Home / Hollard / Determination 12-00-1033599
Determination 12-00-1033599
Dispute over hail claim settlement amount and demand to rebuild home
Summary
The complainant's hail claim was accepted, but she rejected the cash settlement and sought a full rebuild of her home at $576,979.15 due to pre-existing patio construction defects. AFCA rejected the rebuild claim and ordered the insurer to pay a 20% contingency uplift, bringing the settlement to $36,227.86.
The insurer's liability is limited to hail damage during the policy period, but a cash settlement should include a contingency uplift for transferred risk and the lost repair guarantee.
Issues
- Claim amount dispute primary · upheld“The insurer should increase the offer by 20% to cater for contingencies. This brings the overall settlement to $36,227.86.”
- Poor claim handling secondary · upheld“I acknowledge the insurer's handling of the matter could have been better.”
- Product terms interpretation secondary · not upheld“The insurer has no liability for issues which pre-date the policy.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
Text of the determination
Determination
|
Case number
|
12-00-1033599
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-00-1033599 19 July 2024
Determination overview
Complaint
The complainant holds a home building and contents insurance policy, which is underwritten by the financial firm (insurer).
She lodged a claim for hail damage to her patio roof which occurred on or about 15 March 2023. The insurer accepted the claim. It offered to cash settle the complainant $30,189.88 for the damage on 1 November 2023. The complainant rejected the offer.
The complainant believes her home is unsafe based on the assessment by the insurer’s engineer. She wants it demolished and rebuilt.
She seeks cover for the replacement of the home at a cost of $576,979.15.
Issues and key findings
Is the insurer required to repair or replace the home?
No. The insurer’s assessment of its liability is fair. Its liability is limited to the damage caused by the hailstorm. However, the insurer did not include a contingency uplift to account for the transfer of risk and the loss of the lifetime repair guarantee that result from a cash settlement. It is therefore fair the offer is increased to include this uplift. The insurer is required to increase its settlement offer by 20%.
Is an award of compensation appropriate?
No. The insurer’s handling of the matter did not cause the complainant to experience an unusual degree or extent or physical inconvenience, excessive time or interference with her peace of mind. There is no need for the insurer to pay compensation for non-financial loss.
Why is the outcome fair?
The insurer has correctly assessed its liability under the policy. It is not required to rebuild the home or to conduct the necessary repairs. However, it is fair that it pays a contingency uplift as part of the cash settlement. Whilst its handling of the claim could have been better, there is no persuasive reason the insurer should be required to pay compensation.
Determination
This determination is in favour of the insurer.
Within 14 days of being informed of the complainant’s acceptance of this determination, the insurer must settle the complainant $36,227.86. The insurer may deduct from this any amount it has already paid and any applicable policy deductions.
The insurer is not otherwise required to take any further action in relation to this complaint.
Reasons for determination
Is the insurer required to repair or replace the home?
No. The insurer’s assessment of its liability is fair. Its liability is limited to the damage caused by the hailstorm. However, the insurer did not include a contingency uplift to account for the transfer of risk and the loss of the lifetime repair guarantee that result from a cash settlement. It is therefore fair the offer is increased to include this uplift. The insurer is required to increase its settlement offer by 20%.
Complainant seeks cover to rebuild her home
It is not in dispute the complainant’s home sustained hail damage from a storm which occurred on or about 15 March 2023.
The insurer accepted the claim and agreed to cover what it considers is the damage caused to the patio roof by this event. However, during its investigations, the insurer raised concerns about the patio itself and the home’s construction. It informed the complainant it was not prepared to undertake the claim-related repair work. The insurer offered to cash settle the complainant for $30,189.88 based on a quote from its repairer.
The complainant is concerned that the structural integrity of her home has been compromised. She wants the insurer to cover the cost to rebuild the home, as quoted by builder JT for $576,979.15.
The amount in dispute is therefore $546,789.27. The complainant was informed and understands the AFCA limit for an award is $542,500. She agreed to accept this limit as part of her complaint.
Insurer is required to cover the damage caused by the claimed event
The complainant is required to show it is more likely than not that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured.
The terms of the policy include the Certificate of Insurance and the Product Disclosure Statement (PDS). For this matter, there is no dispute:
the insurer sent the policy documents to the complainant
the policy covers storm damage, which includes damage caused by hail, or
the home sustained hail impact damage during the period of cover.
The insurer agreed to cover the damage it says was caused by this event. However, the complainant is dissatisfied with the insurer’s settlement offer. She considers it is inadequate.
The issue relates to the expert evidence from the insurer which raised concerns about the home and its construction. The insurer says it cannot undertake the necessary repairs as the complainant would first have to correct long-standing construction issues.
The complainant says this should be the insurer’s responsibility.
Insurer’s expert confirms construction problems with insured building
The insurer arranged for builder QT to report on the claimed damage. QT attended on 17 March 2023 and confirmed:
hail damage was noted to the patio’s Laserlite sheets in several areas and a sensor light
there were concerns with the patio construction.
QT quoted $30,289.88 to repair the claim-related damage. It recommended an expert review the patio’s overall condition. QT was concerned there were issues which required attention.
The complainant’s partner reportedly informed QT it was their preference to receive a cash settlement for the damage, so repairs could be conducted privately.
To investigate further, the insurer arranged for engineer SW to inspect the patio. The insurer wanted SW to confirm if it was building code compliant when constructed. In its report dated 2 August 2023, SW said:
the home was built in or about 2000 and purchased by the complainant in 2003
the ‘patio structures’ were not constructed in accordance with the building codes in place at the time
new timber roof battens and tie-downs are required due to the ‘poorly constructed and non-compliant structure’
the complainant was informed of safety concerns, and that it was recommended she not enter underneath the structure until it is repaired.
Photos from SW show examples of its concerns. These include a lack of bearing support for a steel column, no anchor support for intersecting rafter beams (which rely on nail fixings) and separation of at least one rafter.
A secondary report dated 11 April 2024 addresses SW’s specific concerns with the patio’s construction. It cites Australian Standard AS 1684:2 N1/N2 Supplement 5 version 1999 (Residential timber-framed construction, Part 2: Non-cyclonic areas) and says:
the minimum bearing length for verandah roof beams is 35mm at end supports and 70mm at internal supports for continuous span members. This requirement has not been met with several of the roof edge beams of the patio with little to no bearing length at the ends
SW also maintained the bottom of the roof anchors were cut, meaning the three-way support for the construction was removed.
Complainant says it is the insurer’s responsibility to rebuild the home
The complainant raised concerns that the:
house plans that were certified and signed off did not match the actual structure and that the structure was not compliant with regulations and building codes and indeed very unsafe. We have not made any changes to the house or structure and kept the property in good condition internally and externally since purchasing the house over 20 years ago.
She considers that if the patio was not constructed properly, the home may be compromised also. She feels ‘unsafe’ in it. Based on her quote from JT, the complainant believes the home should be rebuilt as she has no faith in the builder who constructed it.
The complainant provided the original documents and reports prepared by experts prior to construction of the insured home. She also says the home was inspected by the insurer prior to it insuring the home about 20 years ago. The insurer did not address this issue. The complainant believes it is the insurer’s responsibility to ensure the home is ‘safe, liveable, and up to current Building Standards’.
Given this, she says the insurer must undertake rectification work or rebuild the home.
Insurer is not required to repair or replace the home
I am not satisfied the insurer is required to repair or replace the complainant’s home.
Whilst I acknowledge the complainant was likely unaware of any pre-existing building deficiencies with the patio, the insurer is not liable to fix these issues. The insurer’s only liability for this claim is for the damage caused by the hailstorm. I am satisfied the insurer’s offer generally addresses this.
Furthermore, the insurer has no liability for issues which pre-date the policy. There is no dispute the problem relates to the patio’s construction, or that this pre-dated the policy’s inception.
To the extent there were deficiencies with the build, this is an issue for the complainant to address, not the insurer. The policy provides cover for a series of listed events. It does not cover all eventualities or damage.
The rectification of the pre-existing issues is not the insurer’s responsibility. Even if it conducted a building inspection prior to inception (which was not verified), this does not make the insurer liable. Any issues with the patio were already present. The insurer was not ‘on risk’ and is not required to address the damage as it was not caused by the claimed event during the period of cover.
I acknowledge the complainant may feel unsafe in the home, but this does not mean the insurer has a responsibility to repair or replace it.
Insurer’s offer for settlement must be increased to include contingency uplift
The exchanged material shows the damage caused by the claimed event was limited.
Based on the QT quote, the insurer offered to pay $30,189.88 on 1 November 2023.
It is not clear if the quote for settlement was actionable. The complainant says QT followed her up multiple times to commit to the repair, so I accept it likely was, given QT wanted to undertake the work. There is no persuasive evidence QT (or another repairer) could not attend to the repair. The insurer elected not to do this because it considered the patio was not built in accordance with the relevant requirements.
Given this, I am satisfied the insurer may rely on the quoted amount as a basis for resolving the claim. However, noting it offered a cash settlement, the insurer should have included a contingency uplift. An uplift serves to compensate the complainant for the transfer of risk for the repair work and for the loss of the lifetime guarantee.
I am satisfied the insurer should increase the offer by 20% to cater for contingencies. This brings the overall settlement to $36,227.86.
Is an award of compensation appropriate?
No. The insurer’s handling of the matter did not cause the complainant to experience an unusual degree or extent or physical inconvenience, excessive time or interference with her peace of mind. There is no need for the insurer to pay compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
No need for insurer to pay compensation
The complainant says:
the insurer handled the matter poorly and the understanding of its employees was lacking
it failed to answer calls or adequately settle the claim, and
QT hassled her repeatedly about accepting the quote.
I acknowledge the insurer’s handling of the matter could have been better. However, I am satisfied the original offer (notwithstanding the absence of a contingency uplift) was fair. I am not satisfied the insurer should be required to pay compensation for non-financial loss.
Why is the outcome fair?
The insurer has correctly assessed its liability under the policy. It is not required to rebuild the home or to conduct the necessary repairs. However, it is fair that it pays a contingency uplift, as part of the cash settlement. Whilst its handling of the claim could have been better, there is no persuasive reason the insurer should be required to pay compensation.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.