Home / QBE / Determination 12-00-1023889

Determination 12-00-1023889

Complainant said insurer's roof repairs after hailstorm were defective and roof still leaks; insurer declined further repairs.

FirmQBE
Decided2025-04-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a 2020 hailstorm the insurer replaced the roof, but the complainant said repairs were defective and the roof still leaked. AFCA found in favour of the insurer as the leaks were not shown to result from its workmanship.

The complainant bore the onus of proving the insurer's work was defective and expert evidence showed water entering through box gutters, not the insurer's repairs.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1023889 | Financial firm | QBE Insurance (Australia) Limited Case number: 12-00-1023889 31 March 2025 Determination overview Complaint The complainant had a home building insurance policy underwritten by the financial firm (insurer). A hailstorm damaged the roof of the house in 2020. The insurer repaired the complainant’s roof and resulting internal damage in the house. The complainant says that the repairs were defective and that the insurer must fix the roof which still leaks. The insurer says that the continued leaking is due to ongoing maintenance issues. Issues and key findings Does the insurer need to replace the roof? No. The complainant has not shown that the ongoing water penetration is due to the insurer’s defective works. Why is the outcome fair? The outcome is fair as the complainant has not shown that the insurer’s repairer is responsible for the leaks in the roof. Therefore, it is fair that the insurer decline to undertake further repairs to the roof. Determination This determination is in favour of the insurer. The insurer must attend the property to fold down the end of the roof sheet, which is the only defect from the insurer’s builder. If the complainant does not allow the insurer reasonable access to rectify the defect, the defect does not need to be rectified. Other than the above, no further action need be taken by the financial firm. Reasons for determination Does the insurer need to replace the roof? No. The complainant has not shown that the ongoing water penetration is due to the insurer’s defective works. Background In 2020, the complainant’s property was insured under a building policy underwritten by the financial firm (insurer). The property was damaged in a hailstorm that occurred in 2020. A claim was lodged under the policy and the insurer arranged for replacement of the damaged roof. The property has box guttering and that was not replaced by the insurer. The complainant sought cover for the box guttering. In a preliminary assessment, AFCA held in complainant number 901474 that the box guttering was not damaged in the hailstorm and that the insurer was not required to replace the box guttering under the policy. The preliminary assessment was accepted by both parties. Accordingly, it is outside the scope of this determination to make any finding about whether the box guttering should have been replaced by the insurer. The only issue for consideration in this complainant, is whether the cause of water ingress is due to work undertaken by the insurer in 2021. Complainant does not show faulty workmanship is the cause of water ingress The exchanged documents show that water has continued to enter the property from about 2021. If the complainant can show that the water ingress is due to faulty workmanship or failed repairs undertaken by the insurer in 2021, then the insurer will be responsible for fixing those repairs, and any resultant damage. However, the exchanged documents do not persuasively show that the insurer’s repairs were faulty. The exchanged documents contain expert reports commenting on the cause of the leaks. The complainant had three expert reports, one prepared in 2022 by EB, one prepared in 2024 by CD and one prepared in 2024 by AB. The report of AB is a letter, not supported by reasoning so I do not attribute much weight to it. The report of EB identifies several issues with the building works, however, it does not contain any photographs of those defects, nor does it identify with specificity the actual defect. Rather than reference to a building standard, something is simply stated to be not done properly. The report does not persuade me that the building works undertaken by the insurer were faulty. The insurer has reviewed the report of EB and acknowledges that one defect, being the end of the roof sheet not being folded down, needed rectification. There is no evidence that this acknowledged defect contributed to water ingress in the roof. I expect that if the defect had allowed water ingress, evidence of this would have been provided. The report of CD is comprehensive but does not identify any issues with the work undertaken by the insurer in 2021. CD says that: Upon inspection, we find the roof installation to be satisfactory, displaying a well-finished appearance. However, we note that the parapet flashings lack proper under sealing, particularly evident at the vertical join as depicted in the attached photo. The box gutters do not meet current Australian Standards, lacking necessary components such as sumps, overflows, and adequate depth in certain areas. Additionally, some joints exhibit insufficient finishing. The report does not identify any areas of the roof that, due to faulty workmanship of the insurer, have contributed to the water ingress. Most of the photos taken and included in CD’s report are of the box gutters and the poor sealing within the box gutters. The insurer’s expert CB says that the cause of water ingress is due to poor or failed silicone seals in box guttering. A building report was also prepared by K, at the request of another financial firm. K’s report is comprehensive and says that wind driven rain is entering the property through gaps in silicon throughout box guttering. I accept that the complainant’s roof has continued to leak. However, every expert acknowledges that the box gutters need work. The reports of K and CB say that water is entering the roof through the box gutters. On balance, I accept this. In this matter, the complainant bears the onus of proving that, on the balance or probabilities, the insurer’s work was defective. The exchanged documents show, and I accept that, water is entering through the box gutters. There is no persuasive evidence that shows water is entering the roof through the faulty workmanship of the insurer. As the complainant has been unable to show the insurer is at fault, it is fair that the insurer refuse to repair the roof. Why is the outcome fair? The complainant has not established that the water ingress is caused through defective workmanship of the insurer. Therefore, it is fair that the insurer does not need to rectify any part of the complainant’s roof, other than the part it has accepted responsibility for. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.