Home / NAB / Determination 12-00-1029557

Determination 12-00-1029557

approved construction loan withdrawn before lenders mortgage insurance confirmed

FirmNAB
Decided2024-12-04
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed$25,000
SourceAFCA PDF

Summary

The bank withdrew a construction loan it had unconditionally approved and the complainant had accepted, before LMI was confirmed. AFCA found the contract permitted withdrawal and no financial loss was shown, but awarded $2,500 for non-financial loss.

The contract allowed withdrawal, but the bank's misleading approval and unclear communication caused distress warranting non-financial loss compensation, and the complainant did not prove reliance-based financial loss.

Issues

Subjects and remedies

pay non financial loss

Related

All NAB determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1029557 | Financial firm | National Australia Bank Limited Case number: 12-00-1029557 28 November 2024 Determination overview Complaint In June 2023 the complainant applied for a loan from the financial firm (bank) to fund the construction by PE Homes (builder) of a new house at her investment property (construction loan). On 17 July 2023 the bank made an unconditional offer to lend her $264,524.84, which she promptly accepted. On 4 August 2023 the bank contacted the complainant asking for more financial information, as part of a ‘second verification’ process. It became clear during September 2023 the bank would not be proceeding with the construction loan because lender’s mortgage insurance (LMI) had not been approved. By this time the bank also had separate concerns about the complainant’s capacity to service the loan. The complainant says the bank’s decision to withdraw the construction loan put her in a difficult position. She urged the bank to honour the loan commitment, but the bank said she would have to make a fresh application and accept a substantially lower loan amount. The complainant rejected this. During the AFCA complaint, she made a claim for $300,000 compensation, which she has since reduced to $25,000. Issues and key findings Was the bank entitled to withdraw the construction loan? Yes. The terms and conditions of the construction loan permit the bank to reverse a lending decision if, since the loan application, there has been a significant adverse change in a customer’s financial circumstances or where third-party insurance is declined. Did the bank mislead the complainant about the construction loan approval? Yes. The bank agreed to provide the construction loan before the LMI it required had been confirmed and before it had properly completed its serviceability assessment. Has the complainant suffered financial loss due to the bank’s misleading conduct? No. The complainant has not established the bank’s withdrawal of the construction loan has caused financial loss. Should the bank compensate the complainant for non-financial loss? Yes. The complainant was distressed to learn her construction loan had been withdrawn, especially as the loan contract had already commenced. Why is the outcome fair? I understand the complainant’s frustration her construction project did not proceed as planned and her dismay that having agreed to the construction loan, the bank then changed its mind. Although the loan contract allows this to happen in the circumstances explained in section 2.1 of this determination, it is nevertheless fair the bank pay compensation for the stress, anxiety and inconvenience this caused. Determination This determination is substantially in favour of the bank. If the complainant accepts this determination, the bank must pay $2,500 compensation within 14 days of acceptance, payable to an account nominated by the complainant. Reasons for determination Was the bank entitled to withdraw the construction loan? Yes. The terms and conditions of the construction loan permit the bank to reverse its lending decision if, since the loan application, there has been a significant adverse change in a customer’s financial circumstances or where third-party insurance is declined. Bank reviewed the loan after the contract had commenced The bank made the construction loan offer to the complainant on 17 July 2023, but by 2 August 2023 the bank’s diary notes were flagged ‘Do not proceed to settlement’. The complainant was informed on 4 August 2023 that the bank had commenced a ‘second verification’ process and it needed more information. The bank’s home lending specialist requested additional proof of employment income, in the form of ATO income statements, bank statements and employer payslips. There were subsequent email and text communications between the complainant and the home lending specialist about the information it was now seeking, much of which the complainant said had already been made available. Towards the end of September 2023, it became clear the bank was not going to proceed with the construction loan. The complainant was informed that because LMI had not been approved, she would need to contribute $125,000 of her own funds towards the building project and lodge a fresh construction loan application. The bank said on 25 October 2023 in its initial response to the AFCA complaint that there were three reasons it withdrew the construction loan: The bank’s insurer declined lender’s mortgage insurance (LMI). Income details from the ATO for July 2023 were not supplied by the complainant. ‘[C]ompeting legislative obligations’. Contract permits the bank to withdraw a loan By the time the complainant was notified her construction loan would not proceed, she had already signed and accepted the bank’s 17 July 2023 loan offer. This created a legally binding contract. However, there are certain situations in which the ‘Credit Contract General Terms’ that apply to the construction loan (Contract Terms) permit the bank to refrain from providing the loan, even if it has already agreed to do so. One of these, in clause 2.1(a) of the Contract Terms, is where something has happened since the application was first made ‘which the bank reasonably believes could lead to a significant adverse change in the customer’s financial circumstances.’ Another situation, described in clause 2.1(c), is where the bank’s insurer has refused to insure the loan. It is arguable whether there was an adverse change in the complainant’s financial circumstances or the bank’s assessment of them. The bank points to one outstanding piece of financial information as a contributing reason for the withdrawal, but this only related to the complainant’s income for the first two weeks of financial year 2023-24. In any event, the available information confirms the bank’s LMI insurer did not agree to provide LMI insurance to cover the construction loan, which falls within clause 2.1(c) of the Contract Terms. A copy of clause 2.1(a) and (c) is set out at section 3.2 of this determination. The bank did not raise ‘competing legislative obligations’ with the complainant when it decided not to proceed with the construction loan, and no further details have been provided to her or to AFCA. I address this issue in section 3.4 of this determination. Did the bank mislead the complainant about construction loan approval? Yes. The bank agreed to provide the construction loan before the LMI it required had been confirmed and before it had properly completed its serviceability assessment. Financial firms must not engage in misleading conduct A financial firm must not engage in conduct that is misleading or deceptive or is likely to mislead or deceive. The question of whether conduct is misleading is determined objectively having regard to the surrounding circumstances and context. Misleading conduct can happen when a financial firm: makes a representation about something that is incorrect acts in a way that misleads a complainant does not say or do something (such as correct a complainant’s apparent misunderstanding) when it should. Misleading conduct can occur even if the financial firm did not intend to mislead the complainant, or the complainant could have found out the true position by looking into the matter further. Broadly, to succeed in a claim for misleading conduct, a complainant must establish that they relied on the misleading conduct, and this resulted in a loss. The key laws to which the bank is subject in relation to misleading conduct are set out at section 3.3 of this determination. Complainant was told the construction loan had been approved The bank conditionally approved the proposed construction loan on 5 July 2023, which became an unconditional approval on 17 July 2023. This was communicated that day to the complainant along with the formal loan offer and associated documentation. On 18 July 2023 the complainant accepted the bank’s offer. On 21 July 2023 the bank’s retail construction team emailed to say the bank is ‘ready to progress payments from your construction loan’ and also emailed the builder to say construction finance had been approved. On 24 July 2023 there was another email to the complainant from the bank to formally introduce its retail construction team, who would be administering the loan. LMI had not been approved and serviceability assessment was incomplete In reality, the bank entered into the construction loan contract before LMI had been granted by its insurer. This was despite LMI being a requirement for the loan to proceed, reflected in the incorporation of an allowance for LMI in the loan amount. The commencement of a ‘second verification’ process in early August 2023, not long after the loan had been approved and the builder notified, demonstrates the bank had not yet comprehensively assessed the complainants’ ability to service the construction loan. Approval of the construction loan was misleading It was reasonable for the complainant to expect, once the loan was agreed and she had received further confirmation from the retail construction team, the loan would proceed as documented and she would have access to the finance when needed under the building contract. Although I agree with the bank the Contract Terms permitted it to withdraw the loan in certain circumstances, this does not change my view the complainant has been the subject of misleading conduct. The next question is whether the complainant relied on the construction loan approval in a way that caused financial loss. Has the complainant suffered financial loss due to the bank’s misleading conduct? No. The complainant has not established the bank’s withdrawal of the construction loan has caused financial loss. Complainant seeks compensation When the complainant first lodged her complaint with AFCA, she was not seeking compensation. Rather, she wanted the bank to reverse its loan withdrawal. However, the bank did not agree to reinstate the loan. Instead, it invited the complainant to make another loan application that it would assess afresh. The complainant did not accept this invitation. Preliminary payment made before construction loan The complainant signed a ‘Tender for Fixed Price Contract’ of $323,990 on 24 January 2022 (preliminary agreement) in the hope of eventually entering into a binding building contract. The preliminary agreement required the complainant to pay the builder a ‘non-refundable 5% deposit’ ($16,199.50) to cover surveys, tests and the preparation of plans. In February 2022 the complainant paid the builder $21,549 instead (preliminary payment). The preliminary agreement and preliminary payment occurred well before the complainant’s application to the bank for a construction loan and well before the building contract was signed. It is plain the complainant could not have relied on the bank’s July 2023 construction loan approval when she entered into the preliminary agreement with the builder in January 2022 or made the preliminary payment in February 2022. Any loss resulting from these actions cannot be attributed to the bank. Second payment made after construction loan approval The complainant made a payment of $23,000 to the builder on 28 July 2023 (second payment). This was ten days after the loan contract was agreed and several days before the bank’s 4 August 2024 notification about a ‘second verification’. Complainant did not make second payment in reliance on the loan approval I have carefully examined the circumstances surrounding the second payment. The fixed contract price in the preliminary agreement was $323,990, of which the construction loan would contribute $260,000. The construction loan of $260,000 (exclusive of the allowance for LMI) was earmarked for the building work scheduled to take place after the completion of the slab, so it was never going to cover the deposit or the slab stage payment. The bank’s email of 24 July 2023 explains this: Before we can begin progress payments you will need to make your contribution of $63,991.00, and pay that directly to your builder using your own funds. The reference to $63,991 consists of a 10% deposit of $32,399 together with payment of $31,592 for completion of the concrete slab. These do not quite align with the projected progress payment schedule in the preliminary agreement nor the progress payment schedule in the building contract, both of which total $64,798 rather than $63,991. I do not find it necessary to explore this discrepancy. For reasons that have not been explained, the second payment of $23,000 was made at least one month before the building contract was signed, despite the preliminary agreement anticipating a deposit of $16,199.50, although the building contract, once signed, required a deposit of $32,399. Regardless of the confusion about the proper deposit amount, the preliminary agreement says the deposit will be payable after ‘sign-off’ of all documents, and the building contract says the deposit will be payable ‘Once contract is signed, prior to starting any work.’ Based on the available information, I do not consider the complainant acted in reliance on the loan approval when she made the second payment. Complainant has not established financial loss I have already concluded there is insufficient connection between the bank’s conduct and the complainant’s preliminary agreement and preliminary payment to the builder. I have also found that in making the second payment after the loan approval but before the building contract, the complainant was not relying on the bank’s loan approval. Accordingly, the bank is not responsible for any loss that may have flowed from these preliminary actions. I now consider whether the complainant’s entry into the building contract caused financial loss the bank should compensate. The building contract was eventually agreed and signed on 26 August 2023, when the complainant was still dealing with the bank about the second verification and its implications. Although the complainant was on notice from 4 August 2023 the bank was reviewing the viability of the loan, the result of that review remained unclear when the building contract was signed. The bank’s diary notes for 31 August 2023 show the second verification, labelled internally as a ‘stringent verification process’, had not concluded. It was reasonable for the complainant to sign the building contract in the expectation the construction loan was still going to proceed. As stated above, the complainant could expect the construction loan to cover the cost of all the building work after the slab, but she would first have to use her own means to pay the deposit and pay for completion of the foundations. In other words, the complainant entered into the building contract on the basis she would not have access to the loan until after stage one of the building project was completed (‘Footings poured, stumps, piers or columns completed, internal drainage completed and slab poured.’). Even then, the complainant would not be able to recoup those costs from the construction loan. The complainant now says the building contract has been cancelled and the bank should pay $300,000 compensation. It is not clear which party cancelled the building contract or whether the cancellation was mutually agreed. The complainant has not explained why she could not have sourced alternative construction credit while the builder was engaged with stage one of the building work, nor has she explained how her claim for $300,000 has been calculated. The complainant says she continues to pay her mortgage on the investment home loan she used to purchase the property and continues to pay rent because her construction project has stalled. I do not consider the bank accountable for these generalised assertions of indirect and future financial loss. The complainant’s construction loan was for investment purposes so she would still be paying rent after the build was completed. As for her suggestion the investment home loan would be paid down quicker if the construction loan had proceeded as originally approved, this is speculative. It would depend on a range of factors such as variable interest rate changes, building delays (eg. inclement weather or material shortages) and the amount of rent the property would yield once the construction was completed. Overall, the status of the building project remains unclear, except to say it appears the building work envisaged by the 26 August 2023 building contract did not commence. There is no information to confirm whether the builder has retained or refunded some or all of the complainant’s 28 July 2023 payment of $23,000 or taken any action against her for breach of contract. The complainant has provided a copy of her 3 August 2023 acknowledgment the deposit is non-refundable, and the 28 July 2023 receipt says the deposit is non-refundable. However, $23,000 is neither the designated deposit amount in the building contract nor the amount specified in the preliminary agreement as the anticipated building contract deposit. Further, an acknowledgment or a statement about the status of a payment does not prevent the complainant from requesting reimbursement or the builder providing a refund, especially in circumstances where the project does not proceed. The complainant has not established with any clarity or detail the basis on which she says the bank ought to pay her $300,000 compensation. Based on the available information, I do not consider the complainant has suffered financial loss due to the bank’s conduct in misleading her, in July 2023, about the true status of her loan application. Accordingly, it would not be fair or reasonable to require the bank to pay financial loss compensation. Should the bank compensate the complainant for non-financial loss? Yes. The complainant was distressed to learn her construction loan had been withdrawn, especially as the loan contract had already commenced. AFCA’s approach to non-financial loss AFCA can require a financial firm to compensate a complainant for non-financial loss caused by the firm’s conduct. However, AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to minimise the inconvenience suffered. Where a complainant has contributed to their loss arising from the financial firm’s conduct, their level of compensation may be reduced accordingly. Bank must exercise care and communicate clearly The bank is subject to the Banking Code of Practice (BCoP), which requires it to ‘exercise the care and skill of a diligent and prudent banker’ when considering providing a customer with a new loan. The BCoP also requires the bank to communicate ‘in a timely manner’ with information that is ‘useful and clear’. Bank made the loan offer before LMI was confirmed The bank has failed to act consistently with the BCoP. I recognise the bank was entitled to insist the loan should be covered by LMI (paid by the complainant) but the bank appears to have assumed LMI cover would be automatically be granted by its insurer, without waiting for confirmation. This put the complainant in jeopardy, because the bank was unlikely to lend the agreed amount without the benefit of LMI. Bank revised its serviceability assessment According to the bank’s diary notes, it had already started to revise the serviceability assessment within a fortnight of approving the construction loan. Regardless of what triggered the ‘second verification’ process, I consider the bank was less alert and thorough than it ought to have been when its initial serviceability assessment was done. Bank’s communication was unclear The bank’s obligation to provide useful and clear communication was not met. The bank affirmed unconditional approval by text, email letter and then by the loan contract, despite no confirmation of LMI at that time. Then, two weeks later it embarked on the ‘second verification’. This was described in the bank’s email of 4 August 2023 as necessary for the back-office team: so that they can move the application forward so that when you builder trying to claim for funds it will be able to release it. On the one hand this implies the loan had reverted to the application stage despite already having been approved and documented. On the other hand, it implies the second verification was routine, to help ensure drawdowns would not be delayed by any administrative technicality. The 4 August 2023 messaging exemplifies the bank’s lack of clear communication. Complainant assumed the construction loan would proceed The complainant had been planning the construction project at her investment property since at least January 2022 when she entered into the preliminary agreement with the builder. By the time she applied in June 2023 for a construction loan, preparation for the start of the building work was well advanced. It formed the basis for the loan of $264,524.84 the bank committed to provide. The complainant was taken by surprise when notified that a second verification was underway in early August 2023. She reported to AFCA in February 2024 the bank has ‘used me and abused my feelings.’ When she lodged her complaint with AFCA on 20 October 2023, she put it this way: I am honestly disappointed and my life is falling apart. I am a single mother with 2 children with Autism, I worked so hard to make our dream come through and now [the bank] let us down. The complainant had a reasonable expectation her construction loan would proceed. The loan had been through two approval stages, the loan contract had been signed and the administration of the loan transferred to the retail construction team. The bank’s ‘withdrawal’ of the promised loan caused the complainant undue stress, anxiety and inconvenience. A later aggravating factor is the bank’s confirmation the withdrawal of the loan was also influenced by ‘competing legislative obligations’ it cannot reveal. I consider it fair in all the circumstances the bank should pay the complainant $2,500 compensation for non-financial loss. Why is the outcome fair? I understand the complainant’s frustration her construction project did not proceed as planned and her dismay that having agreed to the construction loan, the bank then changed its mind. Although the loan contract allows this to happen in the circumstances explained in section 2.1 of this determination, it is nevertheless fair the bank pay compensation for the stress, anxiety and inconvenience this caused. Outcome is fair The outcome is fair because: the loan contract permitted the bank to withdraw the construction loan the preliminary agreement and payment to the builder occurred well before the complainant sought construction finance from the bank the second payment was not made in reliance on the loan approval the construction loan did not apply to the first two payments under the building contract the complainant did not suffer financial loss as a result of the bank’s misrepresentation the complainant is entitled to non-financial loss compensation for the impact of the bank’s refusal to proceed with the construction loan. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Extracts from the ‘Credit Contract General Terms’ First Steps 2.1 We only have to provide credit under this contract if: (a) nothing has happened since you applied for this contract which has led, or which we reasonably believe could lead, to a significant adverse change in your financial circumstances; (b) … (c) any insurer of our choice has not refused to insure this contract for us; Misleading and deceptive conduct Section 12DA of the Australian Securities and Investments Commission Act 2001 (ASIC Act) and section 1041H of the Corporations Act 2001 both prohibit misleading conduct in relation to financial services. Section 1041H of the Corporations Act states: “A person must not, in this jurisdiction, engage in conduct, in relation to a financial product or a financial service, that is misleading or deceptive or is likely to mislead or deceive.” Section 12DA(1) of the ASIC Act states: “A person must not, in trade or commerce, engage in conduct in relation to financial services that is misleading or deceptive or is likely to mislead or deceive.” ‘Competing legislative obligations’ The bank has stated repeatedly that one of the reasons it withdrew the loan after it had been approved and agreed was the presence of ‘competing legislative obligations.’ AFCA asked the bank for an explanation, but it declined to elaborate, saying the obligations did not authorise disclosure. It is doubtless frustrating for the complainant to be left wondering about the facts or circumstances underpinning the bank’s assertion. However, AFCA cannot compel the bank to divulge the basis on which it makes this claim. I have to respect the bank’s decision that to disclose any details of the competing legislative obligations would be inappropriate or unlawful. As I do not know what underpins the competing legislative obligations, I have not taken the bank’s claim into account in this determination except that it reinforces the conclusion I have reached that for other reasons, the bank should pay the complainant $2,500 non-financial loss compensation. Further issue - repayment history information The complainant raised a further issue during the course of AFCA’s handling of her complaint. She says the bank reported a late payment on her investment home loan without first giving her the opportunity to catch up the payment. She claims the bank did this because she was in dispute over its decision to cancel her construction loan and it will compromise her opportunity to refinance her investment home loan with another lender. The bank denies it has acted inappropriately. It says it has followed credit reporting rules and also, AFCA’s guidance on credit reporting for complaints that are under active consideration. This issue is quite separate from the complaint about the construction loan. The complainant has been invited to lodge a new complaint if she wishes to pursue this matter any further. Chronology of key events | Date | Action | October 2021 | Complainant purchases investment property with investment home loan provided by the bank. | 24-01-2022 | Complainant signs construction tender with PE Homes (builder) for new dwelling at the vacant investment property. | 17-02-2022 | Complainant pays $21,549.50 to builder as a non-refundable sum to allow for survey, tests and preparation of plans. | October 2022 | Plans prepared for the construction of new dwelling. | October 2022 | Complainant obtains investment home loan with bank. | June 2023 | Complainant applies for construction loan. | 05-07-2023 | Bank confirms conditional approval of the construction loan. | 17-07-2023 | Bank confirms unconditional approval, makes construction loan offer and issues contract to complainant. Loan is for $264,524.84, with first two years interest-only. Loan amount incorporates expected cost of compulsory LMI, being $4,524.84 | 18-07-23 | Complainant accepts construction loan offer. | 21-07-2023 | Bank contacts builder in writing to confirm the complainant’s construction loan has been approved. | 24-07-2023 | Bank confirms its retail construction team contact and asks for copies of building permit, plans, warranty insurance before it can agree to advance the loan money. | 28-07-2023 | Complainant pays builder $23,000. | 04-08-2023 | Bank calls and emails complainant to say it has commenced a ‘second verification’ of her application and needs more information from her. | 26-08-2023 | Complainant signs building contract with the builder. | 31-08-2023 | Bank diary note says ‘stringent verification’ is required and ATO income statement for FY23-24 (year to date) is required. | 01-09-2023 | Bank’s LMI insurer says to bank it is not satisfied the complainant can service the loan. | 20-09-2023 | Bank emails complainant about the format of additional documents needed for the second verification. | 20-09-2023 | Bank asks complainant to send a copy of her own bank statement showing the funds she has available to put towards the building project.