A strata complainant sought cover for water ingress damage to common property and other units, plus about $20,000 in exploratory costs. AFCA found the damage was more likely caused by waterproofing deficiencies and faulty workmanship, which are excluded, so the insurer could deny the claim and no payment was ordered.
The complainant must prove a sudden and accidental claimable loss, and the engineering evidence showed excluded defects, so the exploratory costs cover was also not triggered.
Issues
- Claim denial primary · not upheld“Based on the exchanged information, the complainant has not established a claimable loss under the policy terms.”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
|
Case number
|
12-00-1044235
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-00-1044235 19 September 2024
Determination overview
Complaint
The complainant holds residential strata insurance with the financial firm (insurer). A claim was lodged for water damage to unit 33 (unit 33 claim) by its owner, H.
The insurer initially denied the unit 33 claim, but later accepted the resultant internal damage. The complainant also claimed for resultant internal damage to other units and to common property (the disputed claim).
The insurer denied the disputed claim. It says none of the damage was from a sudden and accidental cause. Rather, the damage was due to excluded causes including building defects and faulty workmanship. The insurer says the unit 33 claim was erroneously accepted based on incomplete information, but it nevertheless paid its cash settlement offer for that claim.
The complainant maintains that having accepted the unit 33 claim, the insurer should accept the disputed claim. It says the internal water ingress damage is due to multiple severe weather events. The complainant seeks coverage for the related repair costs and for exploratory costs it incurred in investigating the cause and extent of the damage.
The complainant is represented by H. The complainant and H are referred to below as ‘the complainant’, unless context requires otherwise.
Issues and key findings
Is the insurer entitled to deny the disputed claim?
Yes. Based on the exchanged information, the complainant has not established a claimable loss under the policy terms. Instead, the damage is more likely than not due to waterproofing deficiencies and excluded.
Is the insurer liable for exploratory costs?
No. The policy coverage for exploratory costs has not been triggered. The water ingress was not due to a leaking pipe or similar, it was caused by building defects and faulty workmanship.
Why is the outcome fair?
The outcome is fair because the insurer has correctly applied the policy terms in reaching its coverage position.
Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim. It is not required to take any other action.
Reasons for determination
Is the insurer entitled to deny the disputed claim?
Yes. Based on the exchanged information, the complainant has not established a claimable loss under the policy terms. Instead, the damage is more likely than not due to building defects and faulty workmanship and excluded.
Complainant must show claimable loss under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than not), that it suffered a claimable loss under the policy. This means it must show the loss was caused by a risk for which it is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the insured building against ‘Damage’ occurring during the period of insurance. The PDS defines Damage as ‘any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy’.
The PDS does not define ‘sudden’ or ‘accidental’. However, I am satisfied their natural and ordinary meanings are, respectively, ‘unexpected and without warning’ and ‘unforeseen and unintended’.
Multiple seemingly overlapping claims have been made. However, the unit 33 claim appears to have been lodged on 30 March 2022, with 10 January 2022 the specified date of loss. The lodgement date for the disputed claim is unclear. It relates to ten other units (1, 3, 4, 12, 17, 18, 19, 24, 29, and 32), as well as the insured building’s fire stairs and accessible roof areas.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Insurer denied the disputed claim
After inspecting the insured building on 18 July 2022, engineer IE provided the insurer with a report concerning water entry into units 33, 29 and 17, and the stairwell. IE concluded:
the exact location of the deficiencies enabling water entry remained unconfirmed
it believed the cause was deficiencies in the building’s waterproofing
there was no evidence to suggest a sudden and accidental event caused the defects
while it could not establish a precise timeline, there was no evidence to suggest the instances of water ingress were all recent occurrences.
On 5 May 2023, the complainant provided to the insurer a report dated 28 April 2023 by engineer FM concerning the damage the subject of the disputed claim. FM said:
the waterproofing of unit balconies was compromised, allowing water penetration into the slab substrate, leading to ceiling damage to the units below
most balconies had inadequate overflow provision, leading to flooding and water ingress
balcony tile movement damage was long term, due to thermal expansion and contraction and inadequate movement joint provision
gaps/exposed penetrations/cracks in the external walls enabled water ingress and damage
inadequate waterproofing of sliding doors, windows and glazed walls was contributing to the ongoing internal water damage
inadequate waterproofing and drainage to external planter boxes was also resulting in water ingress and damage
ceiling lining water stains were indicative roof waterproofing and stormwater management deficiencies
inadequate waterproofing at the junctions of external concrete slab overhangs and adjoining precast wall panels was contributing to the water ingress
water penetration along wall to slab joints and precast panel joints was indicative of inadequate weather seals
leaks in unit 29’s bathroom were due to inadequate waterproofing
bathroom tile damage in units 1, 27 and 29 was due to differential thermal expansion and contraction as well as building material deterioration.
On 3 January 2024, the insurer advised that having reviewed the reports of IE and FM and other available information, it partially accepted the unit 33 claim. The insurer said that it:
acknowledges the engineers’ findings do not clearly show this damage was caused by or related to factors which are expressly excluded by the policy. The insurer accepts a valid claim was established at face value for this damage.
According to the insurer, it was unaware as of 3 January 2024 that a claim had been lodged with its intermediary for other units (being the disputed claim). It says it subsequently received a building defects report dated 22 February 2022 building consultant BC prepared for the complainant. It appears that the report had been provided to the intermediary in May 2022.
BC had inspected the insured building on 16 July 2021, 24 August 2021, 1 November 2021, and 18 February 2022. BC outlined ongoing water ingress issues for the reasons FM identified in its report dated 28 April 2023.
The insurer says the complainant has not established a claimable loss under the policy as it has not shown the damage the subject of the disputed claim was from a sudden and accidental cause. Instead, it says the disputed claim is excluded because the PDS states on pages 21 and 22 that the policy does not cover:
damage caused by or arising directly or indirectly from maintenance issues, wear and tear, developing flaws, or gradual deterioration
damage caused by or arising directly or indirectly from inherent or latent defect
damage caused by non-rectification of a defect the insured was or should reasonably have been aware of
the cost of rectifying faulty or defective materials, workmanship, design or specification.
The insurer says that in the circumstances the unit 33 claim should not have been partially accepted, but as it had been, it would honour its cash settlement offer. It has paid the relevant amount to H.
Complainant says disputed claim should be accepted
The complainant maintains that the insurer should accept the disputed claim because:
according to H, ‘the various building reports were procured by the Owners Corp [sic], and these later proved to be deficient both in the scope of the assessments undertaken, and the findings’
BC’s inspections took place before the damage the subject of the disputed claim occurred
the claim is for resultant damage arising from severe weather events
the damage to the units was sudden and unexpected
the reports relied on the insurer have not established it is more likely than not the damage was caused by defects in the roof or elsewhere
the insurer conceded that was the case in accepting the resultant damage under the unit 33 claim
as a matter of logic, the insurer should therefore accept all damage of a similar nature
by not doing so, the insurer was in breach of its duty of utmost good faith.
Insurer is entitled to deny the disputed claim
Based on the exchanged information, I am not satisfied the complainant has established a claimable loss under the policy terms. Instead, the damage is more likely than not due excluded defects and faulty workmanship. This is because:
the reports of BC, IE and FM are consistent in identifying the cause of the water ingress affecting the various units and common areas as waterproofing deficiencies
the water ingress was a long term and ongoing problem, noting BC first inspected the insured building in July 2021
I find the reports of BC, IE and FM persuasive, particularly in the absence of any contrary expert opinions
H’s submission the building reports the complainant obtained (presumably, those by BC and FM) were deficient in scope and findings have not been particularised and no evidence in support has been provided
I am not satisfied that BC’s inspections took place before any damage was sustained. Even if that was so, BC’s defect findings carry weight as they were confirmed as causative by IE and FM, both of which certainly inspected the building after damage was sustained
no details or evidence have been provided in relation to the severe weather events said to have caused the damage
in an email sent to the insurer’s intermediary on 12 June 2022, H conceded that ‘… the damage has been caused by faulty workmanship and a failure to address/investigate the issues by strata management… I don’t think the costs of repair should lie with the residents in this instance, given the incredible failures of the builder/developer and now strata management’
the insurer’s (incorrect) acceptance of the unit 33 claim does not of itself oblige it to accept the disputed claim.
Accordingly, the insurer is entitled to deny the disputed claim.
Is the insurer liable for exploratory costs?
No. The policy coverage for exploratory costs has not been triggered. The water ingress was not due to a leaking pipe or similar, it was caused by building defects and faulty workmanship.
Policy covers exploratory costs in specified circumstances
As set out on page 20 of the PDS, the policy covers reasonable:
exploratory costs an insured necessarily incurs in locating the source of bursting, leaking, discharging or overflowing tanks, apparatus or pipes used to carry water or other liquid
costs incurred in repairing damage caused by the exploratory work
costs up to $1,000 incurred in repairing or replacing the defective tank, apparatus or pipe
costs up to $1,000 incurred in rectifying contamination caused by the escape of liquid.
However, the policy does not cover any of those costs if the escape of liquid is from specified causes, including building defect, faulty workmanship, gradual deterioration, or wear and tear.
Insurer is not liable for exploratory costs
The complainant says it incurred around $20,000 in in investigating the cause and extent of the damage. It says the insurer should reimburse it.
However, the water ingress was not from a bursting, leaking, discharging or overflowing tank, apparatus or pipe used to carry water. Further, the water ingress was caused by building defects and/or faulty workmanship.
Accordingly, the exploratory costs cover under the policy has not been triggered.
Why is the outcome fair?
The outcome is fair because the insurer has correctly applied the policy terms in reaching its coverage position.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.