Home / Suncorp Group / Determination 12-00-1034744
Determination 12-00-1034744
claim_denial
Summary
The complainant claimed for storm damage to the whole roof of her home, and the insurer accepted internal water damage but denied the main roof as pre-dating the policy. AFCA upheld the denial and ordered $1,500 for non-financial loss due to excessive claim delays.
The complainant had the onus to establish a valid claim, and the engineer's evidence that the main roof damage pre-dated policy inception was more persuasive than the complainant's expert.
Issues
- Claim denial primary · not upheld“The exchanged material shows the damage to the main roof likely occurred before the complainant's policy was incepted in May 2019.”
- Delay secondary · upheld“There were excessive delays in the processing of the claim which caused undue stress and anxiety for the complainant.”
- Misleading conduct secondary · not upheld“There is no persuasive evidence the insurer misled the complainant.”
Subjects and remedies
home or building damagepay non financial loss
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
|
Case number
|
12-00-1034744
|
Financial firm
|
AAI Limited
Case number: 12-00-1034744 30 July 2024
Determination overview
Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer). On or around 15 March 2022 she lodged a claim for damage to her home which, she believes, was caused by a storm that occurred on 25 February 2022 (the storm).
The insurer investigated the circumstances of the claim. It accepted the claim for internal water damage. However, it only partially accepted the claim for damage to the roof of the complainant’s home. In particular, the insurer offered a cash settlement of $8,708.30 for hail damage to part of the roof of an extension to the dwelling that was built in the 1990’s. The insurer says this roof damage probably occurred after the complainant’s policy was incepted in May 2019.
The settlement offer also includes the cost to replace some roof sheets damaged by foot traffic, as the insurer accepts its repairers may have contributed to this damage.
The insurer did not accept the claim for damage to the rest of the roof - that is, the original roof covering most of the main dwelling which existed before the extension was added (the main roof). It says such damage to the main roof most likely occurred before the complainant’s policy was incepted.
The complainant disagrees. She seeks replacement of the entire roof.
The complainant also believes all roof damage had initially been accepted by the insurer at a cost of $85,000 but, when it received a higher quote for the replacement, the insurer decided to decline the claim.
Further, the complainant is dissatisfied with the quality of the insurer’s communications and the length of time it has taken for her claim to be assessed and processed.
Issues and key findings
Is the insurer entitled to deny the claim for damage to the main roof?
Yes. The exchanged material shows the damage to the main roof likely occurred before the complainant’s policy was incepted in May 2019. Therefore, the complainant has not established a valid claim for this damage. It follows the insurer is entitled to deny the claim for the damage to the main roof.
Did the insurer mislead the complainant?
No. There is no persuasive evidence the insurer misled the complainant.
Should the insurer pay non-financial loss compensation?
Yes. There were excessive delays in the processing of the claim which caused undue stress and anxiety for the complainant. It is fair and reasonable that the insurer pays the sum of $1,500 in non-financial loss compensation to the complainant.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
the complainant has not established a valid claim for the damage to the main roof
the damage to the main roof likely occurred before the policy was incepted
the insurer did not mislead the complainant
there were excessive delays in the processing of the claim
the sum of $1,500 in non-financial loss compensation is fair and reasonable in the circumstances.
Determination
This determination is substantially in favour of the insurer.
Within 14 days’ notice that the complainant accepts this determination, the insurer must pay to the complainant the sum of $1,500 in non-financial loss compensation.
Otherwise, the insurer is not required to take any further action in relation to this complaint.
Reasons for determination
Is the insurer entitled to deny the claim for damage to the main roof?
Yes. The exchanged material shows the damage to the main roof likely occurred before the complainant’s policy was incepted in May 2019. Therefore, the complainant has not established a valid claim for this damage. It follows the insurer is entitled to deny the claim for the damage to the main roof.
Complainant says entire roof damaged by the storm
The complainant’s home was originally built about 120 years ago. She purchased the property in 2011.
The site is a single storey dwelling on a block that gently slopes from rear to front, located in a residential area. The construction consists of stump footings, weatherboard external walls, and a metal roof.
The rear and right-hand side of the dwelling (looking from the street) has an extension that was added by a previous owner; however, it is unknown exactly when the extension was constructed. The exchanged material appears to show it was, most likely, added to the main home in the 1990’s.
The complainant says the flat roof at the back of the dwelling leaked in a February 2022 rain event. In addition, after a hailstorm in 2019, a skylight on the right-hand side of the main roof was changed (the skylight). No insurance claim was made after this event.
The complainant contacted the insurer on 15 March 2022 to make the claim which is the subject of this complaint. She told the insurer her home had been damaged by the storm.
The insurer investigated the circumstances of the claim and arranged for CC, builder, to inspect the complainant’s home on 29 April 2022. Upon review of CC’s report, the insurer accepted the claim for internal water damage to the property. CC did not inspect the roof of the dwelling.
The insurer then arranged for RR, roofing experts, to inspect the roof of the complainant’s home on 9 June 2022. Unfortunately, RR’s report adds little detail to the matter. RR concluded:-
The roof has been impacted by hail stones on several occasions, the roof appeared to be in fair working condition, A final inspection by a licenced builder should be completed on the exposed sections of roof to analyse the structure.
HP, plumber and gas fitter, then inspected the roof for the insurer on 9 September 2022. HP concluded:
there is a lot of manmade damage to the main roof
about 50% of the main roof has hail damage
the hail damage to the main roof must be more than 40 years old because the roof of the extension, secured with spring head nails, is not hail damaged
there are numerous maintenance issues with the main roof.
Subsequently, in November 2022, CC provided a scope of works (SOW) in the sum of about $259,000. Most of the costs involved related to the replacement of the entire roof of the complainant’s home.
Due to the complex structure of the roof overall, and uncertainty about when the hail damage may have occurred, the insurer arranged for JH, structural engineer, to inspect the property on 19 January 2023. JH’s report written pursuant to that inspection is dated 9 February 2023. The report is comprehensive and logical and is supported by many helpful photographs. Page 8 of the report also includes a photograph of the entire property from above which colour-codes different sections of the roof, thereby distinguishing the original and newer sections of the main roof from the roof of the extension.
Upon inspection JH observed, amongst other things:-
the main roof appears to have the sheeting replaced on the right and rear sides (green) as the condition of the sheeting and fixings appear newer compared to the front, left and rear (red) where it appears to be original sheeting. This original sheeting (red area) is in very poor condition with some hail damage observed, however most damage is due to foot traffic
the fixings to the red area are of an old-style button head nail indicating it may be original sheeting
the right and rear (green) of the main roof appears to have been replaced and it is assumed to have been done before the extension, as this area still utilises nail fixings
the extension (yellow) was built using tek-screw fixings to secure the sheeting
there was observed hail damage to the front, left and rear of the main dwelling roof (red), a couple of small dents to the rear main roof (green), the rear extension area (yellow) and rear awning (purple). However, the small dents on the rear main roof, extension and rear awning areas are considered to be minor hail dents
the significant hail damage observed appears to be to the older sections of roof [and] the front, left and rear areas of the main dwelling (red)
the transition between the main roof (green) and the extension (yellow) does not appear to be adequately sealed which may allow the ingress of water.
JH concluded:
the oldest historical images of the property revealed the extension was not able to be clearly identified until 1994
the exact date of the hail damage noted in the main roof is unable to be determined, however, it would be reasonable to assume it occurred before the extension was constructed (that is, before 1994), as no hail damage to the extension was observed
due to the skylight and surrounding panels being replaced in 2019/2020, the damage to the main roof likely occurred prior to this date as there are no cracks in the skylight or hail dents to the thinner metal panels surrounding it.
Accordingly, on 6 March 2023 the insurer conveyed its decision to deny that part of the claim concerning the damage to the main roof. The insurer says that damage was caused by, amongst other things, maintenance related issues. The insurer also says the damage to the main roof occurred before the complainant’s policy was incepted.
The complainant disagrees. She says the insurer should accept the claim in its entirety and pay for the replacement of the whole of the roof of her home.
Complainant has onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the contents of the documents.
Policy covers storm damage within period of insurance
The complainant’s home building and contents insurance policy was incepted in May 2019 and renewed in May 2021 for a period of 12 months.
Page 41 of the PDS states the policy provides cover for loss or damage caused by a ‘storm’. On page 107 of the PDS, ‘storm’ is defined as:
… a single weather event being, a cyclone or sever atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust.
As mentioned, the insurer accepts that a storm damaged parts of the complainant’s property and accepted the claim for internal storm damage. Thus, the primary issue remaining in this dispute is whether the storm caused damage to the main roof during the period of insurance. The complainant believes it did and says she has a valid claim for such damage. However, the insurer says it is entitled to deny the claim for damage to the main roof because the exchanged material shows the damage to the main roof occurred prior to the inception of complainant’s policy.
Complainant arranged for an expert to inspect the roof of her home
In an effort to establish she has a valid claim for the damage to the main roof, the complainant arranged for TN, roofing specialist, to inspect her home in October 2023. TN reported:
[Main roof] - Major hail damage was found on sheeting to all elevations and ridge capping.
TN also found minor damage consisting of small hail impacts that were relatively hard to locate (visually) on the roof sheeting of the extension.
Unfortunately, I consider TN’s findings do not assist the complainant, as:-
TN’s report lacks detail regarding the exact location, number (or prevalence) and size of the hail dents
TN offers no analysis about why there is an apparent dramatic difference in the severity of hail damage to the main roof compared to the roof of the extension
whilst TN provides photographs of some of the damage, it does not state where exactly on the roof the photographs were taken
some of the damage depicted in the photographs supplied by TN resemble damage from causes other than hail impacts, such as foot traffic and the like
TN provides no description of the overall condition of the various sections of the roof of the complaint’s home
TN provides no assessment of the age of the complainant’s home, the age of the various sections of the roof, the age of the extension or, indeed, the age of the hail damage.
Complainant has not established a valid claim for damage to the main roof
I am of the opinion the complainant has failed to establish a valid claim for the hail damage to the main roof. In other words, the complainant has failed to show the claimed loss occurred after the policy was incepted in May 2019. I consider JH’s evidence, that the damage pre-dates policy inception, is compelling and persuasive. Moreover, TN’s report is cursory and perfunctory in nature and in no way displaces the evidence of JH.
It follows the insurer is entitled to deny the claim insofar as it relates to the damage to the main roof of the complainant’s home.
Insurance commenced on 27 May 2019
As mentioned, the policy covers storm damage which has occurred during the period of insurance. The complainant says the damage claimed occurred in the May 2021 to May 2022 period of insurance. I also note the insurer has provided cover for this property under the policy since it was incepted in May 2019.
Moreover, the complainant says she was insured by another insurer in the same group of companies as the insurer involved in this complaint after she purchased the property in 2011 up until the current policy was incepted in May 2019. The complainant says the policy inception date should therefore be counted from 2011 and, as a result, the insurer should accept the entirety of her claim.
I disagree. I am of the opinion the insurer is not required to accept the totality of the claim on this basis because:-
the policy that is currently on foot was issued by a different business compared the business that issued the policy which provided cover for the property from 2011 to 2019
the current policy wording is different compared to the wording of the previous policy held by the complainant
as set out above, the damage to the main roof most likely predated the complainant’s purchase of the property the property in 2011. Thus, even if the commencement of cover is deemed to be 2011, it is unlikely to make a difference to the outcome of this complaint.
Did the insurer mislead the complainant?
No. There is no persuasive evidence the insurer misled the complainant.
Complainant says the insurer initially accepted the claim
The complainant says the insurer has been misleading and withheld information. She believes the insurer initially accepted the claim for all roof damage in the sum of $85,000. However, when a SOW was submitted for more than $200,000, the decision to accept the claim in total was retracted.
I have carefully reviewed the exchanged material. I have found nothing to suggest the insurer misled or withheld information from the complainant. The exchanged material shows the sum of $85,000 was a reserve placed on the claim by the insurer, should it be accepted. This claim reserve was not based on a definitive estimate or SOW.
It is standard practice for an insurer to set a claim reserve for the estimated cost of repairs, should the claim be accepted in future, before the insurer determines an outcome for the claim.
Should the insurer pay non-financial loss compensation?
Yes. There were excessive delays in the processing of the claim which caused undue stress and anxiety for the complainant. It is fair and reasonable that the insurer pays the sum of $1,500 non-financial loss compensation to the complainant.
Delays interfered with complainant’s expectation of enjoyment of peace of mind
Under the AFCA rules, non-financial loss compensation (capped at $5,400) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the part of the insurer.
I accept the complainant in this matter has suffered an unusual degree interference with her expectation of enjoyment and peace of mind, as well as undue stress and anxiety. She lodged the claim on 15 March 2022 and the roof of her home was not inspected until 9 June 2022 when RR attended. RR’s report lacked detail.
The second inspection of the roof by HP was completed on 9 September 2022. However, definitive evidence about the condition of the roof and what caused the damage was not obtained until JH attended at the complainant’s property on 19 January 2023.
Subsequently, the complainant was not provided with a claim outcome by the insurer until 6 March 2023.
I acknowledge that 2022 and 2023 was a difficult period for insurers due to the volume of claims. However, I consider the delays in having the roof inspected and providing an outcome were excessive. I also accept these delays caused stress and anxiety for the complainant. Understandably, she feels aggrieved.
Given these considerations, the insurer should pay to the complainant the sum of $1,500 non-financial loss compensation.
Why is the outcome fair?
Complainant has not established a valid claim for damage to the main roof
The outcome is fair in all the circumstances because:
the complainant has not established a valid claim for the damage to the main roof
there were excessive delays in the processing of the claim
the sum of $1,500 financial loss compensation is fair and reasonable in the circumstances.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.