Adequacy of storm claim repairs, cash settlement amount, temporary accommodation and compensation
Text of the determination
Determination
|
Case number
|
12-00-1030251
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-00-1030251 26 June 2025
Determination overview
Complaint
The complainants held home building insurance with the financial firm (insurer). They lodged a claim following a severe storm in February 2020. The insurer accepted the claim, but due to the COVID-19 pandemic repairs were not completed until May 2023.
Issues with the repairs were identified, including cupping of new flooring. The insurer accepts that some of the issues were due to poor workmanship, but says the cupping was caused by subfloor ventilation problems. It offered the complainants a $17,418.83 cash settlement based on the cost of sanding down the flooring plus a 20% uplift, and $5,000 in compensation.
The complainants maintain that the cupping is due to poor workmanship and that the flooring requires replacement. They also say the insurer failed to complete some repairs and caused additional damage. They seek the cost of full rectification of the home, future temporary accommodation (TA) costs, loss of income, and more in non-financial loss compensation.
Issues and key findings
Is the insurer required to pay more than it offered?
Yes. Based on the exchanged information, I am satisfied the flooring must be replaced due to poor workmanship, some claim related repairs were not adequately completed, and that the insurer’s trades caused additional damage. However, the insurer is not liable for the subfloor.
Is the insurer required to cover future TA costs?
Yes. The home will be uninhabitable during the required repairs, so the insurer must cover the resultant TA costs.
Is compensation for loss of income payable?
No. Compensation for loss of income is not justified in the circumstances.
Is non-financial loss compensation payable?
Yes. The insurer has caused both complainants considerable stress and inconvenience. It is required to pay each of them $4,000 ($8,000 in total) in non-financial loss compensation.
Why is the outcome fair?
It is fair to require the insurer to cover the cost of claim related repairs not completed, and of rectifying its poor workmanship and the additional damage its trades caused.
Determination
If the complainants accept this determination, which is substantially in their favour, the insurer:
is to pay them the amounts calculated in accordance with sections 2.1 and 2.2 below
within 14 days, pay each of them $4,000 in non-financial loss compensation.
Reasons for determination
Is the insurer required to pay more than it offered?
Yes. Based on the exchanged information, I am satisfied the flooring must be replaced due to poor workmanship, some claim related repairs were not adequately completed, and that the insurer’s trades caused additional damage. However, the insurer is not liable for the subfloor.
Background
Subject to the terms and conditions set out in the product disclosure statement (PDS), the complainants’ policy covers loss or damage to their home caused by a listed insured event that occurs during the policy period. Those events include ‘Storm’.
On 21 February 2020, the complainants notified the insurer that their home had sustained damage during a severe storm on 9 February 2020. They said that, amongst other things, there was extensive floorboard damage and damage to the garage door.
The insurer accepted the claim on 19 May 2020. However, repairs were delayed due to the COVID-19 pandemic as well as some logistical issues. The insurer’s builder MC reinspected the home on 7 September 2022, prepared an updated scope of work (SOW) for the claim related repairs, then five variations over the following months.
The insurer authorised repairs, which relevantly included:
sanding and repolishing the entry/hallway timber floor
removal and installation of replacement timber flooring in the kitchen/dining area, with the timber to be acclimatised for two to three weeks prior to laying
install floor expansion joint trim
check moisture content in exposed subfloor is suitable for new timber flooring
remove and reinstate kitchen cupboards, kickboards and benchtop
disconnect and reconnect kitchen electrical services and plumbing
remove and replace damaged rear exterior door and prepare, seal and paint both sides
store contents offsite and return
supply and fit a new main board to the garage door controller.
MC commenced repair work in early April 2023. The new flooring was installed in mid-May 2023. The complainants raised concerns about the quality of the repairs in late May 2023, and noted the new flooring had already started cupping.
Parties disagree on adequacy of insurer’s works
On 1 June 2023, MC inspected the flooring and reported to the insurer that:
there was visual cupping across the kitchen/dining area floor
this was due to high moisture levels in the subfloor air causing the bottom of the floorboards to expand, while the top side of the boards remained unchanged
the strip drain that the complainants had installed along the low side of the subfloor space had not sufficiently reduced the moisture level
it recommended mechanical ventilation be installed to remedy the problem
once the subfloor space moisture level drops, the moisture content in the underside of the boards would reduce and the floor would flatten out.
MC obtained a report from the Australian Timber Flooring Association (AT). After inspecting the home on 5 July 2023, AT reported that:
ongoing seepage into the subfloor space had likely caused a high humidity environment under the home
insufficient ventilation and drainage along with the seepage had caused the new timber floor in the kitchen, dining and living area to cup
four fans and a dehumidifier had recently been set up in the subfloor space by the complainants. While only a temporary fix, this seemed to be working as the relative humidity recorded under the home was similar to that inside the home and externally
the following workmanship issues were present:
> the putty used to fill nail holes in the new flooring was noticeably lighter in colour than that used for the same purpose in the remaining old flooring
> the floor in the linen cupboard had not been re-sanded and polished so was a much darker colour than the re-sanded and polished flooring running up to it
> the nosing at the top of the stairs from the hallway was lower than the main floor level
> the previous floor stain remained on small sections of the stairs and was noticeable
to ensure effective remedial work the drainage system around the home needs to prevent any water seepage through the external walls
the current ventilation system in the subfloor space was only temporary, and a more permanent solution would be required to maintain consistent, lower humidity levels
one possible solution would be to install a plastic vapour barrier over the ground
‘Once these steps are taken, the moisture gradient would be expected to reduce to an acceptable level over time. Although it is unlikely that the timber floor will completely flatten out, it can be re-sanded back to its raw timber state to even out the surface’.
MC re-inspected the home on 19 January 2024 and prepared a SOW totalling $13,198.90 for re-sanding and polishing the cupped new flooring. In the SOW, MC stated the cupping was due to ongoing subfloor moisture issues, not poor workmanship, and it would not be able to warrant the repairs.
On 1 March 2024, the insurer offered the complainants a $15,838.68 cash settlement for rectification of the cupped flooring, based on MC’s 19 January 2024 SOW plus a 20% uplift.
The complainants rejected the offer. On 21 March 2024, they said:
the cupping was due to poor workmanship as the timber was laid immediately without any acclimatisation
AT had identified additional poor workmanship
the issue with the garage door controller board had not been addressed
during the initial repairs, the front door magnetic stop had been removed then lost, leading to damage to the adjacent wall
the kitchen cabinetry had been reinstalled poorly, the benchtop had not been installed flush and had been cracked
the dishwasher valve was not reinstalled
cables had not been positioned to enable the oven mains electrical isolation to be refitted
the flush mount electrical plates on the benchtop had been reinstalled poorly
the fridge door had been damaged
the external hardwood door had been replaced with a veneer kit door which had not been sealed at its base and top and did not match the other four doors in the bi-fold set.
The complainants provided numerous photos of the issues they had identified as well as a $30,794 quote dated 7 March 2024 from builder AJ for rectification of the flooring. AJ said:
the timber flooring had been installed in a non-compliant manner as it was hard up against the wall without a 10mm gap to allow for expansion and contraction
the replacement timber was to be left onsite for six to eight weeks to acclimatise ‘due to moisture concerns in the subflooring’.
The insurer obtained additional commentary from MC on 4 April 2024. MC said:
when the old flooring was removed on 5 April 2023, it was identified that subfloor moisture was visible and would need to be addressed, including the subfloor ventilation
on 20 April 2023, it was advised that the subfloor works had been completed
the flooring had been delivered on 1 May 2023, and installed between 9 and 12 May 2023
its 19 January 2024 SOW adequately addressed rectification of the cupping
photos showed a 10mm gap was left between the wall and the flooring. They had also installed 2mm control joins every metre throughout the flooring
photos showed it had installed electrical isolation in the kitchen cabinetry, had correctly installed the flush mount electrical plates on the benchtop
the complainants had signed off on delivery of their contents (the document said to show this has the handwritten notation ‘Signed on behalf of [male complainant]’).
The insurer advised that the floor installer told MC that a two-to-three-week acclimatisation period was not required, and that nine days was sufficient. No document has been provided to verify this. The insurer conceded the garage door controller board had not been addressed. It offered the complainants $1,580.15 for that work based on MC’s SOW dated 24 May 2023.
The complainants maintained that the floorboards had not been acclimatised, and that a 10mm gap was not left around the floor’s entire perimeter. Further, that they were only told to remove standing water in the subfloor to enable the flooring work to proceed, which they did. They noted the previous flooring was in place over the same ground for more than 15 years and did not cup, while the new flooring cupped within days of installation. They denied giving anyone authority to sign the contents delivery form.
On 19 December 2024, the insurer advised that MC had confirmed the flooring had been installed on the same day it was delivered, without acclimatisation. The insurer also quoted AT as follows (but did not provide AT’s additional report):
As detailed in the report, the primary cause of the cupped appearance is the humid conditions in the subfloor space. It is also important to note that the moisture gradient in the boards (wetter in the lower portion compared to the top) cannot develop before the floor is installed – nor is there a subfloor space before the floor is installed. As such, the time frame to install the floor or the period of acclimatisation has had no significant impact on the current issues on site.
Insurer is required to pay more than it offered
Based on the exchanged information, I am satisfied that the flooring must be replaced due to poor workmanship, that some claim related repairs were not adequately completed, and that the insurer’s trades caused additional damage. This is because:
it is not in dispute that aspects of MC’s work were unsatisfactory
MC’s assertion that it acclimatised the flooring before installation was a seriously misleading misrepresentation. I am therefore unable to place any weight on its reports
while I do not question AT’s independence, the party that engaged it to inspect and report on the adequacy of repairs was MC, the party that had undertaken the repairs. This affects the weight that can be given to AT’s report
without AT’s additional report from which the insurer quoted on 19 December 2024, I am unable to contextualise the quote which means I cannot place much weight on it
AJ’s quote supports a finding that the flooring was installed non-compliantly, without a 10mm gap to allow for expansion and contraction. As noted above, I am not able to place any credence in MC’s commentary, and AT did not address this point
I accept it is likely that subfloor humidity has been a contributing factor in the cupping. AJ specifically identified the need for extended acclimatisation to address that
MC’s SOW included ‘check moisture content in exposed subfloor is suitable for new timber flooring’. It is apparent that MC did not do that
at least since 21 March 2024, the insurer has been aware of the items the complainants said had not been adequately repaired or had been damaged by its trades. Other than some comments from MC, which I am not satisfied can be relied on, the insurer has not provided any information to show it has investigated those issues. Nor has it responded substantively to them.
The relationship between the parties has deteriorated to the point where further extended interactions between them will inevitably give rise to further disputes. I am therefore satisfied that a cash settlement is appropriate. However, AJ’s quote is now more than 12 months old so will not reflect current costs. The complainants have costed items not included in AJ’s quote at $69,000 but have acknowledged that is only their estimation.
In the circumstances, if the complainants accept this determination, the following steps are to be taken:
the complainants are to obtain two itemised quotes from relevant trades for rectification of the items they identified on 21 March 2024 (this may require, for example, two builder’s quotes and two electrician quotes)
the complainants are to provide the quotes to the insurer
within 21 days of receiving the quotes, the insurer is to pay the complainants the average of the quoted amounts plus a 15% uplift to allow for contingencies and the loss of the warranty an insurer provides over works it has had completed
as the work is necessary because of its trades’ poor workmanship and damage they caused, the insurer is to pay that amount itself rather than under the policy.
As the subfloor issues were unrelated to the claim event or its trades’ poor workmanship, the insurer is not required to address those issues.
Is the insurer required to cover future TA costs?
Yes. The home will be uninhabitable during the required repairs, so the insurer must cover the resultant TA costs.
Insurer is required to pay future TA costs
The complainants estimate that they and their family, including pets, will require TA for eight weeks while the necessary repairs are completed.
The insurer has not provided a substantive submission in response.
I am satisfied that it is more likely than not the home will be unliveable for a period while the repairs are completed. I note that a flooring for several rooms will have to be removed and replaced, and the kitchen will not be operational.
I am unable to determine for how long the home is likely to be unliveable. Therefore, the relevant trades from whom the complainants are to obtain quotes in line with section 2.1 above are to include estimates of the period during which the home will be unliveable.
Within 21 days of receiving the estimates, the insurer is to cash settle the complainants’ TA entitlement for accommodation comparable to their home based on the average of the estimates plus a 15% uplift. Such payment is to be paid by the insurer itself, not under the policy.
Is compensation for loss of income payable?
No. Compensation for loss of income is not justified in the circumstances.
Compensation for loss of income is not payable
The complainants seek $10,000 for unpaid leave days taken in 2023 to co-ordinate trades and accommodation, and in escalating issues with MC and the insurer.
I am satisfied those matters mostly related to the claim itself, meaning it is appropriate to consider the terms of the policy. The PDS says on page 77 that there is no cover for consequential loss.
Consequential loss is also known as indirect financial loss. An example is loss of income.
AFCA Rule D.3.2 precludes an award of indirect financial loss if the complaint arises as a result of a claim on a general insurance policy that excludes such liability. Accordingly, I am unable to award compensation for the unpaid leave days taken by the complainants in 2023.
The complainants also seek $10,000 for lost earnings due to time spent preparing AFCA submissions. The AFCA Rules do not contemplate compensation for earnings lost through participation in the AFCA process.
Is non-financial loss compensation payable?
Yes. The insurer has caused both complainants considerable stress and inconvenience. It is required to pay each of them $4,000 ($8,000 in total) in non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under paragraph D.3.3 of its Rules as they were when this complaint was lodged, AFCA may award up to $5,400 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind.
Where there is more than one complainant, and each complainant suffered non-financial loss, each can be awarded compensation.
AFCA takes a conservative approach to awarding compensation for non-financial loss. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation.
Non-financial loss compensation is payable to each complainant
The complainants say the insurer has caused them and their three children significant stress and inconvenience. They seek five maximum non-financial loss compensation awards ($27,000 in total).
I am satisfied that the insurer’s claim handling and communications have been unsatisfactory, and that this caused both complainants considerable stress and inconvenience. The insurer appears to have accepted that to be the case given its $5,000 compensation offer.
However, I am not satisfied the insurer’s offer represents adequate compensation in the circumstances. It only equates to $2,500 per complainant. Taking into account the significant and ongoing disruption to the complainants’ lives caused by the insurer, I consider an award of $4,000 to each of them is fair and reasonable.
Why is the outcome fair?
It is fair to require the insurer to cover the cost of missed claim related repairs not completed, and of rectifying its poor workmanship and the additional damage its trades caused.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.