Text of the determination
Determination
|
Case number
|
12-00-1025306
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-00-1025306 29 August 2024
1 Determination overview
Complaint
The complainant has a home and contents insurance policy (policy) underwritten by the financial firm (insurer). The policy includes optional accidental damage cover. The complainant lodged a claim for hail damage to the home’s roof in October 2020. The insurer accepted the claim and completed a roof replacement in April 2021.
In December 2021, the complainant lodged a claim for sagging ceilings. The insurer denied the claim on the basis the sagging was due to adhesive failure and not the prior roofing repair. In December 2022, the ceilings collapsed, damaging contents. The complainant lodged a further claim. The insurer completed a make safe but denied the claim on the basis ceiling adhesive had failed due to excluded wear and tear.
The complainant maintains that the original or subsequent storms caused the loss. He says that defects in the roof frame were worsened by the roof-replacement and failure to add sarking, creating more movement and stress to the frame. This movement resulted in the ceiling becoming detached from the roof frame.
The complainant seeks the following:
re-roofing of the home
repair to the damaged ceiling
cover for contents damaged when the ceiling collapsed
financial compensation for being unable to work due to stress, loss of opportunity to sell the home, and additional electricity costs when the make safe crew failed to turn the solar electricity unit back on
non-financial compensation for stress and negative impact to mental health.
1.2 Issues and key findings
Were the re-roofing works done in April 2021 adequate?
No. The insurer’s builder did not install sarking during the re-roof which means the repairs did not comply with building standards. The insurer is to attend to rectification of the re-roof under the lifetime guarantee provided within the policy.
Is the insurer entitled to deny the ceiling damage claim?
No. The complainant has established a claimable loss under the policy cover and the insurer has not established that an exclusion applies.
Is compensation for indirect-financial loss payable?
No. The complainant has not established the claim for indirect loss.
Is compensation for non-financial loss payable?
Yes. The complainant has experienced stress, inconvenience and interference with his peace of mind due to the insurer’s poor claims handling and an award of $1,500 is appropriate.
Is compensation for the complainant’s expenses payable?
Yes. The complainant has demonstrated he sought and paid for reports totalling an amount of $3,386 to pursue and establish his complaint. The expert reports were further required due to the complexity of the claim and need for engineering opinion.
Why is the outcome fair?
The determination takes into account the applicable policy terms and conditions for the claims made, the law, AFCA Rules and relevant expert reports to ensure the determination is fair in all the circumstances.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of the insurer receiving confirmation of the complainant’s acceptance of this determination, it must pay the following amounts:
$3,386 to reimburse the professional costs incurred in pursuing this complaint and
$1,500 in non-financial loss.
Within 30 days of accepting this determination, the complainant must provide a final full and complete list of damaged contents and any supporting material to enable the insurer to promptly assess and complete a cash settlement in accordance with the policy terms and conditions.
Within 30 days of the insurer receiving confirmation of the complainant’s acceptance of this determination:
the insurer must review the damage to the ceilings, roof frame and cavity, cost of installing sarking and any damage to the building caused by the collapse of the ceilings. The insurer should select an independent building consultant to prepare a full and complete scope of works (SOW) for claim related repairs and repairs under the lifetime guarantee. Regard should be had to any recommendations made by engineering experts SW and B and the current building standards for the building which is within a bushfire hazard area.
provide to the complainant a copy of the SOW.
Within 60 days of receiving the SOW both parties must exchange market-based quotations (as defined in 2.1) to complete the claim related repairs and lifetime guarantee repairs. The insurer must cash settle the complainant for the average cost of the market-based quotations with a 15% uplift to account for any additional contingencies.
2 Reasons for determination
Were the re-roofing works done in April 2021 adequate?
No. The insurer’s builder did not install sarking during the re-roof which means the repairs do not comply with building standards. The insurer is to attend to rectification of the re-roof under the lifetime guarantee provided within the policy.
Insurer was required to re-roof the property to meet current building standards
At the time of the claim for the October 2020 storm, the applicable policy terms were set out in the Product Disclosure Statement (PDS) dated March 2017. The next PDS was not effective until 21 September 2021 and did not apply at the time of the claim or repairs.
The PDS provides the following terms in relation to payment of a claim:
Reductions we may apply
We may reduce the amount we pay you to allow for age, wear, tear and the condition of your home. If we do that, then the final amount we pay you will reflect the actual value of your home immediately before the loss or damage happened.
We may reduce your payment in these cases:
..
• any part of your home did not comply with relevant building laws when it was originally built.
and
If only part of your home is affected
When only part of your home is damaged or destroyed, then we pay to repair or rebuild only the area that was affected by the damage.
We don’t pay for:
..
• extra costs to rebuild or repair your home to a better condition than it was in before it was damaged or destroyed (unless we need to meet current building standards).
The insurer accepted the claim to repair the roof due to storm damage and there is no information to suggest that it applied a reduction to the claim settlement. Further, under the policy terms, the insurer will spend additional costs to meet building standards that are current at the time of the repair.
Relevant building standards did require installation of sarking
The material provided to AFCA included a Site Plan prepared by the insurer’s builder (PI), the [L] Council Bushfire Overlay document and an email from engineer B dated 21 May 2024. These documents show the complainant’s property is located in a bushfire hazard area.
At least one of these documents references a bushfire report which was not provided to AFCA. It is currently unknown what Bushfire Attack Level (BAL) may apply to the home building as the documents provided do not identify it. It should be noted that the construction requirements differ depending on the applicable BAL.
The relevant roofing standards are set out in both the Building Code of Australia (BCA) and the Australian Standards, particularly AS3959. I note that under the AS3959 even the lowest BAL requires that sheet roofing be fully sarked over the entire roof area, including ridges and hips. The addition of sarking would have been a mandatory inclusion to ensure the re-roofing met the code requirements which applied at the time the repairs were undertaken. There are also additional requirements which relate to the guttering, fascia and eaves and roof penetrations. It is unknown if these requirements were met during the re-roofing.
The building permit for the re-roofing works of April 2021 further stated all new metal roofing was to be installed and fixed in accordance with the manufacturer’s installation guide or similar. The manufacturer’s guidelines for the metal sheeting required sarking to be installed underneath the roof sheeting.
The Form 21 Final Inspection Certificate for the re-roofing also says:
Where the building was designated as Bushfire Hazard Area, the roof complied or was upgraded to comply with AS3959-2018.
As the documentation states the building was in a designated bushfire hazard area, the roof was required to be upgraded to comply with AS3959-2018. The Form 21 clearly contemplates this requirement, so it is unclear why it did not occur.
I acknowledge the insurer’s engineer, SW, has stated in his first report that:
‘roof sarking is the basic requirement for maintaining the building elements and health of occupants from the penetration of the water [sic] accordance with the BCA NCC’
’[w]e further recommend sarking be installed below the roof sheeting’.
However, in his second report, SW stated sarking was not required under the relevant building standards. It is unclear whether SW was aware the building was in a bushfire hazard area and whether this would have changed his opinion. Further, the differences between the first and second report in relation to the sarking are not fully explained.
Based on the above, I accept that the sarking was required under the relevant building standards and to comply with the manufacturer’s installation guide or similar.
The policy terms also contain a lifetime guarantee on repairs under the home cover:
We guarantee the quality of repairs we authorised for your home or contents when you made a claim with us if they were completed by a repairer authorised by us. That means we’ll pay the cost to fix any faulty workmanship while you own your home or contents.
Given that the work did not comply with building standards or manufacturer’s installation instructions, I consider the work is faulty and would be covered under the lifetime guarantee.
Under the policy the insurer may opt to cash settle or arrange repairs. Given the nature of this matter and the clear issues the parties had during the prior claims process, I consider it would be fair in the circumstances to require a cash settlement to be made after receiving a market rate quotation.
For clarity, a market rate quotation is obtained from an independent builder based on the SOW once known. The independent builder should not have previously provided a quotation for this matter and be able to undertake the works on the same conditions and for the same costs, even if engaged directly by the complainant outside the claim.
The insurer must select an independent building consultant to prepare a SOW for repairs under the lifetime guarantee to install sarking. Regard should be had to any recommendations made by engineering experts SW and B and the current building standards for the building which is within a bushfire hazard area.
2.2 Is the insurer entitled to deny the ceiling damage claim?
No. The complainant has established a claimable loss under the policy cover and the insurer has not established that an exclusion applies.
Policy provides storm and accidental damage cover subject to exclusions
The policy provides cover for loss or damage to the complainant’s home or contents caused by the insured event of storm. The PDS relevant at the time the claimed damage occurred defines storm as:
Strong winds that may also involve heavy rain, hail, or snow. For example, a cyclone
The complainant added accidental damage cover to the policy. The PDS defines accident as:
An event or incident which you did not intend or expect.
The policy therefore provides cover for damage to the home building which arises from storm or from an event the complainant did not intend or expect.
Complainant has the onus to establish a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
The complainant has established a claimable loss under the policy
The complainant has provided an engineering report from B. B physically examined the building (including the roof cavity) and provided his opinion that the ceiling failed because:
wind-driven rainfall from the subject storm event would allow moist conditions inside the roof cavity
moist conditions in the roof cavity results in softening of the plasterboard ceilings throughout
wind-gusts from the storm event incurs spikes of wind pressure within the roof cavity, which enters via roof corrugations at roof flashings and via the soffit ventilation
spikes of wind-pressure within the roof cavity places loads upon the plasterboard ceilings throughout the home, at a time when the plasterboard sheeting is in a softened state as a result of the moist conditions
these conditions caused the failure of the ceiling sheeting fixing to occur.
B noted the damage was identified after a secondary storm event which was the subject of another roof damage claim. Photograph 9 of B’s report show a broken roof truss which B states may be indicative of wind-pressure damage being incurred.
Given this, I consider that B has established a claimable loss that a storm event caused damage to the home. I find B’s report persuasive because it explains the widespread failure of the ceilings.
It should be noted that the insurer’s expert, PI, attended prior to the ceiling collapse. Although PI attributed the sagging to adhesion failure, they made no recommendations within the report findings to take specific remedial action. A later report from PR, the make safe entity, who attended after the ceiling collapse stated:
there would be no maintenance related repairs that could have prevented the damages occurring
In such circumstances, the collapse could still be deemed as accidental damage as it was not intended or expected.
The policy exclusion does not apply
The insurer denied the claim because it says the failure was caused by failed adhesion which falls under the wear and tear exclusion.
In order to determine whether the exclusion applies, I need to determine the proximate cause of the damage. This is a question of fact depending on the circumstances. Damage can have more than one cause. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
I have reviewed all expert reports but consider the engineering reports to be the most relevant due to the authors’ expertise and inspection method which included the roof cavity.
The insurer’s engineering expert, SW, stated that it was their opinion that the following issues had arisen:
ceiling framework twisting and bowing triggered the observed ceiling lining collapse within the Dining, Living and Kitchen areas, and did not result from the roof replacement. The ceiling plasterboard lining directly fixed into the bottom chord of the timber trusses with 1/3 fixing method which alternates combination of fasteners and adhesive
the long-term failure of the plasterboard ceiling adhesive is a contributing factor to the experienced ceiling collapse, in combination with the inherent issues with the ceiling framework
the spacing of ceiling joists, noted at 550 – 700mm, exceeded the maximum allowable spacing (450mm centres) of the framing members directly supporting 10mm standard grade Gyprock plasterboard
insufficient edge trimmers have been installed about the edge of the ceiling lining, and the ceiling lining has not been sufficiently supported about the edge of Dining, Kitchen and Living rooms
SW refers to AS 2589:2017 – Gypsum Lining – Application and Finishings which outlined the trimmers requirements for truss roof structures. Such failure of the plasterboard ceiling sheeting is due to the installation methods that do not comply with AS/NZS 2589.
It is noted that the complainant’s engineer, B, disagrees with SW on the following basis:
the locations where framing exceeded maximum required centres were at isolated locations only, meaning B would expect to see isolated damage, not the widespread failure which has occurred throughout the home
while there is deformation/twisting of some ceiling joists and truss binder/hanging beams, these members were installed in their deformed state at time of construction of the house frame. Such disparities in the house frame at the time of construction does not cause ceilings to collapse.
It is SW’s opinion that the proximate cause of loss is roof frame defects:
At the end, in our opinion, ceiling framework twisting and bowing is triggered [sic] the observed ceiling lining collapse within the Dining, Living and Kitchen areas, and not resulted from the roof replacement.
SW does not state adhesive failure is a primary cause of the loss but does note it as a ‘contributing factor’ to the ceiling collapse in his report dated 14 November 2023. In addition, SW considered the poor application and bonding of the adhesive could be deemed an ‘inherent construction issue’ which appears to be defective or faulty workmanship. In contrast B states that whilst there may be some contribution from framing defects and lack of sarking, the overall reason for the damage relates to storm winds and driven rain which softened the plaster and caused it to detach.
Based on the evidence, I prefer the findings of B as it explains the widespread collapse of the ceiling and the broken roof beam in the roof frame. The storm is the proximate cause of the damage because it resulted in softening of the plaster and pressure on the ceiling sheets which resulted in weakening of the fixing points. Notably, B’s opinion appears supported by one of the builders who have quoted for the damage. This builder said:
Plasterboard ceiling sheet fixings have become damaged from high windspeed. Vibrating trusses causing glue line to break and screw fixing to tear plasterboard ceiling and fail to carry sheet load.
Even if I was incorrect to find that the storm event triggered the ceiling collapse, this claim would still be covered under accidental damage optional coverage as it was neither expected nor intended. If SW is correct to say the roof frame defects caused the loss, then the relevant exclusion would not be wear and tear but rather defective or faulty workmanship. The exclusion contained in the PDS applicable to the 2022 loss states:
You are not covered for:
Loss or damage caused by any inherent or built-in or defective or faulty workmanship, design or manufacture. (But we do cover you if you can show that you or your tenant did not know or could not reasonably have been expected to know about the defect or defective or faulty workmanship, design or manufacture)
Given the lack of identification by the insurer’s experts of any defect when replacing the roof, I consider that this demonstrates the complainant did not know and could not be reasonably expected to know of the defect in the workmanship or design of the roof.
Insurer is liable for damage caused by subsequent collapse of ceilings
The complainant has established a valid claim under the policy for the damage to his ceiling linings and resulting damage. The insurer has not established that a relevant exclusion applies to part or all of the loss.
It should be noted that the roof now has an identified defect in the roof framing, a broken roof beam which B considers the result of the storm winds and is missing sarking which should have been installed during the prior roof repair. These elements of the roof will also form part of the repair costs under the policy as the repairs to bring the roof into line with current building standards.
The insurer must review the damage to the ceilings, roof frame and cavity, and any damage to the building caused by the collapse of the ceilings. The insurer should select an independent building consultant to prepare a full and complete SOW for claim related repairs. Regard should be had to any recommendations made by engineering experts SW and B and the current building standards for the building which is within a bushfire hazard area.
I consider that the most appropriate method of settlement is a cash settlement due to the deterioration in the relationship between the parties. The parties will be allowed to obtain market-based quotations based on the SOW and the insurer will pay the average cost of the market-based quotations together with an uplift of 15% to allow for contingencies.
Is compensation for indirect-financial loss payable?
No. The complainant has not established the claim for indirect loss.
AFCA can award compensation for indirect-financial loss
Under the AFCA Rules, we can award up to $5,400 compensation for indirect financial loss. We will award this type of compensation if the complainant suffers a loss as an indirect consequence of an error by the financial firm. More than one award of compensation may be made in a complaint when separate events lead to indirect-financial loss.
Under D.3.2 of the AFCA Rules, AFCA cannot award indirect financial loss if the complaint arises as a result of a claim on a general insurance policy that expressly excludes such liability. This rule does not preclude AFCA from making an award if the indirect loss arises from claims handling rather than the claimed event itself.
The complainant has claimed for compensation arising from indirect loss
The complainant has claimed for loss of income in the amount of $150,000 due to the stress and deterioration of his mental health due to the claims process. This amount is well above the AFCA compensation cap for a claim for indirect financial loss.
The complainant had made a prior claim for higher electricity costs due to the failure to reconnect the solar system for which the financial firm offered reimbursement of $200.
The policy excludes indirect financial loss and an award cannot be made
The policy provides the following exclusion relating to indirect financial loss:
Indirect loss
You are not covered for:
Any indirect loss. Any loss or extra expense which indirectly results from an event we cover under your policy. For example:
• any lost productivity from the loss or damage to your mobile phone,
• you purchased an extended warranty for a TV or DVD player which is destroyed by an insured event – we’ll replace the item but we won’t give you a new extended warranty,
• the drop in an item’s value after it has been repaired or replaced,
• lost pay because you are unable to get to work because of an insured event.
Accordingly, the exclusion relates to any indirect loss resulting from the claimed event, but not claims handling.
The claim for indirect loss has not been established
The complainant has provided psychological opinion dated 28 June 2024 that says:
I am in no doubt that the fundamental reason behind the decision to stop work was a result of the mental health challenges associated with the damage to his property and the ongoing struggles to access support to get the house repaired to make it liveable.
The issues associated with the house and the lack of response to at a minimum make it safe and habitable continues to have a significant impact on [complainant’s] well-being.
There is further evidence of the complainant’s salary in relation to the work he ceased.
The complainant’s submissions addressing the indirect loss claim dated 25 June 2024 describe the basis for the claim as related to the insurer’s failure to note roofing defects during the first re-roof and bring the roof into compliance. The second issue was due to the error made by the financial firm in failing to properly identify the cause of the ceiling sag. The complainant says the collapse of the ceiling led to him stopping work.
The issue is that the complainant’s expert states the primary cause of the ceiling collapse was a storm event and not the defects in the roof. I have made findings above to this effect. Given this, it would be contrary to the other findings of this determination to make a finding that indirect loss could be established on this basis.
Further, the complainant has submitted that the failure to properly investigate the sagging ceiling led to its collapse. It should be noted that the insurer only had this one report and had no contrary evidence on the cause of the sagging ceiling. The insurer accordingly relied on its expert report and based its claim decision on the evidence available at the time. This is not an error which reasonably gives rise to a claim for indirect loss.
I do not have sufficient grounds relating to causation to award an amount for indirect loss
Is compensation for non-financial loss payable?
Yes. The complainant has experienced stress, inconvenience and interference with his peace of mind due to the insurer’s poor claims handling and an award of $1,500 is appropriate.
AFCA can award compensation for non-financial loss in certain circumstances
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
There were errors in the claims handling
I acknowledge the original claim took quite some time to resolve due to ongoing issues in relation to trades being unaware of which works had been completed and the completion of items such as the oven. The complaint relating to the roof is separate to these issues. However, the complaint before AFCA relates to the original incomplete roof repairs and the failure to identify the cause of the sagging ceilings which led to their later collapse and additional damage.
For reasons noted above, the failure to install roof sarking is an incomplete repair as it was required by the applicable roofing standards. Further, the complainant has noted the failure to properly investigate the sagging ceilings led to their collapse, although it is recognised that experts have stated there was no maintenance to be performed. I also accept that later expert reports were required to confirm the cause of the ceiling collapse and whether policy cover extended to the loss, and this would involve some time to complete.
The complainant has lived without ceilings to most of the property since December 2022 and has been unable to sell the home. He has suffered from mental health issues which his treating medical practitioner has stated is due to the handling of the insurance claim. I note that the insurer has offered some assistance in this regard during the complaint at AFCA. However, I accept that the claim and the length of the claim handling would be capable of causing stress, inconvenience and general interference with the complainant’s peace of mind.
In the circumstances, I consider an award of $1,500 appropriate in the circumstances.
Are the complainant’s costs for pursuing the complaint payable?
Yes. The complainant has demonstrated he sought and paid for reports totalling an amount of $3,386 to pursue and establish his complaint. The expert reports were further required due to the complexity of the claim and need for engineering opinion.
The AFCA Rules permit an award for the costs of pursuing the complaint
Under D.5 of the AFCA Rules, an aware of up to $5,000 can be made for contribution to the complainant’s costs of pursuing the complaint. These costs are professional costs incurred during the course of the complaint.
The complainant has incurred professional costs during the complaint
The complainant has incurred the following professional fees in pursuing the complaint:
reimbursement of the $2,926 payment for B’s report (invoice date 7 September 2023)
reimbursement of the $460 payment for BB’s report (invoice dated 19 July 2023).
The reports assisted in establishing the complaint at AFCA and were required due to the need for expert opinion on the prior roof repairs and cause of the collapsed ceilings. I note that both reports were reviewed for the purpose of determining this complaint at AFCA. I consider that the total cost of $3,386 should be awarded.
Why is the outcome fair?
The determination takes into account the applicable policy terms and conditions for the claims made, the law, AFCA Rules and relevant expert reports to ensure the determination is fair in all the circumstances.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.