Home / Hollard / Determination 12-00-1023152
Determination 12-00-1023152
Storm damage claim settlement, repairs and claim mishandling
Summary
After a hailstorm damaged his home, the complainant sought a $422,583 cash settlement and the insurer offered a cash settlement for external damage, mould remediation and $5,400. AFCA ordered the external cash settlement with a 20% uplift, full mould remediation, reassessment of internal damage and the $5,400.
Accepted storm damage is settled on a fair repair quote with a risk uplift, and non-financial loss may be awarded where the insurer mishandled the claim.
Issues
- Claim amount dispute primary · not upheld“The panel considers the insurer's offer to cash settle the external building damage is fair and reasonable, however considers a 20% uplift is fair”
- Poor claim handling secondary · upheld“The information shows lengthy delays and mismanagement on the part of the insurer.”
- Delay secondary · upheld“there were lengthy delays, and it was the insurer's failure to make the building watertight that caused the damage to worsen”
- Repairs or contractors secondary · upheld“the substandard repairs undertaken by its trades”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial lossreassess claimrepair or rectify
Related
Text of the determination
Determination
|
Case number
|
12-00-1023152
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-00-1023152 26 February 2025
Determination overview
1.1 Complaint
This complaint relates to a claim by the complainant under his home and contents insurance policy held with the financial firm (insurer), for damage to the insured property caused by a storm.
The insurer accepted the claim; however, there have been delays and problems in the management of the claim and repairs, and the parties are in dispute about how the claim is to be progressed from here.
The insurer proposes to:
cash settle the external building repairs,
pay the complainant for 8 weeks of temporary accommodation,
undertake mould remediation works upon the building being made watertight,
reassess and re scope the internal building damage,
complete the assessment of the contents claim and
pay the complainant $5,400 compensation for non-financial loss.
The complainant wants the insurer to pay a cash settlement for all aspects of the claim.
1.2 Issues and key findings
Is the insurer's proposal fair and reasonable?
Yes. The panel considers the insurer’s offer to cash settle the external building damage is fair and reasonable, however considers a 20% uplift is fair given the risk of the repairs will transfer to the complainant.
The panel considers the insurer’s proposal to settle the outstanding matters in the claim to be fair and reasonable overall, however the insurer must pay the complainant the temporary accommodation benefit until the claim for the internal building damage has settled.
Did the insurer mishandle the claim?
Yes. The information shows lengthy delays and mismanagement on the part of the insurer. The panel considers the insurer’s offer to pay the complainant $5,400 compensation for his non-financial loss to be fair and reasonable and in line with AFCA’s rules.
Why is the outcome fair?
The outcome is fair as the insurer’s offer to cash settle the external damage is based on the complainant’s quote and includes non-event related damage.
The claim is in progress and the parties need to work together to finalise the claim. It is fair to require the complainant to bring the building to a watertight state so that no further internal building damage and contents damage will occur, enabling the claims for internal building damage and contents to be finalised.
It is fair to require the insurer to pay for temporary accommodation until such time as the property becomes habitable in accordance with its obligations under the policy.
Where the insurer has mishandled the claim, it is fair for it to compensate the complainant for his non-financial loss.
1.3 Determination
This determination is substantially in favour of the insurer.
Should the complainant accept this determination, the parties must work together in good faith to finalise the claim as soon as is practicable. In doing so, the parties are to take the following steps:
within 14 days of being notified of his acceptance, the insurer is to:
> pay the complainant $21,239.90 plus 20% uplift in settlement of the external building damage, less any applicable policy excess
> $5,400 compensation for non-financial loss.
as soon as reasonably practicable, after receiving the cash settlement for external building repairs, the complainant is to complete the external repairs ensuring the building is watertight
within 21 days of being notified of the completion of the external building repairs, the insurer is to undertake a full mould remediation of the interior of the property
the restorer is also to assess the contents and provide the insurer with a list of non-restorable contents that remain at the property
within 14 days of receiving the restorer’s additional contents report, the insurer is to settle the contents claim in accordance with the terms and conditions of the policy based on the quotes provided by its suppliers for items listed in the report and for the contents previously agreed to have been damaged by the event
within 14 days of the remediation works being completed, the insurer is to provide the names of three new engineers or building consultants to the complainant who will select one of those
to reassess and rescope the claim related internal building damage
on receipt of the new SOW, each party is to obtain an actionable quote for the repairs detailed in the SOW
the insurer is to pay the complainant the average of the two quotes plus a 20% uplift for the transfer of risk to the complainant
the insurer is to continue to pay the complainant for his temporary accommodation until it completes the remediation works, plus an additional amount to reflect the time that will be taken to complete the event related internal repairs.
2 Reasons for determination
2.1 Is the insurer's proposal fair and reasonable?
Yes. The panel considers the insurer’s offer to cash settle the external building damage is fair and reasonable, however considers a 20% uplift is fair given the risk of the repairs will transfer to the complainant.
The panel considers the insurer’s proposal to settle the outstanding matters in the claim to be fair and reasonable overall, however the insurer must pay the complainant the temporary accommodation benefit until the claim for the internal building damage has settled.
Coverage of the policy
The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
The panel is satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant.
Insured events include storm. The policy contains exclusions to the storm cover, as well as general exclusions that apply to all cover under the policy.
Storm cover on page 53 of the PDS states:
What is covered
Your buildings and/or contents are covered for loss or damage caused by storm
The PDS details the general exclusions that apply to all cover at page 78 of the PDS as follows:
The following general exclusions apply to all sections of the cover
...
Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with:
...
Wear and tear and lack of maintenance, including rust corrosion and deterioration
...
It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Circumstances of the loss and claim
The complainant lodged his claim with the insurer on 17 March 2022, advising that the property had been damaged by a hailstorm in January 2022.
The insurer appointed roof plumber TP who attended the property on 31 March 2022 to assess the damage to the roof, and builder AJG attended on 21 April 2022 to assess the damage to the building.
TP identified approximately 140 broken roof tiles and was of the view that about 80 of these tiles were broken by the impact of hail with the remaining being maintenance related. TP silicone sealed split roof tiles as a make safe measure.
TP also identified hail damage to the lead flashing but says the pointing at the ridge and gable ends was cracked and falling away due to lack of maintenance, and that the timber fascia board was rotten and had fallen away due to age and lack of maintenance.
AJG also noted hail damage to the property but also considers the rotten timber fascias were the result of a lack of maintenance requiring immediate attention to prevent further damage.
The reports note some internal damage due to the water ingress through the storm damaged tiles but noted that water ingress was occurring over an extended period through the window frames which were observed to be rotten and not watertight.
Based on these reports the insurer partially accepted the claim. It did not accept the damage to the ridge, gable ends, and fascia identified as being caused by wear, tear, and gradual deterioration.
AJG prepared a scope of works dated 14 June 2023 and the associated quote was for $20,402.39. AJG undertook some works, however ultimately the works detailed in the SOW were not completed.
The information shows the roof repairs were started by AJG but not completed due in part to the complainant’s failure to undertake the necessary maintenance and in part due to delays in the claim management. The claim notes indicate that the complainant was dissatisfied with AJG ‘s work because the wrong colour tiles were used and AJG charged for use of a safety rail during repairs that was not actually used.
It appears from the claim notes that these issues were not resolved and that from about May 2023 the relationship between the parties deteriorated and little progress was made on the repairs. The complainant says water ingress was still occurring through the roof through the delay period and mould was growing throughout the property.
To progress the claim, the insurer engaged roofers DG to inspect the roof and provide a report. The DG report of 28 August 2023 shows that some roof tiles had been replaced but noted there were still cracked tiles. DG also noted that no make safe had been done on the roof.
The insurer undertook further assessment of the event related damage and the damage caused by the delayed repairs. It engaged builder ARC to review the SOW from AJG and make note of works that had been completed and the outstanding matters.
On 19 December 2023 ARC prepared a SOW for outstanding event and delay related damage, and the associated quote was for $23,286.00.
The complainant engaged builders CB to provide a report on the damage at the property on 3 October 2023.
CB noted there was damage to the building from the initial hailstorm and subsequent water ingress and says that as the damage was not repaired for almost two years, water has continued to come into the house.
It was CB’s view that the damage had deteriorated the house exponentially, and that the damage repair will now need to include removing all the mould in the house.
The insurer then engaged building consultants SW who provided a report dated 18 October 2023.
SW reviewed the earlier reports and inspected the works completed at the property. SW agreed with previous reports that some of the damage was storm related, and some was due to lack of maintenance.
SW acknowledged that the delay in repairing the roof had allowed further water ingress to further deteriorate the interior, although some of this was through the deteriorated gable ends, barge bedding and pointing and not event related. SW concluded:
It is SW’s opinion, that ARC have accurately assessed the issues concerning the dwelling in its current condition. They have not necessarily assessed the storm related items and have not prepared a scope of works for rectification. It is [SW]’s opinion, that AJG had commenced a rectification work to the residence and only got so far into the works
...
The complainant also engaged a second builder AB who attended the property on 31 January 2024 and noted the following:
Upon inspection of the property, I observed the following: -
Mould has developed in every room making the building uninhabitable, this mold [sic] has affected every surface of every room requiring a complete strip out and reinstatement of all joinery and plasterboard surfaces including the kitchen and wet areas the mold [sic] has also affected the insures contents
It was also observed that an unacceptable amount of roof tiles have been broken during the claimed event and have not been replaced by the insurer's builder leading to damage to the rafters in the roof with them requiring reinforcing...
From reviewing the previous reports and onsite observation it is of my professional opinion that although there was considerable owner maintenance to be undertaken by the insurer the insurance builder has failed to complete repairs to a satisfactory condition leading to additional damage to the insureds home leading to additional damage to the house and loss of contents to which the insurers builder is liable for.
AB provided a quote for repairs to the whole property, including to the roof for $10,201 and external areas of the house for $9,108.
There were multiple reports obtained during the course of the claim regarding the mould damage.
The most recent was provided by the insurer’s restorer FE. FE noted high moisture levels throughout the house. FE also noted microbial activity on the ceilings, walls, and contents of all the rooms.
FE provided a SOW for extensive mould remediation and strip out and associated quote for $59,949.43. The insurer has agreed to undertake remediation works as per the FE SOW.
The insurer has offered to cash settle the external damage to the property based on the AB quote. The insurer also agrees to undertake a full mould remediation of the property as per the FE SOW.
Based on the SW opinion that the building has not been assessed in its current condition, the insurer proposes to undertake further assessment when the property is watertight, and the remediation work is completed. It has also offered to pay for 8 weeks temporary accommodation.
The complainant says the insurer should cash settle the whole claim for $422,583 plus an uplift, which he says will adequately compensate him for the loss including his temporary accommodation costs.
Insurer‘s offer to cash settle building claim is fair and reasonable
The parties do not dispute there is storm damage to the roof, however the complainant disputes that some of the damage was caused by wear, tear, and deterioration, which is excluded from cover under the policy.
The panel is satisfied, on balance, the damage to the gable end, bedding and pointing and wet rot damage to the timber barge boards was not caused by the storm event but is due to wear, tear, deterioration and a lack of maintenance, and that policy does not provide coverage for this damage.
The reports from TP, AGJ, ARC and SW all note the same pre-existing damage to the roof. The panel consider these reports, and particularly the report from SW, to be thorough, logical, compelling, and supported by helpful photographs which clearly show long term damage to the roof.
The AB quote includes repairs to the damaged fascia and gable end which are excluded from cover. Despite this, the insurer has offered to cash settle the complainant‘s claim for the roof and external repairs based on his quote from AB.
While the quote is from March 2024, the panel considers it is a fair and reasonable basis for the cash settlement given it includes repairs of excluded damage. The panel also considers an uplift of 20% should be applied to compensate the complainant for the transfer of the risk of the repairs to him.
Should the complainant accept this determination, within 14 days of being notified of the complainant’s acceptance, the insurer is to pay the complainant $21,239.90 plus 20%, less any applicable policy excess in settlement of the external building damage.
Insurer's offer to fully remediate property is fair and reasonable
The information shows there is significant mould damage at the complainant’s property, and that the cause is likely a combination of long-term water ingress and claim related water ingress. Given the length of time the claim related damage has remained unrepaired it is now difficult to discern the pre-existing damage from the claim related damage.
FE provided a SOW for extensive mould remediation and strip out and associated quote for $59,949.43. The insurer has agreed to undertake remediation works as per the FE SOW, which includes all mould damage at the property.
The panel considers the insurer’s offer to undertake complete mould remediation works to be fair and reasonable. It covers all mould damage at the property, some of which is likely to have been occurring over time and not claim related.
Should the complainant accept this determination, the insurer is to undertake a full remediation in accordance with the FE SOW within 21 days of being notified by the complainant that the external repairs have been completed.
Panel considers further assessment of internal building damage is needed
The lack of progress on the building repairs has meant further internal damage has occurred.
The panel accepts the reports from ARC and SW that there have been multiple sources of water ingress at the property, and that water ingress is likely to have been occurring for an extended period through the windows and parts of the roof which are deteriorated due to lack of maintenance.
However, none of the repairs to the inside of the property have commenced, and the panel considers there will be some difficulty in assessing the cause of damage given the time that has passed since the storm and the multiple sources of water ingress.
The complainant says the claim related internal repairs includes the complete replacement of the kitchen and bathroom among other things. The AB quote includes this work but does not provide any persuasive evidence to show these repairs are necessary due to the storm related damage and subsequent water ingress. Further, AB acknowledges there is damage caused by both the storm and failure to maintain the property.
It is the panel‘s view that the parties need to work together to resolve the claim. In doing so the panel considers the further assessment of the internal building damage is necessary to determine what damage is related to the claim and the delayed repairs, and what damage is related to the lack of maintenance.
Should the complainant accept this determination, within 14 days of the remediation works being completed by FE, the insurer is to provide the names of three new engineers or building consultants to the complainant who will select one of those to reassess and rescope the claim related internal building damage.
On receipt of the new SOW, each party is to obtain an actionable quote for the repairs detailed in the SOW. The insurer is to pay the complainant the average of the two quotes plus a 20% uplift for the transfer of risk to the complainant.
The panel considers further assessment of contents damage is needed
The complainant’s policy renewed on 10 February 2021. The certificate of insurance shows the complainant had contents cover of $152,221.
The complainant says that given the extent of the damage to his contents, he should be cash settled the sum insured on his policy. He has provided photographs of his damaged contents.
The insurer accepts that the complainant’s contents were damaged by the storm but says there is insufficient information to support that it should pay the sum insured. The insurer says the complainant is claiming higher replacement value for some damaged items.
At this stage, more than two years after the storm event, it will be difficult for the insurer to show any damaged contents are from an excluded cause such as water ingress due to maintenance failures. However, the insurer is entitled to rely on the terms and conditions of the policy regarding the contents claimed.
The PDS details the proof of loss and ownership that needs to be provided as follows:
Proof of loss and ownership
You must provide us with all documents and information that we request in order to establish:
That you have suffered loss or damage to your building contents and/or portable contents; that are the subject of your claim; and
The details and value of your building, contents and/or portable contents that are the subject of your claim
The types of documents and information that we may request include but are not limited to:
receipts;
warranty certificates;
valuation certificates
instruction manuals
spare parts for the item
original packaging
tenancy agreements
credit card and/or bank statements; and
photographs
If you do not provide us with sufficient proof, we may refuse to pay all or part of your claim
While the complainant has provided photographs and many of his contents have been assessed onsite, he has not been able to provide information regarding the value for some items. The panel agrees that some of the values he has provided are excessive. The insurer’s obligation is to replace the complainant’s damaged contents with contents of the same value.
Where the complainant is unable to provide reliable information about the value of his contents in line with the policy, the panel considers it fair for the insurer to apply the price information from its suppliers when settling the contents claim.
Should the complainant accept this determination, within 14 days of receiving the restorer’s additional contents report, the insurer is to settle the contents claim in accordance with the terms and conditions of the policy based on the quotes provided by its suppliers for items listed in the report and for the contents previously agreed to have been damaged by the event.
Insurer must pay temporary accommodation until property is inhabitable
The temporary accommodation benefit is detailed in the PDS as follows:
What is covered
If we agree to pay your building and/or contents claim as a result of an insured event and we agree that the damage at your insured address is so extensive that you can no longer live there, we will pay, up to a maximum of 52 weeks:
Your reasonable alternative temporary accommodation costs if you own your insured address and have building cover
...
If we agree to pay your alternative accommodation costs, we will do so form the time your insured address becomes unliveable until it is repaired, rebuilt, replaced or liveable, for up to a maximum of 52 weeks
...
The complainant has received some of the temporary accommodation benefit, and the insurer has offered to pay him a further eight weeks of temporary accommodation. It says its assessor considers the roof and external building repairs will take up to eight weeks.
The information shows the property is currently uninhabitable, and it will not be inhabitable until at least the remediation works are completed, possibly longer depending on the extent of claim related internal building works required.
Given the above, the panel does not consider it fair to limit the insurer’s future liability for temporary accommodation to eight weeks. The need for temporary accommodation at this stage is due, at least in part, to the insurer’s poor handling of the claim and the substandard repairs undertaken by its trades.
It may take the complainant some time to arrange the repairs upon receipt of the cash settlement for the external repairs. After the roof is repaired, the remediation works need to be arranged and then the internal damage repairs need to be re scoped. The timeframe for completion of the works, and the extent of the claim related internal building repairs is unknown.
Should the complainant accept this determination, the insurer is to continue to pay the complainant for his temporary accommodation until it completes the remediation works, plus an additional amount to reflect the time that will be taken to complete the event related internal repairs.
Did the Insurer mishandle the claim?
Yes. The information shows lengthy delays and mismanagement on the part of the insurer. The panel considers the insurer’s offer to pay the complainant $5,400 compensation for his non-financial loss to be fair and reasonable and in line with AFCA’s rules.
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400 for complaints lodged before 1 January 2024) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim.
Information shows insurer mishandled the claim
The panel is satisfied the information establishes that the insurer mishandled the claim.
The claim notes show the insurer conducted the initial assessment and made a claims decision within a reasonable timeframe, however after that there were lengthy delays.
While the delays from this point were at times caused by the complainant not agreeing to do the required maintenance and at times caused by the insurer, it was the insurer’s failure to make the building watertight that caused the damage to worsen and the claim to become more complex.
The insurer acknowledges it handled the claim poorly and has offered the complainant $5,400 compensation for non-financial loss.
The panel considers the insurer’s offer to be fair and reasonable, and notes that it is the maximum it could award under the AFCA rules.
Should the complainant accept this determination, within 14 days of being notified of his acceptance the insurer is to pay the complainant $5,400 compensation for non-financial loss.
Why is the outcome fair?
The outcome is fair as the insurer’s offer to cash settle the external damage is based on the complainant’s quote and includes non-event related damage.
The claim is in progress and the parties need to work together to finalise the claim. It is fair to require the complainant to bring the building to a watertight state so that no further internal building damage and contents damage will occur, enabling the claims for internal building damage and contents to be finalised.
It is fair to require the insurer to pay for temporary accommodation until such time as the property becomes inhabitable in accordance with its obligations under the policy.
Where the insurer has mishandled the claim, it is fair for it to compensate the complainant for his non-financial loss.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.