Storm damage claim limited to assessed damage; mould damage excluded and claim handling
Text of the determination
Determination
|
Case number
|
12-00-1039675
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1039675 16 January 2025
Determination overview
Complaint
The complainants held a home building insurance policy with the financial firm (insurer). On 24 February 2022, a claim was lodged for storm damage to their home. The insurer accepted the claim, however, has limited cover to damage it has assessed to be consistent with the storm event.
The complaints are dissatisfied with the insurer’s assessment of its liability under the policy. They are seeking a higher settlement from the insurer including reimbursement of their legal expenses, temporary accommodation as well as removalist and storage costs.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the policy fair?
No. The exchanged information shows the insurer is liable for a greater extent of damage than it has accepted under the policy. The insurer has not shown an entitlement to rely on the policy exclusions to limit its liability under the policy to the extent claimed.
The complainants are entitled to cover for temporary accommodation, reimbursement for expenses incurred in sourcing expert reports but not contents removal and storage costs.
Are the complainants entitled to compensation?
Yes. The insurer’s poor claim management has left the complainants having to live in a home with significant mould damage for over two years. This is despite the insurer being aware the urgency relating to the complainants’ medical conditions. The insurer’s overall management of the claim was not to a level expected of a professional organisation.
The insurer is to pay the complainants $4,000 in non-financial compensation (NFL). Further, the insurer is to reimburse up to $5,000 towards their legal expenses.
Why is the outcome fair?
The complainants have shown the storm water caused the mould damage. The insurer did not establish any exclusion applied. The claim should have been accepted but was incorrectly denied. The complainants have shown the insurer handled the claim poorly and unreasonably delayed the claim process.
1.3 Determination
This determination is in favour of the complainants.
Within 21 days of acceptance of this determination, the insurer shall settle the complainants’ claim as set under sections 2.1 and 2.2 of this determination.
Reasons for determination
Is the insurer’s assessment of its liability fair?
No. The exchanged information shows the insurer is liable for a greater extent of damage than it has accepted under the policy. The insurer has not shown an entitlement to rely on the policy exclusions to limit its liability under the policy to the extent claimed.
The complainants are entitled to cover for temporary accommodation but not contents removal, storage and reinstatement costs.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Storm, cyclone, rainwater or run-off’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
The complainant has shown damage that triggers cover under the policy
The complainants are first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainants can do this will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
There is no dispute the insured building has suffered loss and damage consistent with a storm event, and that the insurer has accepted the complainants’ claim offering a cash settlement. However, the insurer has sought to limit its liability to only that damage which it has assessed to be consistent with the storm event giving rise to the claim.
The panel is satisfied the complainants have been successful in establishing loss or damage that triggers cover under the policy. The onus rests with the insurer to show, on balance, an entitlement to limit its liability in line with the policy provisions or otherwise.
Information relevant to the consideration of this complaint
The panel notes the following relevant information in its consideration of this complaint:
there is no dispute the location of the insured building experienced significantly high levels of rainfall on 23 and 24 February 2022, which is recorded as the time of loss and damage
the policy is a building insurance contract of insurance and does not cover contents
the insurer accepted to cover damage to two bedrooms, hall and office and originally made a cash settlement offer of $7,371.72
the insurer has declined cover for loss or damage relating to mould noted to the lower level of the insured building
the insurer says the mould is the result of multiple concurrent contributing factors, some of which are excluded under the policy. Therefore, in line with the Wayne Tank Principle, it says it can limit its liability under the policy
the complainants refute this position and say the mould and associated loss and damage is due to the claimed storm event and therefore covered under the policy
the insurer, since the complainants’ disputing its original claim settlement offer, has made several increased without prejudice cash settlement offers, the final offer being in the amount of $175,000
the complainants have rejected each offer and have made counter offers between $240,000 and $300,000 via their legal representatives
the exchanged information shows the insurer failed to provide the complainants all the required information/reports relating to their claim, despite several requests from the complainants and their legal representatives
the complainants are seeking approximately $90,000 in legal expenses.
Both parties have provided a substantial amount of information in support of their positions, including but not limited to numerous reports from several consultants. The panel has considered all of this information and is satisfied each party has had the opportunity to review and comment on this information. In the interest of brevity, the panel does not intend to refer to or reiterate all this information in providing this determination.
Parties dispute when the mould damage occurred
The insurer says whilst there is reference by experts to vapour fusion being the cause for the mould infestation of the lower level, this is not the proximate cause. The insurer says the elevated moisture and associated mould is caused by defects in construction and maintenance related issues with the roofs.
The insurer says these causative factors acted concurrently resulting in the damage. Therefore, it is entitled to decline indemnity for the mould and mould related damage under the policy. The insurer does not accept any one cause would have been capable of causing the loss and damage in isolation. Further, the insurer also says the mould may have been present prior to the storm.
The complainants refute the insurer’s position and say the mould and associated loss and damage is due to the storm for which the claim was lodged. They say the mould appeared after the storm in February 2022 and the dominant proximate cause is the said storm. The complainants say the insurer bases its position on reports from consultants who are not qualified to provide opinions on the cause and extent of mould damage.
The complainants maintain that the only two appropriately qualified consultants to provide an opinion on this issue are their appointed consultants ‘PP’ and the insurer’s appointed consultants ‘R’. The complainants note even the insurer’s appointed consultants’ ‘A’, who first attended (on or about 27 February 2022), confirmed at the time of their attendance that there was no mould present.
Without persuasive information to the contrary and having carefully considered the exchanged information, the panel is not satisfied the insurer has shown the mould existed before the storm event in February 2022. The panel accepts it is more likely than not that the mould appeared after the storm event giving rise to the claim.
Evidence from consultants PP and R more qualified and persuasive
The panel has considered all the various reports from the parties. It acknowledges consultants A, AS and MM formed the view that the mould infestation to the lower section of the insured property was not due to a single insured event but due to:
wet sub ground level walls and poorly installed metal roof sheeting
lack of waterproofing to the back of the lower level walls which have been cut into the slope of the land and may not be adequately waterproofed to prevent sub ground water ingress
possibly there has not been sub ground level drainage installed to control and divert sub-ground level water away from the external face of the lower level walls
long term deterioration of the paint on the external walls that would be absorbing stormwater and contributing to the dampness present in the home
lack of maintenance works to the home and especially the roofs and that the mould growth would have been visible for some time.
The panel notes the insured building has been assessed to be approximately 50 years old. Having considered the exchanged information, the panel is not satisfied the insurer has provided any compelling evidence of the insured building experiencing previous instances of mould infestation or that the present mould infestation has been there for some time.
Rather, reference by A of the mould growth being visible for some time is contrary to its first report where it says there was no mould present at the time. The panel notes the insurer’s subsequent comments regarding the external roofs requiring maintenance works. However, these are made after the insurer has already accepted liability for internal stormwater ingress damage.
The panel believes it is fair that any and all damage found to be consistent with the accepted internal stormwater ingress damage also be covered. This would extend to the mould infestation, if the panel is satisfied this relates to the same stormwater ingress. The panel accepts the information supports the view the external roofs require maintenance. The insurer is not required to cover the cost to complete these maintenance works to the external roofs, other than what has been assessed as being consistent with storm damage.
The panel notes the complainants late in the complaint have raised an expectation to be covered for a roof replacement. However, the panel is not satisfied this arises from damage caused by the storm event in February 2022 or that it would be reasonable to accept this as being fair and reasonable in the circumstances. To be clear, the panel is not satisfied the insurer is required to cover the cost to replace the roof and/or cover the maintenance related works to the external roofs (tile and metal).
The panel is not satisfied the insurer, or its consultants have provided any persuasive information in support of the assumptions made regarding the lower level walls. There is an no compelling evidence to establish the walls do not have waterproofing or there is no drainage in place. Reference to these concerns are merely assumptions at best with no supporting information or reasonable investigation.
There is no information to show, even if there is an absence of waterproofing and drainage, that this would be considered a building defect having regard to the time of construction. Finally, the panel is satisfied that A, AS and MM are not the most appropriately qualified consultants to provide an opinion on the mould infestation issue. Rather, it is consultants PP and R that are the more appropriately qualified.
The panel notes MM recommended the insurer appoint an engineer to further investigate the concerns raised regarding the lower level external walls. The insurer has elected not to do so.
PP undertook the required (lab) testing to confirm the presence of mould. PP notes that during the relevant period it was appointed to assess more than 100 homes, including the complainants. In all the cases where mould was present, the moisture source causing the mould was either via liquid or vapor diffusion. PP formed the view that the mould present at the insured building was due to vapour diffusion.
Vapour diffusion is when moisture from one or more sources becomes vapour within an indoor environment, diffuses throughout the building and then condenses on to the surfaces that are at, or below, dew point. When MM was asked if it could rule out that the cause of the mould was vapour diffusion, it advised that it could not.
R says in its opinion the mould is the result of stormwater leaking through the roof after which mould has started to form heavily on the ceilings in multiple rooms. Further, that it was consistent with the mould becoming apparent after the February 2022 storms. S says based on the information available, it is possible the damage may have been caused by vapour diffusion.
Given the above, and in the absence of any persuasive information to the contrary:
the panel is not satisfied the insurer has shown it more likely than not that there are multiple concurrent (or not) causes for the mould infestation
the panel is satisfied it is fair to accept the mould infestation and associated loss and damage is due to the insured event (Storm) giving rise to and accepted under the policy
the panel is not satisfied the insurer has shown an entitlement to rely on the Wayne Tank principle to decline the claim. However, it is fair that the insurer be allowed to refuse cover for the cost to repair/maintain the external tile and metal roofs.
Insurer has not shown it can decline claim based on policy exclusions
In seeking to decline and/or limit its liability under the claim, the insurer refers to policy exclusions which exclude from cover loss or damage due to wear and tear, gradual deterioration, lack of maintenance and/or poor workmanship.
The panel is not satisfied the insurer has shown is more likely than not that the loss or damage associated with the mould infestation of the insured building is due to one or more of the noted policy exclusions. Rather, in line with the matters considered above, the panel accepts it is fair that the insurer be required to accept liability for the loss or damage in dispute i.e. loss or damage to the insured building associated with the mould infestation.
The panel accepts that it is reasonable that the insurer settles its liability under the policy by way of a cash settlement. This is because the complainants will be required to first complete repairs and maintenance works to the roofs to stop the water ingress issues. Also, it is reasonable to accept the relationship between the parties has deteriorated to a point that it is unlikely they can cooperate to a reasonable and productive level.
Complainants entitled to temporary accommodation
The panel accepts the complainants will require temporary accommodation whilst the necessary repairs are completed. The estimated time has been provided as being four weeks.
In considering what it fair and the parties’ obligations and entitlements under a contract of insurance, the panel accepts there exists a responsibility on the complainants to mitigate their loss. The panel accepts this responsibility extends to the issue of temporary accommodation (i.e. the provision of and cost of temporary accommodation should be fair and reasonable having regard to the relevant circumstances).
The panel has reviewed the various examples provided by the complainant of properties they propose as temporary accommodation options. The panel accepts these options are comparative to the insured building. However, the panel is satisfied that is fair in all the circumstances that the insurer be permitted the opportunity to complete its own research in this regard. The insurer’s liability is limited to what it would cost it to arrange and provide suitable temporary accommodation, if it is able to do so.
Therefore, the panel determines that the insurer is to locate, and cash settle the complainants for reasonable temporary accommodation over a period of six weeks. This is to allow the complainants additional time to arrange the moving out and return to their home. The insurer is to be mindful of the complainants’ medical conditions and reasonable day to day requirements in selecting the temporary accommodation.
In the interest of completeness, the insurer is not required to cover the complainant for costs associated with the removal, storage and return of the contents. The complainants have elected to purchase a building only contract of insurance, and therefore are not covered for any costs associated with their contents.
The panel has considered the complainants’ position that these costs should be accepted as direct financial loss under the AFCA Rules. The panel notes that the said costs have not yet been incurred and therefore cannot be considered direct financial loss.
The panel accepts the complainants are likely to incur such costs. However, the panel is not satisfied these are costs which arise from any fault or error on the part of the insurer. This is because the complainants would have been required to incur these costs even if the claim had been accepted and settled straight away.
Insurer to settle building damage claim as set out below
Within 21 days of receiving notice of the complainants’ acceptance of this determination, the insurer is to:
arrange two fresh and actionable repair quotes from appropriately qualified consultants to cover the internal stormwater ingress damage and mould infestation
the quotes are to be based on the scope of works proposed (excluding repairs to the external roof) provided by the complainants’ preferred consultant ‘GA’ in its report dated 7 November 2023
cash settle the complainants within 7 days of receiving the quotes based on the higher of the two quotes
the cash settlement for the repairs should add 20% to the higher quote to allow for contingencies and loss of lifetime guarantee.
The insurer is to also (subject to being provided with proof of payment), within 21 days of receiving notice of the complainants’ acceptance of this determination, reimburse the complainant for the below professional expenses. The panel is satisfied this information assisted it in coming to an informed decision on the claim and complaint.
$6,297.32 payment for GA’s report
$1,707.75 payment for GA’s report
$3,390.00 payment for PP’s report
$385.00 payment for PP’s report
$3,080.00 payment for A’s report
The insurer is to pay interest on these payments in line with section 57 of the Insurance Contracts Act 1984. Interest commences from the date each of these payments were made by the complainants to the date on which the insurer issues payment to them in line with this determination.
Are the complainants entitled to compensation?
Yes. The insurer’s poor claim management has left the complainants having to live in a home with significant mould damage for over two years. This is despite the insurer being aware of the urgency relating to the complainants’ medical conditions. The insurer’s overall management of the claim was not to a level expected of a professional organisation.
The insurer is to pay the complainants $4,000 in non-financial compensation (NFL). Further, the insurer is to reimburse the complainants up to $5,000 towards their legal expenses.
AFCA can award NFL in certain circumstances
The AFCA Rule D 3.3 allows for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation.
An award of non-financial loss compensation under the Rules is based on an unusual degree or extent. In this instance and considering AFCA’s approach to compensation, the panel is satisfied it is fair that the insurer be required to pay the complainants $4,000 in NFL. This is because the reasons discussed below.
Insurer unreasonably delayed settling the claim
The panel is satisfied that the insurer received persuasive information from its appointed consultants’ early in the life of the claim supporting settlement (including the mould damage). The insurer has elected to further investigate and appoint various other consultants to investigate the mould issue. The panel notes the insurer did not appoint appropriately qualified experts for this investigation despite earlier consultants recommending it do so.
The insurer’s poor management of the claim including but not limited to incorrect claims decisions and failure to appoint appropriate experts has unreasonably extended the life of the claim. This even continued after the insurer was later informed of the complainants’ medical conditions and associated challenges.
The panel believes the insurer was in a position to make a fair decision on the claim within a few months of lodgement. Given this, the complainants have been exposed to unreasonable levels of stress, anxiety, delays and physical inconvenience for a significantly unnecessary period of time.
Insurer failed to provide information to complainants
After the complainants engaged solicitors, the complainants’ solicitors made numerous requests to the insurer between June 2022 and January 2024 for copies of all expert reports about this matter.
It was not until February 2024 during the AFCA process that the insurer provided the complainants with two reports from February and March 2022 that, in part, dealt with the cause of the mould.
The insurer says the non-provision of these reports was due to ‘human error and system issues’.
There is no direct evidence to suggest this non-provision was deliberate. This is because the insurer did provide to the complainants with other reports which also were not entirely supporting of its position.
However, the failure to provide the complainants with all the information that they requested and were entitled to, has had a negative impact on the claims process, relationship between the parties and further delayed bring the claim to conclusion.
Insurer to contribute to complainants’ legal expenses
AFCA is an alternative to the courts available for free to consumers. AFCA’s process allows consumers to access our service without the need to engage lawyers. For consumers who choose to engage and pay lawyers, AFCA generally does not allow for such legal costs to be awarded.
Whilst the facts of this case are somewhat complex, legally it is not complex. Usually, for a case such as this, no legal costs would be awarded.
However, the panel accepts the complainants had medical issues during the course of this claim, including hospitalisations. In these circumstances, it was reasonable for the complainants to consider they needed some form of assistance.
Given this, and considering what is fair and reasonable, the panel finds the insurer is to contribute to the claimed costs in the amount of $5,000. The panel is not satisfied the circumstances meet the requirements to apply special consideration to award more than the $5,000 specified in the AFCA Rules.
Why is the outcome fair?
The complainants have shown the storm water caused the mould damage. The insurer has not shown an entitlement to rely on the claimed policy exclusions. The claim for the mould damage was incorrectly denied. The complainants have shown the insurer handled the claim poorly and unreasonably delayed the claim process. Given this, it is fair the insurer be required to cover the mould damage, professional fees and pay NFL.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as an industry representative.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.