Cash settlement amount and scope of works for escape of liquid damage, plus claim mishandling
Text of the determination
Determination
|
Case number
|
12-00-1041176
|
Financial firm
|
AAI Limited
Case number: 12-00-1041176 16 December 2024
1 Determination overview
1.1 Complaint
This complaint relates to a claim by the complainant under his home and contents insurance policy held with the financial firm (insurer), for damage to the insured property caused by an escape of liquid.
The Certificate of Insurance (COI) names two joint policy holders, the complainant and his wife (Ms J).
The insurer accepted the claim and paid the complainant a cash settlement, on the basis that the repairs could not be warranted due to some identified building defects and pre-existing damage. Ms J accepted the cash settlement, although the complainant did not wish to accept the offer.
The parties disagree about the scope of works (SOW) necessary to repair the damage to an appropriate standard, and the reasonable cost of repairs.
The complainant also says the insurer mishandled the claim by improperly deciding to cash settle the damage, and that it engaged in misleading and deceptive conduct and made misrepresentations in the course of the claim management.
1.2 Issues and key findings
Is the insurer’s cash settlement offer fair and reasonable?
The panel considers the insurer‘s cash settlement offer for building and contents damage is fair and reasonable, although it must increase its settlement offer for the building damage by 25% to compensate the complainant for the loss of the lifetime warranty on the repairs.
Is the complainant entitled to the extra costs claimed?
No. The panel is satisfied the policy does not cover these costs and it is not fair to require the insurer to reimburse the complainant for them.
Did the insurer mishandle the claim?
Yes. The information shows the insurer mishandled the claim. The panel considers $4,000 compensation for non-financial loss is warranted in the circumstances.
Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim.
Where the insurer has mishandled the claim causing delay and undue stress to the complainant, it is fair to require it to compensate the complainant for his non-financial loss.
1.3 Determination
This determination is substantially in favour of the insurer.
Should the complainant accept this determination, within 14 days of being notified of his acceptance, the insurer is to pay the complainant the following amounts, if it has not already done so:
$4,425.46 for the building repairs
$17,372.27 for restoration works
25 % uplift on the total building cash settlement amount of $93,450.94, being $23,362.74
$11,953.64 for contents
$2,445.20 reimbursement for agreed restoration works.
The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable as follows:
calculated on the amounts 1.1 - 1.4 from the date of the first cash settlement offer on 26 October 2023 until the date payment is made
calculated on the amount of $71,653.18 (the building damage cash settlement amount accepted by Ms J) from the date of the first cash settlement offer on 26 October 2023 until the date the payment was made in June 2024
calculated on $2,445.20 from the date the insurer received the paid invoice to the date payment is made.
Given both policy holders have been involved in the claim process, albeit to differing extents, and the settlement payment already made was made into their joint account, the panel considers it appropriate in the circumstances for the insurer is to seek instructions from both the complainant and Ms J regarding the payment of the above amounts.
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address all issues.
Both parties provided numerous submissions, reports and documents to AFCA. While this determination does not refer to all those materials, the AFCA panel has read them all and taken them into account in reaching their decision.
AFCA may request parties to a complaint to provide information relevant to the issues in dispute. However, AFCA cannot compel parties to provide information, although we can draw adverse inferences when appropriate.
The insurer has identified, and provided, the information it relied on in assessing the claim. The reasonableness of that position can therefore be tested by reference to the information the insurer relied on, rather than assessing the weight to give to the complainant’s request for information not provided.
The panel is satisfied there is sufficient information exchanged between the parties to properly assess the complaint and the issues in dispute.
2.1 Is the insurer’s cash settlement offer fair and reasonable?
The panel considers the insurer‘s cash settlement offer for building and contents damage is fair and reasonable, although it must increase its settlement offer for the building damage by 25% to compensate the complainant for the loss of the lifetime warranty on the repairs.
Coverage of the policy
The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant.
Insured events include “Escape of Liquid.”
The PDS details:
Escape of liquid
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
...
• any drain, fixed pipes, drainage and sewage systems (not forming part of a shower cubicle wall, floor or base);
...
Page 33 of the PDS lists several general exclusions that apply to all cover including:
We do not cover
• the cost of repairing or replacing the item from which the liquid escaped (e.g. a cracked pipe or leaking tap);
...
• wear, tear and gradual deterioration or loss or damage as a result of a gradual process of liquid leaking, splashing, dripping or overflowing;
• loss or damage to, or caused by, a leaking shower floor or base, leaking shower cubicle walls, leaking shower glass screening or doors, leaking open shower floor areas or other wet areas;
...
• loss or damage caused by wear, tear and gradual deterioration, rust, fading, rising damp, mould, mildew, corrosion or rot;
...
It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Circumstances of the loss and claim
The complainant lodged the claim on 9 July 2023, advising that he returned home from a holiday to discover water leaking from under the sink in the kitchen and that his home was flooded.
It is not in dispute that the event is covered by the policy, and that the complainant’s home sustained damage due to the leak. The parties disagree on the extent of the damage caused by the leak.
Following lodgement of the claim, on 9 July 2023 the insurer engaged its own trades RC and BB to attend the property for initial assessment and make safe.
RC re-attended the property on 3 August 2023 to assess the extent of the damage due to the leak.
RC confirmed the leak had caused damage to several areas including damage to the kitchen cabinetry, particleboard flooring in the kitchen, dining and living room.
RC engaged a plumber for leak detection testing of the bathroom, who confirmed the waterproofing membrane to the shower recess has failed.
RC said due to the following maintenance issues, it is unable to warrant repairs:
ceramic tiles laid over and particleboard yellow tongue flooring
no expansion joint between the concrete slab and the yellow tongue flooring
failed waterproofing membrane to the shower recess
pre-existing defects to the cypress pine floorboards
age related wear and tear to the skirting boards and kitchen joinery
joinery end panels are sitting in the substrate with a ceramic floor tile have been tiled around.
Based on the RC report the insurer sought to cash settle the claim because RC could not provide a warranty on the repairs.
An initial cash settlement was paid by the insurer by cheques on 26 October 2023 to the complainant and Ms J. The complainant rejected the offer, and the cheques were returned to the insurer on 27 November 2023.
Complainant arranged damage report and quote for repairs
The complainant arranged his own report and quote for repairs. He engaged builder CC who inspected the damage and provided a SOW and quote dated 23 October 2023, although the complainant did not provide a copy of the quote to the insurer until April 2024.
CC noted the following water damage to the following areas detected using thermal imaging:
the non-structural wall adjacent to the fridge in the kitchen
the non-structural wall adjacent to the pantry in the kitchen, which is a common wall with bathroom
the pantry in the kitchen, evidenced by the swollen cabinetry
the linen cupboard via the cupboard door, evidenced by the swollen floor
access panel
the entry door of the bathroom which has a raised floor which is immediately adjacent to the linen cupboard.
The CC quote includes a complete bathroom replacement and says the waterproofing system has been compromised and repairs involve demolishing the bathroom, stripping the current waterproofing and starting again.
CC provided a quote for repair for $153,780 which includes a 20% builder’s margin.
Insurer arranged second assessment
The insurer arranged a second assessment to be carried out at the complainant's property on 14 April 2024. It says the purpose of the second assessment was to assess the damage caused by the escape of liquid and provide an alternate opinion on the required repair works and an opinion as to whether it could warrant the repairs.
The insurer appointed panel builder AC to undertake the second assessment.
AC identified water damage to the kitchen and other parts of the home.
It was AC’s opinion that damage to the bathroom was due to failed waterproofing and not related to the escape of liquid event. AC says:
the bathroom area has a degraded and rotting architrave on the inside of the bathroom indicating long term damage
there is a damage to the flooring joist under the bathroom flooring and water staining to a section of floor joist in the centre of the bathroom where water runoff from the leak event would not have been able to reach
the water stain is not continuous from the timber floored section and originates in a section in the middle of the bathroom flooring which would indicate water is coming directly from above
the level of damage to this area is not consistent with water staining present on other flooring members which indicates that damage to this area predates the kitchen leak event.
AC concluded that the failed waterproofing and bathroom damage are not related to the leak from the kitchen sink and that it predates the claimed event, and that they are unable to warrant any repairs due to the pre-existing maintenance issues.
After some negotiations between the parties, and based on the AC SOW, the insurer proposed a building settlement amount of $65,224.94 inclusive of a 15% builder's margin.
The complainant says the usual builder's margin in his area is 20%, however he has not provided any information to support this, aside from the CC quote which includes a 20% margin.
Insurer made a second cash settlement offer
Following the second assessment, and on receipt of the AC report stating they also could not warrant the repairs, the insurer determined that it could not use a builder from its supplier network to undertake repairs of the complainant’s property and again offered to cash settle the claim.
The complainant maintained he did not agree to a cash settlement; however the joint policy holder Ms J accepted and approved a settlement offer of $126,593.21 from the insurer on 7 June 2024. Ms J advised the insurer via email that the complainant agreed with the payment being made into their joint account, and the complainant was copied into that email.
The settlement accepted by Ms J was comprised of the following:
building repair $60,799.48 (prior to inclusion of linen cupboard and stone benchtop in SOW)
restoration works $10,853.73
temporary accommodation $54,940.00.
The complainant says the insurer should not have cash settled the claim when it was aware he did not agree with the proposed settlement.
While the panel accepts that the joint policyholder Ms J has as much right as the complainant to deal with the policy, the insurer knew that the complainant was the main person driving the claim, and that he was the complainant in the open, unresolved AFCA complaint.
Moreover, the complainant had made it clear, prior to funds being transferred, that he would not accept the cash settlement as resolving the claim or complaint.
Where there is more than one policy holder, the PDS says the following:
We will treat a statement, act, omission, claim, request or direction ... made by one policyholder ... as a statement, act, omission, request or direction by all policyholders.
However, the PDS also explicitly contemplates a situation where the insurer will require input from both policyholders:
There are, however, some exceptions to this. During the period of insurance, we might ask all joint policyholders before we action a request or direction in relation to your policy (e.g. before we cancel your policy, reduce your cover or remove another policyholder). This way we can help protect the interests of all policyholders.
The panel considers this was such a situation, and the insurer should have exercised its express power to ask both joint policyholders before actioning the request to cash settle the claim.
Taking all the above matters into account, it was not fair, reasonable, or consistent with its PDS for the insurer to seek to circumvent the complainant with respect to the cash settlement, and the panel does not consider the cash settlement paid on Ms J‘s instructions finalised the claim.
Policy allows for cash settlement where insurer cannot complete repairs
Based on the two assessments conducted by the insurer, it determined that it was not possible for it to use a builder from its supplier network to undertake repairs of the complainant’s property.
The PDS details how claims will be managed in these circumstances at pages 92 and 93 as follows:
HOW WE SETTLE HOME CLAIMS
We will aim to use a member of our builder supplier network to repair or rebuild the damage to the home. Sometimes this is not always possible e.g. if there is a building defect that prevents us from undertaking the repairs. This will determine how the home claim will be settled.
....
When a member of our supplier network is unable to complete the repair or rebuild
When your claim for loss or damage to the home is covered and a member of our supplier network is unable to complete the repair or rebuild, we will ask you to engage a builder to provide a scope of works and provide a quote on the cost to repair or rebuild the home on a ‘new for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be assessed. This will involve reviewing the quote to determine it is appropriate and reasonable for the scope of works. This includes a consideration of the appropriateness of materials, repair method, labour and material costs and overall cost effectiveness .If the quote is appropriate and reasonable for the scope of works, we will then pay you the assessed amount. If it is not, the quote may be adjusted. This may include adjusting the scope of works or the quote. We will then pay you the adjusted amount of the quote.
If we pay you for the repair or rebuild, the Lifetime guarantee on home repairs does not apply
When we settle the home claim we will not:
...
• pay extra to repair or rebuild the home to a better standard, specification or quality than it was before the loss of damage occurred, except as stated in the meaning of ‘new for old’ on page 94 or unless otherwise stated in your policy;
• fix inherent defects, structural defects, structural faults and/or faulty/poor workmanship that are not covered by your policy (see section 3 ‘Things we don’t cover’ on page 34), other than a defect or fault that we guarantee under this policy;
• pay extra to repair or rebuild undamaged parts (some limited cover is available in ‘Matching undamaged parts’ see page 76);
• fix or pay to fix pre-existing damage (unless your policy provides otherwise).
The policy allows for a cash settlement where repairs cannot be warranted, and it sets out a process to be followed when this occurs.
Although the insurer did not follow the correct process, the policy is clear and unambiguous that it can settle the claim by way of cash settlement where a member of its supplier network is unable to complete repairs.
Both RC and AC said they could not warrant the repairs. The panel is satisfied both RC and AC are qualified builders and are appropriately qualified to make that assessment. In these circumstances the insurer is entitled to cash settle the claim under the policy.
Information shows, on balance, some damage not caused by the escape of liquid
In terms of establishing the damage that has been caused by the event, and therefore a fair and reasonable cash settlement amount, the complainant has the initial onus to demonstrate a loss that is covered by the terms and conditions of the policy.
The complainant provided a brief report from builder CC regarding the damage to the property. CC says the bathroom needs complete replacement as a result of the escape of liquid, although does not provide any reasons as to why they say the failure of the waterproofing has been caused by the escape of liquid.
The panel is satisfied that the reports from RC and AC, including the leak detection testing undertaken, are thorough, logical and compelling, and supported by helpful photographs.
In the panel‘s view, the insurer's reports have established that the damage to the bathroom has not been caused by the escape of liquid event. Rather, RC and AC have established that the damage has been caused by a failure of the waterproof membrane in the shower which is not related to the event.
The panel is satisfied that the policy does not provide coverage for this damage.
Regarding the bathroom damage, the complainant has not met his onus to establish a loss covered by the terms and conditions of the policy.
Further, the cause of the damage, failed waterproof membrane in the shower, is specifically excluded from coverage under the terms and conditions of the policy.
The result is that the insurer is entitled to partially deny the complainant’s claim for damage to the bathroom, and the costs to replace the bathroom should not be included in the SOW or therefore form part of the cash settlement.
The complainant also provided an invoice for electrical works carried out on 13 May 2024 for $715, however there is no information to show these works are related to the damage caused by the escape of liquid.
The panel is not satisfied, on balance, the complainant has established these electrical works were required due to damage caused by the escape of liquid event, and the insurer is entitled to deny the claim for this damage.
Settlement for building costs is fair and reasonable
The insurer engaged two builders, RC and AC, who both inspected the premises, and the final SOW includes damage noted on each inspection.
While the insurer did not follow the correct process in arriving at the cash settlement, the policy allows for the insurer to cash settle the claim where its panel builders are unable to do the repairs due to a building defect or pre-existing maintenance issues.
Neither RC nor AC were prepared to warrant the works at the complainant‘s property due to the pre-existing maintenance issues.
The policy provides for the complainant to obtain a SOW and quote in these circumstances, and for the insurer to assess the quote.
The complainant‘s quote prepared by builder CC is not itemised and includes damage not caused by the event. The panel does not consider this quote to be a fair and reasonable basis for the cash settlement.
The panel is satisfied, on balance, that the AR SOW accurately reflects the damage caused by the escape of liquid. In the interests of bringing the dispute between the parties to an end, the panel considers a settlement based on the insurer’s SOW to be a fair and reasonable basis for a cash settlement.
However, a cash settlement must allow for an uplift for the transfer of the risk of repairs and for the loss of the lifetime warranty on the repairs. In the circumstances, the panel considers an uplift of 25% is fair to compensate the complainant for these things.
Settlement for restoration costs is fair and reasonable
The insurer provided a SOW for the restoration works and paid Ms J $10,853.73 for these works in June 2023.
Since that date, the complainant provided two quotes from restorer PP on 2 November 2024 for $16,476 and $15,740 for what he says is the cost of the outstanding restoration works.
The insurer says the quote appears to be higher than it would consider reasonable for the required restoration repairs. However, in the interest of progressing the matter to finality, the insurer agreed to increase its settlement offer to align with the quotes provided by the complainant.
The insurer increased its settlement offer paid to Ms J by $17,372.27 to $32,216.00 for the restoration works in line with the PP quotes.
The panel notes much of the strip out was included in the AR SOW is duplicated in the PP quote. However, the insurer did not deduct amounts where its scope of works included removal and replacement of items in the same line as it was unable to obtain individual costings for removal only in the time available.
Prior to obtaining the PP quotes the complainant raised concerns regarding an inadequate make safe on 9 July 2023. The complainant obtained a mould report and a quote for works ’to secure or clean off the mould that is forming at his property’ for $2,455.20.
The exchanged information shows the insurer agreed to reimburse the complainant for this cost, however, he later provided an invoice for the works which were carried out on 15 April 2024 for $4,963.00.
Because the insurer agreed to pay $2,455.20 prior to the complainant incurring this expense, it is fair for the insurer to pay this cost in addition to its settlement offer for the remediation works.
The complainant has not provided any explanation for the increase in the cost, and the works appear to duplicate some items in the PP quote.
Given the insurer has agreed to pay the complainant the amount in the two PP quotes which covers the ’cleaning off of mould‘, the panel does not consider it fair for the insurer to pay the additional amount.
Contents claim
AC assessed damage to the complainant’s contents, and provided a list of non salvageable items.
The complainant sought to add the following items to the list:
sony Blue Ray Disk Player (UBP-x800) $628
denon AVR1912 valued at $1,699
ikea sofa valued at $1,900.
While the information shows the insurer tested the electrical items and the Blu-ray player and AVR1912 passed the testing, it agreed to pay the claim for these items, offering a cash settlement for the contents claim of offer of $11,953.64.
The panel considers the cash settlement offer for the contents to be fair and reasonable in the circumstances.
Insurer is required to make additional payments to the complainant to settle the claim
Given the above, if it has not already done so, the insurer is required to make the following payments to the complainant in addition to the cash settlement payment already made in October 2023 for
1.1 $4,425.46 for the building repairs
1.2 $17,372.27 for restoration works
1.3 25 % uplift on the total building cash settlement amount of $93,450.94, being $23,362.74
1.4 $11,953.64 for contents
1.5 $2,445.20 reimbursement for agreed restoration works.
The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable is payable as follows:
calculated on the amounts 1.1 - 1.4 from the date of the first cash settlement offer ion 26 October 2023 until the date payment is made
calculated on the amount of $71,653.18 (the cash settlement amount for the building claim accepted by Ms J) from the date of the cash settlement offer on 26 October 2023 until the date the payment was made in June 2024
calculated on $2,445.20 from the date the insurer received the paid invoice to the date payment is made.
The panel considers that had the insurer followed the cash settlement process detailed in the PDS the claim would likely have settled on or around the date of the first cash settlement offer. Therefore, it is fair for the insurer to pay interest from this date.
The panel notes the insurer has settled the complainant the maximum benefit under the policy for temporary accommodation. The insurer is not required to pay any further amount for temporary accommodation.
2.2 Is the complainant entitled to the extra costs claimed?
No. The panel is satisfied the policy does not cover these costs and it is not fair to require the insurer to reimburse the complainant for them.
Complainant seeks reimbursement of his claim management costs
The complainant is seeking the insurer to reimburse him the extra costs he says he incurred as a result of the escae of liquid. These include:
claim management costs in excess of $200,000
pest inspection and treatments costs
cleaning costs
mould testing costs.
Policy specifically excludes extra costs
Page 35 of the PDS states:
We do not cover:
Extra costs or other losses following an incident covered by your policy
extra costs or other losses (financial and non-financial loss) following an incident covered by your policy, including but not limited to:
• loss of income or wages;
...
• costs, including the cost of your time, to prove your loss or to help us with your claim (e.g. phone calls, postage) unless stated otherwise in your policy;
...
• professional, expert, legal, consulting or valuation costs, unless you obtained our prior authority to incur these costs;
• cost of replacing or reapplying pest control chemicals and baits in or around the insured address;
...
• cleaning costs, unless stated otherwise in your policy;
AFCA can award professional costs in some circumstances
Paragraph D.5 of the AFCA Rules provides that we may determine an insurer should contribute up to $5,000 towards a complainant’s professional costs in pursuing a complaint.
AFCA aims to provide a dispute resolution process which is accessible to complainants, without the need for professional advisors. Accordingly, professional costs will only be reimbursed where external advice is reasonably required, given the nature of the dispute.
Panel is not satisfied, on balance, award of professional costs is warranted
The claim management costs were supported by unitemised invoices from the complainant’s company totalling more than $200,000. The invoices describe the services rendered as being:
Contract, Project, Claim and related services
It is unclear exactly what work was undertaken by the complainant’s company on behalf of the complainant, however the panel does not consider the claim and issues in dispute were sufficiently complex to warrant an award of professional fees, and the insurer is not required to reimburse the complainant for these costs or any part of them.
The complainant submitted an invoice for mould sampling at the property on 26 May 2024. The complainant has not provided the results from any testing undertaken on the samples. Therefore, the mould sampling did not assist with this resolution of the complaint in any way, and the panel does not consider it fair for the insurer to reimburse the complainant for these professional costs.
Cleaning and pest treatment costs are excluded by the policy
The complainant submitted an invoice for cleaning dated 13 October 2024. The invoice provides no information about how these costs were event related, and these costs are specifically excluded under the policy. The insurer is not required to pay these costs.
The complainant submitted an invoice for a pest inspection carried out on 12 October 2024 and a quote for further pest treatment works. The report does not indicate that these costs were related to the event, and these costs are specifically excluded under the policy. The insurer is not required to pay these costs.
2.3 Did the insurer mishandle the claim?
Yes. The information shows the insurer mishandled the claim. The panel considers $4,000 compensation for non-financial loss is warranted on the circumstances.
AFCA can award up to $5,400 compensation for non-financial loss
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400 for claims lodged before 1 January 2024) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim.
Complainant says the insurer misled him
The complainant says the insurer misled and deceived him and made misrepresentation at the dual assessment by its employees JA and MW making the following representations:
that the insurer was responsible for the delay and that the insurer falsely represented that the complainant caused the delay
that the complainant’s tiled kitchen floor was not compliant with the National Construction Code (NCC)
that the insurer could not replicate the damaged kitchen
that the insurer would explain and document its position fully to the insured in writing
that repairs would require 4 to 8 weeks to complete.
The complainant asked the insurer to provide statements from its employees and contractors who were present at the site meeting. The statements show that the recollections of all those in attendance differ from the complainant‘s recollection.
Given the above, the panel is not satisfied, on balance, that the complainant has shown that the insurer, via its agents, made any misrepresentations or engaged in deceiving or misleading conduct.
Even if the insurer’s agents did make these statements, they are not in the nature of misleading and deceptive conduct that led the complainant into error. The complainant has not provided any information to show he relied on these statements to his detriment. Further, the duty of utmost good faith does not always prevent an insurer from retracting an earlier representation as the complainant contends.
Insurer failed to follow cash settlement process set out in the PDS
While it is not satisfied the insurer engaged in misleading or deceptive conduct, the panel is satisfied the insurer mishandled the claim.
As stated, the policy allows for the insurer to cash settle claims where its builders cannot warrant the repairs. When this occurs, the policy sets out the process that is to be followed by the insurer. The insurer failed to follow this process.
The insurer did not inform the complainant in a timely manner that as their builders were unable to complete the repairs, that he should find his own builder to prepare a SOW and quote and that the insurer would assess that quote.
The insurer persisted with using its own builder’s SOW and its own assessment of that SOW and quote as a basis of establishing a cash settlement, both the first cash settlement in October 2023 and the second cash settlement accepted by Ms J in June 2023.
Further, the panel does not consider it was fair, reasonable, or consistent with its PDS for the insurer to pay the June 2024 cash settlement to Ms J when the complainant, who had been managing the claim, clearly stated he did not accept the settlement offer.
The complainant did obtain his own quote but seemingly not at the instruction of the insurer.
If the insurer followed the correct process set out in the policy, which also ends in a cash settlement, it would have been clear to the complainant how the claim was to be settled and it is likely the claim would have proceeded to settlement in a timelier fashion.
As it happened, the claims process was delayed for more than a year which caused considerable stress to the complainant and his family.
The panel also notes that the initial make safe was not thorough and adequate which caused additional stress to the complainant.
The insurer has offered $1,000 compensation in recognition of the complainant’s poor claim experience.
The panel considers this amount to be inadequate given the delays and stress the insurer’s conduct caused the complainant. The panel considers payment of $4,000 compensation for non-financial loss is warranted in the circumstances.
2.4 Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim.
Where the insurer has mishandled the claim causing delay and undue stress to the complainant, it is fair to require it to compensate the complainant for his non-financial loss.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.