Home / Suncorp Group / Determination 12-00-1044310

Determination 12-00-1044310

Storm damage claim: roof damage and mould remediation

FirmSuncorp Group
Decided2024-11-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$91,390
Non-financial loss$5,400
Amount claimed—
SourceAFCA PDF

Summary

The insurer partly denied a storm claim for roof damage and offered a lower cash settlement for internal damage and mould. AFCA rejected the roof claim, ordered a higher cash settlement of $86,390.04, reimbursement of up to $5,000 expert costs and electricity costs with interest, and $5,400 non-financial loss compensation.

A claimable loss must be shown on the balance of probabilities, and a cash settlement must reflect a current, actionable quote with a contingency uplift.

Issues

Subjects and remedies

third party authoritypay claimpay compensationpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1044310 | Financial firm | AAI Limited Case number: 12-00-1044310 14 November 2024 Determination overview Complaint The complainant is the daughter of and lives with B, who holds home building and contents insurance with the financial firm (insurer). The complainant also represents B. For brevity’s sake, the complainant and B will be referred to below as ‘the complainant’ unless context requires otherwise. In May 2023, the complainant lodged a claim for storm damage which included mould contamination. The insurer initially denied the claim, but partially accepted it after this complaint was lodged with AFCA. The insurer has paid out the sums insured for temporary accommodation and contents. It has also offered to attend to, or cash settle, the home’s internal damage repair costs. However, it denies liability for the roof damage saying it is not storm related. The complainant has acknowledged that the dispute regarding temporary accommodation and contents has been resolved. She wants the insurer to accept all the building damage and to pay a higher cash settlement based on her repair and remediation quotes. She also seeks costs reimbursement and non-financial loss compensation for stress and inconvenience. Issues and key findings Is the insurer required to accept the roof damage? No. The complainant has not shown the roof damage was caused by storm. Is the insurer to pay more for the claim? Yes. Due to the breakdown in the parties’ relationship, the claim should be cash settled. The insurer is to pay $86,390.04 as a cash settlement for repairs and remediation. Is the insurer to reimburse costs? Yes. The complainant’s expert reports assisted her to establish an entitlement to indemnity. The insurer is to reimburse up to a total of $5,000 for the proven costs of the reports, plus proven electricity costs incurred in remediation works, and pay interest. Is non-financial loss compensation payable? Yes. The insurer’s poor claim handling and delays have caused significant stress and inconvenience. It is to pay $5,400 in compensation. Why is the outcome fair? The insurer’s partial denial is fair as the complainant has not established a claimable loss for the roof damage. It is fair that the insurer pays a higher cash settlement than it offered, to reflect current pricing. It is also fair in the circumstances that it reimburses costs and pays compensation. Determination This determination is substantially in favour of the complainant. If the complainant provides written notice she accepts this determination, the insurer is to:  Within 21 days, pay the complainant $86,390.04 as a cash settlement  within 21 days of receiving proof of payment, reimburse the complainant: > up to $5,000 of the cost of her expert reports, and pay interest under section 57 of the Insurance Contracts Act,1984 (Cth) (ICA) from 29 September 2023 to the date the reimbursement is paid > electricity costs incurred due to the insurer’s previous remediation activities (while she was living in TA) plus interest under section 57 of the ICA from the date each invoice was paid  within 21 days, pay the complainant $5,400 in non-financial loss compensation. Reasons for determination Is the insurer required to accept the roof damage? No. The complainant has not shown the roof damage was caused by storm. ​​Complainant must show a claimable loss under the policy ​​​The complainant is required to show, on the balance of probabilities (that it is more likely than not), that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured. ​​​Subject to the terms and conditions set out in the certificate of insurance and the product disclosure statement, the policy covers the complainant for damage to the home or contents caused by a listed insured event. Those events include ‘Storm’. On 29 May 2023, the complainant lodged a claim for water ingress and mould contamination following a storm on 22 February 2023. The insurer initially denied the claim, but in late March 2024, accepted responsibility for the internal damage to the home as well as to contents. To that extent, I am satisfied that the complainant has established a claimable loss. The complainant says the storm also caused damage to the home’s roof. ​​​If the complainant proves the existence of a claimable loss for the roof, the insurer is liable for that loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Complainant has not shown a claimable loss for roof damage The complainant says the roof was damaged by winds and heavy rain during the storm. She also says the roof was in good condition and well maintained prior to the storm, but a piece of flashing became loose due to the intense rainfall, leading to water ingress. The parties have exchanged numerous expert reports, including in relation to the roof. None of the reports suggest that the storm damaged the roof. Instead, several reports identify construction defects affecting the roof. I am therefore not satisfied that the complainant has shown a claimable loss for the roof damage. Is the insurer to pay more for the claim? Yes. Due to the breakdown in the parties’ relationship, the claim should be cash settled. The insurer is to pay $86,390.04 as a cash settlement for repairs and remediation. Reasonable for the claim to be cash settled The insurer has said on several occasions it is willing to attend to claim related repairs or to pay a cash settlement based on its quotes. The complainant does not want the insurer attend to repairs as she does not have any faith in it or its trades. I am satisfied that it is reasonable for the claim to be cash settled. It is apparent that the relationship between the parties has broken down to the extent that extended further interactions between them are likely to give rise to further disputation. ​​​A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then usually applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. Parties disagree on scope of works (SOW) for claim related repairs and cost The insurer relies on an itemised SOW dated 6 June 2023 from builder RB. The SOW outlines repairs to the sunroom, bedroom, two and rear lounge room. The total costing amounts to $7,973.99. In addition, the insurer relies on a SOW dated 6 June 2023 prepared by RB’s associated restoration business, RS. The SOW provides for condition two cleaning of the entire home and provision of a PRV clearance certificate. The total costing amounts to $7,876. On 27 June 2024, the insurer’s employed assessor (assessor) noted that he had recently contacted RS, and ‘they have stated the works outlined in their quote is sufficient to complete the required restoration repairs to the property’. In support of its position that condition two cleaning will be sufficient mould remediation, the insurer has provided a mould and moisture assessment report dated 27 August 2024 by hygienist JM. The assessment took place on 21 August 2024. JM said:  the inspection found no elevated moisture and no visible mould on any building material surface within the home  some contents had mould growth, but these were not in the vicinity of the previous water ingress so were not associated with the water ingress. Rather, they were likely associated with surface dust proliferation and condensation due to poor ventilation  subfloor soil accessed through the crawl space had elevated moisture levels. Improved ventilation would likely assist with this issue  internal and external airborne samples returned similar results  ‘These results are considered satisfactory for an indoor environment such as this, and no further actions are required’  relative humidity readings throughout the home were at 65% and above. This was conducive to mould growth. On 14 August 2024, restorer KR inspected the home. KR recommended to the insurer that further drying to timber floorboards be undertaken to return them to dry standard. The affected rooms were the master bedroom, bedrooms two and three, lounge room, dining/lounge, and kitchen. KR agreed with JM’s comments concerning contents. It also said: Based on our inspection, the resultant damage appears to be caused by Storm event in Feb 2023 based on conversations with the Insured. The complainant provided several builders’ SOWs, the latest of which is DB’s SOW dated 23 July 2024, costing repairs at $35,090. On 8 August 2024, the assessor noted that the ‘required repairs are correct and match with the previous approved liability quote provided by [RB]’. However, the assessor said there was insufficient price itemisation, and that $6,600 for rubbish removal was excessive. The complainant has also provided two mould remediation quotes. The first, from hygienist MD and dated 17 June 2024 totals $48,059, but contains little detail. The second, dated 1 July 2024 by EM is fully itemised, and totals $55,255.20. $18,353.50 of that amount relates to contents remediation. Insurer to pay more for the claim I am not satisfied that RB’s SOW/quote encompasses the reasonable cost of claim related repairs payable by a consumer. The SOW/quote was prepared nearly 18 months ago so is unlikely to reflect current retail prices. I also note the assessor described it as a liability quote, which suggests it is not actionable. The assessor acknowledged DB’s SOW dated 23 July 2024 correctly outlined the required repairs. As the insurer has had ample opportunity to obtain an up-to-date quote, it is therefore reasonable to base a cash settlement of the damage repairs on DB’s SOW. Similarly, RS’s SOW/quote dated 6 June 2023 is not a satisfactory basis for cash settlement of mould remediation requirements. Simply put, it is too old. I acknowledge that the SOWs by MD and EM pre-date the reports by JM and KR. However, the reports of JM and KR are somewhat contradictory given KR refers to a need for further drying of flooring. Further, neither of them undertook surface sampling, and JM confirmed that it did not inspect areas where mould could be present such as internal wall linings. The lack of detail in MD’s SOW means it is an unacceptable basis for cash settlement. However, I am satisfied that EM’s SOW is sufficiently detailed. After deducting the allowance for contents remediation (noting the insurer has paid out the contents sum insured), EM’s costing comes to $36,901.70. The insurer has previously proposed a 20% contingency uplift. I agree that is reasonable. Accordingly, if the complainant accepts this determination, the insurer is to pay her:  $42,108.00 for building repairs (DB’s quote plus 20%), and  $44,282.04 for mould remediation (EM’s adjusted quote plus 20%). Is the insurer to reimburse costs? Yes. The complainant’s expert reports assisted her to establish an entitlement to indemnity. The insurer is to reimburse up to a total of $5,000 for the proven costs of the reports, plus proven electricity costs incurred in remediation works, and pay interest. ​AFCA may require insurer to contribute to a complainant’s professional costs ​​The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000. ​​When considering whether to require an insurer to make a costs contribution, AFCA considers matters such as the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. ​Insurer to reimburse costs The insurer initially incorrectly denied the claim. It was only as a result of the complainant’s expert reports that it eventually agreed to cover the internal damage. As noted above, the SOWs/quotes by DB and EM have also assisted the complainant in securing an entitlement to a higher cash settlement than the insurer was willing to pay. In the circumstances, upon being provided with proof of payment the insurer is to reimburse the complainant the cost of her expert reports/SOW’s up to a $5,000 maximum. Noting the claim was lodged on 29 May 2023, the standard four-month time frame for a claim decision referred to in the General Insurance Code of Practice, and for ease of calculation, interest is payable from 29 September 2023. The complainant also says that while she was in TA, electricity costs were incurred due to the insurer’s remediation activities – in particular, the operation of dryers for an extended period. I am satisfied that it is reasonable for the insurer to reimburse those electricity fees and pay interest from the date each relevant invoice was paid by the complainant. I acknowledge that the complainant says she has also incurred medical expenses as well as contents storage costs due to the mould contamination. However, I am not satisfied that AFCA is the correct venue to address personal injury claims, and the insurer has already paid out the contents sum insured. Further, to the extent these expense claims may be considered, that is best done through an award for non-financial loss compensation. The insurer is therefore not required to reimburse these expenses. Is non-financial loss compensation payable? Yes. The insurer’s poor claim handling and delays have caused significant stress and inconvenience. It is to pay $5,400 in compensation. ​AFCA can award compensation for poor claim handling ​​​​Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind Insurer is to pay non-financial loss compensation The insurer accepts that it should have handled the claim better and has offered the complainant $1,000 in non-financial loss compensation. While I acknowledge the insurer’s acceptance it’s claim handling was flawed, I am not satisfied its offer represents fair compensation for the stress and inconvenience caused. Its incorrect initial denial caused considerable avoidable delay, as did its subsequent claim handling after it accepted liability for the internal damage. I also note the complainant’s detailed outline of the impact the mould had on the health of her and B. Further, that B was kicked out of a hotel and forced to sleep in a garage on one occasion due to the insurer’s failure to renew the TA arrangements in place. In the circumstances, I am satisfied it is reasonable to require the insurer to pay $5,400 in non-financial loss compensation. Why is the outcome fair? The insurer’s partial denial is fair as the complainant has not established a claimable loss for the roof damage. It is fair that the insurer pays a higher cash settlement than it offered, to reflect current pricing. It is also fair in the circumstances that it reimburses costs and pays compensation. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.