Home / Strata Community Insurance Agencies Pty Ltd / Determination 12-00-1036889

Determination 12-00-1036889

Cash settlement amount for water damage claim disputed; complainant sought $748,445.52 against insurer offer of $123,436.35

FirmStrata Community Insurance Agencies Pty Ltd
Decided2025-08-18
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$5,000
Non-financial loss$1,000
Amount claimed$748,446
SourceAFCA PDF

Summary

A strata property owner disputed the insurer's $123,436.35 cash settlement of an escape-of-liquid claim and sought about $748,000. AFCA found the offer inadequate but the claim excessive, ordered new scopes of work and a cash settlement with 20% contingency and more temporary accommodation, plus $5,000 professional costs and $1,000 non-financial loss.

The complainant bore the onus to show the claimed repairs were caused by the insured event; the insurer omitted some covered items but the complainant's claim included pre-existing defects and unsupported replacement work.

Issues

Subjects and remedies

broker or intermediaryhome or building damagethird party authoritypay claimpay compensationpay non financial lossreassess claim

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1036889 | Financial firm | Strata Community Insurance Agencies Pty Ltd Case number: 12-00-1036889 18 July 2025 1 Determination overview 1.1 Complaint The complainant has been represented by several agents throughout the course of this complaint, including TM, owner’s representative, and IA, broker. The complainant’s engineer, CM, also took up an advocacy role on several occasions. Unless otherwise indicated, the complainant, TM, IA and CM will be collectively referred to as ‘the complainant’. The complainant holds a residential strata insurance policy with the financial firm (the insurer) for her home that is located in an inner-city suburb in Brisbane, Queensland (the property). She lodged a claim after a flexi hose under a bathroom vanity burst, causing a large volume of water to escape into the property over a period of several hours. The insurer accepted the claim for the property damage and damage to the complainant’s contents. Nevertheless, the parties have been in dispute for an extended period about the claim outcome. Recently, each party set out their relative positions regarding the current situation. The complainant says she is not satisfied with the insurer’s handling of her claim. She says the insurer should be liable for: · her preferred cash settlement in the sum of $748,445.52. This includes building repair and remediation costs in excess of $700,000, together with professional costs of $41,420.50 (being expert fees together with CM’s professional costs amounting to over $29,000). The complainant says this substantial sum is due to significant shortcomings in the insurer’s assessments and scopes of work (SOWs) and the costs associated with the repair of the property that have increased due to incomplete mould remediation work and avoidable delays caused by the insurer · additional temporary accommodation costs · compensation for her poor claim experience including delays, misconduct on the part of the insurer and its trades (including withholding evidence) and poor service. In addition, the complainant seeks, amongst other things: · a direction from AFCA that the insurer reinstates more favourable insurance premiums while repair work is completed · oversight by AFCA on future policy renewals by the insurer to ensure future premiums are not being incorrectly inflated · an indemnity from the insurer for any liability arising from hazards affecting site attendees because of poor safety compliance and controls. The insurer disagrees and says: · it completed remediation of the insured-event related mould affecting the property in late 2023 · while completing remediation works it located pre-existing and non-compliant building work which is not covered by the policy, meaning it had to cash settle the claim in lieu of further repairs · its offer dated 21 May 2024 to cash settle the claim for $123,436.35 is fair and reasonable and includes an allowance for all claimable losses, including building repairs and temporary accommodation, together with a 20% contingency uplift · the disputed mould now occurring at the property is not related to the insured event and is not otherwise the insurer’s liability · the complainant’s experts have included repairs in their SOWs which are maintenance or defect-related and are not something which the policy covers. Moreover, the insurer does not accept it mishandled the claim or withheld evidence. In addition, the insurer denies the allegations of misconduct made by the complainant against it and its trades. The insurer says its cash settlement offer is reasonable and fairly reflects the extent of its liability to the complainant and is in accordance with the terms and conditions of the policy. Because of the nature and complexity of this complaint it was determined by a panel of three. 1.2 Issues and key findings Is the complainant entitled to the claim settlement amount she seeks? No. Whilst the insurer’s cash settlement offer does not completely cover its liability to the complainant, the cash settlement amount the complainant seeks is excessive, and includes costs related to maintenance and rectification of defects. Must the insurer adjust the policy premium? No. If the complainant is dissatisfied with a decision the insurer has made regarding a policy premium, she must lodge a fresh complaint about the issue. Moreover, AFCA is unable to make a determination regarding the fairness of a future policy premium before the renewal notice is issued. Is the insurer liable for the complainant’s professional costs? The insurer must pay the complainant’s professional costs, up to $5,000. Is the insurer liable for site attendance liabilities? No. AFCA cannot make a determination about a future event. Should the insurer pay non-financial loss compensation? Yes. It is fair and reasonable that the insurer pays the complainant $1,000 in non-financial loss compensation. Why is the outcome fair? The outcome is fair in all the circumstances because: · the insurer’s cash settlement does not completely cover its liability to the complainant under the terms and conditions of the policy · the cash settlement amount sought by the complainant is excessive and includes the cost of repairs and remediation for damage and defects which were not caused by, and are not related to, the insured event · evidence provided by some of the complainant’s experts assisted in the resolution of the issues in dispute · AFCA is unable to make determinations about future events such as premium increases or a potential liability which may stem from attendances at the property · an award of non-financial loss compensation is reasonable and appropriate. 1.3 Determination This determination is partially in favour of the complainant. The complaint should be resolved in accordance with section 2.6 below. 2 Reasons for determination 2.1 Is the complainant entitled to the claim settlement amount she seeks? No. Whilst the insurer’s cash settlement offer does not completely cover its liability to the complainant, the cash settlement amount sought by the complainant is excessive, and includes costs related to maintenance and rectification of defects. Property was damaged by an insured event The property includes a two-storey, semi-detached weatherboard clad dwelling with a Colourbond roof. Most internal walls are clad with plasterboard. The insurer estimates the property was constructed about 20 years ago. It was generally in good condition before the insured event occurred. Water damaged the property and its contents during an escape of liquid (EOL) insured event that occurred on 9 August 2023. The damage occurred when a flexi hose located within the master ensuite of the property failed. A significant amount of hot water escaped into the property over a period of several hours while the complainant was at work. The complainant lodged her claim for building damage the following day. Later that day AR, one of the insurer’s builders, inspected the property. It also attended the property on a further four occasions in August 2023 to facilitate make-safe repairs and drying, and to commence repairs. AR also produced an initial SOW for the restoration and remediation of the property. PC, loss assessor, also inspected the property on behalf of the insurer on 10 August 2023. PC produced several reports during the claim, mainly providing a summary of other expert reports commissioned by the parties. By early November 2023 the property was still vacant, however, it had been partially remediated with gyprock being removed from the ceilings of several downstairs rooms. Unfortunately, around this time the complainant became dissatisfied with the insurer, PC and AR, and with PR, another builder/restorer engaged by the insurer. The complainant was not confident the insurer and its trades would complete the required works satisfactorily. The complainant was also becoming increasingly concerned about the spread of airborne contaminants (mould) throughout the property as time passed. The dispute between the parties intensified throughout 2024, during which time the complainant commissioned several experts, including OP, a mould remediation expert, CM, an engineer, as well as NL, a restoration specialist. She also arranged for two builders (including TJ) to inspect and assess the property. The current situation and the primary issues that remain in dispute between the parties are set out in section 1.1, above. It is clear the parties remain entrenched in their positions, especially in light of the divergent opinions provided by the parties’ respective experts, and the allegations of misconduct levelled by the complainant and some of her experts against the insurer and its trades. Complainant has onus to establish a valid claim It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim. If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim (or part of it) or is otherwise entitled to decline the claim because, for example, the damage occurred outside the period of insurance. Policy provides cover for building damage and other losses, subject to terms and conditions The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy. The policy provides cover for loss and damage caused by various insured events, including an event such as an EOL. For instance, page 22 of the PDS includes the following: Section 1 – Insured Property […] Section 1 – Part A We will pay up to the sum insured… against loss or damage to your insured property on the basis set out in “Claims – basis of settlement”… The policy documents also define “Loss” or “Damage” to mean direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by the policy. Dispute mainly involves the extent of the insurer’s liability The insurer accepted the claim, completed some make-safe and remediation works and resolved a claim for damaged contents. However, not all claim-related repairs have been completed, and the parties disagree about the nature and extent of the damage caused by the loss event and the extent of the insurer’s liability pursuant to the terms and conditions of the policy. The complainant satisfactorily established that she has a valid claim, but she still bears the onus of showing, on the balance of probabilities, that all damage and loss claimed was caused by, or is the result of, the insured event, and not some other cause or factor. Parties agree the claim should be cash-settled The nature of the dispute means that the claim for building damage must be resolved by a cash settlement. As mentioned, in May 2024, the insurer offered the sum of $123,436.35. However, the complainant says she is entitled to a higher cash settlement amount in excess of $748,000. The complainant has the responsibility to show the cash settlement amount includes remediation and repair costs only for the damage caused by the insured event during the period of insurance, and not the costs associated with maintenance and defect-related issues. The complainant must also establish that such costs are fair and reasonable in all the circumstances. The complainant primarily relies on SOWs and quotations submitted by her builder TJ, and evidence provided by, in particular: · CM · FC, fire engineer specialist · CB, building certification specialist · OP, mould damage/remediation expert · LT, mould analysis laboratory · NL, restoration specialist · FE, electrician. The insurer relies on its builders, AR and KB, and evidence provided by: · DB, civil engineer · PS, fire certifier · PI, mould damage/remediation expert · VI, mould testing company · CD, mould analysis laboratory · PC, loss assessor · PR, a restoration specialist. Expert evidence has been summarised A summary of the expert evidence relevant to this determination is set out in section 3.2, below. The panel has reviewed and analysed all the exchanged material and the evidence. The main areas of disputed building damage include: · electrical make-safe works set out in FE’s reports · stripping out the flooring of the upper level of the property and wall linings up to 1200mm from the floor · stripping out wet rooms, floor to ceiling on both levels · removing and replacing two mould damaged floor trusses in the living room ceiling · removing and replacing flooring throughout the entire lower level of the property · performing additional mould remediation, cleaning, and clearance on both levels · whether the costs of temporary accommodation offered by the insurer cover a reasonable timeframe to complete the repairs. Insurer’s settlement offer is inadequate The panel is satisfied the insurer omitted several claim-related losses and consequential damage in its original SOW and offer of settlement. These omissions include: · the electrical make-safe works set out in FE’s assessment · the mould on the lounge-room ceiling trusses discovered relatively recently · sufficient temporary accommodation costs. The panel also notes additional mould may have spread throughout parts of the property since late 2023/early 2024. Insurer is liable for additional damage and loss FE provided evidence demonstrating the electrical system in the property required further work to be considered safe and useful. The panel is satisfied the evidence of damage and the requirement for the electrical work is consistent with an escape of liquid loss event of the magnitude which occurred in this matter. Moreover, photographic evidence clearly depicts some of the damage that needs to be remedied and repaired. The insurer should cover the costs associated with this additional electrical work. The panel is also satisfied the insurer should provide cover for the costs associated with the remediation of mould on the ceiling joists. The panel notes the mould is in a similar location to where previous testing discovered mould earlier in the claim process. The method of remediation of the ceiling trusses is discussed below. The panel does not accept the insurer’s submission that some of the mould discovered relatively recently has been caused by environmental factors, such as moisture naturally rising from water ponding beneath the property. For instance, the panel is satisfied this mould is claim-related because: · there is no sign of mould between the joists and the floor. This is the logical point of entry for moisture based on the insurer’s assertion the issue is arising from water ponding beneath the property · there is no evidence showing there is mould damage to the subfloor or floorboards · the mould damage is below where the leak occurred and is relatively close to where the insurer previously completed remediation work. The insurer should assess the extent of any additional mould that has occurred since early 2024 and remediate it (see section, 2.6 below). Cash settlement amount sought by complainant is excessive The panel considers the cash settlement amount sought by the complainant is excessive. In particular, the panel notes the following repairs included in the complainant’s SOWs are not consistent with the evidence: · the replacement of the living room ceiling trusses, which OP says are mould damaged and porous · the extent of remediation works the complainant’s trades say are required to repair the upstairs section of the property · replacement of the timber flooring (in light of evidence showing pre-existing damage and movement). This is because of the following factors. First, whilst the insurer should cover the costs of the remediation of the ceiling trusses (as set out above), there is no persuasive evidence which shows, on balance, the ceiling trusses should be replaced. The panel also notes OP did not sufficiently explain why remediation of the mould it located on the living room timber trusses should not be attempted first, prior to replacement, in accordance with its remediation practices. Moreover, the insurer appears to have successfully repaired and remediated other timber surfaces in the vicinity of the mould affected trusses. Further, the complainant’s evidence includes opinion that timber is semi-porous and should be remediated first, before attempting replacement. It follows the panel is not satisfied the full replacement of the ceiling trusses is the only way to repair the damaged timber. Second, there is a paucity of persuasive evidence that mould, to the extent claimed by the complainant, was present at the time of experts’ assessments. Third, OP’s reports do not provide persuasive evidence that it is necessary to strip the upstairs level of the property to the extent it has recommended. On balance, the mould tests fail to confirm there is mould in the upstairs area which escaped the earlier remediation attempts. For instance, in November 2023, CD collected nine air samples and fourteen surface samples throughout the property for the evaluation of mould. CD reported: Results from the collected surface and air samples indicate that, at the time of sampling, – • the rate of fungal structures being shed from areas impacted by mould growth is negligible, and there has been no definable nor distinguishable impact to the airborne concentration of fungal structures within the residence due to mould growth. • the mass transfer of fungal structures from areas impacted by mould growth to other areas in the residence appears negligible. In its report dated 22 December 2023, after further testing, CD concluded: Microscopic analysis indicated that all samples had a normal mould ecology… It is our considered opinion that the Residence has been appropriately dried and remediated for mould. Internal works may now continue readying the Residence for re-occupancy, ensuring that air-conditioners in the Lounge Room and Bedroom 1 have been appropriately serviced. PR also confirms it undertook a partial strip out and ‘decontamination clean of structure - triple clean process – mould’ in late 2023. The panel is of the opinion PR’s multiple reports written in November and December 2023 are considered and comprehensive. Moreover, OP’s reports regarding this particular issue are speculative in parts. For instance, it refers to the carpet in bedroom two and infers associated damage to the flooring beneath, without adequate testing. Fourth, the panel is not persuaded that replacement of the timber floorboards is warranted. The exchanged material shows, on balance, pre-existing damage. The panel is satisfied the insurer’s evidence obtained during inspections in December 2023 in this regard is logical and comprehensive. For instance, the panel notes the ‘filler’ appears in only one location in the property, whereas the insured event appears to have extended virtually throughout the lower level of the property. Moreover, the complainant’s experts do not adequately address the reasons why some floorboard edges lifted, resulting in debris filling the gaps, and why the damage occurred on a relatively small section of the floor. In addition, there is no persuasive evidence which explains the mechanisms involved, specifically, how water damage to the floorboards caused them to shrink, instead of expanding and swelling. The panel notes photographs of the property taken shortly after the insured event occurred clearly show separation of some of the boards had occurring at that stage of assessment. It is therefore reasonable to conclude the boards did not shrink during the subsequent remediation process and drying. It appears, on balance, separation of some boards had occurred before the insured event happened. Accordingly, the panel is not satisfied the insurer is liable for the costs associated with the full replacement of the floorboards. Moreover, several of the complainant’s experts have not adequately explained why the floorboards cannot be repaired with filler, sanding, and re-staining, which is the remedy proposed by the insurer’s trades. Finally, the insurer has established there is a pre-existing defect in the firewall partition between the property and the adjoining building which is not related to the insured event. The exchanged material shows the firewall does not meet current standards and must be corrected while the property is repaired. The panel is of the opinion the insurer should not be compelled to cover the costs of these repairs. Summary of additional building repair and remediation costs to be paid by the insurer In addition to the repairs and remediation processes set out in the insurer’s quotations and SOWs which formed the basis of its offer of cash settlement made in May 2024, the panel is satisfied the insurer must also provide cover for the costs associated with: · any repairs of the property’s electrical system that are recommended in FE’s reports but have not yet been completed · repair of the ceiling trusses (instead of replacement) · repair of the floorboards (instead of replacement) · remediation of the property in accordance with the matters set out above (that is, for example, in a manner which may not necessarily involve a complete strip-out of the upper level). 2.2 Must the insurer adjust the policy premiums? No. If the complainant is dissatisfied with a decision the insurer has made regarding a policy premium, she must lodge a fresh complaint about the issue. Moreover, AFCA is unable to make a determination regarding the fairness of a future policy premium at this juncture. AFCA can only consider a premium adjustment because of errors in calculation AFCA’s jurisdiction limits the basis on which it can direct an insurer to adjust policy premiums. AFCA considers an insurer is at commercial liberty to set its policy premiums in the market it intends to operate in. However, within these jurisdictional confines, AFCA can ensure an insurer makes decisions which fairly reflect the circumstances of the risk it is insuring. Where an error is shown in the calculation, it is fair for the insurer to correct it. If the complainant is dissatisfied with a decision the insurer has made regarding a past or existing policy premium, she must proceed through the insurer’s internal dispute resolution process before AFCA can consider a fresh complaint about the issue within its jurisdictional limits. A future premium dispute must be the subject of a new complaint The panel cannot make a determination regarding a hypothetical future premium or provide a guarantee it will review any premium increase, as the complainant requests. Should a dispute arise in future about premiums, the complainant may raise a new complaint at that time. If necessary, and if that complaint is within AFCA’s jurisdiction, it will resolve the complaint. 2.3 Is the insurer liable for the complainant’s professional costs? The insurer must pay the complainant’s professional costs, up to the sum of $5,000. AFCA’s approach to awarding professional costs Under its Rules, AFCA may decide that the insurer is to contribute to the legal or other professional costs or travel costs incurred by a complainant in the course of a complaint. Unless there are exceptional circumstances, AFCA will not require the insurer to contribute more than $5,000 to these costs. The complainant says the insurer should reimburse her for the professional costs she incurred when she commissioned various experts. The complainant claims these costs are in excess of $17,000. The complainant also says the insurer should pay for CM’s professional costs in the sum of $29,656. The panel has considered whether the professional costs claimed by the complainant are fair and reasonable and whether the evidence and services provided by the complainant’s experts and CM assisted with the analysis and resolution of the issues in dispute. The panel is satisfied some of the expert evidence obtained by the complainant contributed to analysis and resolution of the issues in dispute. However, the panel is not satisfied there are exceptional circumstances in this complaint which justify an order that the insurer pay a sum in excess of $5,000. It follows the insurer must pay the complainant’s professional costs, up to $5,000. 2.4 Is the insurer liable for site attendance liabilities? No. AFCA cannot make a determination about a future event. AFCA cannot make a decision about a hypothetical liability The complainant says AFCA should direct the insurer to provide her with an indemnity for any liability which might arise from site attendees because of poor safety compliance and controls. The panel notes no information has been provided which shows the complainant is subject to any such liability. The exchanged material does not include evidence which demonstrates the complainant will be subject to any such liability in the future. AFCA cannot make a finding on the basis of a hypothetical scenario. Should such a liability arise in the future, the parties should engage with each other to determine if the liability is something the insurer must cover. Then, if a dispute does arise, the complainant may raise a new complaint about this issue. 2.5 Should the insurer pay non-financial loss compensation? Yes. It is fair and reasonable that the insurer pays the complainant $1,000 in non-financial loss compensation. No persuasive evidence the insurer mismanaged the claim Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer. The complainant has provided a voluminous amount of documentation, especially in the form of emails. This correspondence has been exchanged with the insurer and will not be referred to in detail in this determination. The panel has studied all this correspondence and evidence. Whilst the panel is satisfied the insurer did make errors during the course of the claim (for example, those errors which necessitated additional electrical make-safe works), the panel is not satisfied the complainant has endured an adverse impact, over and above expectations of normal fortitude, as a result of the manner in which the insurer has managed the claim. Moreover, the panel is not convinced by the complainant’s allegations that the insurer has failed to disclose, and is deliberately withholding, evidence. The panel notes the insurer has repeatedly reiterated it is not aware of the specific evidence the complainant is referring to and that, in its opinion, it has provided all relevant evidence as required, including in correspondence dated 14 March 2024, 24 May 2024, 15 October 2024, 4 December 2024 and 31 January 2025. Further, the panel acknowledges the complainant has substantial concerns about the insurer’s conduct. She has provided voluminous submissions explaining why she thinks the insurer and its trades have engaged in serious misconduct. Allegations of this nature are serious and carry serious consequences if proven. In all the circumstances, the panel is not satisfied the complainant’s allegations are made out. The panel also considers the information supplied by the complainant in support of her allegations contains speculation. Moreover, the evidence of her experts and trades regarding their allegations of misconduct on the part of the insurer (for example, that the insurer effectively changed its initial decision to accept the damage to the floorboards and the need for their replacement) is, in general, not consistent with the evidence overall. Finally, the panel is of the opinion some of the correspondence from the complainant is inflammatory and does not advance her position. Given these considerations, the panel is of the opinion the insurer should pay to the complainant the sum of $1,000 in non-financial loss compensation to reflect her claim experience. 2.6 Complaint should be resolved this way Time is of the essence Within 14 days’ notice that the complainant accepts this determination, the insurer must: · pay to the complainant the sum of $1,000 in non-financial loss compensation · pay to the complainant the sum of $5,000 for her professional costs. The panel notes the quotations and SOWs are dated. Therefore, within 28 days’ notice that the complainant accepts this determination, and subject to the complainant providing access to the property, the insurer must engage a suitably qualified builder, electrician and mould specialist/remediation expert (who have not previously inspected the property) to attend and inspect the property. These experts must prepare a SOW together as soon as practicable (or they must prepare separate SOWs), covering the necessary repairs and associated works required to repair the claimed damage in accordance with the terms and conditions of the policy and the matters set out in section 2.1, above. If the complainant accepts the determination they must co-operate with the insurer to enable the insurer to comply with the determination. After receipt of the SOW(s), the insurer must promptly obtain at least one actionable quotation based upon the SOW(s), either by way of a tender process or otherwise. All repairs and remedial works included in the SOW(s) must also comply with all current and applicable Commonwealth and Queensland building-related, safety-related and health-related laws, regulations and codes. Within seven days of receipt of the associated quotation(s), the insurer must pay to the complainant a cash settlement based upon and reflecting the quotation(s), but in accordance with the terms and conditions of the policy, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required. The insurer must also increase its offer regarding temporary accommodation costs to reflect a repair and remediation period of 10 weeks, at the current rate she is paying. This is in addition to covering the costs of the temporary accommodation in which the complainant currently resides. 2.7 Why is the outcome fair? The claim settlement amount the complainant seeks is excessive The outcome is fair in all the circumstances because: · the insurer’s cash settlement does not completely cover its liability to the complainant pursuant to the terms and conditions of the policy · the cash settlement amount sought by the complainant is excessive and includes the cost of repairs and remediation for damage and defects which were not caused by, and are not related to, the insured event · evidence provided by some of the complainant’s experts assisted in the resolution of the issues in dispute · AFCA is unable to make determinations about future events such as premium increases or a potential liability which may stem from attendances at the property · an award of non-financial loss compensation is reasonable and appropriate · whilst the parties have raised a number many of issues in their submissions, the panel has restricted this determination to the issues that are relevant to the outcome · AFCA’s approach throughout this complaint has remained objective, consistent with the facts and based upon the law. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in consumer and small business advocacy · a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Summary of relevant expert reports The expert reports summarised below were relevant to the determination outcome. Other reports obtained by the parties, but not relevant to the determination, have not been included in this summary. | Report | Key points | Insurer’s builder (AR) Report 28 August 2023 | · AR and complainant present during inspection (10 August 2023 according to PC’s first report) · Confirms escape of liquid loss event due to burst flexi-hose under upstairs bathroom (master ensuite) vanity · Significant damage to both levels of the property · Stripped out upstairs level skirting to facilitate drying · Significant damage to ceiling and floorboards in the downstairs area · Attached images show flooring with disputed grey substance between the floorboard joins, and separation occurring. | Insurer’s restorer (PR) Report 9 October 2023 | · Estimated minimum hot water escape during insured event is 14,000 gallons · No pre-existing damage noted · Temporary accommodation required as the property is not habitable · Further drying required following moisture testing – attached photographs show multiple locations on both levels still wet · Mould testing completed with surface tape lifts · Containment barriers and air scrubbers required · Full height strip out required in lower level, including walls, window and door architraves, as well as plasterboard · Remove and dispose of damaged timber flooring in lounge, kitchen, dining, and hallway area · Decontamination of underlying structure – triple clean process – Mould · Electrical appliances, kitchen appliances, fixtures and cabinetry to be stripped out · Mould sampling, air and surface testing required · Post remediation verification required · Attached photographs show timber flooring gap between joins, indicating shrinkage. Floor has also risen (sic) across surfaces. | Insurer’s mould lab (VI) Report 11 October 2023 | · Condition 3 mould located on samples 1, 2, and 3 (lounge ceiling/wall frame, wall left, rear base plate, rear left framing) · Condition 2 mould located on sample 4 (lounge base plate, rear right.) · Condition 3 mould definition - An indoor environment contaminated with the presence of actual mould growth, associated spores and fungal fragments. Actual growth includes growth that is active or dormant, visible or hidden · Condition 2 mould definition - An indoor environment that is primarily contaminated with settled spores or fungal fragments that were dispersed directly or indirectly from a Condition 3 area, and which may have traces of actual growth. | Insurer’s civil engineer (DB) Report 1 December 2023 | · Site inspection completed with PI on 22 November 2023 · No evidence of water damage or moisture damage to ceramic tiling · No damage located to remaining building material during inspection · Fire wall removed prior to attendance and will need to be reinstalled during the repair · Reviewed concerns of bowing in the external wall - none located · Reviewed concerns of building movement generally, particularly around the exterior deck · Raised concerns about site drainage · Highlighted dry rot around external deck · Concludes structural integrity of the property not affected by the leak · Flooring “peaking” damage not seen. Contingency repair cost added to SOW in case missed on visual only inspection · Provided SOW for repairs. | Insurer’s restorer (PR) Report 4 December 2023 | · Completed moisture assessment. Concluded further drying of the hallway timber base plate was required · Upper level floor tiles now below 4% moisture level · Moisture content of the lower levels below 15%, showing successful drying. · H class vacuuming to be completed and surface and air sampling required · Further drying to occur in the laundry and hallway areas. | Insurer’s mould hygienist (CD) Report 22 December 2023 | · Inspected property on 20 December 2023 to complete PRV · Timbers visibly clean and moisture content readings less than 15% recorded · Air samples and 30 surface samples collected, all displaying normal mould ecology · CD considers the property is appropriately dried and remediated for mould · Cleared for internal works to continue once air conditioners are appropriately serviced. | Insurer’s restorer (PR) Report 27 December 2023 | · Moisture check completed. Drying successful · Removed all drying equipment · PRV certificate issued · Inspected lounge flooring – pre-event movement and gapping located · Presence of filler between the boards, compromised by the insured event · In the void beneath flooring and on the underside of flooring, there is no sign of microbial damage. Area is open to the elements/natural earthen solum · Timber floor will move naturally as a result of (environmental factors such as) increases and decrease in humidity · Flooring moisture will follow external weather, causing expansion and contraction · Removal of tongue and groove timber flooring not warranted – able to fill the gap with flexible filler, sand and refinish · Slight cupping noted in the attached photographs. | Complainant’s engineer (CM) Report 16 January 2024 | · Recounts the details of the dual site inspection · Says insurer’s experts did not give a clear answer about the alleged non-conformity of the file wall · Various questions about extent of liability the insurer have not been answered by the insurer’s attendees · Insurer’s engineer left the site, stating questions being posed were not engineering questions and deferred to PC to answer · Insurer’s attendees did not answer the question of how they gained access to the subfloor areas · Subfloor area inspected with a strong torch, rather than trying to gain access during the meeting · Challenged the insurer’s attendees about not taking photographs to support their views during the site inspection. Alleged response received “it will be noted” · Timeframes to next update discussed · Meeting ended by insurer’s attendees deciding to leave the site, approx. 25 mins. | Insurer’s firewall expert (PS) Report 8 February 2024 | · Attended property to review fire wall construction on 16 January 2024 · Fire wall is cut off flush with the top of the upper-level subfloor · Material can be reused, however, original construction is not to manufacturer’s specifications. Sheet is not continuous to the height of the property · Recfification requires shifting the upper floor structural elements to enable a compliant install. | Insurer’s engineer (DB) Report 14 February 2024 | · Attended property on 16 January 2024 with PS to review fire wall separation compliance issues · Original installation of the fire wall was not compliant with the code of the time of construction · Holes have been cut in the fire wall for electrical outlets, the board stops at the underside of the stairs, and continues again above it, and the same occurred at the upper-level floor joists · Rectification options provided by PS which will most likely need approval from a building certifier. | Complainant’s firewall specialist (FC) Report 7 May 2024 | · Purpose of the report is to make recommendations regarding the water-damaged fire wall · Inspection occurred on 16 April 2024 · Damaged portion of ground floor fire wall only removed · Ground floor slightly raised from the common wall between the dwellings, which is reported to be masonry blocks · Existing fire wall extends into the roof cavity · CSR guide says water damaged plaster board including this type of board (CSR2067) must be replaced if wet · Recommends: > removing water damaged fire wall > replace or repair any other water damaged material behind it > reinstall with compliant materials > fill all gaps with fire rated sealant · Report includes a diagram showing how this will affect the wall cavities and where building material will need to be shifted or wrapped in fire-rated material to correct non-compliance. | Complainant’s mould expert (OP) Report 28 May 2024 | · Says poor hygiene and incomplete restoration resulted in property being exposed to mould for a long period, including contents · Recommends significant work to upstairs level of the property, as outlined in NL and TJ reports and SOWs · Water damaged carpet in second bedroom never removed - likely damage to floor beneath · Furnishings and clothing left in upstairs without protection · Air conditioner not removed in upstairs bedroom · Noticeable movement in ensuite floor tiles · No drilling in upstairs walls and floors to assist drying · No testing of waterproof membrane shown · Noticeable toilet and laundry wall drill holes, and water staining observed between the wall sheets and bracing · Recommends: > contents be removed and tested > removal of structural materials if they cannot be effectively restored, particularly bedroom two flooring > stripping upper floor walls to 1200mm from floor > assessing waterproof membranes > replacing lower-level water damaged timber flooring > porous material showing visible mould be replaced > semi-porous material should be cleaned with HEPA vacuum, abrasive methods, and wet wiped with anti-microbial material. | Complainant’s building certifier (CB) Report 24 July 2024 | · Visual inspection on 28 May 2024 · Unable to properly inspect Bedroom 2 as full of home contents · All upper floor coverings not removed showing signs of flooding · Ensuite has serious undermining of the existing water-proof membranes due to water ingress below the floor tilling system · Tiles are peaking and have likely ruptured the waterproof membrane · Obvious damage to the walls and floors below the bathroom remain · Water damage to upper floor wall plaster board shows water ingress has occurred to upper-level frame · Evidence of water damage to almost all walls of the lower level · Entire lower floor plasterboard has been compromised · Floor frame mould present in exposed areas · Musty smell in the property · Ceiling should be removed to enable drying and treatment · Damage to the floorboards is most severe in the main living area, kitchen, and hallway. Cupping of floorboards present. Flooring needs full replacement throughout lower level to meet compliance requirements · Joints were either open or filled with grey dust or from debris which extend into the tongue and groove, compromising the floor integrity. Removing floors will require frame support and engineer review to certify the new floor · Lower-level bathroom affected in a similar manner as the upper-level bathroom. Wall linings also affected · Signs of paint blistering in the under croft of the stairs · Water damage has occurred to internal fire wall separation. Defers to the fire wall specialist opinion. | Complainant’s electrician (FE) Report 2 August 2024 | · Attended on 2 August 2024 and 6 August 2024 · Correcting work in previous electrical report (10 October 2023) that not completed · Switchboard not replaced, temp GPOs, and an unprotected sub mains feed were live · Live wiring and switchboard left in an unsafe manner · Corroded terminals in GPO · Two living room cables were showing exposed conductors, requiring a make safe · Extent of the concerns located meant full identification could not be achieved without significant time spent · To be able to warrant upper-level electrical systems, will need two electricians for 1 day for around $2,000 plus GST · Electrical make-safe completed on first visit · Repair not suitable. Replacement of damaged items required · Final sub-circuits for aircon (ground floor), lights in both upper and lower levels and power circuit 2 on the ground floor · Switchboard needs new switchgear, including safety switches to each circuit and new re-wired final sub-circuits · Feeds for lighting and power to upper level will also need to be replaced, as the run downstairs to the switchboard is water affected. | Complainant’s mould expert (OP) Report 13 August 2024 | · There is still mould in the ceiling beams below where the leak occurred. Specifically, the report says OP tested the: > kitchen/living room ceiling timber beam surface, next to rear wall, in the centre, above the sliding door to outside > kitchen/living room ceiling timber beam surface, in approximate centre of the room > kitchen/living room ceiling timber beam surface, in approximate centre of room · All three of these areas returned a positive result for Aspergillus/Penicillium mould, which is known to be linked to water damage · Supporting photographs attached to the report also showed visible mould on timber joist surfaces. OP recommends replacement, as the strip pine is porous material · This is in conflict with the earlier report saying wood is a semi-porous material which should be remediated first. | Complainant’s restorer (NL) Report 2 September 2024 | · Scope of work recommendation. > Strip upper level including flooring and joists as directed by engineer and hygienist > Plaster removed from all walls to sheet joins (approx. 1200mm from floor) and chipboard flooring removed > Essentially, removing material back to the frame in all upstairs rooms except for the ceiling and anything above the wall sheet join > Replace all lower-level timber flooring > Removing timber joist in the living room following OP directions > Remove all ceiling and wall plaster in the laundry and toilet, including waterproof screed > Full strip out of walls in wet rooms · Presence of condition 2 – settled mould spores – on floor of bedrooms 1 and 2 · Solid timber floors on lower level have elevated moisture content · Subfloor is I-beam composite joists exposed to environment and sub floor soil · Recommends localized containment and airflow controls · HEPA filters for airborne mould removal · Surfaces to be HEPA vacuumed, abrasive scrub, anti-microbe wash before PRV review. | Complainant’s engineer (CM) Report 23 September 2024 | · References images showing all upper and lower-level rooms were impacted by EOL, ceiling in lower level damaged, and insurer’s remediation work did not include all the same places · Says insurer’s remediation work was incomplete and left risks preventing restoration work proceeding · Insurer has not completed the time consuming and difficult repairs · SOW increase due to delay leading to further work and required due to incomplete stripping out and drying by the insurer · Says insurer withheld key pieces of information about safety and construction work which has left high potential for the SOW it provided to be inadequate. · Site was left unsafe, in contradiction of the insurer’s position · Time delay means only an initial scope can be determined · Settlement of foundations and subfloor ponding arguments have been dismissed by level checks of the property and proof of adequate site drainage · Fire wall latent condition defect fully assessed and $3,000 removed from the quoted building works to account for the minor adjustment needed to rectify the defect · Damage to the property can be described as very high/costly. Removal of 4 full wet area rooms, and half of the wall linings in the upper floor, full replacement of lower-level floor, and contaminated floor joists. Structural bolstering during the works, and specialised decontamination work is required. | Insurer’s restorer (PR) Letter 6 November 2024 | · No mould controls at site since PI left on 27 December 2023 · Report on 27 December 2023 showed flooring was dried to acceptable levels · PRV completed by independent hygienist issued 22 December 2023 confirming surface and air ‘OK’ in both levels of the property · 3 November 2023 testing of contents in bedrooms 1 and 2 showed they were not mould affected · Condition 1 achieved in upper levels on 3 November 2023 · NL assessment occurred 9 months after clearance · No vapour barrier protecting lower-level floor · Current moisture levels in the property are not related to the insured event · Mould occurring due to settled spores being activated by environmental moisture in unoccupied property. | Insurer’s engineer (DB) Letter 12 November 2024 | · Lack of water staining to plasterboard in historical photos supports the insurer’s position · No water staining to lower-level timber framing · No water staining to fire board · Water will cause floorboards to swell, not shrink, and shrinkage is what is shown in the images · Poor surface draining not considered by the Complainant’s experts · Flooring was not peaking until well after the drying was completed · Sanding and staining are sufficient to repair the flooring · Joist removal is excessive · Complainant’s experts have included maintenance work and other work in claimed loss which is not related to the insured event. | Complainant’s mould expert (OP) Letter 15 January 2025 | · PI initially planned to remove the flooring, then changed its mind without justification · Flooring was never removed (consistent with photos) · Porous materials not removed from site or properly made safe from mould contamination · Mould now in the building is from EOL event, or cross contamination of improperly dried materials · Ventilation is the responsibility of those in possession of the property, not necessarily the owner, given it is a work site · Subfloor water ponding is not occurring, and that argument is distracting from the real cause of the damage. | Complainant’s restorer (NL) Letter 18 January 2025 | · Insurer’s trades’ positions are contradictory with earlier positions · Mould contamination confirmed · Insurer did not provide necessary documents to confirm the work completed · DB’s and insurer’s inspections happened before remediation was successful by approximately 1 month, rendering any earlier PRV certificates invalid · The insurer and PI do not appear to have planned correctly for the work needed · PI stopped work when they discovered the timber flooring was supporting the wall structure. | Complainant’s builder (TJ) Letter 19 January 2025 | · Denies that mould is due to water ponding beneath the building · Denies the quote includes maintenance or building defect work · Says joints between the floorboards are full of water born detritus from the insured event · DB’s assessment was made before remediation was completed · DB assumes remediation was completed when it was not · Remediation work stopped when the insurer’s trades realised the hard wood flooring was supporting external and load bearing walls · Says insurer’s position relies on a methodology which does not take the flooring support into account · Incomplete remediation work carries risks the insurer should bear, rather than the Complainant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.