Settlement method, scope of repairs and loss of rent after burst water pipe

FirmSuncorp Group
Decided2025-02-19
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$57,946
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a burst hot water pipe damaged a rental home, the complainant disputed the insurer's repair scope and sought more loss of rent. AFCA found the insurer's $52,678.58 repair quote fair, with a 10% uplift if cash settlement is elected, and refused additional loss of rent.

The policy permits repair of damaged parts only, and the insurer's actionable quote and lifetime guarantee were reasonable, with no evidence the additional replacement or rental costs were necessary.

Issues

Subjects and remedies

pay claimrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1036125 | Financial firm | AAI Limited Case number: 12-00-1036125 ​27 June 2024 Determination overview Complaint The complainant held a landlord home building and contents insurance policy underwritten by the financial firm (insurer). He lodged a claim for water damage to the home, which occurred on or about 16 May 2023. The insurer accepted there was damage caused by an escape of liquid, which is a covered event under the policy. It agreed to repair the resultant damage and arranged for a repairer to quote the work. The complainant is unhappy with the proposed scope of work (SOW) and disagrees with the insurer’s proposed repair approach. He is also dissatisfied with the loss of rent (LOR) incurred through the delays he says were caused by the insurer. He wants cover for this loss also. Issues and key findings Is the insurer’s proposed building settlement fair? Yes. The insurer’s offer to repair or cash settle the costs to repair the home is fair and in accordance with the terms and conditions of the policy. Should the complainant elect to receive a cash settlement, the insurer must pay $52,678.58 plus a contingency uplift of 10%. This will compensate the complainant for any minor additional work required, the loss of the lifetime guarantee and for the transfer of risk. Is the insurer required to pay additional LOR? No. The insurer’s settlement offer was fair and the complainant has not explained why further LOR should be paid. There is therefore no need to pay additional LOR. Why is the outcome fair? The insurer’s offer to repair or cash settle the cost to repair the damage is fair and in line with the terms and conditions of the policy. It would not be fair to require the insurer to replace undamaged items or aspects of the home, unless it was necessary to do so to attend to the required repairs The exchanged information does not show this work is necessary. It is also not necessary for the insurer to pay additional LOR costs as these have not been substantiated. Determination This determination is mostly in favour of the insurer. The insurer is entitled to rely on its repair quote for $52,678.58 to attend to the necessary repairs at the home. The complainant may elect to retain the insurer’s builder to undertake the work or accept a cash settlement for this amount. If the complainant chooses to receive a cash settlement, the insurer must include a contingencies uplift of 10% with the payment. There is no need to include interest in the settlement. Reasons for determination Is the insurer’s proposed building settlement fair? Yes. The insurer’s offer to repair or cash settle the costs to repair the home is fair and in accordance with the terms and conditions of the policy. Should the complainant elect to receive a cash settlement, the insurer must pay $52,678.58 plus a contingency uplift of 10%. This will compensate the complainant for any minor additional work required, the loss of the lifetime guarantee and for the transfer of risk. Policy covers escape of liquid subject to terms, conditions and exclusions The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy covers loss or damage caused by an escape of liquid. Any cover provided is subject to the policy’s terms, conditions and exclusions. Damage caused by water leak from burst pipe The insurer arranged for builder AB to attend the home after the loss was reported. AB’s report confirmed damage was caused by an escape of liquid. AB said: the complainant had owned the home for about 10 years and the tenants have been in it for about four years a copper hot water hose pipe burst and the tenants arranged for a plumber to repair it damage was caused to the ‘entire left wing’ of the home, including the wall cavity, vanity, kickboards, gable ends, architraves, doors, door jambs, subfloor, carpets and floating floor the damaged pipe sustained a ‘small pinhole leak’ which ‘turned into a burst, due to weather as the pipe had shrunk and expanded during hot and cold’ conditions. AB’s original quote to address the damage on 7 June 2023 was for $39,665.95. Later, it provided a revised quote for $52,678.58 on 14 November 2023. The insurer relied on this quote for its settlement offer. Complainant unhappy with insurer’s proposed method of settlement The complainant does not agree with AB’s proposed method of repair. He says AB cut areas of the flooring, intending to repair, rather than replace it. He wants the insurer to repair the home ‘the way [it] was before the water damage’. The complainant met with the insurer’s assessor and AB at the property on or about 8 August 2023. The insurer’s assessor reports the parties discussed the appropriate repair methodology for the damage. The complainant wants the insurer to replace the damaged areas ‘new for old’. He wants all the particle board flooring replaced directly under the timber wall framing with no joins. He also wants the plaster walls to be replaced from floor to ceiling. Whilst the insurer acknowledged the policy covers ‘new for old’ replacement, it said this is only if replacement is necessary. The assessor said it is not. The complainant obtained repair quotes from builders AC and RB for $137,500 and $98,120 respectively. Later, he obtained a further two quotes from builder MF for $53,350 (which was not itemised) and another from builder YH. The YH quote provided no firm figure but estimated the work would cost between $45,000 and $53,000. Whilst the complainant wants the insurer to undertake the repairs, he wants it to do so in accordance with his view of how the repairs should be done. He wants the insurer to replace the infrastructure in all the damaged areas. The insurer’s assessor reviewed the complainant’s repair quotes. The assessor wrote that the initial quotes do not include measurements and RB has not included a breakdown for the repair costs. He considered these quotes were not fair and reasonable. The insurer says the first two quotes focus on rebuilding aspects of the home, rather than repairing the damage. The insurer does not consider this is appropriate or necessary. It says its proposed repair approach is in line with the policy terms and conditions. The later quotes from MC and YH are for similar amounts to what is proposed in the AB quote. Insurer’s proposed settlement method is fair The insurer’s internal building coordinator confirmed AB’s proposed repair method: Is a compliant installation method to finish the sheet at the bottom plate edges and [to] install trimmers across the floor joists to take the fixings of the sheet ends The building coordinator confirmed this can only be done if the sheet below the bottom plate has not been compromised. This means that if the repairer finds the repairs cannot be completed as proposed, the insurer will be required to replace the plasterboard. Relevant to the complainant’s concerns, the insurer’s PDS notes: We will only repair or rebuild the parts that are damaged where the damage is covered by your policy. Apart from the limited circumstances where we will repair or rebuild undamaged parts… the policy does not cover you to replace undamaged parts… Noting the insurer is prepared to undertake the work, I am satisfied its proposed repair method is fair. Whilst the insurer agrees it replaces damaged items on a ‘new for old’ basis, the PDS says the insurer can either repair or cash settle the appropriate amount. Any repairs completed by the insurer’s contractor will be subject to a lifetime guarantee. Should the complainant not agree to this, the PDS says: You will be paid the amount of the assessed quote to repair or rebuild on a ‘new for old’ basis. Note: this amount may be less than what it would cost you to arrange the repairs or rebuild with your own builder. We are able to secure supplier discounts from within our supplier network The insurer is prepared to undertake the necessary repairs it estimates will cost $52,678.58. As previously noted, any repairs conducted by the insurer‘s trades will be subject to a lifetime guarantee. Should the complainant not be prepared to permit the insurer to repair the home, I accept the insurer should be entitled to cash settle the claim. I further accept a 10% contingency uplift should be added to AB’s quoted amount. The addition of the contingency uplift will compensate the complainant for any minor additional repairs required, the loss of the lifetime repair guarantee and the transfer of risk. Is the insurer required to pay additional LOR? No. The insurer’s settlement offer was fair andthe complainant has not explained why further LOR should be paid. There is therefore no need to pay additional LOR. Insurer is not required to pay additional LOR to the complainant Noting the policy provides cover for a tenanted rental property, the complainant seeks additional cover for LOR whilst he has been waiting for the insurer to complete work. It is not in dispute that the insurer has paid LOR previously for this claim. The parties did not make significant submissions on this issue and the complainant has not detailed how or why he thinks the amount the insurer has paid is deficient. Given I am satisfied that the insurer’s proposed repair settlement is fair (and that this could have been accepted previously) and the complainant has not explained why the previous LOR payment was insufficient, I do not consider the insurer is liable for additional LOR. Why is the outcome fair? The insurer’s offer to repair or cash settle the cost to repair the damage is fair and in line with the terms and conditions of the policy. It would not be fair to require the insurer to replace undamaged items or aspects of the home, unless it was necessary. The exchanged information does not show this work is necessary. It is also not necessary for the insurer to pay additional LOR costs as these have not been substantiated. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.