Home / Hollard / Determination 12-00-1029033
Determination 12-00-1029033
Storm damage claim: additional damage not established; delays in claim handling
Summary
The complainant's storm claim was accepted in part and cash settled, but he sought cover for additional damage and full settlement. AFCA found the additional damage not established, ordered $17,937.16 for accepted damage plus $5,400 non-financial loss for the insurer's poor claim handling.
The complainant's unitemised quotes and emails did not establish that the additional damage was caused by the October 2021 storm, but the insurer's delays warranted the maximum non-financial loss award.
Issues
- Claim denial primary · not upheld“The complainant has not established, on balance, the additional damage is covered by the policy.”
- Claim amount dispute secondary · not upheld“I am persuaded that the insurer's cash settlement offer for the accepted damage is fair and reasonable.”
- Delay secondary · upheld“It is not in dispute the insurer did not handle the claim in a timely manner.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Related
Text of the determination
Determination
|
Case number
|
12-00-1029033
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-00-1029033 29 October 2024
Determination overview
Complaint
The complainant holds a Residential Insurance policy underwritten by the financial firm (insurer). On 26 November 2021, the complainant lodged a claim for damage to the insured property following a storm. The insurer accepted the claim and offered to cash settle the claimed damage (which the complainant rejected).
The complainant subsequently claimed additional damage he says was caused by the storm. The insurer re-assessed the property and attempted to engage an engineer to determine whether the additional damage was caused by the storm. The parties have been unable to agree on the necessity of an engineer’s assessment. The complainant:
says the insurer has delayed progressing the claim, and
wants the insurer to accept all the claimed damage and cash settle the claim.
Issues and key findings
Has the complainant established a claim for the additional damage?
No. The complainant has not established, on balance, the additional damage is covered by the policy.
Did the insurer handle the claim appropriately?
No. The parties agree the insurer did not handle the claim appropriately. The insurer’s offer of $5,400 non-financial loss compensation is fair and reasonable because this is the maximum amount AFCA can award for non-financial loss.
Why is the outcome fair?
The outcome is fair because the complainant has not established:
the additional damage is covered by the policy, or
the insurer’s cash settlement offer is not fair and reasonable.
It would be unfair to require the insurer to accept the claim for additional damage. As the insurer is willing to continue to engage with the complainant to assess the additional damage, it remains open to the complainant to do so.
Determination
This determination is partially in favour of the complainant. If the complainant accepts this determination, within 14 days of receiving notice of the complainant’s acceptance, the insurer must pay the complainant:
$17,937.16 in settlement of the accepted damage, and
$5,400 non-financial loss compensation.
The insurer is not required to cover the additional damage as an outcome to this complaint. If the complainant wants the insurer to consider cover for the additional damage, he must engage with the insurer about the assessment of the damage.
Reasons for determination
Has the complainant established a claim for the additional damage?
No. The complainant has not established, on balance, the additional damage is covered by the policy.
Complainant must establish a claimable loss
It is established insurance law that the complainant carries the initial onus to show a loss of a type covered by their policy. The complainant must show this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is shown, the onus shifts to the insurer to show the loss is not covered, either by way of one of the policy exclusions or on some other basis.
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer provided the policy documents to the complainant. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
The complainant holds an insured events policy which covers the complainant’s building and/or contents for loss or damage as a result of the events listed in the PDS. The relevant insured event in this case is ‘storm’, which is set out below in section 3.2 of this determination.
It is not in dispute the insurer accepted the claim for damage to the solar panels. The insurer offered to cash settle this damage based on a repair quote it obtained which shows the estimated cost of repairs is $9,978.23 (plus a 25% uplift).
The complainant does not dispute the insurer’s repair quote, or cash settlement offer. It is therefore fair and reasonable for the insurer to pay the complainant $12,472.78 in settlement of the damage to the solar panels.
Insurer partially accepted the claim for initial damage
The complainant initially made a claim for the following damage:
mould on the ensuite ceiling
warped window frame
warped vanity doors
stains on the main bedroom carpet, and
twisted shed in the backyard due to blocked drains caused by heavy rainfall.
The insurer engaged a builder (DW) to assess the damage and provide a report on the cause of the damage. The building report dated 13 December 2021 says at the time of inspection, damage was visible to the following:
ensuite ceiling
ensuite vanity
ensuite floor tile
boundary fencing panels, and
ground (erosion).
In relation to the cause of the damage, the building report says:
water got in because of hail build up around a vent pipe over the ensuite
there are no storm created openings
there are no issues with building codes, design faults or manufacturer specifications having not been met
the sole cause of water entry is not a maintenance issue or design fault
the internal damage to the property does not pre-date the storm event
the ground erosion appears to be aged
there were no existing maintenance issues prior to the storm event, and
a building consultant/engineer is not required.
The building report identifies the cause of the damage to the:
ensuite ceiling and vanity to be water entry
ensuite tile floor to be impact by a dropped bottle because the complainant slipped on water that had entered the ensuite, and
boundary fencing to be impact by trampoline.
The building report notes DW is unsure of the cause of the ground erosion.
The insurer obtained a quote for the accepted damage and offered to cash settle for $3,492.06. The complainant rejected the insurer’s cash settlement offer because he says it did not include all the damage caused by the storm.
The complainant subsequently notified the insurer of additional damage he says was caused by the storm and the insurer’s failure to remove damp insulation from the roof cavity.
Insurer obtained building report for the additional damage
On 24 May 2023, the insurer arranged for DW to re-attend the property to assess the additional damage the complainant says was caused by the storm. The re-attendance report says:
the complainant advised hail stones had built up on the roof blocking the roof drainage causing water to flood the ensuite and laundry
areas of the property including the garden shed, water tank pump and garage panel lift door are not operating properly
at the time of re-attendance, the complainant was claiming damage relating to:
> the ensuite ceilings, floor tiles, and cracks in cornice joins
> the laundry, which was said to have been flooded
> the water tank submersible pump which was not operating correctly
> the rear shed slab, which was crooked
> the garage roller door, which was not operating correctly, and side rails were out of alignment
> the roof which was hail dented, and
> the ensuite vanity.
In relation to the cause of the additional damage, the DW re-attendance report notes:
paint crazing on the ensuite ceiling and timber architraves is from a paint adhesion failure
there is no associated water staining observed to the ceiling lining
the ensuite floor tiles show chip marks from multiple impacts from an object with downward force
the cracks in the cornice joins are from building movement
the laundry was said to have been flooded, but DW is unable to sight any resulting damage
the complainant was concerned the floor tiles may become loose/damaged in future
DW is unable to sight any resulting damages to the water tank submersible pump as the water pump is located within the water tank
the ground beneath the shed slab is eroding causing the shed to become misaligned
DW is unable to sight any resulting damages to the garage roller door or the roof, and
the ensuite vanity shows mild swelling to the base areas only, which appears to be from water on the ensuite floor soaking up the to the vanity where the vanity is close the floor.
The DW reattendance report does not report on a claim conclusion. Rather, it says the claim involves complexities that would require the following so the insurer can determine whether the policy responds:
a building consultant be appointed to determine/confirm the cause of the claimed damages and develop a remedial scope of works, and
an electrician to report on the submersible water pump.
The complainant says the insurer’s assessor advised him an engineer’s assessment would not be useful considering the storm happened in October 2021.
Complainant’s quotes do not persuasively establish the cause of the damage
In support of his claim, the complainant provided:
photographs of the claimed damage, and
various repair quotes.
The complainant also says the insurer failed to remove damp insulation from the roof following the storm, which caused mould to manifest throughout the house.
The complainant’s landscaping quote from HLE dated 7 August 2022 lists proposed work to the backyard. The quote contains no commentary on the cause of the damage.
The complainant also provided an email HLE sent the insurer which says:
I can confirm these damages were from the floods in 2021.
The complainant’s quotes for the work to the laundry, backyard, ensuite and garage door from builder LBD generally say LBD will conduct the work listed in the quotes to address the damage caused by the water ingress, and ice build-up during October 2021 hailstorm.
The complainant also provided an email from LBD saying:
As a licensed builder of over 25 years I can say that the original house was build [sic] correctly and that the damage was due to the hail storm event in October 2021.
The complainant’s quotes from builder AB include:
the removal and replacement of 14 square metres of carpet in the main bedroom
the complete demolition and renovation of the ensuite, and
repairs to the laundry due to water entry.
The complainant’s quote from builder HTS for the renovations to the ensuite and laundry say the complete ensuite and laundry removal and renovations are due to storm/water damage.
I acknowledge the complainant’s quotes and supporting emails generally say the damage listed for repair was caused by a storm event.
However, this general commentary is not sufficiently persuasive to establish the cause of the additional damage was the October 2021 storm event. This is because the quotes and emails do not explain, among other things:
why or how the trades people reached the conclusion that the damage was caused by the storm
the investigation (if any) the trades people undertook to conclude the damage was caused by the storm
the evidence the trades people relied on to reach their conclusion, or
the qualifications of each trades person to show they are qualified to assess and report on the cause of the damage.
I acknowledge the complainant says mould manifested in the house because the insurer failed to undertake make safe work to remove damp insulation.
The laundry quotes include work to prevent the spread of mould. However, this does not establish, on balance, mould was:
present in the laundry, and
caused by damp insulation being left in the roof after the storm.
I accept there was a significant amount of time between the complainant lodging the claim, and the insurer issuing a cash settlement offer for the claimed damage. However, this does not mean the complainant has shown the additional damage was caused by, or is related to, the storm.
As stated above, the onus is on the complainant to establish, on balance, a loss of a type covered by the policy. I am not persuaded, on the exchanged information, the complainant has met his onus.
Policy requires complainant to co-operate
The insurer says it has:
offered to engage an engineer to assess the additional damage, or alternatively
asked the complainant to provide an independent report that comments on the cause of the damage and challenges the DW reports.
The complainant says he has completed significant work to the property and an additional assessment would not be helpful.
The insurer is entitled to make reasonable enquiries and conduct investigations to clarify the circumstances surrounding the claim. This is so it can make an informed decision as to whether the claim falls within the scope of the policy.
The PDS sets out the complainant’s responsibilities when making a claim, including:
allowing us or anyone appointed by us to:
[…]
inspect your building, contents and/or your portable contents;
providing us with all information and documents we request in order to:
assess your claim…
As the complainant has not established, on balance, the additional damage was caused by the storm, the insurer’s proposal to appoint an engineer to assess the damage, or obtain a report from the complainant is:
fair and reasonable, and
in line with the terms of the policy.
It remains open to the complainant to work with the insurer to see the additional damage assessed in a timely manner. This is so the insurer can make an informed decision about whether the additional damage is covered by the policy in a timely manner.
The insurer is not required to cover the additional damage as an outcome to this complaint. This is because the complainant has not established, on balance, the additional damage was caused by the storm in October 2021.
Insurer’s offer is fair and reasonable in the circumstances
The insurer has provided a statement of works for the initial claimed damage. This includes work to:
repair the ensuite ceiling
remove and replace the ensuite vanity
remove and replace the ensuite ceiling insulation
remove and replace the damaged ensuite floor tile
supply and install granular fill that washed away from the backyard retaining wall, and
remove and replace the damaged Colourbond fence panel.
The insurer has offered to cash settle the claim for $17,937.16, which includes:
the cost of repairs for the accepted damage as per the scope of works (being $4,371.51)
the accepted repairs to the solar panels, and
a 25% uplift for contingencies and the transfer of risk to the complainant.
I acknowledge the complainant’s repair quotes include some of the above repairs. However, the complainant’s quotes are not itemised. Therefore, I am not persuaded the complainant has shown the insurer’s scope of works and quote is insufficient to cover the accepted damage.
Further, as the complainant has not established, on balance, any additional damage was caused by the storm, I am persuaded that the insurer’s cash settlement offer for the accepted damage is fair and reasonable.
Insurer is not liable for damage to the complainant’s car or jet ski
For completeness, I note the complainant says his car and jet ski became damaged because they sat outside in direct sunlight while the insurer considered the claim.
The complainant has provided a repair quote which estimates it will cost $14,440 to repair and repaint the weather damage to the car.
The insurer says the damage to the complainant’s car and jet ski was not caused by the storm, and is consequential loss, which is not covered by the policy.
I acknowledge the complainant’s concerns. However, I am not satisfied the complainant has shown the damage to the car or jet ski manifested during, or because of, the claim delays.
Therefore, the insurer is not liable for the damage to the complainant’s car or jet ski.
Did the insurer handle the claim appropriately?
No. The parties agree the insurer did not handle the claim appropriately. The insurer’s offer of $5,400 non-financial loss compensation is fair and reasonable because this is the maximum amount AFCA can award for non-financial loss.
AFCA may award non-financial loss compensation
Under the AFCA Rules, we may award up to $5,400 compensation for non-financial loss for complaints lodged between 1 January 2021 and 31 December 2023 (as is the case here).
AFCA takes a conservative approach to awarding this compensation. We will only award this compensation if the complainant has suffered an unusual degree of stress, inconvenience or delay due the insurer’s conduct (e.g. unreasonably handling the claim).
Insurer did not handle the claim appropriately
It is not in dispute the insurer did not handle the claim in a timely manner. The insurer also does not dispute it did not call the complainant between 14 December 2021 and 7 December 2022.
There is no information to show the insurer took any steps to progress the claim between 14 December 2021 and 18 September 2022, which is around the time the insurer issued the first cash settlement offer. The insurer has not explained why:
it did not engage with the complainant in that time, or
it took so long to issue the cash settlement offer, considering the cash settlement was based on the scope of works contained in the building report.
The complainant says the insurer’s conduct caused him significant stress and inconvenience because, among other things:
his claim was passed around and forgotten about
he had personal items that became damaged while the insurer was considering the claim, and
mould manifested in the house, which meant he had to move out.
I acknowledge the insurer did not handle the claim appropriately. However, the insurer is not required to accept the additional damage as a remedy to its poor handling of the claim.
The insurer has offered the complainant $5,400 compensation for the non-financial loss its handling of the claim caused him. As this is the maximum amount of compensation AFCA can award for non-financial loss in these circumstances, I consider the insurer’s offer to be fair and reasonable.
Why is the outcome fair?
Outcome is fair in the circumstances.
The outcome is fair because the complainant has not established:
the additional damage is covered by the policy, or
the insurer’s cash settlement offer is not fair and reasonable.
It would be unfair to require the insurer to accept the claim for additional damage. As the insurer is willing to continue to engage with the complainant to assess the additional damage, it remains open to the complainant to do so.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Relevant extract of the policy
Storm
What is covered
Your building and/or contents are covered for loss or damage caused by storm.
What is not covered
Your building and/or contents are not covered under this Insured Event for:
loss of or damage to
any exterior blind, shade cloth or awning unless professionally installed in the last 10 years;
pools, spas or in-ground tanks caused by hydrostatic pressure;
pool and spa liners or covers;
synthetic turf unless it forms part of a tennis court or bowling green;
retaining walls;
pontoons, jetties, wharves or similar structures; or
loss or damage caused by wind, rain, hail or snow which entered an ordinarily fully enclosed part of your building through an opening not created by the storm. This includes but is not limited to:
an open window or door; and
any opening made for the purpose of any renovation, repair or maintenance work, including where tarpaulins or other fixings have been set up.
[…]
Your building and/or contents are not covered under this Insured Event for loss or damage as described in the General Exclusions listed on pages 78 to 81.