1 Determination overview
1.1 Complaint
The complainant holds a home and contents policy with the financial firm (insurer). On 12 May 2022 the complainant made a claim for storm damage to his property that occurred on 20 October 2021. The insurer accepted the claim and, following a request by the complainant, cash settled the claim in January 2023 based on the complainant’s builder’s (AC) quote. The complainant has since submitted variations for the building works. The insurer accepted the variation for guttering and that is not being considered in this determination. The insurer declined variations for cladding and downpipes, and for engineering works.
The insurer says that cover for these repairs is excluded under the policy terms. However, it says that some engineering works may be accepted if further information is provided.
The complainant says the insurer should accept the variations, and pay non-financial loss compensation and reimbursement of $2,000 for professional fees.
The complainant is represented by a claims advocate. In this determination, the complainant and representative will be referred to as ‘the complainant’ unless context requires otherwise.
1.2 Issues and key findings
Is the insurer required to cover the variations?
Generally, no. The insurer is not required to cover variations sought beyond what it has agreed to for roofs one and two, and for cladding that is damaged during replacement of the flashing.
Is the complainant entitled to professional fees?
No. The insurer is not required to pay the complainant’s professional service costs. That is because I am not satisfied that the representative’s work was necessary for the complainant’s case to be determined by AFCA.
Is non-financial loss compensation payable?
Yes. The insurer’s claims handling delayed the resolution of the claim. This is likely to have caused inconvenience and frustration to the complainant. The insurer is required to pay $2,000 non-financial loss compensation.
Why is the outcome fair?
The outcome is fair because it requires the insurer to pay for the covered damage in accordance with the policy terms. It would not be fair to require the insurer to pay for repairs that were not required, or excluded, by the policy terms. It is fair that the insurer pay non-financial loss compensation to the complainant due to its poor claims handling.
1.3 Determination
This determination is in favour of the insurer.
If the complainant accepts this determination, the insurer is required to:
· pay the cost of the repair variations it has agreed to for roofs one and two
· pay the cost of replacement of cladding and downpipe that is damaged during replacement of the flashing, upon the complainant providing proof of this to the insurer
· within 14 days of being notified of the complainant’s acceptance, pay $2,000 compensation for non-financial loss to the complainant.
2 Reasons for determination
2.1 Is the insurer required to cover the variations?
Generally, no. The insurer is not required to cover variations sought beyond what it has agreed to for roofs one and two, and for cladding that is damaged during replacement of the flashing.
Onus on complainant to establish a valid claim
It is established insurance law that an insured has the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of cover. Once that is established, the onus falls on the insurer to prove on the balance of probabilities the application of any relevant condition or exclusion should it wish to decline the claim.
Policy provides cover for storm subject to exclusions
The policy provides cover for storm damage.
The policy sets out how it settles claims. Relevantly, it says:
How we settle your claim
If you are claiming for buildings
1. If we can, we will settle your buildings claim by:
· Repairing the damaged parts of your buildings…
· Rebuilding the damaged part of your buildings…
…
If we cannot repair or rebuild the damage part of your buildings, we will pay you an amount equal to the reasonable cost that you would incur to repair or rebuild the buildings up to the limits noted in your policy…
The policy contains general exclusions. Relevantly, these include (Page 28):
We will not pay for:
2. additional costs resulting from your buildings or any part thereof not being compliant with building codes, regulations or laws, including any required approval by the relevant building authority that were already in place when the buildings were originally built, subsequently altered or renovated.
3. upgrading undamaged parts of your buildings to comply with current building codes, regulations and laws.”
Complainant says insurer should cover variation for cladding
The complainant says the insurer should cover the variations for cladding and downpipe. He says:
· the installation of apron flashing necessitates the removal and replacement of the existing vinyl cladding so that it sits flush with the roof sheets and the property is water-tight
· once the cladding is removed, it cannot be reinstalled, making it essential to replace the cladding and paint it to achieve the best possible match with the existing structure. This step is critical to ensuring that the installation is both certifiable and warrantable
· given the cladding is vinyl, it must be replaced up to the nearest architectural break point to maintain the structural integrity and aesthetic consistency of the property.
The complainant refers to LO roofer report of 2 November 2022 which says that the cladding will have to be removed to facilitate gutter repairs.
It says the insurer should pay the following as set out in AC’s (undated) amended quote for $4,578.75 to:
· remove and replace vinyl cladding to best match existing, approx. 15/m2
· remove and reinstate downpipe 15/lm.
Insurer says it is entitled to decline cladding variations
The insurer does not dispute that a valid storm damage claim for the roof has been established. However, the insurer says the complainant has not shown that the storm damaged the cladding and says that undamaged items are excluded from cover under general exclusion 3 (set out above) of the policy. It notes that its builder, JL, report of 4 August 2022 says that the cladding was in a poor state of repair at the time of the event and that the flashing could be replaced without removing the cladding although some damage may occur.
Insurer is not required to cover the cladding variation
There is no dispute that the cladding and downpipe were not damaged by the storm. I accept that the vinyl cladding was in poor condition and broken and missing near the box gutter prior to the storm event. Further, the information shows that the downpipe was not connected at that time.
I acknowledge that replacement of the cladding and downpipe is required in order to replace the box gutter. However, as set out below, I am not satisfied that the policy requires the insurer to cover replacement of the box gutter.
I accept that replacement of the cladding may be necessary for the flashing replacement if it is damaged during those repairs. In its email to the complainant of 8 August 2023, the insurer said it was willing to consider covering this variation if the cladding damage did occur during repairs and invited the complainant to provide images of the damage for its review. I accept this is a fair outcome in the circumstances.
I do not accept the complainant’s position that the policy requires the insurer to otherwise replace these items. I am not satisfied that the information shows that, except for the replacement of the flashing (dealt with above), the replacement of the cladding and downpipe is required for the structural integrity of the building. Further, the policy does not require the insurer to repair undamaged parts of the building for the purposes of builder’s warranty. Rather, the policy excludes upgrading undamaged parts of the building to comply by current building codes.
Complainant says insurer should cover variation for engineering costs
In August 2023 the complainant submitted a request to the insurer for a variation for engineering works. The complainant says should cover the variation for engineering work to the premises of $30,907.80.
The complainant acknowledges that the insurer has partially accepted the engineering works. However, he says that the partial denial creates inconsistency and that an independent engineer has deemed the works essential for compliance with current building codes.
The complainant relies on reports including PE engineers report, dated 29 June 2023 which includes the following:
· rafters in roof one and roof two are overspan and will require chocking beam/s and tie down
· roof 3 is underpitched for the use of Trimdek roof. Graduated battens are required to increase the roof fall to the minimum 2 degrees
· the existing box gutter is insufficiently sized. New box gutter with 140mm depth and 400mm wide is required. This requires timber purlins to be installed to increase depth, raising the roof by approximately 200mm and requires additional flashings along the roof perimeter.
The complainant arranged for builders, AC, to provide a variation report and quotation dated 2 August 2023 and says:
· the work includes the supply and installation of chocking beams, purlins, rain head, box gutter and support, and flashings/fascias to fit new roof height for $30,907.80
· the variation is required to maintain the structural integrity of the roof and required for AC to warrant the repairs
· the additional works are required in conjunction to its SOW to bring the property to a pre-event condition and to complete the overall works in accordance with the building codes.
Insurer says it is entitled to partially decline engineering variations
The insurer says it is not required to repair the box gutter or the framing of roof three because no storm damage occurred to those items. Further, it says the variations sought for those items are due to the original construction works being non-compliant. Therefore, it says, it is entitled to rely on the policy term that excludes additional costs for buildings that were not compliant at the time they were built. Further, it says that the policy excludes cover for upgrading undamaged parts of buildings to comply with current building codes, regulations and laws.
The insurer arranged for CR Building Consultants and Engineers to review PE’s report and the AC variation. CR’s report is dated 12 December 2023 and says:
· roof three was constructed in the last 10 to 20 years. Its roof has a one degree pitch. Based on information from the Lysaght Referee 1967, regardless of the date of construction it is underpitched and non-compliant
· the home was built around 1970. The 1967 Lysaght Referee provides standards relevant to the construction of the box gutter. According to those standards, the box gutter was also a non-compliant installation as it is 19m between the downpipe and the next point of discharge where the maximum is 40 feet (approximately 12m in conversion)
· the AC variation was reviewed and found to be inaccurate and excessive
· its suggested method of addressing the over spanning of roof 1 and 2 was cost-effective.
The insurer offered to settle the costs relating to the over spanned rafters on roofs one and two in line with the costing suggested by CE. It says this is fair because it does not relate to any original non-compliant construction.
Insurer not required to replace the roof framing of roof three or the box gutter
The complainant says the insurer should cover variations for replacement of the box gutter and roof framing of roof three to make the overall repairs compliant with current building standards and warrantable and to return the building to its pre-loss condition.
I accept that the exchanged information shows that the box gutter is insufficiently sized and made from incompatible material (galvanised) and that roof three is insufficiently pitched. However, I do not accept that the policy requires the insurer to cover these repairs. That is because the information does not show that these items were damaged by the storm. While the policy requires the insurer to repair damaged parts of the building, I am not persuaded that extends to repairing undamaged parts. Further, the policy excludes upgrading undamaged parts of buildings to comply with current building codes. Because the policy does not cover this damage, I have not considered whether these items were compliant with building standards at the time of their original construction.
Insurer has agreed to cover the costs relating to the over spanned rafters
The complainant has not said that storm damage occurred to further elements of roof one and two beyond that already cash settled. Rather, he says further items should be covered to achieve compliance with relevant building codes, make the repairs warrantable and bring about the roof’s functional equivalence.
I accept that the exchanged information shows that the complainant’s house is in a cyclonic area. The relevant Australian Standard and QBCC require closer batten spacing, type 17 screws connections, ridge ties and strapping of rafters to top plate. The policy does not require the insurer to upgrade undamaged parts of the building to comply with current building codes. However, the insurer has agreed to cover these costs but not the costs related to the box guttering which involves raising the height of the roof in order to increase the depth of the box gutter and provide height to also provide the required fall. As set out above, I am not persuaded that the insurer is required to cover the repair of the box gutter. I am also satisfied that the insurer is not required to pay for roof alterations to allow for the altered box gutter proposed by the complainant.
The insurer has agreed to cover the costs relating to the over spanned rafters of roofs one and two in line with the costing suggested by CR. I am satisfied that is a fair outcome and the insurer is not required to pay for repairs beyond what it has agreed to.
2.2 Is the complainant entitled to professional fees?
No. The insurer is not required to pay the complainant’s professional service costs. That is because I am not satisfied that the representative’s work was necessary for the complainant’s case to be determined by AFCA.
AFCA can award professional costs
The complainant seeks $2,000 professional service fees for the preparation and handling of this complaint.
Under the AFCA Rules, we can require an insurer to contribute to legal costs, other professional costs, or travel costs a complainant incurred in making a complaint. AFCA cannot award professional costs of more than $5,000 unless there are special circumstances.
In deciding whether to award compensation, we consider whether the costs were reasonably incurred, and whether they helped resolve the complaint.
Insurer is not required to pay the complainant’s professional fees
AFCA is designed as a forum where paid representatives are not required. I am not satisfied that the representative’s work in preparation and handling of this complaint was necessary for the complainant to understand or run his complaint at AFCA. The insurer is not required to make a contribution towards his professional costs.
2.3 Is non-financial loss compensation payable?
Yes. The insurer’s claims handling delayed the resolution of the claim. This is likely to have caused inconvenience and frustration to the complainant. The insurer is required to pay $2,000 non-financial loss compensation.
AFCA may award compensation in certain circumstances
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Complainant says the insurer caused unnecessary delays
The complainant says the insurer caused unnecessary delays in dealing with the complainant’s request for variations. He says this includes the insurer not providing meaningful updates and responses as required by the General Insurance Code of Practice. He says this has caused him unnecessary hardship.
Insurer is required to pay $2,000 non-financial loss compensation
I accept that the exchanged information shows that the insurer delayed providing updates and responding to the complainant’s enquiries and requests for information. The insurer has recognised its delays caused hardship to the complainant and offered $2,000 compensation. I consider this is a fair outcome.
2.4 Why is the outcome fair?
The outcome is fair because it requires the insurer to pay for the covered damage in accordance with the policy terms. It would not be fair to require the insurer to pay for repairs that were not required, or excluded, by the policy terms. It is fair that the insurer pay non-financial loss compensation to the complainant due to its poor claims handling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.