Cash settlement amount and disputed items under a flood contents claim, plus claim handling delay
Text of the determination
Determination
|
Case number
|
12-00-1032310
|
Financial firm
|
AAI Limited
Case number: 12-00-1032310 7 April 2025
1 Determination overview
1.1 Complaint
The complainant holds home contents insurance with the financial firm (insurer). He lodged a claim following a flood event on 5 July 2022. The home had previously been flooded in March 2021 and March 2022, and the insurer had paid the resultant claims on a total loss basis.
After an initial denial, the insurer accepted the July 2022 claim and has offered amounts totalling about $160,000 as a cash settlement. However, it says it is not liable to cover many items on the basis they were part of the total loss payouts for the earlier claims but not replaced, fall outside the policy terms, or a satisfactory proof of loss is yet to be provided.
The complainant says the insurer has undervalued the items for which it has offered a cash settlement, and that the disputed items should be accepted. He is also dissatisfied with the insurer’s claim handling.
1.2 Issues and key findings
Is the insurer required to pay more than it offered?
Yes. The cost of replacing the accepted items will have increased due to the passage of time. In relation to some (but not all) of the disputed items, the panel is satisfied that the proof of loss provided is sufficient or that it is fair that the insurer accepts the proof provided noting the low value involved and to bring finality to the dispute.
Is non-financial loss compensation payable?
Yes. The insurer is partially responsible for the delays experienced and should have dealt with the complainant more empathetically. This added to the trauma the complainant has experienced from going through repeated flood events. The insurer is to pay him $2,000.
Why is the outcome fair?
It is fair that the insurer pays the complainant a higher amount considering increased replacement costs and the adequacy of the proof of loss provided for some disputed items. It is also fair that the insurer compensates the complainant for stress it unreasonably caused.
1.3 Determination
This determination is substantially in favour of the complainant.
If the complainant provides written notice he accepts this determination, the insurer is to:
· take the steps outlined in section 2.1 below, and
· within 14 days of receiving the notice, pay the complainant $2,000 in non-financial loss compensation.
The insurer is otherwise not required to take any further action, unless the complainant provides adequate proof of loss for the remaining disputed items, in which case it is to promptly assess those items for coverage in line with the policy terms and conditions.
2 Reasons for determination
2.1 Is the insurer required to pay more than it offered?
Yes. The cost of replacing the accepted items will have increased due to the passage of time. In relation to some (but not all) of the disputed items, the panel is satisfied that the proof of loss provided is sufficient or that it is fair that the insurer accepts the proof provided noting the low value involved and to bring finality to the dispute.
Background
The complainant and some of his family live on a rented property comprised of a home, large outbuildings and sheds spread over an acre.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainant for loss or damage to home contents caused by a specified insured event. Those events include ‘Flood’.
The complainant lodged a claim following a flood on 21 March 2021. The insurer accepted the claim and paid out the $250,000 contents sum insured plus additional amounts in accordance with the policy terms such as for clean-up, storage and enthusiast items.
The complainant lodged another claim after a flood on 8 March 2022. The insurer accepted the claim and paid out approximately $330,800 on a total loss basis, including the $265,000 contents sum insured. The payment was issued on 31 March 2022.
On 6 April 2022, the complainant increased the contents sum insured to $495,000.
The complainant lodged the current claim after another flood on 5 July 2022. The insurer’s loss assessor inspected the property on 27 July 2022 and reported that floodwater inundation to a height of 1.2m to 1.6m had occurred at the property.
The insurer initially denied the claim. However, after the complainant lodged his complaint with AFCA, the insurer accepted the claim and has offered amounts totalling about $160,000.
Broadly speaking, the issues in dispute between the parties are whether the insurer’s offer in relation to the accepted items is reasonable, and the adequacy of the proof of loss submitted for the disputed items.
Policy sets out proof of loss requirements and how claims are settled
The PDS sets out on pages 87 and 88 the policy’s proof of loss requirements. These include:
· the insured must provide proof of loss, value and ownership of items claimed
· while an inspection by the insurer may be sufficient to prove loss, it may ask for photos or other evidence that supports the extent of loss
· for damaged items no longer available for inspection, the insured must validate their claim by providing details of when and where they were purchased, and proof of ownership and value. That could involve a receipt as proof of purchase, a professional valuation, original operating manual, manufacturer’s box, a close-up photo, and a full description
· more evidence will be required to substantiate claims for higher value items. For items over $3,000 the minimum requirement is proof of purchase, a professional valuation, and a close-up photo
· a statutory declaration is of itself not acceptable proof of ownership and value.
How contents claims are settled is described on pages 91 and 92 of the PDS. The insurer may repair or replace items or pay the insured the cost to do so (cash settle). Repair and replacement are on a ‘new for old’ basis, meaning replacing or repairing:
· with new items or new materials that are reasonably and readily available at the time of replacement or repair from Australian suppliers
· regardless of age, with no allowance for depreciation. ‘For example, a leather lounge which was purchased 5 years ago for $5,000 and is now worth $2,000 will be replaced with [a] brand new leather lounge equivalent to your old leather lounge when it was new. Cover is not limited to $2,000’.
Insurer is to pay more for accepted items
On 1 May 2024, the insurer valued the items it had accepted as covered at $113,046.45. Following receipt of further information from the complainant, on 29 May 2024 and 28 June 2024, the insurer accepted additional items which brought its total valuation to $123,110.25, then to $137,938.36.
On 12 August 2024, the insurer accepted that the complainant had provided satisfactory proof of loss for seven more items, it says were worth $16,867.62 all up. That brought its total valuation of accepted items to $154,805.98. The insurer confirmed it had also accepted the clothes tier, and awaited costing from the complainant.
The insurer says it has agreed to settle ‘based on the evidenced replacement costs’.
The complainant says the insurer’s assessment is based on purchase rather than new for old replacement costs. He says on that basis, the amount offered should be $179,986.05.
The complainant has provided links to various online stores to support his position. However, as the prices on the links do not align with the amounts claimed by the complainant, the panel is not satisfied that the complainant’s calculations are reliable.
The panel nevertheless accepts that the replacement costs will likely exceed the original purchase prices given the passage of time and inflation. While requiring updated valuations be prepared is an option, the panel is mindful that these will likely result in further disputes between the parties. It is also readily apparent that the claim has gone on for too long.
In the circumstances, and in an effort to bring certainty and prompt finality, if the complainant accepts this determination, the insurer is to within 28 days pay him $154,805.98 for the accepted items plus interest under section 57 of the Insurance Contracts Act 1984 (Cth) (ICA), payable on each accepted items batch from the date the batch was accepted to the date of payment.
Insurer is required to accept some of the disputed items
Having carefully reviewed the exchanged information, the panel is satisfied that the following represents fair and reasonable outcomes on the disputed items.
Mowers
The complainant has claimed for three ride-on mowers. He has provided receipts and bank records showing two were bought on 12 April 2022 for $24,680.00, and the other on 22 June 2022 for $14,490.00, as well as a statutory declaration from a local mechanic stating that:
· he inspected the mowers in December 2022
· each were flood affected
· due to the extent and type of damage sustained, they could not be repaired and were only useful for spare parts, and
· their salvage value was between $700 and $1,000 per mower.
The insurer has only agreed to pay the complainant for the cost to replace the third mower. It says the complainant has not provided sufficient information to show the other mowers were at the property and damaged by the July 2022 flood. It questions why someone would purchase three ride-on mowers in a ten week period.
The panel acknowledges that it seems rather unusual for a person to purchase three ride-on mowers in such a brief period. However, that is not in itself a legitimate basis for the insurer to refuse to cover the damage to all of them. The complainant has provided adequate proof of purchase, and the statutory declaration indicates they were extensively flood damaged.
In addition, the insurer has not adequately explained why the proof of loss material provided was enough to enable it to accept one mower but not the other two.
Accordingly, if the complainant accepts this determination, the insurer is required within 28 days to pay him the $24,680.00 he paid in total for the other two mowers, plus interest under section 57 of the ICA from the date it accepted the mower bought on 22 June 2022.
Kitchen cabinetry and flooring
The complainant says kitchen cabinetry had been fabricated, delivered and placed at the centre of the kitchen, but was awaiting alignment and fixing. He also says floating floorboards had been delivered but were yet to be installed. He claims the flood damaged the cabinetry and floorboards beyond repair. Further, as they were not installed, they were contents.
The complainant has provided a statutory declaration from a friend who is a kitchen cabinet maker, who says:
· after the March 2022 flood, he built a new kitchen for the complainant
· the kitchen was delivered in mid June 2022, and installation would be undertaken outside his working hours for a kitchen company
· the cupboards were laid out in the kitchen for alignment and fixing
· the cost of the kitchen cabinetry and its installation was $10,000.
The complainant says that as he paid cash to his friend, he is unable to provide a receipt.
In relation to the floorboards, the complainant has provided a quote dated 17 July 2024 from the supplier indicating the same product and amount would cost $5,718.24.
The complainant submits that the cabinetry and floorboards are contents under the policy because the PDS states on page 17:
If contents are insured in a property that is not a unit and you are a tenant
When you are a tenant of a property that is not a unit, contents also include any items used primarily for domestic and residential purposes, which are permanently attached to the insured address and are not common property and which you own (e.g. a permanently attached dishwasher).
The insurer has declined cover for both the cabinetry and floorboards on the basis they are not contents for the purpose of the policy. It notes that the PDS:
· states that contents do not include anything defined as the home (unless ‘If contents are insured in a property that is not a unit and you are a tenant’ applies)
· confirms that the definition of the home includes ‘uninstalled home building fittings, fixtures and materials (limits apply) but only when kept in a locked and secured building at the insured address’.
The panel is satisfied that both the cabinetry and the floorboards were uninstalled home building fittings, fixtures or materials.
Based on the exchanged information, the cabinetry was kept in a locked and secured building at the insured premises, being the home. Therefore, it is excluded as it falls within the PDS definition of the home.
It is unclear whether the floorboards were also kept in a locked and secured building at the insured premises when the flood occurred. If not, they are by default contents so should be covered, and the insurer is required to pay the complainant $5,718.24 plus interest under section 57 from 17 July 2024.
The parties are required to work together to establish the whereabouts of the floorboards when the flood occurred. Payment, if any, is to be made within 14 days of the whereabouts of the floorboards having been established.
The panel acknowledges the complainant’s submission on the cover provided under the ‘If contents are insured in a property that is not a unit and you are a tenant’ section. However, that cover does not apply as neither the cabinetry nor the floorboards were permanently attached at the time of the flood.
Items purchased with business power pass
The complainant has provided receipts for various items totalling $6,528.78 purchased from hardware store B after the March 2022 flood but before the July 2022 flood. The items include storage containers, door handles, shower screen and base, toilet seat, unused paint, and garage remotes. The complainant says they were all damaged in the July flood.
The insurer says those items are not covered because they were purchased through a business power pass so constituted contents owned by the company named on the business pass, AS, and not contents owned by the complainant.
The complainant says the items were purchased with the business power pass to access associated discounting. Nevertheless, they were household items he/family owned. He has provided a letter from his accountant stating the business name had been registered by his wife (who is also a named insured), and AS ceased trading in FY2011/12.
In the circumstances, and considering the nature of the items, the panel is satisfied that the insurer should within 28 days of the complainant’s acceptance of this determination pay him $6,528.78 plus section 57 interest from 3 September 2024 (date the accountant’s letter was made available to the insurer).
Items ordered in early July 2022
The complainant says he ordered several contents items in the days immediately prior to the flood on 5 July 2022. He has provided evidence of purchase.
The insurer questions whether the items were delivered to the complainant before the flood.
The panel considers that a reasonable outcome to bring the claim to finality promptly is for the insurer to pay the complainant for those items without an award of interest. Payment is to be made within 28 days of the complainant’s acceptance of this determination.
Low value items
The dispute between the parties has gone on for too long. In the circumstances, noting the PDS makes clear that more evidence will be required to substantiate claims for higher value items, the panel considers it fair that the insurer accepts, without further proof, items:
· that are contents for the purpose of the policy
· were not purchased/owned before the March 2022 flood
· which are individually worth less than $250.
Payment is to be made within 28 days of the complainant’s acceptance of this determination.
Additional policy benefits
The policy contains several additional benefits. As noted above, these include clean-up costs, storage costs and an amount for enthusiast items.
The insurer is required to within 28 days of the complainant accepting this determination, request any information reasonably required to enable it to make a claim decision on whether any of those additional benefits are payable. It is to provide the complainant with a claim decision on each additional benefit within 28 days of receiving the required information.
Disputed items for which payment is not required
The complainant has provided invoices/receipts pre-dating the March 2022 flood for items that were stored above the level of inundation that and the earlier flood reached but were impacted by the July 2022 flood. The panel is not satisfied that it would be fair to require the insurer to pay for those items given that they were captured in the prior total loss payments.
The complainant has in relation to several items provided operating manuals only. The panel acknowledges that the PDS refers to operating manuals as materials that may be submitted as part of a proof of loss. However, the panel is on balance not satisfied in the circumstances that manuals alone are sufficient given records of purchase between 8 March and 5 July 2022 should be available online or via bank account statements.
To the extent items do not fall within the categories of disputed items to be accepted outlined above, the panel is not satisfied sufficient proof of loss has been provided. However, if the complainant provides an adequate proof of loss for the remaining disputed items, the insurer is to promptly assess those items for coverage in line with the policy terms and conditions.
2.2 Is non-financial loss compensation payable?
Yes. The insurer is partially responsible for the delays experienced and should have dealt with the complainant more empathetically. This added to the trauma the complainant experienced from going through repeated flood events. The insurer is to pay him $2,000.
AFCA can award compensation for non-financial loss
Under paragraph D.3.3 of its Rules as they applied when the complaint was lodged, AFCA may award up to $5,400 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation for non-financial loss. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation.
Insurer is to pay non-financial loss compensation
The complainant says the insurer has acted in a blunt, arrogant and intimidating way. He says its initial claim denial followed by unreasonable proof of loss expectations have caused extensive delays. He says these matters have had a profound impact on his mental and emotional wellbeing.
Having carefully reviewed the exchanged information, the panel is satisfied that the insurer partially responsible for the delays experienced and should have dealt with the complainant more empathetically. This added to the profound trauma the complainant experienced from going through repeated flood events.
If the complainant accepts this determination, the insurer is to pay him $2,000 in non-financial loss compensation.
2.3 Why is the outcome fair?
It is fair that the insurer pays the complainant a higher amount considering increased replacement costs and the adequacy of the proof of loss provided for some disputed items. It is also fair that the insurer compensates the complainant for stress it unreasonably caused.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.