Denial of claim for mould damage said to result from inadequate remediation of earlier claims
Text of the determination
Determination
|
Case number
|
12-00-1039919
|
Financial firm
|
RAC Insurance Pty Limited
Case number: 12-00-1039919 18 August 2025
1 Determination overview
1.1 Complaint
The complainants held a home building and contents insurance policy with the financial firm (the insurer).
The complainants lodged multiple claims with the insurer between 2016 and 2022 for water ingress events, including escape of liquid and storm damage. All claims were accepted and the insurer completed make-safes and repairs.
In December 2021 the complainants reported mould contamination at the property, which they say was related to previous claims and the insurer’s failure to adequately remediate the property. The insurer denied the claim for further mould damage, which it says was caused by dust build up, condensation and gradual deterioration.
1.2 Issues and key findings
Is the insurer required to complete mould remediation?
Yes. The exchanged information shows the mould was more likely than not caused by the insurer’s failure to adequately remediate the property.
Are the complainants entitled to professional costs?
Yes. The insurer is required to pay the costs of the complainants’ expert reports up to a maximum of $5,000. This does not include the complainants’ representative’s costs.
Are the complainants entitled to accommodation costs?
Yes. The insurer should cover the complainants’ temporary accommodation costs because it was the insurer’s failure to adequately remediate the property that caused the complainants to need alternative accommodation.
Is the insurer required to pay non-financial loss compensation?
Yes. The available information shows the insurer’s failure to remediate the property caused the complainants significant stress and inconvenience.
Why is the outcome fair?
It is fair for the insurer to provide cover and compensate the complainants for loss and damage that resulted from its failure to adequately remediate the property.
1.3 Determination
This determination is in favour of the complainants. The insurer is to settle the claim in accordance with the requirements set out in sections 2.2 to 2.4 of this determination.
2 Reasons for determination
The complainants are represented by a paid representative. For convenience, any representation made on their behalf is referenced as being from ‘the complainants’.
2.1 Is the insurer required to complete mould remediation?
Yes. The exchanged information shows the mould was more likely than not caused by the insurer’s failure to adequately remediate the property.
Complainants say they found mould following multiple claims on policy
As both parties are familiar with the background to the current dispute, the panel will not restate the full history. In summary:
· the complainants lodged multiple claims with the insurer between 2016 and 2022 for water ingress events, including escape of liquid and storm damage
· the insurer accepted the claims and remediated the property, including drying, building repairs, and replacing affected fixtures and contents
· in late 2021, the complainants raised concerns about mould contamination
· the complainants say the insurer failed to adequately remediate mould following the previous claims, resulting in cross-contamination throughout the property
· the insurer denied liability for the current mould damage
· the insurer says the property was adequately remediated after previous claims and the mould was caused by condensation, poor ventilation and poor housekeeping (which it says are excluded under the policy).
Experts disagree on cause of mould
The insurer relies on a report from environmental consultancy expert (PR). PR says the mould was:
· caused by design defects, condensation, poor ventilation and poor housekeeping
· unrelated to the insured events or previous remediation efforts.
The complainants rely on a report from expert mycologist (MY), which says:
· inadequate remediation caused the cross-contamination in the property
· the property is unfit for occupation.
The panel is satisfied both experts are appropriately qualified.
PR’s report does not adequately explain or provide sufficient supporting information about:
· what ‘living habits’ or ‘poor housekeeping’ it says caused the mould
· how elevated mould levels could result from lifestyle factors
· a clear alternative cause for contamination in Bedrooms two, three, and four
· how the mould genera found in those rooms could originate from non-claim-related sources.
Nor did PR:
· assess concealed areas such as wall cavities
· conclusively demonstrate that containment measures used during remediation were effective.
In contrast, MY found the property to be in a state of abnormal fungal ecology (Grade 3–4 contamination under AMG 2010), with elevated Penicillium sp. and Cladosporium sp. levels in nearly all internal rooms, consistent with cross-contamination from previously affected areas. MY also ruled out environmental conditions as the primary cause and recommended full structural remediation.
Insurer not entitled to rely on policy exclusions
The insurer relies on exclusions including for gradual deterioration and lack of maintenance. However, the panel is not satisfied the exchanged information shows that any of these factors were, more likely than not, present or caused the damage. This is because:
· there was insufficient information to support claims of poor housekeeping or unhygienic habits
· PR’s report lacks a clear causal link between lifestyle factors and the current contamination
· the insurer failed to conduct clearance testing after previous remediations or assess concealed areas, relying solely on visual inspection to conclude that the remediations had been successful.
Given these gaps, the panel is not persuaded that the contamination arose independently of the previous claims or was caused by excluded factors. Therefore, the insurer cannot rely on these exclusions to deny the claim.
Insurer not entitled to deny the claim
Based on the exchanged information, the panel is not satisfied the property was returned to a state of normal fungal ecology after previous remediations the insurer had arranged. This is because, after the insurer arranged previous remediations, it:
· relied only on visual inspection to assess the adequacy of the remediation
· did not conduct clearance testing
· did not assess wall cavities.
In these circumstances and consistent with MY’s findings, the panel is satisfied that, more likely than not:
· the insurer did not take reasonable steps to verify the adequacy of its remediation
· the insurer’s previous remediation efforts were inadequate
· the current mould contamination was caused by failed remediation following previous accepted claims.
This is because the panel accepts that MY’s report is well-reasoned and supported by appropriate testing in reaching conclusions including that:
· the property had abnormal fungal ecology, rated Grade 3–4 contamination under the Australian Mould Guidelines (AMG 2010)
· Bedrooms three and four were the contamination source, with Penicillium sp. levels over 150 colonies (vs. <6 outdoors)
· elevated Penicillium was found in all internal rooms except the games room, indicating cross-contamination throughout the property.
· cladosporium sp. was present indoors but absent outdoors, supporting indoor mould growth
· indoor temperature and humidity were within normal ranges, ruling out environmental factors.
For instance, MY’s findings were supported by objective data, rather than subjective visual inspection alone.
The panel acknowledges the insurer says cross contamination was unlikely. However:
· the insurer’s records show that Bedrooms two, three, and four were previously remediated following accepted claims
· the recurrence of mould in these areas supports the complainants’ view that remediation efforts were not adequate
· the panel is satisfied that MY’s explanation that failure to adequately remediate these areas led to cross-contamination throughout the property, is plausible.
The panel also acknowledges the insurer says the elevated airborne spores in all bedrooms were not excessive. However, the panel accepts MY’s findings that airborne spores in Bedrooms one and four were very high and that the property should not be occupied, are supported by credible testing by an appropriately qualified expert.
Therefore, the insurer must accept and settle the claim under the policy terms. If remediation costs exceed the property’s sum insured, this limitation does not apply. This is because the costs result from the insurer’s actions, rather the insured event, and therefore fall outside the policy terms.
Insurer is required to accept claim for mould damage to the building
Within 14 days of being notified of the complainants’ acceptance of this determination:
· the insurer is required to provide a choice of three hygienist / remediation specialists who are independent and have not previously been involved with the claim, to the complainants
· if a builder is also required, the insurer is required provide the complainants with a choice of three independent builders who have not previously been involved with the complainant, to the complainant.
Within 7 days of receiving the list of experts, the complainants are required to communicate their choice to the insurer.
Within 14 days of being notified of the complainants’ chosen experts, the insurer is required to engage them to provide a scope of works.
Within 14 days of receiving the scope of works, the insurer is required to engage a builder to provide an actionable quote.
Within 14 days of receiving the actionable quote, the insurer is required to advise the complainants if it will:
· cash settle the complaint (in which case it is required to make the cash settlement), or
· conduct the repairs in accordance with the terms and conditions of the policy (in which case it is required to organise the repairs).
If the insurer choses to cash settle the clam, it must provide the complainants with a 20% uplift on the quoted remediation cost, to allow for the transfer of risk, unforeseen contingencies and the loss of the lifetime guarantee.
Complainants to provide further information about contents
The complainants say they incurred costs in purchasing new furniture, clothing, appliances and other contents and personal items.
The panel does not consider there is sufficient information to establish what these costs were or why they were incurred.
Within 14 days of accepting this determination, the complainants are required to provide the insurer with:
· information about why these costs were incurred and the insurer is liable for them
· information substantiating these costs, such as receipts, invoices or other documentation.
The insurer is then required to make its decision about this part of the claim in accordance with the terms and conditions of the policy without undue delay.
Should a dispute arise of the settlement amount offered to the complainants, they will be entitled to lodge a further AFCA complaint.
2.2 Are the complainants entitled to professional costs?
Yes. The insurer is required to pay the costs of the complainants’ expert reports up to a maximum of $5,000. This does not include the complainants’ representative’s costs.
The complainants are entitled to reimbursement of expert costs
The AFCA Rules allow for the payment of the complainants’ professional costs in pursuing the matter. We may decide the insurer contribute to the professional costs incurred by the complainants during the complaint. Unless exceptional circumstances apply, we will not require the insurer to contribute more than $5,000 to these costs.
In deciding whether the insurer should contribute for the cost of this report, we consider what is fair in the circumstances. We consider the complexity of the complaint and whether the complainants genuinely required expert assistance.
The complaint was complex. The insurer had the benefit of expert reports and the complainants’ expert information, particularly the MYC report, was relevant and assisted the panel in determining the complaint. Therefore, the panel is satisfied the insurer should reimburse the complainants for these costs as required below.
However, the panel is not satisfied that the costs of the complainants’ representatives should be reimbursed. This is because the panel is not satisfied the complainants required the assistance of a professional representative, noting that AFCA is a free service that is designed to be informal and accessible.
If the complainants accept this determination, they are required to provide the insurer with evidence of the costs of expert reports they incurred.
Within 14 days of receiving this information, the insurer is required to pay:
· the costs of expert reports obtained in full, up to the maximum amount of $5,000
· statutory interest under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) on these costs, calculated from the date the costs were incurred, until the date the payment is made.
2.3 Are the complainants entitled to accommodation costs?
Yes. The insurer should cover the complainants’ temporary accommodation costs because it was the insurer’s failure to adequately remediate the property that caused the complainants to need alternative accommodation.
Complainants entitled to reimbursement of accommodation costs
The insurer’s inadequate remediation resulted in mould contamination reaching levels which required the complainants and their family to abandon the property.
The panel accepts MY’s evidence that the property should not be occupied in its current state because MY is appropriately qualified and used credible testing methods to reach its findings.
For the reasons explained above, the panel is also satisfied that the insurer’s failure to adequately remediate the property caused the complainants to need temporary accommodation.
The panel is satisfied the policy limitation on temporary accommodation does not apply. This is because:
· the insurer’s failure to remediate the property sufficiently caused the complainants to incur the costs
· the costs are therefore outside the policy limitations.
If they accept this determination, the complainants are required to provide the insurer with evidence of the accommodation costs they have incurred to date.
Within 14 days of receiving this information, the insurer is required to:
· pay the complainants all costs incurred
· statutory interest under section 57 of the Act on these costs, calculated from the date the costs were incurred, until the date the payment is made.
The insurer is also required to continue to pay the complainants’ temporary accommodation costs until the property remediation is completed, a clearance certificate is provided and the resultant damage is repaired.
2.4 Are the complainants entitled to non-financial loss compensation?
Yes. The available information shows the insurer’s failure to remediate the property caused the complainants significant stress and inconvenience.
Complainants are entitled to non-financial loss compensation
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We will only award this type of compensation if you suffer an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
The available information establishes the insurer’s inadequate remediation led to persistent and significant mould contamination throughout the property, which remained unresolved over an extended period.
The panel accepts this caused serious disruption to their daily lives, including relocation and emotional distress. The panel has not considered any adverse health impacts as part of this complaint at the complainants’ request.
Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to pay the complainants $6,000 non-financial loss compensation (that is $3,000 to each complainant).
2.5 Why is the outcome fair?
It is fair for the insurer to provide cover and compensate the complainants for loss and damage that resulted from its failure to adequately remediate the property.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.