hydrology Report 1 | Ground level at the back shed is approx. 2.9m AHD Debris mark is at 0.75m Therefore peak water level at the location is approx. 3.65m AHD Flood level peaked Source of inundation was floodwater from Cudgen Lake The impact of local rainfall on the peak flood level at the site is small Point 3 | Financial firm’s expert (WMA) Supplementary report (email) 14-9-2022 | Ground level at the site is around 2.8 – 2.9m AHD Nearby gauge reached this level around 6am – 7am on the morning of 28 February 2022 The floor level of the house is only slightly higher than ground level, so the flood levels would have risen above floor level a little later than 6-7am | Financial firm’s expert (WMA) Hydrology Report 4 12-4-2024 | The footing type of the house does not change the assessment, it is the floor level that is relevant The report assumed floor height was 0.2 above ground level at the site making the elevation approx. 3.1m AHD Higher floor levels reduces the likelihood of rainwater runoff being the cause

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.