Home / Youi / Determination 12-00-1039274
Determination 12-00-1039274
Storm damage claim for granny flat declined and garage unassessed, plus claim handling delays and conduct
Summary
The complainants' storm claim for a granny flat was declined and the garage was yet to be assessed. AFCA upheld the granny flat decline, required remediation and a fresh garage assessment, and awarded $3,000 non-financial loss.
Complainants did not establish the storm was the proximate cause of the granny flat damage and the mould exclusion applied, but claim handling delays and errors warranted non-financial loss compensation.
Issues
- Claim denial primary · not upheld“The insurer is not required to cover the damage to the granny flat; complainants have not established a claimable loss and the mould exclusion applies.”
- Poor claim handling secondary · upheld“there have been issues in the way the claim has been handled by the insurer and its contractors”
- Inadequate claim investigation secondary · upheld“garage not yet assessed; new assessor to be appointed after remediation to assess storm damage to the garage”
- Complaint handling failure secondary · upheld“took approximately two months to provide its IDR response”
- Delay secondary · upheld“The insurer took five months to provide its initial claim decision; unreasonable delay in EG attending”
- Misleading conduct secondary · upheld“The insurer did make incorrect representations to the complainants regarding the cover available under the policy”
- Repairs or contractors secondary · upheld“insurer must obtain updated quote from LR and engage it for garage remediation; insurer's claim no alternate contractor was not accurate”
Subjects and remedies
health or medicalhome or building damagepay non financial lossreassess claimrepair or rectify
Related
Text of the determination
Determination
|
Case number
|
12-00-1039274
|
Financial firm
|
Youi Pty Ltd
Case number: 12-00-1039274 20 May 2025
Determination overview
Complaint
The complainants held a home and contents insurance policy with the financial firm (insurer). On 8 March 2022, the complainants lodged a claim under the policy for damage to the property due to storm.
The insurer declined the claim for the external building (granny flat) on the basis that the damage was not caused by an insured event and is yet to make a claim decision on the garage as a further assessment needs to take place (collectively, the building dispute). The insurer did however carry out mould remediation work at the property and make certain payments.
The complainants disagree with the insurer’s position on the building dispute and seek that the granny flat and garage be covered. They are also dissatisfied with the insurer’s handling of the claim for a number of reasons (service dispute). They seek compensation for their claims experience.
Issues and key findings
Can the insurer decline cover for the building dispute?
The insurer is not required to cover the damage to the granny flat. The parties are otherwise required to carry out the steps outlined in section 2.1 in relation to the garage, for the remediation of the contents and mould and assessment of storm damage. Following this, the insurer should make a claim decision regarding the damage to the garage in a timely manner.
Are the complainants entitled to compensation?
Yes. The complainants are entitled to $3,000 in non-financial loss compensation.
Why is the outcome fair?
I am satisfied the insurer is entitled to decline cover for the granny flat and it is fair that the steps outlined in section 2.1 of this determination be carried out in relation to the garage. I also consider there is merit to some of the matters raised in relation to the service dispute. Therefore, it is fair that the complainants are compensated for their claims experience.
Determination
This determination is partially in favour of the complainants.
The insurer is required to carry out the remediation works and reassess the garage damage in accordance with the steps outlined in Section 2.1 of this determination.
Within 14 days of this determination being accepted, the insurer is required to pay the complainants $3,000 in non-financial loss compensation.
Reasons for determination
Can the insurer decline cover for the building dispute?
The insurer is not required to cover the damage to the granny flat. The parties are otherwise required to carry out the steps outlined in section 2.1 in relation to the garage, for the remediation of the contents and mould and assessment of storm damage. Following this, the insurer should make a claim decision regarding the damage to the garage in a timely manner.
Onus on complainants to establish claimable loss
The complainants are required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainants must prove the loss or damage was caused by a risk that is covered under the policy.
Once the complainants prove there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies.
Policy covers insured events subject to exclusions
The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainants.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by an insured event, and not subject to an exclusion, is covered. The insured events are set out in the PDS and include storm. However, the policy excludes cover for damage caused by certain factors, including:
rain, wind, hail or snow entering the buildings through open windows,
doors or openings made for alterations, renovations or repairs;
rain, wind, hail, or snow entering the buildings unless through an opening that was:
> created by the storm; or
> not created by the storm and that you could not reasonably have been aware of.
The policy also generally excludes cover for damage caused by, amongst other things:
39. mould, rot, damp, or the effects of the climate or weather, unless as a direct result of an incident for which [the insurer has] accepted a claim.
Certain facts not in dispute
The complainants lodged a claim on 8 March 2022.
Shortly thereafter, a restorer, EG, was appointed to assess the contents damage and remove mould from the property.
The insurer appointed an assessor, AB, to assess the damage to the building. On 23 April 2022, AB carried out an inspection.
EG carried out the removal of damaged contents and removal of mould on 24 May 2022. The complainants were very unhappy with the significant delay and the manner in which EG carried out the work. The same day, the complainants informed the insurer of threatening, aggressive and unprofessional behaviour exhibited by EG toward them.
AB provided its report on 7 June 2022. It says the renovations, the window opening and the kitchen door being open at the time of the storm event caused the mould observed due to the continued airborne moisture over time and/or the water ingress from wind driven rain. AB also engaged a roofing expert, AI, who confirmed there was no storm created opening.
On 23 June 2022, an engineer, ST, inspected the property. It provided a report on 1 August 2022 which, in summary, says there is no storm created opening and the mould in the granny flat has not been caused by a single insured event. It also confirms that a further assessment of the garage will be required once the contents are removed.
On or about 12 July 2022, the insurer appointed an alternate restorer, LR, to attend the property. LR provided a scope of works and quote for the works on 19 July 2022.
On 5 August 2022 the insurer declined the claim. The same day, the complainants lodged a complaint with the insurer’s internal dispute resolution service (IDR). On 30 September 2022, the insurer issued its IDR response. In the IDR response, the insurer apologised for the conduct of its claims advisor, NT. It also said that feedback had been provided to the claims advisor’s team manager to review and action.
The insurer accepts that its claims advisor provided incorrect information to the complainants regarding the contents claim. Therefore, it agreed to cover the disposed contents items on a new for old basis. It paid $61,504.17 on 29 November 2022. The complainants queried a further content item and the insurer paid a further $4,395.77 on 24 November 2023. Therefore, the insurer has paid $65,899.94 in total for the contents claim (settled contents).
On 12 December 2023 the insurer advised an apology could not be provided directly from the claims advisor as he no longer worked for the insurer and apologised again for the claims advisor’s conduct. On 3 April 2024, the insurer also provided the complainants with an apology letter for their overall experience with the insurer’s claims advisor, at the complainants’ request. It said ‘the experience [the complainants] received falls below [the insurer’s] service expectations, and we sincerely apologise for this…’.
Complainants have made various complaints against the insurer
The complainants have made various complainants against the insurer. In relation to the building dispute, they say:
the insurer should cover all of the damage outlined in the claim lodged on 8 March 2022 in relation to the granny flat, garage and outdoor furniture and other items;
the damage to the garage was not assessed; and
there is an outstanding amount owing to the complainants of $4,395.77 for the disposed content items.
On 17 May 2024, the complainants advised that the complaint in relation to the garage damage not being assessed has been resolved. The parties agree that a further assessment of the garage is required once the contents are removed. However, it said the amount of $4,395.77 for the contents was still outstanding (disputed sum).
In relation to the granny flat, specifically, they say:
the damage was caused as a result of a single weather event on 23 February 2022 and the insurer’s contractors failed to properly inspect the damage;
it is impossible that sealing the windows caused the mould proliferation as the windows to the granny flat were sealed 77 days after the claim was lodged and this was done at the insurer’s request by EG;
the two reports obtained by the insurer had inaccuracies, false statements and guesswork;
the granny flat has remained in the same condition as it was in on 23 May 2023 with the windows covered in tarpaulin and air still able to circulate. Despite the same weather conditions of humidity, rain and temperature over the preceding 21 months, there has been no evidence of black mould on any of the surfaces in the granny flat.
Insurer says cover is not available for granny flat damage
As stated above, the complaint regarding the failure to assess the garage has been resolved. The insurer also says sufficient compensation has been provided for the settled contents and that nothing further should be paid.
In relation to the other aspects of the building dispute, the insurer says AB, AI and ST have concluded that there is no storm created opening or evidence of water ingress into the property causing the claimed damage. Further, ST says that the mould damage has not been caused by a single insured event but rather several weather events over a period of months.
The insurer relies on the exclusion in the storm event cover where rain, wind, hail or snow has entered a building other than through a storm created opening that the complainants ought reasonably to have been aware of. It also relies on the general exclusion for mould, rot, damp or other effects of climate or weather that are not the direct result of an incident for which the insurer has accepted the claim. Therefore, it says the internal damage to the granny flat is excluded from cover.
On balance, proximate cause of granny flat damage is not storm
In order to determine whether the granny flat damage should be covered, it is necessary to establish, on the balance of probabilities, the proximate cause of the loss.
The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause.
Having reviewed all the available information, I am not satisfied that cover is available for the granny flat damage.
I acknowledge that the storm occurred and that there is damage to the granny flat. However, I accept that there were a number of weather events in the period between January and April 2022 and that renovation works were ongoing to the structure.
Further, I consider the reports of AB, AI and ST are persuasive. I am satisfied that they are each suitably qualified to comment on the cause of the damage to the property. Based on the available information, there is no storm created opening identified by any of the experts. They also consider that there has been mould proliferation over a number of months and there was inadequate ventilation and natural light in the granny flat (in breach of the Building Code of Australia). I also note that the complainants have not provided any expert reports on the cause of the damage or evidence to support why it says the ST report is incorrect.
Given this, on balance, the complainants have not established a claimable loss. That is, they have not established that the damage to the granny flat was caused by a storm created opening, or that it was caused by a storm created opening they could not reasonably have been aware of. The complainants were clearly aware of the ongoing renovation of the granny flat, the condition of the granny flat and that it was unoccupied. The complainants say EG removed the windows after the storm. Even if this were the case, there is no evidence of the storm being the proximate cause of the damage. There is also no evidence that the damage was a result of something the complainants could not reasonably have been aware of. The onus is on the complainants to establish a claimable loss in relation to the damage to the granny flat. On balance, they have failed to do so.
Further, even if a claimable loss was established, I consider that the insurer is entitled to rely on the mould exclusion to decline the claim. This is because, on balance, the mould is not the result of a single storm event but rather the ongoing exposure of the granny flat to weather events over a period of several months and the lack of ventilation and natural light in contravention of the Building Code of Australia.
Therefore, the insurer is not required to take any further action in relation to the damage to the granny flat.
Complainants and insurer disagree on various issues regarding garage
The complainants say there was water ingress into the garage with both the smell and visibility of mould and the insurer’s assessor failing to properly inspect the garage. The insurer agrees that a further assessment of the garage is required. However, it says this will only be possible once the contents of the garage have been removed.
On 17 May 2024, the complainants advised that they accept that the garage cannot be assessed until the damaged contents have been cleared and the internal space remediated. The complainants are dissatisfied with the work undertaken by AB and ST. They request that the insurer provide a list of building assessment companies used by it in New South Wales for the complainants to choose from. Alternatively, they say they can supply a list of building assessors for the insurer to choose from.
Since shortly after the claim was lodged, there have been issues between the parties regarding the remediation of the contents and mould. In particular, the complainants reported issues with EG the day it attended the property to carry out remediation works on 24 May 2022. They say they are no longer comfortable with EG attending the property.
The insurer considers the confrontation between EG and the complainants was resolved between themselves. In terms of the ongoing remediation works, it says an alternate restorer is not available. It proposes that EG complete the remediation works but that none of the personnel from EG who previously attended the complainants’ property be involved in any of the future work. The insurer says LR is unable to complete the remediation works as they do not have offsite sheds where items can be stored. LR would likely organise storage sheds for this review however, given the mould issues with the contents items, the risk would be too great in contaminating other items stored in these storage sheds. The insurer also says LR is unable to remediate the contents at the property due to issues with site access. The insurer therefore considers that LR cannot be utilised.
The insurer reiterated its position in its further letter on 28 May 2024 saying LR ‘are unable to complete the required remediation as the restoration would be completed in storage facilities as previously communicated. Please see further portal message received from [LR] confirming this statement’. It then attaches the extract below (LR statement):
Parties must follow certain steps in relation to garage
There is no doubt there has been a breakdown in communication between the complainants and the insurer and its contractors. The complainants have however indicated that they would be happy for LR to carry out the remediation works relating to the garage.
I am not persuaded, based on the submissions made by the insurer (in reliance on the LR statement), that LR is unwilling or unable to carry out the works and that it is necessary to reengage EG to carry out the work. I consider the LR statement simply says the items would have to be put into a storage facility for cleaning and storage until works are completed. It does not say that LR is unable to carry out the works or that it is not possible to put the items into a storage facility. In fact, the LR statement suggests that it can in fact carry out the work. If it is the insurer’s position that the items could not be put into a storage facility due to the risk of mould contamination, I consider it ought to have made enquiries with storage facilities to confirm this. In the absence of any information from storage facilities that the items cannot be stored, on balance, it is reasonable that LR be engaged to carry out the remediation works to the garage. This is also consistent with what the complainants have wanted as LR has been to the property and the complainants are happy with them.
I acknowledge that it has been some time since the original scope and quote was provided by LR. Therefore, an updated actionable quote should be obtained, as the LR statement says variations may apply. LR should then be instructed to carry out the remediation works. Once this occurs, it is reasonable that a new assessor should be appointed to assess the storm damage to the garage.
Therefore, I consider that the following steps should be taken:
within 21 days of this determination being accepted, an updated actionable quote should be obtained from LR;
once an updated actionable quote has been provided, LR can immediately be engaged to carry out the remediation works to the garage;
within 7 days of being notified by LR that the remediation works have been completed, the insurer is to provide the complainants with the names of three building assessors who have not previously been involved with this or any past claim lodged with the insurer in relation to the property;
within 14 days of being provided with these names, the complainants are to advise the insurer of the building assessor to be engaged;
within 14 days of receiving this response from the complainants, the insurer is required to engage the selected building assessor; and
once the new building assessor’s report is received, the insurer should make a claim decision in relation to the garage in a timely manner.
No further payment required in relation to settled contents
In relation to the settled contents, I am satisfied the insurer has made two payments, the second of which was for the disputed sum, on 24 November 2023. Therefore, I do not consider there is any further amount required to be paid in relation to the settled contents.
Are the complainants entitled to compensation?
Yes. The complainants are entitled to $3,000 in non-financial loss compensation.
AFCA can award compensation for poor claim handling
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:
an unusual degree of stress, delay, or inconvenience, and/or
interference with a person’s expectation of enjoyment and/or peace of mind.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
The complainants seek non-financial loss compensation
In relation to the service dispute, the complainants say, among other things, that:
the insurer’s employee, NT, acted inappropriately in managing the claim. Specifically, the insurer’s representative stated that there were too many documents provided by the complainants to review;
there have been various delays in the conduct of the claim and the insurer has failed to follow up its contractors;
the insurer’s contractors repeatedly provided them with misleading information;
the representative from AB handled the claim poorly;
the insurer has sought to reinstate EG without justifiable reasons. The insurer has disregarded the future impact EG’s attendance would have on the complainants’ emotional, physical and mental wellbeing;
EG employees and NT have both acted inappropriately toward the complainants and the insurer has failed to acknowledge the psychological impact that one of its subcontractors and staff have had on one of the complainants;
the insurer has knowingly ignored the insured’s medically diagnosed condition and has failed to comply with its duty of care; and
they seek $5,400 in compensation and a written apology from the insurer in relation to the management of the claim.
Compensation is warranted in the circumstances
The insurer says there is no evidence the complainants were asked to keep their emails brief or that its representatives used ‘passive-negative’ comments regarding the complainants. It considers its handling of the claim has been adequate and in line with its procedures.
The insurer has, however, apologised to the complainants on more than one occasion for the conduct of its claims advisor, NT. It has also issued an apology letter to the complainants in this regard. Therefore, I do not consider any further action is required in relation to NT.
The insurer also says it has to reengage EG as there are no other suitable contractors. Based on the available information, I do not consider this accurately reflects the position.
Overall, I consider there have been issues in the way the claim has been handled by the insurer and its contractors. For example, there was an unreasonable delay in EG attending the premises to carry out the remediation works. The complainants repeatedly had to contact the insurer to seek updates and to arrange appointments with contractors. There have also been delays between each step in the process for assessing and making a decision on the claim. The insurer took five months to provide its initial claim decision to the complainants. It also took approximately two months to provide its IDR response from the time the IDR complaint was made. However, I acknowledge that the complainants did not wish the IDR response to be provided until they had an opportunity to provide all their submissions to the IDR team. This took some time. The insurer did make incorrect representations to the complainants regarding the cover available under the policy, however it has made a significant ex gratia payment to the complainants to rectify this error.
Given the above, I consider that the complainants have had more than a normal degree of stress and inconvenience and there have been delays in the claims process. Therefore, I consider that the complainants are entitled to $3,000 in non-financial loss compensation.
Why is the outcome fair?
I am satisfied the insurer is entitled to decline cover for the granny flat and it is fair that the steps outlined in section 2.1 of this determination be carried out in relation to the garage. I also consider there is merit to some of the matters raised in relation to the service dispute. Therefore, it is fair that the complainants are compensated for their claims experience.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Expert reports
Insurer’s reports regarding building dispute
On 23 April 2022, AB carried out an inspection and provided a report. AB’s report was provided on 7 June 2022 and says:
the complainants advised that they have progressively been renovating the granny flat. They also said another contractor from a different assessor, EG, had attended prior to AB’s inspection and was in discussion with the complainants regarding the restoration/mould mitigation;
the sash windows in the kitchen had been removed and the opening had been tarped up. The window opening is not airtight and airborne moisture can enter through this opening;
the timber flooring in the kitchen and passageway was wet at the time of the inspection. The complainants advised this was due to wind driven rain entering via the kitchen external door opening. The external door has only recently been fitted;
it arranged a roof inspection by AI. AI’s report states that the gutters are full of debris which will limit the discharge of rainwater and may result in overflowing gutters. There is also leaf debris at the back of the skylight and no storm created opening was observed; and
in its opinion, the renovations, the window opening and the kitchen door being open at the time of the event caused the mould observed due to the continued airborne moisture over time and/or the water ingress from wind driven rain.
On 23 June 2022, an engineer, ST, inspected the property. It provided a report on 1 August 2022 which says:
the renovations performed by the complainants did not comply with the Building Code of Australia with respect to ventilation and natural light, creating conditions known to cause mould proliferation;
greater than average humidity levels were recorded between January and April 2022. This is consistent with extended periods and higher than average rainfall that occurred over a number of months;
the building was unoccupied and had ongoing renovation work since 2020. This period of reduced natural ventilation, no solar exposure and elevated humidity has likely encouraged mould proliferation;
there is a possibility of condensation risks due to inadequate subfloor ventilation and climatic conditions could have created condensation locally where the floors have been covered with cortflu for example;
the guttering along the eastern side showed signs of watermarks to the fascia;
there was no evidence of a storm created opening at the time of inspection;
the complainants said there was also water ingress in the garage due to stormwater flow bypassing the surface drain at the front of the garage door. However, the garage could not be inspected internally due to the contents being stored in it;
in its opinion, the mould in the granny flat is consistent with a combination of prolonged humidity variation over a period of months, extended period of vacancy due to the renovations and building works that have reduced natural ventilation and natural light into the area, i.e. tarping and sealing windows;
the mould is unrelated to a single defined storm event. Rather, it is due to a prolonged period of rainfall extending for a period of months;
various maintenance works are required to be caried out. A hydraulic engineer should also be engaged to provide a designed certified solution to manage site drainage, particularly to the garage.
the complainants reported damage to the roof sheets on the garage and hail damage to the pool coping (first claim). They also report damage to the internal wall of the granny flat and pool lining (second claim). The insurer has put all damage under one claim;
on inspection, it found that the damage to the roof has been caused by metal roof sheeting being too short and no guttering being installed. This has allowed water to enter between the roof sheets and fascia boards and run down the wall cavity causing damage to the internal wall.
dents to the roof sheet over the garage were popped out by a roofing trade with no damage occurring;
therefore, the damage to the granny flat and roof are a direct result of maintenance and workmanship issues;
the damage in the pool area has been caused by hail stone impact and strong winds from the recent storm event;
since the storm event, the complainants have engaged a builder to install new cladding to the rear external and install guttering around the granny flat. It recommends cleaning out the existing gutters and installing leaf guard to prevent any further water ingress;
the internal damage behind the kitchen units in the granny flat could not be assessed as the complainants refused to remove the contents until the insurer approved the kitchen unit removal.