Text of the determination
Determination
|
Case number
|
12-00-1036038
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-00-1036038 10 September 2024
Determination overview
Complaint
The complainant holds home building and contents insurance with the financial firm (insurer). On 9 August 2022, she lodged a claim for internal and external damage to the home that she noticed following a storm on 28 February 2022.
The insurer accepted the water ingress damage and offered $40,751.87 as a cash settlement based on a scope of works (SOW) dated 6 June 2023 from builder JL. However, it denied the cracking and movement damage (disputed damage). It says that damage was not the result of a storm but was from excluded causes including long term ground movement.
The complainant maintains all the damage is storm related and says the insurer’s cash settlement offer is insufficient to cover the internal damage repair costs. She wants the insurer to accept the entire claim and to pay for temporary accommodation (TA) while repairs are completed. She is also dissatisfied with the insurer’s claim handling.
Issues and key findings
Is the insurer required to cover the disputed damage?
No. The disputed damage was more likely than not from excluded causes.
Is the insurer to pay the complainant more than it offered?
Yes. The offer was based on a quote prepared a year ago and did not include a contingency uplift. The insurer is to obtain from JL a desktop quote for the current retail cost of its SOW and estimates of how long (if at all) the home will be unliveable during repairs and if contents storage will be needed. The insurer is to pay the quoted amount, TA and storage costs based on the estimates, and a 15% uplift.
Is non-financial loss compensation payable?
Yes. The insurer’s claim handling unreasonably caused the complainant stress and inconvenience. It is to pay her $1,500 in compensation.
Why is the outcome fair?
It is fair that the insurer be permitted to deny the disputed damage as it has shown exclusions apply. However, it is also fair that the insurer cash settles the accepted damage based on a current retail quote plus a contingency uplift. As the insurer has unreasonably caused the complainant stress and inconvenience, it is also fair that it pays her compensation.
Determination
This determination is partially in favour of the complainant. If the complainant provides written notice to the insurer that she accepts this determination, the insurer is required to:
take the steps outlined in section 2.2 below to cash settle the covered damage, and
within 14 days, pay the complainant $1,500 in non-financial loss compensation.
Reasons for determination
Is the insurer required to cover the disputed damage?
No. The disputed damage was more likely than not from excluded causes.
Complainant is required to show claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than not), that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainant and W for damage to their home caused by a listed insured event. Those events include ‘Storm, cyclone, rainwater or run-off’.
The certificate of insurance (COI) confirms that the complainant also purchased optional accidental damage cover. The PDS defines ‘accidental damage’ as ‘damage caused by sudden, unforeseen and unintended events’.
On 9 August 2022, the complainant notified the insurer that following sustained heavy rainfall on 28 February 2022, her home showed signs of water ingress damage as well as internal and external cracking and movement damage.
The insurer accepted the water ingress damage, and, to that extent, it agrees that the complainant has established a claimable loss. However, the insurer denies the complainant has shown a claimable loss for the disputed damage and also says that damage is from causes excluded from cover under the policy terms.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Insurer denied the claim
Builder JL inspected the home on 2 September 2022. JL reported to the insurer that:
the resultant damage from the storm involved the ceilings in multiple rooms, some of the kitchen cabinetry, and the vinyl flooring in the living room and book room
it had arranged for a roofer to undertake make safe repairs to broken tiles and leak points
it recommended reports be obtained from a roofer and an engineer.
Roofer AR inspected the home’s roof on 8 September 2022, and found cracked roof tiles and pointing, slipped and poorly installed roof tiles, a broken barge tile, defective barge bedding and pointing, and debris in the guttering.
On 30 September 2022, engineer TC inspected the home. It reported that:
its floor level survey indicated 36mm of differential movement internally, which was not a concerning amount of building movement
the area is known to have reactive soils. While the internal movement suggested this was a moderate site, it is likely the true classification would be higher than that
the cracking was more severe than that expected from the limited measured movement. TC hypothesised that could be due to the foundation soil drying out after having expanded during the extremely wet few preceding years
there appeared to be a low point in the rear northern outside area. A geotechnical issue would be causing the subsidence, such as:
> tree root ball removal during original earthworks, with reinstated soil not well compacted
> rotting vegetation left in the ground when the site was originally developed
> a geotechnical inconstancy and/or variation in the natural material, or
> over-excavation for plumbing/drainage, which has not been sufficiently compacted
apart for cracking in the rear wall and a few other areas, the floor level survey results suggest the home has not been adversely affected by the foundation movement
the internal plaster cracks were the result of building movement and can be patched
it concluded that ‘the building movement is not a consequence of the recent rain events. The building movement has been occurring for some time, and that the building movement at the rear of the property, is due to some pre-existent geotechnical issue’.
In the circumstances, the insurer says the complainant has not established the disputed damage was from a single storm event. Rather, the disputed damage is from excluded causes, noting that the PDS says:
the Storm insured event only covers damage caused by or arising from soil movement or subsidence if it is caused directly by or occurs within 72 hours of a storm (PDS page 17)
the policy does not cover damage as a result of, caused by or arising from:
> gradual deterioration, wear and tear or lack of maintenance
> faulty design or materials, structural defects or poor workmanship
> soil movement unless it is directly caused by and occurs within 72 hours of (relevantly) a storm (PDS page 54).
Complainant says disputed damage should be accepted
The complainant says the home is insured against storm damage, and that the disputed damage is the result of a series of heavy rain events over time. Further, that the consequences of the rain events would not necessarily be evident within 72 hours to an average person.
She submits that having accepted the internal damage as storm related, the insurer should also accept the disputed damage.
In support of her position, the complainant has provided information from the Bureau of Meteorology website showing high rainfalls affected her area in the first half of 2022.
She also provided a report dated 12 February 2024 from KW, building consultant. KW says:
he did not agree with TC’s conclusion that the building movement had been occurring for some time and was not due to recent weather events
he had prepared a pre-purchase inspection report for the complainant in December 2012, and had undertaken minor, non-structural renovations over the next four years. Over that period, there was no indication of movement
the disputed damage is generally occurring at the rear of the building. For this to occur the rear of the building has cranked from the main section of the home
‘In my opinion the foundation soils have moved in a localised section of the property. This could be due to the possibility of moisture in the soils changing or even sections of the subsoils being engulfed into a substrata section of the area. This damage is not caused by general and normal expected movement of soils to the foundations of a building’.
The complainant submits that ‘the unprecedented rainfall reported for the Brisbane area in the months and years prior to our property damage was the biggest contributing factor to the movement of our home’.
Insurer is entitled to deny the disputed damage
Based on the exchanged information, I am satisfied that it is more likely than not that the disputed damage is the result of excluded causes rather than a covered storm because:
AR’s findings all the roof damage was maintenance related supported by multiple photos and has not been challenged
TC’s report contains extensive analysis, supported by photos and scientific test results. While the report contains some speculation, it is nevertheless well reasoned and I find it more persuasive than KW’s less detailed report
I am not satisfied that KW’s observations of the home up to 2016 (four years after its purchase) are sufficient to rule out subsequent long term building movement
KW agrees with TC that there has been localised foundation soil movement, possibly due to changes in moisture content, but does not say that occurred immediately after a storm
there is no evidence to show that the disputed damage was directly caused by and occurred within 72 hours of a storm
the exclusions limiting cover for storm related soil movement to that which occurs within 72 hours of a storm are not unusual, and commonly appear in home insurance policies.
I acknowledge that the insurer has not directly addressed the accidental damage cover included in the policy. However, as the general exclusions set out on page 54 of the PDS apply to all policy exclusions, the accidental damage cover does not assist the complainant.
Is the insurer to pay the complainant more than it offered?
Yes. The offer was based on a quote prepared a year ago and did not include a contingency uplift. The insurer is to obtain from JL a desktop quote for the current retail cost of its SOW and estimates of how long (if at all) the home will be unliveable during repairs and if contents storage will be needed. The insurer is to pay the quoted amount, TA and storage costs based on the estimates, and a 15% uplift.
A cash settlement is reasonable
It appears the parties agree that to the extent the claim is covered, it should be cash settled.
Regardless, I am satisfied that a cash settlement is reasonable. Both claim related and non-claim related damage are present. Also, the parties’ relationship has deteriorated to the point where further extensive interactions between them will likely result in additional disputes.
A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then typically applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs.
Insurer offered a cash settlement
On 2 March 2023, the insurer offered the complainant a $34,959.28 cash settlement. The insurer says the offer was based on a SOW/quote from JL.
After the complainant requested the insurer reconsider its claim decision, the insurer arranged for JL to review its SOW. JL provided an updated SOW dated 6 June 2023, quoting $41,751.88. The insurer offered the complainant $40,751.88 as a cash settlement, being JL’s updated quote amount less the $1,000 policy excess.
The policy covers TA costs if the home is rendered unliveable due to damage from an insured event, for the reasonable period it takes to be repaired. However, the insurer says neither the accepted damage nor the required repairs would render the home uninhabitable.
Complainant says insurer’s offer is inadequate
The complainant says the insurer’s cash settlement offer for the internal repairs is inadequate. She relies on the SOW included in KW’s report dated 12 February 2024, which KW estimated would cost $492,000. KW provided a more detailed SOW on 24 April 2024, quoting the same amount.
The complainant says that it will be necessary to vacate the home during repairs, which she had been informed would take two to four weeks. She seeks TA costs on that basis and is also concerned that her contents may need to be removed and stored.
Insurer is required to pay more to cash settle the claim
I am satisfied JL’s SOW is a more reasonable basis on which to formulate a cash settlement than KW’s SOW. JL’s SOW contains significantly more itemisation and makes allowances for items a retail customer would typically pay, including home warranty insurance and a builder’s margin. Further, KW’s SOW includes large allowances for disputed damage repairs.
However, the insurer’s cash settlement offer did not include a contingency allowance as it should have done. This means the offer was not a reasonable one. Further, offer was based on a quote that is now over a year old, so will not reflect current retail prices.
I also note that JL stated in its report dated 2 September 2022 that the home was habitable and would remain so during repairs but estimated that the repairs would take 90 days. If the repairs are likely to take three months I consider it likely there must be some prospect that TA will be required.
Therefore, if the complainant provides written notice she accepts this determination, the insurer is to take the following steps:
within 14 days of receiving the notice, it is to request from JL a desktop quote for the current retail cost of the repairs set out in its SOW dated 6 June 2023, and estimates of how long (if at all) the home will be unliveable during repairs and whether it will be necessary to place contents into storage during the repairs
within 14 days of receiving JL’s updated quote and estimates, the insurer is to provide a copy to the complainant and pay her the quoted amount, TA based on the estimate, storage costs based on the estimate, and a 15% contingency uplift on each component
payments are subject to the terms and conditions of the policy. This means the insurer is entitled to apply any relevant sum insureds and deduct the $1,000 excess.
Is non-financial loss compensation payable?
Yes. The insurer’s claim handling unreasonably caused the complainant stress and inconvenience. It is to pay her $1,500 in compensation.
AFCA can award compensation for poor claim handling
Under the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, or interference with the complainant’s peace of mind.
Insurer is to pay non-financial loss compensation
The complainant says the insurer has caused her major stress and inconvenience. She refers to delays, repeatedly answering the same questions, and poor communications generally.
It took the insurer eight months to make its initial claim decision, which is double the standard period referred to in the General Insurance Code of Practice. I also consider that the insurer should have on occasions communicated more regularly and clearly.
I accept those issues were stressful, frustrating and inconvenient for the complainant. The insurer is to pay her $1,500 in non-financial loss compensation.
Why is the outcome fair?
It is fair that the insurer be permitted to deny the disputed damage as it has shown exclusions apply. However, it is also fair that the insurer cash settles the accepted damage based on a current retail quote plus a contingency uplift. As the insurer has unreasonably caused the complainant stress and inconvenience, it is fair that it also pays her compensation.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.